1 2 3 4 A B C D E F G 5 B B A A Roof Construction Marley bold roll interlocking tiles to match existing on treated timber battens on Marley breather underlay on (underlay vapour resistance to be lower than 0.25MNsg-1) counter battens fixed to Haironville TAC TacTray system. All perimeter tiles to be nailed or clipped. Eaves tile supported on continuous strip ventilator. Ridge tiles to include ridge ventilators bedded on dentil slips, Solid bed third round hip tiles with single course of dentil slips fully bedded laid into pas of tiles. Verge tiles bedded onto 150mm wide undercloak or reinforced cement strip, mortar bedding struck flush & neatly pointed. Valley gutters to be fully supported metal formed, lead code 5 to detail. Haironville TAC TacTray 90 perforatted with 50mm battens fixed to liner upstands. 140mm Insulation to meet U value 0.25Wm2/K. (Type TBC) with Lapped & sealed vapour barrier within liner. Liner finish TBC. EPDM washers to be used when securing trays to steel structure, foam fillers to eaves & ridge to ensure vapour tightness. Internal integral ridge flashing. TacTray supported on Purlins to engineers specification on portal steel frame @ max 3000cs. 230 E25 eaves beam fixed to stub section to eng. detail with 45 x 45 C leader rail to fix Eternit Fascia & master board soffit. Marley rainwater gutter & downpipes to detail. Wall Construction External Cavity Wall 102.5 brick 125 cavity generally (Note Cavity size varies as shown) 100 7N/mm2 block in 1:1:6 mortar 215 Block Wall (215thk o/a collar jointed wall) 100 7N/mm2 block in 1:1:6 mortar 15 cavity (mortar filled - engineer to confirm) 100 7N/mm2 block in 1:1:6 mortar 140 Block Wall 140 7N/mm2 block in 1:1:6 mortar Internal Block Wall 100 7N/mm2 block in 1:1:6 mortar (generally) Wall ties to be stainless steel safety type at 450cs. vertically and 750cs. horizontal in standard staggerd pattern, & at 225 cs. vertical at door & window reveals. Min class 2 to DD140 with 50mm embedment All blocks below groundlevel to be dense concrete block in 1:3 mortar Inner leaf of all external cavity walls to be reinforced with brickforce GBF4W60 at 450cs. vertical except where inner leaf is backed by RC retaining wall where bricktor at 450cs. vertically to be used. All 215thk. block walls to be collar jointed with BRC CF35 W175 bed joint reinforcement at 450 cs. vertically to be used. All bed joint reinforcement to have min 225mm laps. Lintels to engineers detail all lintels to have 150mm min. bearing Install Horizontal DPC to both external wall leaf 150mm min above ground level where no Caltite Wall below. Vertical cavity closers to external door openings, Cavity Tray Type H or similar. Cavity tray type C for use over external window & door openings with stop ends & caviweeps. 50mm Celotex 3050 insulation to cavity walls. G F E D C B A 6.905 basement SS level 10.000 FFL Sports hall 8.480 Top of Caltite Wall m.j m.j m.j m.j m.j Level along GL '4' shown for information & to be adjusted on site to suit stepped foundations to Gyoury Self Detail D203 D204 D205 D206 D207 D209 D303 beyond D107 D112 D103 13.888 ToS - may vary on site 16.525 Eaves Level Floor Construction Basement Floor Generally Altro vinyl sheet flooring on Gyvlon Screed Min 50mm Sand & cement screed laid to fall in shower area to shower drainage outlet Ground Floor Generally 200mm thk precast concrete hollow core floor slabs to engineers specification Isocrete Gyvlon screed to manufacturers recommended minimum thickness (55mm max when allowing for camber to precast concrete floor). Maintain a dry internal environment when laying screed, do not allow screed to come into contact with additional moisture during & after the curing process. 45mm Granwood Gransprung area elastic timber sports floor laid by & in accordance with Granwood Flooring Systems. 25mm min thk timber skirting to perimeter to detail Areas to sports store, office & stair well to be topped with concrete screed level with Gransprung floor. Floor Construction First Floor Generally TJI timber floor joists in accordance with engineers specification 19mm plywood flooring or similar as approved by engineer screw fixed to joists to form floor base. Finished covering to be Flotex Carpet to client approval. 2no. 12.5mm layers of Gyproc Duplex Tapered Wall Board taped seamless finish to recieve Artex coating with broken leather finish Basement Wall & Ground Bearing Slab Caltite waterproof concrete by Cement Aid to engineers specification. Slab on 25mm Jablite Jabfloor 100 on 75thk. Gen 3 blinding on subsoil Slab reinforced to engineers specification. M.C. strip footings & R.C. slab thickenings to engineers specification. All construction joints in joncrete walls & slabs to contain hydrophilic water stops. Junction of steel & concrete to b epainted with bitumastic paint. Steelwork to be painted in accordance with engineers steelwork specification. All steelwork which is 40mm or less from outer leaf to be painted with 2 coats bitumastic paint to 200 microns DFT. All walls to be fair face paint grade, apply 1no. mist coat & 2no. coats of vinyl matt emulsion. Walls to office & entrance foyer areas to be lined with Gyproc Duplex tapered wall board, joints taped & filled seamless to receive 2.5mm thk Thistle multi-finish plaster, painted 1no. mist coat & 2no. coats of vinyl matt emulsion. Jobno. Scale Date Drawn by Dwg.no Rev 332 1:50 @A1 PB Aug. 03 B 332/08/02 Title Project Client Hazlewood School Bexwell Home Ltd. tel: 020 8802 4109 fax: 020 8802 0523 e: - ARCHITECTS ROBERT BARNES Architect Genral Arrangement Section B-B Units 1 & 2 tel: +44 (020) 8964 4700 246 Acklam Road fax: +44 (020) 8964 3833 London W10 5YG UK [email protected] Revison - - - General Notes Drawings not to be scaled Contractor must verify all dimensions on site before commencing work Any discrepancies to be reported to the architect All drawingsare to be read in conjunction with all relevant drawings and specifications c Robert Ian Barnes Architects filter drain in pea shingle surround to engineer/drainage consultant specification canopy & structure to detail ramped vehicular access beyond to detail sports equipment by stadia sport shown for indicative only 12.856 FFL First Floor 9.890 SSL all steelwork below ground level to have 100mm min conc. casing voids under floor unit to be fully grouted tight void to be back filled with suitable granular material 50mm insulation to underside of precast concrete unit on 1200 gauge dpm dressed up to underside of slab cut block to align coursing along GL 'A' @ GF slab level note dpc req where caltite is not 150mm above ext grnd lvl stepped Caltite wall beyond shown for information shower & w.c cubicles to detail 9.680 Top of Caltite Wall balustrade & handrail at first floor viewing gallery to detail 2400 645 2856 290 ceiling to corridor may reduce to 2.3m if required doors to schedule Section B-B General Arrangement Marley rainwater gutter & down pipe Eternit fascia & Masterclad soffit to detail Eternit fascia/barge board & Masterclad soffit with supressed gable fascia to match to detail 533 x 210 UB109 152 X 89 UB16 cantilever stub beam & Metsec 230 E 25 eaves beam all round 610 x229 UB101 610 x229 UB101 610 x229 UB101 610 x229 UB101 610 x229 UB101 533 x 210 UB109 533 x 210 UB109 533 x 210 UB109 533 x 210 UB109 152 x 152 UC23 152 x 152 UC23 152 x 152 UC23 152 x 152 UC23 152 x 152 UC23 152 x 152 UC23 254 x 146 UB37 254 x 146 UB37 139.7 CHS 5.0 Brace (position indicative) 139.7 CHS 5.0 Brace (position indicative) 139.7 CHS 5.0 Brace (position indicative) 139.7 CHS 5.0 Brace (position indicative) Haironville Tactray 90 on 3no rows Metsec 232 Z 25 purlins at 3000cs. max measured at slope Haironville Tactray 90 on 3no rows Metsec 232 Z 25 purlins at 3000cs. max measured at slope 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 232 Z 25 Purlin 305 x 165 UB (within first floor) 305 x 165 UB (within first floor) 203 x 203 UC46 with 100 x 10 Flat Cross Brace shown indicative 100w x 140dp PC beam lintel 100w x 140dp PC beam lintel 100w x 140dp PC beam lintel 100w x 100dp PC beam lintel Shower Area Year 7/8 Boys Changing Rm. Year 7/8 Girls Changing Rm. Shower Area Corridor Sports Hall Viewing Gallery 139.7 CHS 5.0 Brace (CL position indicative) 139.7 CHS 5.0 Brace (CL position indicative) 254 x 146 UB37 100 x 10 Flat Cross Brace shown indicative 22.50° 16.985 ToS (Col) 16.16.880ToS PRELIMINARY ISSUE 2no. 100w x 215dp PC beam lintel 2no. 100w x 215dp PC beam lintel 2no. 100w x 215dp PC beam lintel 2no. 100w x 215dp PC beam lintel 6.955 basement FFL - TBC NOTE WHERE BACKFILL TO TOP OF CALTITE APPLY RUBEROID HYLOAD DPC SPOT BONDED TO CONCRETE USING HYLOAD MASTIC WITH 100MM MINIMUM LAP ONTO DPM FULLY SEALED WITH HYLOAD JOINTING TAPE INSULATION TO TURN DOWN AT CALTITE WALL FOR 1M MIN NOTE Reduced concrete slab thickness to shower area to engineers detail NOTE Reduced concrete slab thickness to shower area to engineers detail double doors to max available ht required for store rm access 203 x 203 UC 46 within slab 215w x 300lng x 215dp MC padstone shown for information A 01 09 03 Omit Aco drainage channel to shower area for Harmer type or similar Gyvlon screed notation to basement added Sand & cement notation to shower added DPC/DPM bonded to caltite note added Suspended ceiling note added Structural steels within GF slab zone added Re Date Change ToC 16.985 Tactray cut at eaves level Tactray continues to abut new block liner to Willow Building Tactray continues to abut new block liner to Willow Building Tactray continues down to abut stairwell roof & is cut to suit B 04 09 03 UB position adjusted at gable ends Stub sections along GL (A) & (G) increased in length to suit eaves condition Tactray abutting Willow shown for information Profile of Willow Building shown for information Stud wall construction to first floor lobby noted Rev B Note 254 x 146 UB37 adjusted with extended stub section to suit eaves detail Rev B Note 254 x 146 UB37 relocatted and shown for information position to be confirmed by steelwork subcontractor Rev B Note Note 152 x 152 UC23 relocatted and shown for information position to be confirmed by steelwork subcontractor Willow Building beyond shown for information studwall partition to first floor lobby A3 COPY 1:100 G F E D C B A 6025 5625 5625 5625 6025 5625 continuous top support plate prefab support bracket welded to UB @ 900 cs. to eng detail 50ø balustrade posts with glazed panel infill details TBC shown for information 180 x 90 PFC

Upload: others

Post on 14-Feb-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • 1 2 3 4

    A

    B

    C

    D

    E

    F

    G

    5

    Lift

    m.j

    B

    B

    A A

    Roof Construction

    Marley bold roll interlocking tiles to match existing ontreated timber battens on Marley breather underlay on(underlay vapour resistance to be lower than 0.25MNsg-1)counter battens fixed to Haironville TAC TacTray system.All perimeter tiles to be nailed or clipped.Eaves tile supported on continuous strip ventilator.Ridge tiles to include ridge ventilators bedded on dentil slips,Solid bed third round hip tiles with single course of dentil slips fully bedded laid into pas of tiles.Verge tiles bedded onto 150mm wide undercloak or reinforced cement strip, mortar bedding struck flush & neatly pointed.Valley gutters to be fully supported metal formed, lead code 5 to detail.

    Haironville TAC TacTray 90 perforatted with 50mm battens fixed to liner upstands.140mm Insulation to meet U value 0.25Wm2/K. (Type TBC) withLapped & sealed vapour barrier within liner.Liner finish TBC.EPDM washers to be used when securing trays to steel structure, foam fillers to eaves & ridge to ensure vapour tightness. Internal integral ridge flashing.

    TacTray supported on Purlins to engineers specification on portal steel frame @ max 3000cs.

    230 E25 eaves beam fixed to stub section to eng. detail with 45 x 45 C leader rail to fix Eternit Fascia & master board soffit.

    Marley rainwater gutter & downpipes to detail.

    Wall Construction

    External Cavity Wall102.5 brick 125 cavity generally (Note Cavity size varies as shown)100 7N/mm2 block in 1:1:6 mortar

    215 Block Wall (215thk o/a collar jointed wall)100 7N/mm2 block in 1:1:6 mortar15 cavity (mortar filled - engineer to confirm)100 7N/mm2 block in 1:1:6 mortar

    140 Block Wall140 7N/mm2 block in 1:1:6 mortar

    Internal Block Wall100 7N/mm2 block in 1:1:6 mortar (generally)

    Wall ties to be stainless steel safety type at 450cs.vertically and 750cs. horizontal in standard staggerd pattern, & at 225 cs. vertical at door & window reveals.Min class 2 to DD140 with 50mm embedment

    All blocks below groundlevel to be dense concrete block in 1:3 mortar

    Inner leaf of all external cavity walls to be reinforced with brickforce GBF4W60 at 450cs. vertical except where inner leaf is backed by RC retaining wall where bricktor at 450cs. vertically to be used.

    All 215thk. block walls to be collar jointed with BRC CF35 W175 bed joint reinforcement at 450 cs. vertically to be used.

    All bed joint reinforcement to have min 225mm laps.

    Lintels to engineers detailall lintels to have 150mm min. bearing

    Install Horizontal DPC to both external wall leaf150mm min above ground level where no Caltite Wall below.

    Vertical cavity closers to external door openings, Cavity Tray Type H or similar. Cavity tray type C for use over external window & door openingswith stop ends & caviweeps.

    50mm Celotex 3050 insulation to cavity walls.

    G F E D C B A

    6025 5625 5625 5625 60255625

    6.905 basement SS level

    10.000 FFL Sports hall

    8.480 Top of Caltite Wall

    m.j m.j m.j m.j m.j

    Level along GL '4' shown for information & to be adjusted on site to suit

    stepped foundations to Gyoury Self Detail

    D203 D204 D205 D206 D207D209

    D303

    beyond

    D107 D112D103

    13.888 ToS - may vary on site

    16.525 Eaves Level

    Floor Construction

    Basement Floor GenerallyAltro vinyl sheet flooring onGyvlon Screed Min 50mmSand & cement screed laid to fall in shower area to shower drainage outlet

    Ground Floor Generally200mm thk precast concrete hollow core floor slabs to engineers specificationIsocrete Gyvlon screed to manufacturers recommended minimum thickness(55mm max when allowing for camber to precast concrete floor).Maintain a dry internal environment when laying screed, do not allow screed to come into contact with additional moisture during & after the curing process.

    45mm Granwood Gransprung area elastic timber sports floor laid by & in accordance with Granwood Flooring Systems.

    25mm min thk timber skirting to perimeter to detail

    Areas to sports store, office & stair well to be topped with concrete screed level with Gransprung floor.

    Floor Construction First Floor GenerallyTJI timber floor joists in accordance with engineers specification19mm plywood flooring or similar as approved by engineer screw fixed to joists to form floor base.Finished covering to be Flotex Carpet to client approval.2no. 12.5mm layers of Gyproc Duplex Tapered Wall Boardtaped seamless finish to recieve Artex coating with broken leather finish

    Basement Wall & Ground Bearing SlabCaltite waterproof concrete by Cement Aid to engineers specification.Slab on 25mm Jablite Jabfloor 100 on 75thk. Gen 3 blinding on subsoilSlab reinforced to engineers specification.

    M.C. strip footings & R.C. slab thickenings to engineers specification.

    All construction joints in joncrete walls & slabs to contain hydrophilic water stops.

    Junction of steel & concrete to b epainted with bitumastic paint.

    Steelwork to be painted in accordance with engineers steelwork specification.All steelwork which is 40mm or less from outer leaf to be painted with 2 coats bitumastic paint to 200 microns DFT.

    All walls to be fair face paint grade, apply 1no. mist coat & 2no. coats of vinyl matt emulsion.

    Walls to office & entrance foyer areas to be lined with Gyproc Duplex tapered wall board, joints taped & filled seamless to receive 2.5mm thk Thistle multi-finish plaster, painted 1no. mist coat & 2no. coats of vinyl matt emulsion.

    Jobno. Scale

    Date Drawn by Dwg.no

    Rev332 1:50 @A1

    PBAug. 03

    B

    332/08/02

    TitleProjectClient

    Hazlewood SchoolBexwell Home Ltd.

    tel: 020 8802 4109fax: 020 8802 0523e: -

    ARCHITECTSROBERT BARNES

    Architect

    Genral ArrangementSection B-B

    Units 1 & 2 tel: +44 (020) 8964 4700 246 Acklam Road fax: +44 (020) 8964 3833 London W10 5YG UK [email protected]

    Revison

    - - -

    General NotesDrawings not to be scaled Contractor must verify all dimensions on site before commencing work Any discrepancies to be reported to the architect All drawingsare to be read in conjunction with all relevant drawings and specifications c Robert Ian Barnes Architects

    filter drain in pea shingle surround to engineer/drainage consultant specification

    canopy & structure to detail

    ramped vehicular access beyond to detail

    sports equipment by stadia sportshown for indicative only

    12.856 FFL First Floor

    9.890 SSL

    all steelwork below ground levelto have 100mm min conc. casing

    voids under floor unit to be fully grouted tight

    void to be back filled with suitable granular material

    50mm insulation to underside of precast concrete unit on1200 gauge dpm dressed up to underside of slab

    cut block to align coursingalong GL 'A' @ GF slab level

    note dpc req where caltite is not 150mm above ext grnd lvl

    stepped Caltite wall beyond shown for information

    shower & w.c cubicles to detail

    9.680 Top of Caltite Wall

    balustrade & handrail at first floor viewing gallery to detail

    2400

    645

    2856

    290

    ceiling to corridor may reduce to2.3m if required

    doors to schedule

    Section B-BGeneral Arrangement

    Marley rainwater gutter & down pipe Eternit fascia & Masterclad soffit to detail

    Eternit fascia/barge board & Masterclad soffit with supressed gable fascia to match to detail

    533 x 210UB109

    152 X 89 UB16 cantilever stub beam &Metsec 230 E 25 eaves beam all round

    610 x229 UB101 610 x229 UB101610 x229 UB101610 x229 UB101610 x229 UB101

    533 x 210UB109

    533 x 210UB109

    533 x 210UB109

    533 x 210UB109

    152 x 152 UC23 152 x 152 UC23152 x 152 UC23152 x 152 UC23152 x 152 UC23152 x 152 UC23

    254 x 146 UB37 254 x 146 UB37

    139.7 CHS 5.0 Brace (position indicative)

    139.7 CHS 5.0 Brace (position indicative)

    139.7 CHS 5.0 Brace (position indicative)

    139.7 CHS 5.0 Brace (position indicative)

    Haironville Tactray 90 on3no rows Metsec 232 Z 25 purlinsat 3000cs. max measured at slope

    Haironville Tactray 90 on3no rows Metsec 232 Z 25 purlinsat 3000cs. max measured at slope

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    232 Z 25 Purlin

    305 x 165 UB(within first floor)

    305 x 165 UB(within first floor)

    203 x 203 UC46 with100 x 10 Flat Cross Brace shown indicative

    100w x 140dp PC beam lintel 100w x 140dp PC beam lintel 100w x 140dp PC beam lintel100w x 100dp PC beam lintel

    Shower Area Year 7/8 Boys Changing Rm.

    Year 7/8 GirlsChanging Rm.

    Shower Area

    Corridor

    Sports Hall

    Viewing Gallery

    139.7 CHS 5.0 Brace(CL position indicative)

    139.7 CHS 5.0 Brace(CL position indicative)

    254 x 146 UB37

    100 x 10 Flat Cross Braceshown indicative

    22.50°

    16.985 ToS (Col)16.16.880ToS

    PRELIMINARY ISSUE

    2no. 100w x 215dpPC beam lintel

    2no. 100w x 215dpPC beam lintel

    2no. 100w x 215dpPC beam lintel

    2no. 100w x 215dpPC beam lintel

    6.955 basement FFL - TBC

    NOTEWHERE BACKFILL TO TOP OF CALTITE APPLY RUBEROID HYLOAD DPC SPOT BONDED TO CONCRETE USING HYLOAD MASTIC WITH 100MM MINIMUM LAP ONTO DPM FULLY SEALED WITH HYLOAD JOINTING TAPEINSULATION TO TURN DOWN AT CALTITE WALL FOR 1M MIN

    NOTEReduced concrete slab thickness to shower area to engineers detail

    NOTEReduced concrete slab thickness to shower area to engineers detail

    double doors to max available ht required for store rm access

    203 x 203 UC 46 within slab215w x 300lng x 215dp MC padstoneshown for information

    A 01 09 03 Omit Aco drainage channel to shower area forHarmer type or similarGyvlon screed notation to basement addedSand & cement notation to shower addedDPC/DPM bonded to caltite note addedSuspended ceiling note addedStructural steels within GF slab zone added

    Re Date Change

    ToC 16.985

    Tactray cut at eaves level

    Tactray continues to abut new block liner to Willow Building

    Tactray continues to abut new block liner to Willow Building

    Tactray continues down to abut stairwell roof & is cut to suit

    B 04 09 03 UB position adjusted at gable ends Stub sections along GL (A) & (G) increased in length to suit eaves conditionTactray abutting Willow shown for informationProfile of Willow Building shown for informationStud wall construction to first floor lobby noted

    Rev B Note 254 x 146 UB37 adjusted with extended stub section to suit eaves detail

    Rev B Note254 x 146 UB37relocatted and shown for informationposition to be confirmed by steelwork subcontractor

    Rev B NoteNote 152 x 152 UC23 relocatted and shown for informationposition to be confirmed by steelwork subcontractor

    Willow Building beyond shown for information

    studwall partition to first floor lobby

    A3 COPY 1:100

    G F E D C B A

    6025 5625 5625 5625 60255625

    IN ABEYANCE

    continuous top support plateprefab support bracket welded to UB @ 900 cs. to eng detail

    50ø balustrade posts with glazed panel infill details TBCshown for information

    180 x 90 PFC