33kv distributed generation heat map - 33kv connection ......i:\gis\02 activities\activity...
TRANSCRIPT
!(")
!(
!(
!(
!(
!!
!!
!(
!(
!!
!(
!(
!(
!(
!(
!!
")
!(
!(
!(
!(
") ")!!
")
!!
!(
!(
!!
!!
!(
!(
!(
")
!!
!(
!(
!!
!(
!(
!(
!(
!(
!!
!(
!(
!(
!(
!!
!(
!!
!!
!(
!!
!!
!!
!!
!(
!!
!(
!(
!(
!!
!!
!!
!!
")
!!
!(")
")!( !(
!(
!!
")
!(
!(
!(
")
!(
""
!(
!!
!(
!(
!!!!
!!
!!
!!
!(
!(!(!(
!!
!!
!(
!(
!!!!
")
!(
!(
!(
!!!!
!(
!!!!
!!
!!!(
!(
!(
!(
!(
!(
!!
!!
!!
!(!(
!!
!(
!(
!(
!(
")!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!!
!(!!
!(
!!
!(
!!
!(
!!
!(
!(!(
!(")
!(
!(
!!
!(
")!(
!!
!!
!!
!!""!!
!(
!!
!(
!(
!(
!(
!!
!(
!!
!(!(
!(
!(
!!
!!
")
!!
!(!(
!(!(
!!
!(
!(
!(
!!
!(
!(
!(
!(
!!
!!
!!
")!(!!
!(
!(
!(!(
!(
!(!(
!!
!(
""
!!
!!
!!
!(
!(
!!
")
")
!!
!!
!!
!(
!!
!!
!(
!(
!(
!(
!(!(
!(
!(!(
!(")!(!(!(!(")!(
")!(!(
!(
")
")!(!(
!(
!(
"" !!
!(
!(!(
!!
""
!(
!!
!(
!!
!(
!!
!! !(
!(
!(!(!(")!(
!(
!!
!(
!(
!!
!(
!(
!(
!(
!!
!!
!(
!(
!(
!(
!(
!!
!(
!!
!(
!(
!(
!!
!(
!!
08/6539/001/G-MAENTWROG GRID
GS-SJ2947/001 LEGACY LOCAL GRID
07/0274/002/G-ST ASAPH GRID
07/1474/001/G-HOLYWELL GRID
04/3071/001/G-SHOTTON PAPER
07/0180/012/G-RHYL GRID
04/3549/009/G-WREXHAM GRID
08/3939/001/G-FOUR CROSSES GRID
08/5470/002/G-BANGOR GRID
08/4963/001/G-CAERNARFON GRID 04/2965/002/G-HAWARDEN GRID
08/4493/007/G-AMLWCH GRID
04/3966/001/G-CRANE BANK
07/8279/007/G-COLWYN BAY GRID
10/7281/002/G-RHYDLYDAN GRID
07/7767/003/G-DOLGARROG
10/6081/002/G-ABERYSTWYTH GRID
GS-SJ2948/004 LEGACY GRID
04/3070/001/G-SEALAND SHOT.ST.WORK
09/2406/005/G-WELSHPOOL
09/5242/001/G-WHITCHURCH
09/3030/004/G-OSWESTRY GRID
04/3270/040/G-SIXTH AVENUE GRID
04/3171/006/G-DEESIDE PARK
04/2953/001/G-BRYMBO GRID
04/3969/001/G-CHESTER MAIN GRID
04/3765/010/G-SALTNEY GRID LOCAL
08/3078/001/G-CAERGEILIOG GRID
09/1291/007/G-NEWTOWN GRID
04/3849/009/G-MARCHWIEL GRID
Notes
Created by Checked by DateI:\GIS\02 Activities\Activity 1\Mapping\Asset Connectivity\SPM\Act1-Wales-EHV-Infrastructure-A0-v4.mxd
33kV Distributed Generation Heat Map - 33kV Connection Opportunities
File Path0 10 205 Miles
¯
GS 22/05/2014
33kV Cables/ OHLGood Opportunity, 10-20MVAMedium Opportunity, 1-10MVALimited Capacity, <1MVA
132kV/ 33kV Substation") Good Opportunity, 10-20MVA") Medium Opportunity, 1-10MVA"" Limited Capacity, <1MVA
33kV/ 11kV Substation!( Good Opportunity, 10-20MVA!( Medium Opportunity, 1-10MVA!! Limited Capacity, <1MVA
without the requirement for significant upstream reinforcement:
This Heat Map is indicative only, and is based on a numerical assessment of theremaining transforming capacity at each substation (or within each groupwhere substations are interconnected). It does not reflect other aspects of the system which have an impact on deployable capacity. This will generally require detailed analysis, and early engagement from developers is welcomed and encouraged.However, it is possible, by carrying out system reinforcement and/or the use of constraintschemes, that generation in excess of that indicated on this map could be accommodated on the SP Manweb system.
Available Capacity
RS