    Orange LTE Micro wave installation standards

  • HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 2

    35pt

    : R153 G0 B0

    :

    FrutigerNext LT Medium

    : Arial

    32pt

    : R153 G0 B0

    22pt

    ) :18pt

    :

    FrutigerNext LT Regular

    : Arial

    20pt

    ):18pt

    RTN and DDF installation inside TP48

    RTN

    Install All DDF received in the

    delivery at the site , if you receive

    2 DDF you need to install both

    inside the cabinet.

  • HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 3

    35pt

    : R153 G0 B0

    :

    FrutigerNext LT Medium

    : Arial

    32pt

    : R153 G0 B0

    22pt

    ) :18pt

    :

    FrutigerNext LT Regular

    : Arial

    20pt

    ):18pt

    Power cable connection and layout

  • HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 4

    35pt

    : R153 G0 B0

    :

    FrutigerNext LT Medium

    : Arial

    32pt

    : R153 G0 B0

    22pt

    ) :18pt

    :

    FrutigerNext LT Regular

    : Arial

    20pt

    ):18pt

    DDF

    Use the Coronas on DDF must be utilized in the below order :

  • HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5

    35pt

    : R153 G0 B0

    :

    FrutigerNext LT Medium

    : Arial

    32pt

    : R153 G0 B0

    22pt

    ) :18pt

    :

    FrutigerNext LT Regular

    : Arial

    20pt

    ):18pt

    ODU & IF cable installation

    - Extra one IF cable

    length to be left on

    the Dish side and

    another one to be

    from BTS side.

    - Printed steal label to

    be used for the IF

    cable to indicate the

    far end.

    - Earth kit to used on 2

    stages , one on the

    tower and one from

    BTS side.

    - ODU need to be

    grounded to the

    nearest bus bar

    - IF cable to be fixed by ties

    on the tower/pole.