CHAPTER NO. 8
STONE MASONRYDESCRIPTION OF ITEM NO 1: Random, rubble masonry (uncoursed), in
foundation and plinth.a) Dry Masonry
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00
Total 600.00 Contractor's Profit & Overhead 20.00 Percent 120.00 Total 720.00
Labour
Mason 2.00 Nos 300.00 Per Day 600.00 Unskilled Coolies 3.00 Nos 140.00 Per Day 420.00
Total 1,020.00 Sundries 10.00 Percent 102.00 Total 1,122.00
Contractor's Profit & Overhead 20.00 Percent 224.40 Total 1,346.40
Labour Rate for 100 Cft Rs. 1,346.40 Say 1,346.40 Labour Rate P/ Cum Rs. 475.55 Say 475.55
Composite Rate for 100 Cft Rs. 2,066.40 Say 2,066.40 Composite Rate P/ Cum Rs. 729.85 Say 729.85
![Page 2: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/2.jpg)
Page 2
Item No. 1 b) In Mud Mortar
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Good earth 45 Cft 150.00 %Cft 67.50
Total 667.50 Contractor's Profit & Overhead 20.00 Percent 133.50 Total 801.00
Labour
Mason 2.50 Nos 300.00 Per Day 750.00 Unskilled Coolies 3.50 Nos 140.00 Per Day 490.00 Bahishti 0.25 No 160.00 Per Day 40.00
Total 1,280.00 Sundries 10.00 Percent 128.00 Total 1,408.00
Contractor's Profit & Overhead 20.00 Percent 281.60 Total 1,689.60
Labour Rate for 100 Cft Rs. 1,689.60 Say 1,689.60 Labour Rate P/ Cum Rs. 596.77 Say 596.75
Composite Rate for 100 Cft Rs. 2,490.60 Say 2,490.60 Composite Rate P/ Cum Rs. 879.68 Say 879.70
![Page 3: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/3.jpg)
Page 3
Item No. 1 c) In Lime Mortar, Ratio (1 Lime 2 Sand).
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Lime Slaked (Ground) 224 Kg 2.00 Per Kg. 448.00 Sand 30 Cft 350.00 Per %Cft 105.00
Total 1,153.00 Contractor's Profit & Overhead 20.00 Percent 230.60 Total 1,383.60
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,980.00 Sundries 10.00 Percent 198.00 Total 2,178.00
Contractor's Profit & Overhead 20.00 Percent 435.60 Total 2,613.60
Labour Rate for 100 Cft Rs. 2,613.60 Say 2,613.60 Labour Rate P/ Cum Rs. 923.12 Say 923.10
Composite Rate for 100 Cft Rs. 3,997.20 Say 3,997.20 Composite Rate P/ Cum Rs. 1,411.81 Say 1,411.80
![Page 4: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/4.jpg)
Page 4
Item No. 1 d) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 9 Bag 230.00 P. Bag 2,070.00 Sand 33.75 Cft 350.00 Per %Cft 118.13
Total 2,788.13 Contractor's Profit & Overhead 20.00 Percent 557.63 Total 3,345.75
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,980.00 Sundries 10.00 Percent 198.00 Total 2,178.00
Contractor's Profit & Overhead 20.00 Percent 435.60 Total 2,613.60
Labour Rate for 100 Cft Rs. 2,613.60 Say 2,613.60 Labour Rate P/ Cum Rs. 923.12 Say 923.10
Composite Rate for 100 Cft Rs. 5,959.35 Say 5,959.35 Composite Rate P/ Cum Rs. 2,104.84 Say 2,104.85
![Page 5: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/5.jpg)
Page 5
Item No. 1 d) In Cement Sand Mortarii) Ratio ( 1:4 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 7.20 Bag 230.00 Each 1,656.00 Sand 36.0 Cft 350.00 Per % Cft 126.00
Total 2,382.00 Contractor's Profit & Overhead 20.00 Percent 476.40 Total 2,858.40
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,980.00 Sundries 10.00 Percent 198.00 Total 2,178.00
Contractor's Profit & Overhead 20.00 Percent 435.60 Total 2,613.60
Labour Rate for 100 Cft Rs. 2,613.60 Say 2,613.60 Labour Rate P/ Cum Rs. 923.12 Say 923.10
Composite Rate for 100 Cft Rs. 5,472.00 Say 5,472.00 Composite Rate P/ Cum Rs. 1,932.71 Say 1,932.70
![Page 6: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/6.jpg)
Page 6
Item No. 1 d) In Cement Sand Mortariii) Ratio ( 1:6 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 5.14 Bag 230.00 Each 1,182.20 Sand 38.57 Cft 350.00 Per%Cft 135.00
Total 1,917.19 Contractor's Profit & Overhead 20.00 Percent 383.44 Total 2,300.63
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,980.00 Sundries 10.00 Percent 198.00 Total 2,178.00
Contractor's Profit & Overhead 20.00 Percent 435.60 Total 2,613.60
Labour Rate for 100 Cft Rs. 2,613.60 Say 2,613.60 Labour Rate P/ Cum Rs. 923.12 Say 923.10
Composite Rate for 100 Cft Rs. 4,914.23 Say 4,914.25 Composite Rate P/ Cum Rs. 1,735.71 Say 1,735.70
![Page 7: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/7.jpg)
Page 7
Item No. 1 d) In Cement Sand Mortariv) Ratio ( 1:8 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 4 Bag 230.00 Each 920.00 Sand 40 Cft 350.00 Per%Cft 140.00
Total 1,660.00 Contractor's Profit & Overhead 20.00 Percent 332.00 Total 1,992.00
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,980.00 Sundries 10.00 Percent 198.00 Total 2,178.00
Contractor's Profit & Overhead 20.00 Percent 435.60 Total 2,613.60
Labour Rate for 100 Cft Rs. 2,613.60 Say 2,613.60 Labour Rate P/ Cum Rs. 923.12 Say 923.10
Composite Rate for 100 Cft Rs. 4,605.60 Say 4,605.60 Composite Rate P/ Cum Rs. 1,626.70 Say 1,626.70
![Page 8: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/8.jpg)
Page 8
DESCRIPTION OF ITEM NO 2: Coursed Rubble Masonry hammer dressed,foundation and plinth.
a) Dry Masonry
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00
Total 600.00 Contractor's Profit & Overhead 20.00 Percent 120.00 Total 720.00
Labour
Mason 3.00 Nos 300.00 Per Day 900.00 Unskilled Coolies 3.00 Nos 140.00 Per Day 420.00
Total 1,320.00 Sundries 10.00 Percent 132.00 Total 1,452.00
Contractor's Profit & Overhead 20.00 Percent 290.40 Total 1,742.40
Labour Rate for 100 Cft Rs. 1,742.40 Say 1,742.40 Labour Rate P/ Cum Rs. 615.42 Say 615.40
Composite Rate for 100 Cft Rs. 2,462.40 Say 2,462.40 Composite Rate P/ Cum Rs. 869.72 Say 869.70
![Page 9: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/9.jpg)
Page 9
Item No. 2 b) In Mud Mortar
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Good earth 45 Cft 150.00 Per% Cft 67.50
Total 667.50 Contractor's Profit & Overhead 20.00 Percent 133.50 Total 801.00
Labour
Mason 4.00 Nos 300.00 Per Day 1,200.00 Unskilled Coolies 4.00 Nos 140.00 Per Day 560.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,840.00 Sundries 10.00 Percent 184.00 Total 2,024.00
Contractor's Profit & Overhead 20.00 Percent 404.80 Total 2,428.80
Labour Rate for 100 Cft Rs. 2,428.80 Say 2,428.80 Labour Rate P/ Cum Rs. 857.85 Say 857.85
Composite Rate for 100 Cft Rs. 3,229.80 Say 3,229.80 Composite Rate P/ Cum Rs. 1,140.77 Say 1,140.75
![Page 10: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/10.jpg)
Page 10
Item No. 2 c) In Lime Sand Mortar. (Ratio 1:2)
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headers 20 Nos 15.00 Each 300.00 Lime Slaked (Ground) 5.33/ 199 Kg 2.00 Per Per Kg. 398.00 Sand 26.67 Cft 350.00 Per%Cft 93.35
Total 1,091.35 Contractor's Profit & Overhead 20.00 Percent 218.27 Total 1,309.61
Labour
Mason 4.75 Nos 300.00 Per Day 1,425.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,245.00 Sundries 10.00 Percent 224.50 Total 2,469.50
Contractor's Profit & Overhead 20.00 Percent 493.90 Total 2,963.40
Labour Rate for 100 Cft Rs. 2,963.40 Say 2,963.40 Labour Rate P/ Cum Rs. 1,046.67 Say 1,046.65
Composite Rate for 100 Cft Rs. 4,273.01 Say 4,273.00 Composite Rate P/ Cum Rs. 1,509.22 Say 1,509.20
![Page 11: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/11.jpg)
Page 11
Item No. 2 d) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 8 Bag 230.00 Each 1,840.00 Sand 30 Cft 350.00 Per%Cft 105.00
Total 2,770.00 Contractor's Profit & Overhead 20.00 Percent 554.00 Total 3,324.00
Labour
Mason 4.75 Nos 300.00 Per Day 1,425.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,245.00 Sundries 10.00 Percent 224.50 Total 2,469.50
Contractor's Profit & Overhead 20.00 Percent 493.90 Total 2,963.40
Labour Rate for 100 Cft Rs. 2,963.40 Say 2,963.40 Labour Rate P/ Cum Rs. 1,046.67 Say 1,046.65
Composite Rate for 100 Cft Rs. 6,287.40 Say 6,287.40 Composite Rate P/ Cum Rs. 2,220.71 Say 2,220.70
![Page 12: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/12.jpg)
Page 12
Item No. 2 d) In Cement Sand Mortarii) Ratio ( 1:4 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone including wastage 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 35x1.5'x8"x10"(450x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 6.40 Bag 230.00 Each 1,472.00 Sand 32 Cft 350.00 Per%Cft 112.00
Total 2,409.00 Contractor's Profit & Overhead 20.00 Percent 481.80 Total 2,890.80
Labour
Mason 4.75 Nos 300.00 Per Day 1,425.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,245.00 Sundries 10.00 Percent 224.50 Total 2,469.50
Contractor's Profit & Overhead 20.00 Percent 493.90 Total 2,963.40
Labour Rate for 100 Cft Rs. 2,963.40 Say 2,963.40 Labour Rate P/ Cum Rs. 1,046.68 Say 1,046.70
Composite Rate for 100 Cft Rs. 5,854.20 Say 5,854.20 Composite Rate P/ Cum Rs. 2,067.70 Say 2,067.70
![Page 13: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/13.jpg)
Page 13
Item No. 2 d) In Cement Sand Mortariii) Ratio ( 1:6 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 35x1.5'x8"x10"(450x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 4.57 Bag 230.00 Each 1,051.10 Sand 34.20 Cft 350.00 Per%Cft 119.70
Total 1,995.80 Contractor's Profit & Overhead 20.00 Percent 399.16 Total 2,394.96
Labour
Mason 4.75 Nos 300.00 Per Day 1,425.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,245.00 Sundries 10.00 Percent 224.50 Total 2,469.50
Contractor's Profit & Overhead 20.00 Percent 493.90 Total 2,963.40
Labour Rate for 100 Cft Rs. 2,963.40 Say 2,963.40 Labour Rate P/ Cum Rs. 1,046.67 Say 1,046.65
Composite Rate for 100 Cft Rs. 5,358.36 Say 5,358.35 Composite Rate P/ Cum Rs. 1,892.57 Say 1,892.55
![Page 14: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/14.jpg)
Page 14
Item No. 2 d) In Cement Sand Mortariv) Ratio ( 1:8 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stoneNote: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 3.56 Bag 230.00 Each 818.80 Sand 35.60 Cft 350.00 Per%Cft 124.60
Total 1,768.40 Contractor's Profit & Overhead 20.00 Percent 353.68 Total 2,122.08
Labour
Mason 4.75 Nos 300.00 Per Day 1,425.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,245.00 Sundries 10.00 Percent 224.50 Total 2,469.50
Contractor's Profit & Overhead 20.00 Percent 493.90 Total 2,963.40
Labour Rate for 100 Cft Rs. 2,963.40 Say 2,963.40 Labour Rate P/ Cum Rs. 1,046.67 Say 1,046.65
Composite Rate for 100 Cft Rs. 5,085.48 Say 5,085.50 Composite Rate P/ Cum Rs. 1,796.19 Say 1,796.20
![Page 15: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/15.jpg)
Page 15
DESCRIPTION OF ITEM NO 3: Random Rubble Masonry (uncoursed) in groundfloor or 20'(6 M) height,building/other than building.
a) Dry Masonry
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00
Total 600.00 Contractor's Profit & Overhead 20.00 Percent 120.00 Total 720.00
Labour
Mason 2.50 Nos 300.00 Per Day 750.00 Unskilled Coolies 3.00 Nos 140.00 Per Day 420.00
Total 1,170.00 Sundries 10.00 Percent 117.00 Total 1,287.00
Contractor's Profit & Overhead 20.00 Percent 257.40 Total 1,544.40
Labour Rate for 100 Cft Rs. 1,544.40 Say 1,544.40 Labour Rate P/ Cum Rs. 545.48 Say 545.50
Composite Rate for 100 Cft Rs. 2,264.40 Say 2,264.40 Composite Rate P/ Cum Rs. 799.79 Say 799.80
![Page 16: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/16.jpg)
Page 16
Item No. 3 b) In Mud Mortar
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Good earth 45 Cft 150.00 Per % Cft 67.50
Total 667.50 Contractor's Profit & Overhead 20.00 Percent 133.50 Total 801.00
Labour
Mason 3.00 Nos 300.00 Per Day 900.00 Unskilled Coolies 4.00 Nos 140.00 Per Day 560.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 1,540.00 Sundries 10.00 Percent 154.00 Total 1,694.00
Contractor's Profit & Overhead 20.00 Percent 338.80 Total 2,032.80
Labour Rate for 100 Cft Rs. 2,032.80 Say 2,032.80 Labour Rate P/ Cum Rs. 717.99 Say 718.00
Composite Rate for 100 Cft Rs. 2,833.80 Say 2,833.80 Composite Rate P/ Cum Rs. 1,000.90 Say 1,000.90
![Page 17: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/17.jpg)
Page 17
Item No. 3 c) In Lime Sand Mortar. (Ratio 1:2)
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Lime Slaked (Ground) 224 Kg 2.00 Per Per Kg. 448.00 Sand 30 Cft 350.00 Per % Cft 105.00
Total 1,153.00 Contractor's Profit & Overhead 20.00 Percent 230.60 Total 1,383.60
Labour
Mason 4.50 Nos 300.00 Per Day 1,350.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,170.00 Sundries 10.00 Percent 217.00 Total 2,387.00
Contractor's Profit & Overhead 20.00 Percent 477.40 Total 2,864.40
Labour Rate for 100 Cft Rs. 2,864.40 Say 2,864.40 Labour Rate P/ Cum Rs. 1,011.71 Say 1,011.70
Composite Rate for 100 Cft Rs. 4,248.00 Say 4,248.00 Composite Rate P/ Cum Rs. 1,500.39 Say 1,500.40
![Page 18: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/18.jpg)
Page 18
Item No. 3 d) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 9 Bag 230.00 Each 2,070.00 Sand 33.75 Cft 350.00 Per % Cft 118.13
Total 2,788.13 Contractor's Profit & Overhead 20.00 Percent 557.63 Total 3,345.75
Labour
Mason 4.50 Nos 300.00 Per Day 1,350.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,170.00 Sundries 10.00 Percent 217.00 Total 2,387.00
Contractor's Profit & Overhead 20.00 Percent 477.40 Total 2,864.40
Labour Rate for 100 Cft Rs. 2,864.40 Say 2,864.40 Labour Rate P/ Cum Rs. 1,011.71 Say 1,011.70
Composite Rate for 100 Cft Rs. 6,210.15 Say 6,210.15 Composite Rate P/ Cum Rs. 2,193.42 Say 2,193.45
![Page 19: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/19.jpg)
Page 19
Item No. 3 d) In Cement Sand Mortarii) Ratio ( 1:4 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 7.2 Bag 230.00 Each 1,656.00 Sand 36 Cft 350.00 Per % Cft 126.00
Total 2,382.00 Contractor's Profit & Overhead 20.00 Percent 476.40 Total 2,858.40
Labour
Mason 4.50 Nos 300.00 Per Day 1,350.00 Unskilled Coolies 5 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,170.00 Sundries 10.00 Percent 217.00 Total 2,387.00
Contractor's Profit & Overhead 20.00 Percent 477.40 Total 2,864.40
Labour Rate for 100 Cft Rs. 2,864.40 Say 2,864.40 Labour Rate P/ Cum Rs. 1,011.71 Say 1,011.70
Composite Rate for 100 Cft Rs. 5,722.80 Say 5,722.80 Composite Rate P/ Cum Rs. 2,021.29 Say 2,021.30
![Page 20: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/20.jpg)
Page 20
Item No. 3 d) In Cement Sand Mortariii) Ratio ( 1:6 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100.00 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 5.14 Bag 230.00 Each 1,182.20 Sand 38.57 Cft 350.00 Per % Cft 135.00
Total 1,917.19 Contractor's Profit & Overhead 20.00 Percent 383.44 Total 2,300.63
Labour
Mason 4.50 Nos 300.00 Per Day 1,350.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,170.00 Sundries 10.00 Percent 217.00 Total 2,387.00
Contractor's Profit & Overhead 20.00 Percent 477.40 Total 2,864.40
Labour Rate for 100 Cft Rs. 2,864.40 Say 2,864.40 Labour Rate P/ Cum Rs. 1,011.71 Say 1,011.70
Composite Rate for 100 Cft Rs. 5,165.04 Say 5,165.05 Composite Rate P/ Cum Rs. 1,824.29 Say 1,824.30
![Page 21: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/21.jpg)
Page 21
Item No. 3 d) In Cement Sand Mortariv) Ratio ( 1:8 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stoneNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250) 20 Nos. 20 Nos 15.00 Each 300.00 Cement 4 Bag 230.00 Each 920.00 Sand 40 Cft 350.00 Per % Cft 140.00
Total 1,660.00 Contractor's Profit & Overhead 20.00 Percent 332.00 Total 1,992.00
Labour
Mason 4.50 Nos 300.00 Per Day 1,350.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,170.00 Sundries 10.00 Percent 217.00 Total 2,387.00
Contractor's Profit & Overhead 20.00 Percent 477.40 Total 2,864.40
Labour Rate for 100 Cft Rs. 2,864.40 Say 2,864.40 Labour Rate P/ Cum Rs. 1,011.71 Say 1,011.70
Composite Rate for 100 Cft Rs. 4,856.40 Say 4,856.40 Composite Rate P/ Cum Rs. 1,715.28 Say 1,715.30
![Page 22: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/22.jpg)
Page 22
DESCRIPTION OF ITEM NO 4: Coursed Rubble Masonry hammer dressed inground floor or 20' (6 M) height, building otherthan building.
a) Dry Masonry
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 20x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00
Total 600.00 Contractor's Profit & Overhead 20.00 Percent 120.00 Total 720.00
Labour
Mason 3.50 Nos 300.00 Per Day 1,050.00 Unskilled Coolies 3.50 Nos 140.00 Per Day 490.00
Total 1,540.00 Sundries 10.00 Percent 154.00 Total 1,694.00
Contractor's Profit & Overhead 20.00 Percent 338.80 Total 2,032.80
Labour Rate for 100 Cft Rs. 2,032.80 Say 2,032.80 Labour Rate P/ Cum Rs. 717.99 Say 718.00
Composite Rate for 100 Cft Rs. 2,752.80 Say 2,752.80 Composite Rate P/ Cum Rs. 972.29 Say 972.30
![Page 23: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/23.jpg)
Page 23
Item No. 4 b) In Mud Mortar
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Headers or through stonesNote: Special size of stone for headersaverage size = 30x1.5'x8"x10"(457x200x250mm) 20 Nos. 20 Nos 15.00 Each 300.00 Good earth 43 Cft 150.00 Per % Cft 64.50
Total 664.50 Contractor's Profit & Overhead 20.00 Percent 132.90 Total 797.40
Labour
Mason 5.00 Nos 300.00 Per Day 1,500.00 Unskilled Coolies 5.00 Nos 140.00 Per Day 700.00 Bahishti 0.50 No 160.00 Per Day 80.00
Total 2,280.00 Sundries 10.00 Percent 228.00 Total 2,508.00
Contractor's Profit & Overhead 20.00 Percent 501.60 Total 3,009.60
Labour Rate for 100 Cft Rs. 3,009.60 Say 3,009.60 Labour Rate P/ Cum Rs. 1,063.00 Say 1,063.00
Composite Rate for 100 Cft Rs. 3,807.00 Say 3,807.00 Composite Rate P/ Cum Rs. 1,344.63 Say 1,344.65
![Page 24: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/24.jpg)
Page 24
Item No. 4 c) In Lime Sand Mortar. (Ratio 1:2)
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone including wastage 100 Cft 300.00 Per % Cft 300.00
Through Stone or headers 20 Nos 15.00 Each 300.00 Lime Slaked (Ground) 5.33 Mds(19 9)Kg 2.00 Per Per Kg. 398.00 Sand 26.67 Cft 350.00 Per % Cft 93.35
Total 1,091.35 Contractor's Profit & Overhead 20.00 Percent 218.27 Total 1,309.61
Labour
Mason 5.50 Nos 300.00 Per Day 1,650.00 Unskilled Coolies 5.50 Nos 140.00 Per Day 770.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,540.00 Sundries 10.00 Percent 254.00 Total 2,794.00
Contractor's Profit & Overhead 20.00 Percent 558.80 Total 3,352.80
Labour Rate for 100 Cft Rs. 3,352.80 Say 3,352.80 Labour Rate P/ Cum Rs. 1,184.21 Say 1,184.20
Composite Rate for 100 Cft Rs. 4,662.42 Say 4,662.40 Composite Rate P/ Cum Rs. 1,646.76 Say 1,646.75
![Page 25: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/25.jpg)
Page 25
Item No. 4 d) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or headersNote: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 8 Bag 230.00 Each 1,840.00 Sand 30 Cft 350.00 Per % Cft 105.00
Total 2,770.00 Contractor's Profit & Overhead 20.00 Percent 554.00 Total 3,324.00
Labour
Mason 5.50 Nos 300.00 Per Day 1,650.00 Unskilled Coolies 5.50 Nos 140.00 Per Day 770.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,540.00 Sundries 10.00 Percent 254.00 Total 2,794.00
Contractor's Profit & Overhead 20.00 Percent 558.80 Total 3,352.80
Labour Rate for 100 Cft Rs. 3,352.80 Say 3,352.80 Labour Rate P/ Cum Rs. 1,184.21 Say 1,184.20
Composite Rate for 100 Cft Rs. 6,676.80 Say 6,676.80 Composite Rate P/ Cum Rs. 2,358.25 Say 2,358.25
![Page 26: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/26.jpg)
Page 26
Item No. 4 d) In Cement Sand Mortarii) Ratio ( 1:4 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 6 Bag 230.00 Each 1,472.00 Sand 32 Cft 350.00 Per % Cft 112.00
Total 2,409.00 Contractor's Profit & Overhead 20.00 Percent 481.80 Total 2,890.80
Labour
Mason 5.50 Nos 300.00 Per Day 1,650.00 Unskilled Coolies 5.50 Nos 140.00 Per Day 770.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,540.00 Sundries 10.00 Percent 254.00 Total 2,794.00
Contractor's Profit & Overhead 20.00 Percent 558.80 Total 3,352.80
Labour Rate for 100 Cft Rs. 3,352.80 Say 3,352.80 Labour Rate P/ Cum Rs. 1,184.21 Say 1,184.20
Composite Rate for 100 Cft Rs. 6,243.60 Say 6,243.60 Composite Rate P/ Cum Rs. 2,205.24 Say 2,205.25
![Page 27: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/27.jpg)
Page 27
Item No. 4 d) In Cement Sand Mortariii) Ratio ( 1:6 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stone Note: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 4.57 Bag 230.00 Each 1,051.10 Sand 34.20 Cft 350.00 Per % Cft 119.70
Total 1,995.80 Contractor's Profit & Overhead 20.00 Percent 399.16 Total 2,394.96
Labour
Mason 5.50 Nos 300.00 Per Day 1,650.00 Unskilled Coolies 5.50 Nos 140.00 Per Day 770.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,540.00 Sundries 10.00 Percent 254.00 Total 2,794.00
Contractor's Profit & Overhead 20.00 Percent 558.80 Total 3,352.80
Labour Rate for 100 Cft Rs. 3,352.80 Say 3,352.80 Labour Rate P/ Cum Rs. 1,184.21 Say 1,184.20
Composite Rate for 100 Cft Rs. 5,747.76 Say 5,747.75 Composite Rate P/ Cum Rs. 2,030.11 Say 2,030.10
![Page 28: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/28.jpg)
Page 28
Item No. 4 d) In Cement Sand Mortariv) Ratio ( 1:8 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 100 Cft 300.00 Per % Cft 300.00
Through Stone or bond stoneNote: Special size of stone for headersaverage size = 35x1.5'x8"x10"(457x200x250mm) 35 Nos. 35 Nos 15.00 Each 525.00 Cement 3.56 Bag 230.00 Each 818.80 Sand 35.60 Cft 350.00 Per % Cft 124.60
Total 1,768.40 Contractor's Profit & Overhead 20.00 Percent 353.68 Total 2,122.08
Labour
Mason 5.50 Nos 300.00 Per Day 1,650.00 Unskilled Coolies 5.50 Nos 140.00 Per Day 770.00 Bahishti 0.75 No 160.00 Per Day 120.00
Total 2,540.00 Sundries 10.00 Percent 254.00 Total 2,794.00
Contractor's Profit & Overhead 20.00 Percent 558.80 Total 3,352.80
Labour Rate for 100 Cft Rs. 3,352.80 Say 3,352.80 Labour Rate P/ Cum Rs. 1,184.21 Say 1,184.20
Composite Rate for 100 Cft Rs. 5,474.88 Say 5,474.90 Composite Rate P/ Cum Rs. 1,933.73 Say 1,933.75
![Page 29: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/29.jpg)
Page 29
DESCRIPTION OF ITEM NO 5: Ashlar block in course or scabbled masonry(including dressing etc.) in ground floor or 20' (6 M) height, Building other than building.
a) In Lime Sand. (Ratio 1:2)
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 200 Cft 300.00 Per % Cft 600.00 Lime Slaked (Ground) 4Md (149.30 Kg) 2.00 Per Kg. 298.60 Sand 20 Cft 3.50 Cft 70.00 Charcoal 30Lb (13.61 Kg) 4.00 Per Kg. 54.44 Steel 3.3Lb (1.50 Kg) 17.00 Per Kg. 25.50
Total 1,048.54 Contractor's Profit & Overhead 20.00 Percent 209.71 Total 1,258.25
Labour
Mason 17.00 Nos 300.00 Per Day 5,100.00 Unskilled Coolies 10.00 Nos 140.00 Per Day 1,400.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.00 No 170.00 Per Day 170.00 Bellow-man 1.00 No 75.00 Per Day 75.00
Total 6,905.00 Sundries 10.00 Percent 690.50 Total 7,595.50
Contractor's Profit & Overhead 20.00 Percent 1,519.10 Total 9,114.60
Labour Rate for 100 Cft Rs. 9,114.60 Say 9,114.60 Labour Rate P/ Cum Rs. 3,219.28 Say 3,219.30
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 3,663.68 Say 3,663.70
![Page 30: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/30.jpg)
Page 30
Item No. 5 b) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 200 Cft 300.00 Per % Cft 600.00 Cement 6 Bag 230.00 Each 1,380.00 Sand 22.50 Cft 3.50 Cft 78.75 Charcoal 30Lb (13.61 Kg) 4.00 Per Kg. 54.44 Steel 3.3Lb (1.50 Kg) 17.00 Per Kg. 25.50
Total 2,138.69 Contractor's Profit & Overhead 20.00 Percent 427.74 Total 2,566.43
Labour
Mason 17.00 Nos 300.00 Per Day 5,100.00 Unskilled Coolies 10.00 Nos 140.00 Per Day 1,400.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.00 No 170.00 Per Day 170.00 Bellow-man 1.00 No 75.00 Per Day 75.00
Total 6,905.00 Sundries 10.00 Percent 690.50 Total 7,595.50
Contractor's Profit & Overhead 20.00 Percent 1,519.10 Total 9,114.60
Labour Rate for 100 Cft Rs. 9,114.60 Say 9,114.60 Labour Rate P/ Cum Rs. 3,219.28 Say 3,219.30
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 4,125.75 Say 4,125.75
![Page 31: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/31.jpg)
Page 31
Item No. 5 b) In Cement Sand Mortarii) Ratio ( 1:4 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 200 Cft 300.00 Per % Cft 600.00 Cement 4.80 Bag 230.00 Each 1,104.00 Sand 24 Cft 350.00 % Cft 84.00 Charcoal 30Lb (13.61 Kg) 4.00 Per Per Kg. 54.44 Steel 3.3Lb (1.50 Kg) 17.00 Per Per Kg. 25.50
Total 1,867.94 Contractor's Profit & Overhead 20.00 Percent 373.59 Total 2,241.53
Labour
Mason 17.00 Nos 300.00 Per Day 5,100.00 Unskilled Coolies 10.00 Nos 140.00 Per Day 1,400.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.00 No 170.00 Per Day 170.00 Bellow-man 1.00 No 75.00 Per Day 75.00
Total 6,905.00 Sundries 10.00 Percent 690.50 Total 7,595.50
Contractor's Profit & Overhead 20.00 Percent 1,519.10 Total 9,114.60
Labour Rate for 100 Cft Rs. 9,114.60 Say 9,114.60 Labour Rate P/ Cum Rs. 3,219.28 Say 3,219.30
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 4,010.98 Say 4,011.00
![Page 32: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/32.jpg)
Page 32
Item No. 5 b) In Cement Sand Mortariii) Ratio ( 1:6 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 200 Cft 300.00 Per % Cft 600.00 Cement 3.44 Bag 230.00 Each 791.20 Sand 25.70 Cft 3.50 Cft 89.95 Charcoal 30Lb (13.61 Kg) 4.00 Per Per Kg. 54.44 Steel 3.3Lb (1.50 Kg) 17.00 Per Per Kg. 25.50
Total 1,561.09 Contractor's Profit & Overhead 20.00 Percent 312.22 Total 1,873.31
Labour
Mason 17.00 Nos 300.00 Per Day 5,100.00 Unskilled Coolies 10.00 Nos 140.00 Per Day 1,400.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.00 No 170.00 Per Day 170.00 Bellow-man 1.00 No 75.00 Per Day 75.00
Total 6,905.00 Sundries 10.00 Percent 690.50 Total 7,595.50
Contractor's Profit & Overhead 20.00 Percent 1,519.10 Total 9,114.60
Labour Rate for 100 Cft Rs. 9,114.60 Say 9,114.60 Labour Rate P/ Cum Rs. 3,219.28 Say 3,219.30
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 3,880.93 Say 3,880.95
![Page 33: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/33.jpg)
Page 33
DESCRIPTION OF ITEM NO 6: Ashlar fine masonry (including dressing etc.) inground floor or 20' (6 M) height, Building otherthan building.
a) In Lime Sand Mortar. (Ratio 1:2)
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 250 Cft 300.00 Per % Cft 750.00 Lime Slaked (Ground) 2Md (74.65 Kg) 2.00 Per Per Kg. 149.30 Sand 10 Cft 3.50 Cft 35.00 Charcoal 0.73Md(27.2 5)Kg 4.00 Per Per Kg. 109.00 Steel 4Lb (1.82 Kg) 17.00 Per Per Kg. 30.94
Total 1,074.24 Contractor's Profit & Overhead 20.00 Percent 214.85 Total 1,289.09
Labour
Mason 40.00 Nos 300.00 Per Day 12,000.00 Unskilled Coolies 8.00 Nos 140.00 Per Day 1,120.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.50 No 170.00 Per Day 255.00 Bellow-man 1.50 No 75.00 Per Day 112.50
Total ###Sundries 10.00 Percent 1,364.75 Total ###
Contractor's Profit & Overhead 20.00 Percent 3,002.45 Total ###
Labour Rate Per 100 Cft Rs. ### Say ###Labour Rate P/ Cum Rs. 6,362.79 Say 6,362.80
Composite Rate Per 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 6,818.10 Say 6,818.10
![Page 34: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/34.jpg)
Page 34
Item No. 6 b) In Cement Sand Mortari) Ratio ( 1:3 )
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 250 Cft 300.00 Per % Cft 750.00 Cement 3 Bag 230.00 Each 690.00 Sand 11.25 Cft 3.50 Per % Cft 39.38 Charcoal 0.73Md (27.25 Kg) 4.00 Per Per Kg. 109.00 Steel 4Lb (1.82 Kg) 17.00 Per Per Kg. 30.94
Total 1,619.32 Contractor's Profit & Overhead 20.00 Percent 323.86 Total 1,943.18
Labour
Mason 40.00 Nos 300.00 Per Day 12,000.00 Unskilled Coolies 8.00 Nos 140.00 Per Day 1,120.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.50 No 170.00 Per Day 255.00 Bellow-man 1.50 No 75.00 Per Day 112.50
Total ###Sundries 10.00 Percent 1,364.75 Total ###
Contractor's Profit & Overhead 20.00 Percent 3,002.45 Total ###
Labour Rate for 100 Cft Rs. ### Say ###Labour Rate P/ Cum Rs. 6,362.79 Say 6,362.80
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 7,049.13 Say 7,049.15
![Page 35: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/35.jpg)
Page 35
Item No. 6 b) In Cement Sand Mortarii) Ratio 1:4
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 250 Cft 300.00 Per % Cft 750.00 Cement 2.40 Bag 230.00 Each 552.00 Sand 12 Cft 3.50 Per % Cft 42.00 Charcoal 60Lb (27.22 Kg) 4.00 Per Per Kg. 108.88 Steel 4Lb (1.82 Kg) 17.00 Per Per Kg. 30.94
Total 1,483.82 Contractor's Profit & Overhead 20.00 Percent 296.76 Total 1,780.58
Labour
Mason 40.00 Nos 300.00 Per Day 12,000.00 Unskilled Coolies 8.00 Nos 140.00 Per Day 1,120.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.50 No 170.00 Per Day 255.00 Bellow-man 1.50 No 75.00 Per Day 112.50
Total ###Sundries 10.00 Percent 1,364.75 Total ###
Contractor's Profit & Overhead 20.00 Percent 3,002.45 Total ###
Labour Rate for 100 Cft Rs. ### Say ###Labour Rate P/ Cum Rs. 6,362.79 Say 6,362.80
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 6,991.69 Say 6,991.70
![Page 36: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/36.jpg)
Page 36
Item No. 6 b) In Cement Sand Mortariii) Ratio 1:6
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Quarried Stone 250 Cft 300.00 Per % Cft 750.00 Cement 1.73 Bag 230.00 Each 397.90 Sand 13 Cft 350.00 Per % Cft 45.50 Charcoal 60Lb (27.22 Kg) 4.00 Per Per Kg. 108.88 Steel 4Lb (1.82 Kg) 17.00 Per Per Kg. 30.94
Total 1,333.22 Contractor's Profit & Overhead 20.00 Percent 266.64 Total 1,599.86
Labour
Mason 40.00 Nos 300.00 Per Day 12,000.00 Unskilled Coolies 8.00 Nos 140.00 Per Day 1,120.00 Bahishti 1.00 No 160.00 Per Day 160.00 Blacksmith 1.50 No 170.00 Per Day 255.00 Bellow-man 1.50 No 75.00 Per Day 112.50
Total ###Sundries 10.00 Percent 1,364.75 Total ###
Contractor's Profit & Overhead 20.00 Percent 3,002.45 Total ###
Labour Rate for 100 Cft Rs. ### Say ###Labour Rate P/ Cum Rs. 6,362.79 Say 6,362.80
Composite Rate for 100 Cft Rs. ### Say ###Composite Rate P/ Cum Rs. 6,927.87 Say 6,927.85
![Page 37: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/37.jpg)
Page 37
DESCRIPTION OF ITEM NO 7: Extra labour on items 3,4,5 and 6 for work in.
i) First Floor
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Cft.
Mason 0.40 No 300.00 Per Day 120.00 Unskilled Coolies 1.35 No 140.00 Per Day 189.00
Total 309.00 Sundries 10.00 Percent 30.90 Total 339.90
Contractor's Profit & Overhead 20.00 Percent 67.98 Total 407.88
Labour Rate for 100 Cft Rs. 326.31 Say 326.30
Labour Rate P/ Cum Rs. 115.25 Say 115.25
![Page 38: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/38.jpg)
Page 38
Item No. 7 ii) Second Floor
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Cft.
Mason 1.20 No 300.00 Per Day 360.00 Unskilled Coolies 2.60 Nos 140.00 Per Day 364.00
Total 724.00 Sundries 10.00 Percent 72.40 Total 796.40
Contractor's Profit & Overhead 20.00 Percent 159.28 Total for 125 Cft. 955.68 Rate for 100 Cft. 764.54
Labour Rate for 100 Cft Rs. 764.54 Say 764.55
Labour Rate P/ Cum Rs. 270.04 Say 270.05
![Page 39: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/39.jpg)
Page 39
Item No. 7 iii) Third Floor
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Cft.
Mason 2 Nos 300.00 Per Day 600.00 Unskilled Coolies 3.90 Nos 140.00 Per Day 546.00
Total 1,146.00 Sundries 10.00 Percent 114.60 Total 1,260.60
Contractor's Profit & Overhead 20.00 Percent 252.12 Total for 125 Cft. 1,512.72 Rate for 100 Cft. 1,210.18
Labour Rate for 100 Cft Rs. 1,210.18 Say 1,210.20
Labour Rate P/ Cum Rs. 427.43 Say 427.45
Item No. 7 iv) Fourth Floor
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Cft.
Mason 3.60 Nos 300.00 Per Day 1,080.00 Unskilled Coolies 5.60 Nos 140.00 Per Day 784.00
Total 1,864.00 Sundries 10.00 Percent 186.40 Total 2,050.40
Contractor's Profit & Overhead 20.00 Percent 410.08 Total for 125 Cft. 2,460.48 Rate for 100 Cft. 1,968.38
Labour Rate for 100 Cft Rs. 1,968.38 Say 1,968.40
Labour Rate P/ Cum Rs. 695.23 Say 695.25
![Page 40: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/40.jpg)
Page 40
DESCRIPTION OF ITEM NO 8: Extra labour on items 3,4,5 and 6 above for every5ft (1.5 M) additional height building other thanbuilding part thereof.
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Cft.
Mason 0.50 No 300.00 Per Day 150.00 Unskilled Coolies 1 No 140.00 Per Day 140.00
Total 290.00 Sundries 10.00 Percent 29.00 Total 319.00
Contractor's Profit & Overhead 20.00 Percent 63.80 Totalfor 125 Cft. 382.80 Rate for 100 Cft. 306.24
Labour Rate for 100 Cft Rs. 306.24 Say 306.25
Labour Rate P/ Cum Rs. 108.16 Say 108.15
![Page 41: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/41.jpg)
Page 41
DESCRIPTION OF ITEM NO 9: Extra labour for arch work in stone masonryincluding centering and de-centering, etc.
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material
Kikar wood = 3.75 Cft to be used for60 times 3.75/60 = 0.06 Cft 0.06 Cft 250.00 Per Cft 15.00 Earth 2.00 Cft 150.00 % Cft 3.00
18.00 Contractor's Profit & Overhead 20.00 Percent 3.60 Total for 33.8 Cft 21.60 Total for 100 Cft 19.8 x 100 63.91
33.8Labour
Mason 1.50 Nos 300.00 Per Day 450.00 Unskilled Coolies 1.50 Nos 140.00 Per Day 210.00
Total 660.00 Sundries 10.00 Percent 66.00 Total 726.00
Contractor's Profit & Overhead 20.00 Percent 145.20 Total 871.20 Total (i+ii) 935.12
Labour Rate for 100 Cft Rs. 935.12 Say 935.10
Labour Rate P/ Cum Rs. 330.28 Say 330.30
Semi circular opening 15'x1.5'x1.5' = 33.8 Cft
![Page 42: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/42.jpg)
Page 42
DESCRIPTION OF ITEM NO 10: Extra labour for :-
a) Coping and caps etc
Detail Unit Rate (British System) per 100 Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Material for 125 Cft.
Stone 12" (300mm) and above 30 Cft 300.00 Per % Cft 90.00 Steel 0.75Lb (0.34 Kg) 17.00 Per Kg. 5.78 Charcoal 10Lb (4.54 Kg) 4.00 Per Kg. 18.16
Total 113.94 Contractor's Profit & Overhead 20.00 Percent 22.79 Total 136.73
Labour
Mason 18.00 Nos 300.00 Per Day 5,400.00
Total 5,400.00 Sundries 10.00 Percent 540.00 Total 5,940.00
Contractor's Profit & Overhead 20.00 Percent 1,188.00 Total for 125 Cft. 7,128.00 Rate for 100 Cft. 5,702.40
Extra Rate Per 100 Cft Rs. 5,702.40 Say 5,702.40
Extra Rate P/ Cum Rs. 2,014.09 Say 2,014.10
![Page 43: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/43.jpg)
Page 43
Item No. 10 b) Cornice and string course
Detail Unit Rate (British System) per 100 Rft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Rft
Mason 18 Nos 300.00 Per Day 5,400.00
Total 5,400.00 Sundries 10.00 Percent 540.00 Total 5,940.00
Contractor's Profit & Overhead 20.00 Percent 1,188.00 Total for 125 Rft 7,128.00 Rate for 100 Rft 5,702.40
Labour Rate for 100 Rft Rs. 5,702.40 Say 5,702.40
Labour Rate P/ LM. Rs. 187.04 Say 187.05
![Page 44: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/44.jpg)
Page 44
DESCRIPTION OF ITEM NO 11: Dressing Stones
a) Hammer Dressed
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Sft
Mason 5 Nos 300.00 Per Day 1,500.00 Unskilled Coolies 2.50 Nos 140.00 Per Day 350.00
Total 1,850.00 Sundries 10.00 Percent 185.00 Total 2,035.00
Contractor's Profit & Overhead 20.00 Percent 407.00 Total for 125 Sft 2,442.00 Rate for 100 Sft. 1,953.60
Labour Rate for 100 Sft Rs. 1,953.60 Say 1,953.60
Labour Rate P/ Sq.m Rs. 210.21 Say 210.20
Item No. 11 b) Rough tooled dressed
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Sft
Mason 10 Nos 300.00 Per Day 3,000.00 Unskilled Coolies 4 Nos 140.00 Per Day 560.00
Total 3,560.00 Sundries 10.00 Percent 356.00 Total 3,916.00
Contractor's Profit & Overhead 20.00 Percent 783.20 Total for 125 Sft 4,699.20 Rate for 100 Sft 3,759.36
Labour Rate for 100 Sft Rs. 3,759.36 Say 3,759.35 Labour Rate P/ Sq.m Rs. 404.51 Say 404.50
![Page 45: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/45.jpg)
Page 45
Item No. 11 c) Chisel dressed
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Sft
Mason 12 Nos 300.00 Per Day 3,600.00 Unskilled Coolies 5 Nos 140.00 Per Day 700.00
Total 4,300.00 Sundries 10.00 Percent 430.00 Total 4,730.00
Contractor's Profit & Overhead 20.00 Percent 946.00 Total for 125 Sft 5,676.00 Rate for 100 Sft 4,540.80
Labour Rate for 100 Sft Rs. 4,540.80 Say 4,540.80
Labour Rate P/ Sq.m Rs. 488.59 Say 488.60
Item No. 11 d) Fine dressed
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Labour for 125 Sft
Mason 28 Nos 300.00 Per Day 8,400.00 Unskilled Coolies 5 Nos 140.00 Per Day 700.00 Blacksmith 1 No 170.00 Per Day 170.00
Total 9,270.00 Sundries 10.00 Percent 927.00 Total ###
Contractor's Profit & Overhead 20.00 Percent 2,039.40 Total for 125 Sft ###Rate for 100 Sft 9,789.12
Labour Rate for 100 Sft Rs. 9,789.12 Say 9,789.10 Labour Rate P/ Sq.m Rs. 1,053.31 Say 1,053.30
![Page 46: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/46.jpg)
Page 46
DESCRIPTION OF ITEM NO 12: Dhajji walling 5"x5" (125x125mm) thickdeodar framing with stone laid in 1:6 cementsand mortar and (1:4) cement sand plaster onboth sides.
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Rate Analysis for 234 Sft
a) Detail of Woodi) Top bottom
12x12ii) Vertical post 4" (100mm) apart
6x13'x5/12x5/12 = 13.55 Cftiii) Horizontal Pieces
3x18'x5/12x¼ = 5.62 Cftiv) Diagonl Strutts
31.67 Cft
38.00 CftThis wood can be used 10 time hencewood for our operation would be = 38/10 3.80 Cft
b) Stone (Quarried) 1x18x13x5/12 = 98.00 Cft
66.00 CftTherefore stone required = 66 x 2 112 Cft
Material
Wood as above 2nd Class 3.80 Cft 300.00 Cft 1,140.00 Spikes ¾" (20mm) 0.333 Kg. 30.00 Per Kg. 9.99 Wire nail 4" (100mm) 0.333 Kg. 45.00 Per Kg. 14.99 Wood preservative 0.304 Ltr 625.00 Per Litre 190.00 Stone quarried 112.00 Cft 300.00 Per % Cft 336.00 Cement for 1:6 ratio for laying 3.00 Bag 230.00 Per Bag 690.00 Cement for plastering ½" thick bothside (1:4) 3.40 Bag 230.00 Per Bag 782.00
2x18'x5x5 = 6.25 Cft
20x6x5/12x1/6 = 6.25 Cft
Wastage 20% = 6.33
Deduct Scantling = 32.00 Cft
![Page 47: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/47.jpg)
Page 47
Item No. 12
Detail Unit Rate (British System) per 100 Sft
Qty Rate Per Unit (Rs) Amount (Rs)
Sand 40 Cft 350.00 % Cft 140.00 Steel 3Lb (1.36 Kg) 17.00 Per Kg. 23.12 Coal 0.5Md (18.66 Kg) 4.00 Per Kg. 74.64
Total 3,400.74 Contractor's Profit & Overhead 20.00 Percent 680.15 Total 4,080.88
Labour
Carpenters for wood work 4.00 Nos 300.00 Per Day 1,200.00 UnsKilled Coolies 2.00 Nos 140.00 Per Day 280.00 Masons for dressing of stones includinglaying 10.00 Nos 300.00 Per Day 3,000.00 Unskilled Coolies for laying 5.00 Nos 140.00 Per Day 700.00 Masson for plaster 3.00 Nos 300.00 Per Day 900.00 Unskilled Coolies 3.00 Nos 140.00 Per Day 420.00 Blacksmith 0.50 No 170.00 Per Day 85.00 Bellow-man 0.50 No 75.00 Per Day 37.50
Total 6,622.50 Sundries 10.00 Percent 662.25 Total 7,284.75
Contractor's Profit & Overhead 20.00 Percent 1,456.95 Total for 234 Sft 8,741.70 Rate for 100 Sft 3,735.77
Labour Rate for 100 Sft Rs. 3,735.77 Say 3,735.75 Labour Rate P/ Sqm Rs. 401.97 Say 401.95
Composite Rate for 100 Sft Rs. 5,479.74 Say 5,479.75 Composite Rate P/ Sqm Rs. 589.62 Say 589.60
![Page 48: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/48.jpg)
Page 48
DESCRIPTION OF ITEM NO 13: Providing and fixing stone blocks from 2 Cft to 6Cft (0.06 to 017 M³) each, including lift upto20' (6 M).
Detail Unit Rate (British System) per Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Rate Analysis for 4 Cft
Material
Hand dressed stone average 4 Cft 1 No 70.00 Each 70.00 Cement 0.06 Bag 230.00 Bag 14.03 Sand 0.30 Cft. 350.00 % Cft 1.05
Total 85.08 Contractor's Profit & Overhead 20.00 Percent 17.02 Total 102.10
Labour
Mason 0.25 No 300.00 Per Day 75.00 Unskilled Coolies 2.00 Nos 140.00 Per Day 280.00 Blacksmith 0.12 No 170.00 Per Day 20.40
Total 375.40 Sundries 10.00 Percent 37.54 Total 412.94
Contractor's Profit & Overhead 20.00 Percent 82.59 Total for 4 Cft 495.53 Rate for Per Cft 123.88
Labour Rate Per Cft Rs. 123.88 Say 123.90 Labour Rate P/ Cum Rs. 4,375.43 Say 4,375.45
Composite Rate Per Cft Rs. 149.41 Say 149.40 Composite Rate P/ Cum Rs. 5,277.02 Say 5,277.00
![Page 49: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/49.jpg)
Page 49
DESCRIPTION OF ITEM NO 14: Providing and fixing stone blocks under 2 Cft(0.05 M³) each, including lift upto 20 Cft (6 M).
Detail Unit Rate (British System) per Cft
Qty Rate Per Unit (Rs) Amount (Rs)
Hand dressed stone average (2 Cft) 1 No 35.00 Each 35.00 Cement 0.03 Bag 230.00 Bag 6.90 Sand 0.17 Cft. 350.00 % Cft 0.60
Total 42.50 Contractor's Profit & Overhead 20.00 Percent 8.50 Total 51.00 51.00
2.00 25.50
Mason 0.05 No 300.00 Per Day 15.00 Unskilled Coolies 0.25 No 140.00 Per Day 35.00 Blacksmith 0.03 No 170.00 Per Day 5.10
Total 55.10 Sundries 10.00 Percent 5.51 Total 60.61
Contractor's Profit & Overhead 20.00 Percent 12.12 Total 72.73
Labour Rate Per Cft Rs. 72.73 Say 72.75 Labour Rate P/ Cum Rs. 2,568.89 Say 2,568.90
Composite Rate Per Cft Rs. 98.23 Say 98.25 Composite Rate P/ Cum Rs. 3,469.62 Say 3,469.65
Material Rate Analysis for 2 Cft
Labour Rate Analysis for 1 Cft
![Page 50: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/50.jpg)
Page 50
Amount (Rs)
![Page 51: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/51.jpg)
Page 51
Amount (Rs)
![Page 52: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/52.jpg)
Page 52
Amount (Rs)
![Page 53: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/53.jpg)
Page 53
Amount (Rs)
![Page 54: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/54.jpg)
Page 54
Amount (Rs)
![Page 55: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/55.jpg)
Page 55
Amount (Rs)
![Page 56: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/56.jpg)
Page 56
Amount (Rs)
![Page 57: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/57.jpg)
Page 57
Amount (Rs)
![Page 58: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/58.jpg)
Page 58
Amount (Rs)
![Page 59: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/59.jpg)
Page 59
Amount (Rs)
![Page 60: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/60.jpg)
Page 60
Amount (Rs)
![Page 61: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/61.jpg)
Page 61
Amount (Rs)
![Page 62: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/62.jpg)
Page 62
Amount (Rs)
![Page 63: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/63.jpg)
Page 63
Amount (Rs)
![Page 64: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/64.jpg)
Page 64
floor or 20'(6 M) height,building/other than building.
Amount (Rs)
![Page 65: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/65.jpg)
Page 65
Amount (Rs)
![Page 66: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/66.jpg)
Page 66
Amount (Rs)
![Page 67: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/67.jpg)
Page 67
Amount (Rs)
![Page 68: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/68.jpg)
Page 68
Amount (Rs)
![Page 69: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/69.jpg)
Page 69
Amount (Rs)
![Page 70: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/70.jpg)
Page 70
Amount (Rs)
![Page 71: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/71.jpg)
Page 71
Amount (Rs)
![Page 72: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/72.jpg)
Page 72
Amount (Rs)
![Page 73: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/73.jpg)
Page 73
Amount (Rs)
![Page 74: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/74.jpg)
Page 74
Amount (Rs)
![Page 75: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/75.jpg)
Page 75
Amount (Rs)
![Page 76: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/76.jpg)
Page 76
Amount (Rs)
![Page 77: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/77.jpg)
Page 77
Amount (Rs)
![Page 78: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/78.jpg)
Page 78
Amount (Rs)
![Page 79: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/79.jpg)
Page 79
Amount (Rs)
![Page 80: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/80.jpg)
Page 80
Amount (Rs)
![Page 81: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/81.jpg)
Page 81
Amount (Rs)
![Page 82: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/82.jpg)
Page 82
Amount (Rs)
![Page 83: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/83.jpg)
Page 83
Amount (Rs)
![Page 84: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/84.jpg)
Page 84
Amount (Rs)
![Page 85: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/85.jpg)
Page 85
Amount (Rs)
![Page 86: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/86.jpg)
Page 86
Amount (Rs)
![Page 87: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/87.jpg)
Page 87
Amount (Rs)
![Page 88: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/88.jpg)
Page 88
Amount (Rs)
Amount (Rs)
![Page 89: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/89.jpg)
Page 89
Amount (Rs)
![Page 90: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/90.jpg)
Page 90
Amount (Rs)
![Page 91: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/91.jpg)
Page 91
Amount (Rs)
![Page 92: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/92.jpg)
Page 92
Amount (Rs)
![Page 93: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/93.jpg)
Page 93
Amount (Rs)
Amount (Rs)
![Page 94: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/94.jpg)
Page 94
Amount (Rs)
Amount (Rs)
![Page 95: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/95.jpg)
Page 95
Amount (Rs)
![Page 96: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/96.jpg)
Page 96
Amount (Rs)
![Page 97: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/97.jpg)
Page 97
Amount (Rs)
![Page 98: 33788151 Rate Analsis Chapter No 8 Stone Masonary](https://reader033.vdocument.in/reader033/viewer/2022061104/54026ec6dab5ca58648b4603/html5/thumbnails/98.jpg)
Page 98
Amount (Rs)