The Finnish Children and Youth Foundation Youth Leadership, Entrepreneurship and Economic Sustainability Project Proposal 2011

Upload: zaraazahid

Post on 08-Nov-2015

3 views

Category:

Documents


0 download

TRANSCRIPT

  • The Finnish Children and Youth Foundation

    Youth Leadership,

    Entrepreneurship

    and Economic Sustainability

    Project Proposal 2011

  • 2

    PROJECT PLAN for years: 2012 - 2014 Please note the instructions for filling in this project plan form in the Application guide or the internet: http://global.finland/english/ngo/index.htm

    new project

    continuation of on-going project, MFA project code_________, project initiation year _______

    project is based on earlier forms of co-operation, years_______

    the planning of project has been supported by MFA preparation trip allowance, year________

    Organisation: 1. Basic information on the Project

    1.1 Name of organisation registered in Finland

    The Finnish Children and Youth Foundation (FCYF)

    1.2 Name of Project in Finnish

    Nuorten johtajuus, yrittjyys ja taloudellisesti kestv kehitys

    1.3 Name of Project in English

    Youth Leadership, Entrepreneurship and Economic Sustainability

    1.4 Name of Project in other relevant language

    Liderazgo juvenil, emprendedurismo y sostenibilidad econmica.

    1.5 Location of Project (country, province, village/municipality)

    Huallaga river valley in San Martin Region; Apurimac and Ene river valley in Cusco Region.

    1.6 Name ofthe local partner organisation

    Centre of information and education for the prevention of drug abuse CEDRO

    1.7 Contact details of local partner organisation

    CEDRO Roca y Bologna 271, Miraflores. Lima, Peru Email address: [email protected]

    1.8 Representatives of the co-operation Partner responsible for the Project and their contact information, if other than above

    Julio Moscoso Email: [email protected]

    1.9 Internet home pages of the co-operation Partner and/or the Project (if any)

    Website: www.cedro.org.pe

    1.10 Planned initiation and termination dates (on a yearly level) of the Project

    2012 2014

    X

  • 3

    Please answer the following question and fill in the budget summary (1.13) only after answering all other questions on the form.

    1.11 Summary of the Project plan. Describe here briefly (max. 700 characters) the development problem that this project is addressing, its immediate objective and the practical means through which these objectives are to be reached:

    Young peoples participation on the development and employment possibilities are essential elements in poverty reduction. According to figures given by the National Statistics Institute (INEI), the number of youth belonging to the Economically Active Population in Peru is 5 400 000. Two of three unemployed are young people, and one of five young people do not study or work. Of young people who work, 53% are underemployed.

    Young peoples participation on the development and employment prospects are essential elements

    in poverty reduction. Considering this, the long-term development objective of the project is to

    contribute to national and regional efforts for the improvement of youth economy and the promotion

    of youth entrepreneurship, determining young people as key actors in local development. The project

    aims to strengthen the capacities and the economical development of young Peruvians from San

    Martin and VRAE (Apurmac and Ene River Valleys) Regions in Peru rural regions. 650 youth organized

    in 65 youth groups will benefit from the project through participating in life skills and market oriented

    entrepreneurship trainings, and through expanding their networks and abilities to obtain funding for

    the development of their small enterprises. The project will improve young peoples abilities to

    network, their employment possibilities and possibilities to sustain group activities.

    The project will be implemented through the following strategies:

    enhancing youth groups knowledge and capacity on entrepreneurship, occupational and

    leadership skills and life skills,

    improving youth groups self-sustainability and social participation,

    creating a mode of operation and networking between youth groups.

    Mobile technology solutions will be developed and tested in cooperation with Nokia to improve youth

    entrepreneurship and young peoples skills.

    1.12 If this Project is the continuation of an earlier project, please describe here the main results of the earlier stages of the Project.

    The project bases on the results of the two earlier projects, Support for youth leadership, cultural

    identity and occupational training as a tool for development in selected communities in Alto Mayo and

    Central Huallaga (2008-2010) and Promotion of young adults leadership, ecological awareness and

  • 4

    cultural identity as a tool for sustainable

    development in communities located in

    Peruvian Rainforest (2009-2011), which

    focused on the promotion of young adults

    leadership skills, ecological awareness and

    cultural identity in two regions of the Peruvian

    Amazon. Both projects focused on the

    promotion of young adults life skills,

    ecological awareness and cultural identity in

    the Peruvian Amazon as a means to support

    their sustainable development. Both projects

    had also a component of market driven

    employment training. CEDRO has been

    developing specific strategies in these areas, one of which has been the organization of local youth

    groups to secure the legal participation of the youth.

    The following results have been achieved within the first project:

    Outcome Target

    Direct beneficiaries 3 391 3 000

    Indirect beneficiaries 19 798 13 800

    Communities involved 153 120

    Number of youth working for their communities

    3 223 2 700

    Number of youth organizations obtaining formal recognition

    263 120

    Number of youth initiatives benefitting the community

    203 177

    Number of youth with improved leadership skills

    2 973 2 550

    Number of youth with improved labor competences

    122 46

  • 5

    The following results have been achieved within the two first years of the second project:

    Year 2009

    Year 2010 TOTAL

    Total project target

    Youth Target 850 850 1700 Actual 529 1543 2072 2520

    Youth Groups 22 21 43

    32

    Communities 26 12 38 32

    Since 2008 these projects have reached all together 5 463 direct youth beneficiaries, organized in

    youth groups. 30 084 members of the families and communities of the youth have indirectly

    benefited from the project. The projects have been successful in reaching their goals due to the active

    and enthusiastic participation of the youth. The most important results achieved with these projects

    have been:

    1. Enhanced capabilities of the youth to exercise democratic participation in their groups and in

    the life of their communities.

    2. Increased valuing of cultural traditions and cultural identity by both the native and non-native

    youth.

    3. Increased knowledge about environmentally harmful practices.

    4. Enhanced market oriented employment skills.

    5. Enhanced life skills.

    The local governments have recognized the active role of the youth and supported their activities. In

    the last municipal election the results of the active participation of the youth were proved when some

    of the youth leaders were elected as local authorities.

    While the achievements of the earlier projects have been indispensable, the rural youth face still

    challenges concerning their personal development and social participation, and especially in relation

    to their economic sustainability. On the course of the two earlier projects some major obstacles for

    the development of the youth were recognized: unemployment, underemployment, gender

    discrimination and the resistance of adult leaders and organizations to accept the active participation

    of the youth organizations in the society. All this hinders the economical development of the youth.

    The new project aims to enhance and expand the good results reached with the employment training

    component of the earlier projects and to strengthen the sustainability of the results of the earlier

    projects as well as youth groups economical sustainability. The project will improve young peoples

  • 6

    abilities to network, their entrepreneurial skills and possibilities to sustain group activities. As part of

    the project the youth groups will be assisted to establish micro enterprises.

    The main lessons learned from the two previous projects taken into account when planning this

    proposal are:

    - Focus on entrepreneurship (social and/or economic) as the goal and life skills as the tool, but

    in a Doing approach: Peruvian rural youth enjoy training sessions, but even more putting in

    practice what they learn; there are more skills and principles that can be taught in practical

    way than spending hours in theoretical sessions.

    - Focus on youth organized in groups: There is a strong tradition for cooperative work for

    mutual benefit in Peruvian jungle; it is known as Minka in the Andean region and Choba

    choba in most of the San Martin Region. If the project would have developed its

    entrepreneurship and labor training component focusing primarily on individual achievement

    success would have been reduced if not completely a failure. Another important fact is that

    productive units in these areas are primarily formed along kinship ties, which means that also

    the investment in large productive units could have been unsuccesful.

    1.13 Budget Summary

    year 2012 2013 2014

    Self-financing of the Organisation

    30 000 30 000 30 000

    Project support application 170 000 170 000 170 000

    Total costs 200 000 200 000 200 000

    1.14 Other funding of the Project (if any). If the Project receives other funding, please state here the amount and the source of the funding:

    Amount Source

    14 000 CEDRO

    Voluntary work 9000

    Experts 12 months X 600 7200 Volunteers 12 months X 150 1800

    Material donations 5000

    Community support

    (localities, services, volunteer work) 5000

    Total

    14000

  • 7

    2. Local Partner Organisation and nature of co-operation

    2.1. Please describe the criteria used in choosing the co-operation Partner.

    FCYF and CEDRO have cooperated actively since the year 2006. The collaboration has worked out well and has been mutually benefiting through the exchange of experience and good practice. The previous projects surpassed its goals in many ways as described in section 1.12. The lessons learned from the project were taken into account when planning this project proposal. Both organizations belong to the International Youth Foundations (IYF) Global Partner Network (GPN). GPN is working on local, national and international levels in order to strengthen and expand the reach of effective programs serving young people, while maximizing the impact of the children and youth sector as a whole. CEDRO was chosen based on its ability to meet the following criteria:

    - Proven institutional capacity and experience in running successfully youth empowerment programs;

    - Expertise in youth issues and technical and entrepreneurial training; - Good relationships with public, private and third sectors, and ability to network with them; - Good reputation among the indigenous communities of the Peruvian Amazon; - Innovative approaches and joined interest with FCYF to develop youth entrepreneurship

    thematic. CEDRO has proved to be a reliable, committed and professional partner. Communication between the two organizations has been fluent and bilateral. CEDRO has managed to establish good relationships with the native communities of the project areas, which is a perquisite for the success of the project. The two organizations aim to continue their co-operation and further develop their partnership.

    2.2 Has the Organisation previously worked with this Partner? If so, please describe the nature of this co-operation and when it took place?

    Since the year 2006, FCYF has been in cooperation with CEDRO. Additionally, FCYF and CEDRO have shared information through IYF global partners network. In 2007 FCYC and CEDRO planned and presented a project proposal of the first joint youth project to the Ministry for Foreign Affairs of Finland. The proposal was approved and the following year funding was approved for an extension of this earlier proposal. These two earlier projects were:

    1. Support for youth leadership, cultural identity and occupational training as a tool for

    development in selected communities in Alto Mayo and Central Huallaga (2008-2010)

    2. Promotion of young adults leadership, ecological awareness and cultural identity as a tool

    for sustainable development in communities located in Peruvian Rainforest (2009-2011)

    See section 1.12 for further information regarding the two earlier projects.

  • 8

    This third project will be an exit project for these two earlier projects. The aim is to strengthen the economic development of the youth and trough this the overall sustainability of the results achieved in the two earlier projects. In addition, CEDRO and FYCF are implementing in co-operation the project of Youth community empowerment for integral health promotion in two districts of Lima Peru (2010-2013). The current year FYCF is also applying for Ministry for Foreign Affairs funding for a youth employment and entrepreneurship project in Lima Promotion of Youth Employment and Life Skills in Peru which would enhance the sustainability of the results of this project as well.

    2.3 Additional information on the co-operation Partner.

    CEDRO:

    A private, non-profit organization, established in 1986, whose mission is to foster healthy environments and quality of life for young people.

    Conducts research and provides training to teachers, community leaders, law enforcement agents, youth workers, and youth.

    Programs include leadership training, youth involvement in community development, life-skills, technical education, job creation and micro enterprise, and community libraries for young people.

    Has been most successful in establishing close working relationships with the government, other NGOs, traditional authorities and the private sector.

    Runs three shelter homes for street children and youth. In addition CEDRO has been forming entrepreneurship trainings as part of its activities since 1998. Since 2005 it has also included life skills trainings in its activities.

    2.4 How will the co-operation Partner participate in the implementation of the Project (e.g. does it provide labour, economic resources, other assets)?

    CEDRO is the lead implementing agency and will coordinate all in-country activities with local governments, local businesses, training providers and the young people themselves. CEDRO will provide its staff, training infrastructure and networks to implement the project.

    2.5 Are there other parties involved in the co-operation (e.g. Finnish, local or international organisations or officials)? If so, please describe their role and involvement in the Project.

    Nokia

    Nokia, as the cooperation partner of the project, will offer financial assets (financing 15% of the

    project) together with its expertise and knowledge on mobile technology solutions to the project. One

  • 9

    of the central elements of the project is to take advantage of the innovative technologies in order to

    improve the youth entrepreneurship. Through the application of mobile technology solutions the

    capacities and opportunities of young entrepreneurs to develop their initiatives will be enhanced. The

    aim is to reinforce mutual learning on the ways the mobile technology solutions may serve in

    improving youth employment and influence innovatively on the local development. Nokia will take

    actively part in all parts of the project cycle and a strong cooperation between FCYF, CEDRO and

    Nokia has been established. Nokia is already partnering with FCYF through the development

    cooperation projects in Senegal and Tanzania and the Zest-project in Finland.

    This project will be part of a larger cooperation plan between FCYF, Nokia and the local partner

    organizations regarding the development cooperation projects and the advances offered by the

    application of mobile technology solutions for the youth employment worldwide. In addition to this

    project proposal, the Promotion of Youth Employment through Training and Micro

    Entrepreneurship-project proposal is forwarded to the Ministry of Foreign Affairs of Finland in 2011,

    belonging to the cooperation between FCYF, Nokia and the local partner organization CIRD in

    Paraguay. Nokia offers additional funding and expertise for the development of mobile technology

    solutions in regards to the employment/entrepreneurship component in 2011-2012. The timeline and

    plan is as follows:

    2011: Preparations, baseline studies and surveys in Finland, Brazil, Peru and Paraguay by FCYF,

    Nokia and the local partner organizations.

    2012: Development and first applications of mobile technology solutions for the development

    cooperation projects.

    All the actors, FCYF, Nokia and the local partner organizations, will be involved in the development

    process. Solutions which have been developed and are already in use in other development

    cooperation projects, e.g. in Africa, will be surveyed and possibly utilized in the work. Some of the

    possibilities for integrating the mobile technology solutions into the youth employment and

    entrepreneurship projects could be related to marketing, bookkeeping and interaction between the

    entrepreneurs.

    Companies/ indutstries in Peru will support the development of youth groups enterprises and will be

    involved in the baseline study and evaluation of the project.

    Local governmental institutions

    Local governmental institutions will participate actively in the implementation of the project to assure

    the success and the sustainability of the project. They will contribute to the project through

    identification of local needs, spreading information, supporting the trainings (locations, logistics etc.)

    and by giving resources such as starting funding for youth entrepreneurship initiatives. Formal

    agreements will be signed with local governments concerning their material and enabling support for

  • 10

    the project. The formal registration of the micro enterprises of the youth will enable them to apply for

    funding from the local governmental institutions that are working for this purpose.

    Local native authorities

    The acceptance of the native authorities is essential for the proper implementation of the project.

    Native authorities support for the project will enable a smooth implementation process at the local

    level and establish the legitimacy of the project. The native authorities will support the project by

    participating in the planning and evaluation processes and by providing in kind support, for instance

    spaces for the activities of the youth groups.

    In addition, families and communities will support the project, youth groups development and be involved in different phases of the project.

  • 11

    3. Background and sustainability of the Project

    3.1 How was the Project idea initiated? Is it e.g. a part of a larger Program?

    The project idea is a result of a strong cooperation between FCYF and CEDRO. It is based on successful cooperation in the earlier project and ongoing discussions and planning for new initiatives for joint areas of interest and expertise. The previous joint projects gave good insights for the planning of this project proposal (see 1.12 for further information). The thematic of youth groups entrepreneurship and economic sustainability rose from the earlier projects results and from the interest of the two organizations to develop new approaches for youth employment. Also Nokia has been involved in the planning of the proposal.

    CEDRO began its work in the valleys of the Peruvian Amazon region in 1987, developing informational

    activities supporting the prevention of drug abuse and production in coordination with different

    public and private institutions of the area (Tarapoto, Pucallpa, Tingo Maria and Iquitos), focusing on

    the intervention in the educational system, the community and its organizations. In 1992 CEDRO

    started developing complete projects with the support from international donors. In 1996, the

    process expanded to rural populations of the Apurimac and Ene river valleys; these were difficult

    times due to the strong presence in all these zones of subversive terrorism (Shining Path and Tupac

    Amarus Revolutionary Movement), which acted in alliance with drug lords. Thus, CEDROs main task

    was to build and strengthen a social foundation starting with the children, youth and women that

    would contribute to the development of these valleys.

    The present proposal forms part of CEDROs strategy for youth development, which includes labor

    training, entrepreneurship education, life skills training and support to youth initiatives (social and

    economic). The two earlier projects (see 2.2) base on this same strategy. At the same time this

    proposal seeks to contribute with local and regional development plans: The Regional Development

    Plan 2008-20151 and the Regional Education Project 2005 - 20212 and The Peruvian Ministry of Labor

    Strategic Plan 2006 2011, which consider the promotion of labor insertion of vulnerable youth as an

    important objective and the Sectorial Action Plan for the Promotion of Youth Employment 2009

    2012, which has the objective of Increase and improve entrepreneurship skills in youth and the

    development of their entrepreneurships.

    CEDROs strategy for youth development has been produced in close contact with the communities

    and a deep reflection over economic and social changes in the country and in the two regions in

    question. The strategy was introduced in 2002 with the first labor training and seed money strategies

    for youth and was developed further in 2005, including Life Skills training, employability skills

    1 This document can be found at

    http://www.regionsanmartin.gob.pe/administracion/documentos_transparencia/doc_transparencia69.pdf 2 This document can be found at http://issuu.com/dialn/docs/persm

  • 12

    development and leadership enhancement (with the implementation of the first MAKE A

    CONNECTION project). Entrepreneurship has been included in CEDROs strategy for the prevention

    of risk behaviors and building youth citizenship.

    The current strategy is being built with the contribution of the lessons learned during the

    implementation of previous projects. It considers the following as the key components of the training

    process in the project areas:

    - Labor training

    - Life skills training

    - Employability skills training

    - Leadership and organizational skills training

    - Entrepreneurial skills development training

    - Support for social and economic entrepreneurship

    - Labor mediation (considered as the support to youth to know and take advantage of job

    opportunities and internships provided by public or private job agencies and/or companies)

    Currently there are two other projects run by CEDRO working in different zones of the country on the issue of entrepreneurship, one directed to Andean youth and the other to adult women:

    - Hacia la Cultura de la Legalidad sin Drogas working with andean youth in rural Ayacucho.

    - Emprendimiento femenino para el desarrollo comunitario, working with adult women

    organizations in San Francisco and Kimbiri (between Ayacucho and Cusco regions) and in the

    Valley of the Monzon River, Huanuco Region.

    Both projects are following the same guidelines defined above, with differences according the type of

    beneficiaries.

    3.2 Describe briefly the environment in which the Project will be implemented.

    The project will work in two regions of Peruvian forest zone, specifically in San Martin Region and in the Apurimac and Ene Rivers Valley (VRAE) in the Cusco Region. The proposal will be developed in cities, medium sized villages and towns with close and easy connections to local markets that could facilitate the development of small businesses. The project will focus on 65 youth groups (55 from San Martin and 15 from VRAE) and community organizations from the following provinces and communities. Rural poverty affects 54,5% of young people in Peru. Some of the biggest challenges affecting youth and contributing to poverty are unemployment (Perus youth unemployment rate is 18%), underemployment and informal work (the rate of non remunerated family

    work is 41.6% of total rural youth In the case of the jungle region the involvement

    1.San Martin region in Peru

    2.VRAE zone comprises of territories that are part of Cusco, Ayacucho and Junin regions.

  • 13

    in illegal coca leaf cultivation and cocaine drug production is a way for the youth to escape poverty, but at the same time configures a new security problem for the whole country and places youth at risk of violence, criminal charges and low prospects for legal development. The environmentally harmful practices of coca cultivation also risk the sustainable development of these regions. The population of San Martin region is about 205 000 according to the population census of 2007. Population of the region is primarily young. The largest population segment is that of young people between the ages of 10 and 14, the 5-9 year-olds and 15-19 year-olds consist respectively the second and third biggest population segments. The majority of the population lives in and around the major cities: Moyobamba, Tarapoto, Bellavista, Juanjui and Tocache. Agriculture is the main livelihood of people living in this area; coffee, rice, corn, beans, cotton and cacao being the main products. Since early seventies until late in the nineties the main concern of this region was drug production, drug trafficking and terrorism, especially because they worsened poverty and lack of opportunities for the youth. In Pichiri and Kimbiri districts in VRAE the population was 42 241 according to the population census of 2007. Nearly half of the population is of the age of less than 15 years. The high incidence of cocaine drug production and trafficking in both regions is linked to low resources farming and extreme poverty. Other VRAE products are cacao, coffee, corn, fruits and derivates, etc. but cannot compete with drug production and the seduction that easy money develops over youth.

    3.3 What is the general state of development in the field of the Project in the area? How does the local government function in this field and in these issues? How does the local government participate in the implementation of the Project - or limit it?

    Main efforts in the project area have been devoted to labour training of youth and the promotion of employment. Limited support from the national government and very scarce support from regional and local governments have been provided for self employment or youth collective entrepreneurship initiatives. In most occasions these efforts are focused on urban areas or in main capital cities which leave rural youth partially or completely unattended. Government has a labor training and entrepreneurial development program called PROJOVEN, but its success in rural zones has been very discreet (and the success data provided in their reports is unreliable). The program has achieved better results in urban zones where there are more possibilities for youth insertion in the labor market. CEDRO has good relationships with the local governments, which have earlier offered political support. They have also offered additional financial support for the youth groups and their activities, depending on their resources. Local governments in each zone have committed to the initiatives of the project due to the success of the previous projects forming active youth organizations. The fact that in many zones even young leaders are participating actively in politics of their communities enhance the possibility of an harmonious contribution with local and regional governments; even when the support with cash resources cant be well defined, we know that we can count with their support on resources that would help the development of the activities; there is also the possibility that the youth could participate in the Participatory Budgeting Process3, that takes place in every

    3 More information about Participatory Budgeting may be found in:

  • 14

    municipality once a year, this is an opportunity open to all CSO not exclusively for youth so competition for funds can be hard, even so in 2010, 3 youth groups participant in the project from different zones of Pichi Palcazu Valley achieved support for their development projects. Most interesting and creative development of youth entrepreneurship is coming from private institutions, mostly NGOs. Currently there is no public or private formal financial system providing youth with micro credits. Requirements for micro credits are especially problem for very young entrepreneurs (- 19) and more accessible to young adults (over 21) which could fill usual requirements of having properties, getting a bank guarantee or having already a paid job. Even when private financial enterprises are supporting local businesses are at the same time very reluctant to provide resources for youth initiatives and dont include the entrepreneurial education as part of their services.

    3.4 How has the Project been planned?

    See also 1.12 and 3.1. The main concept for this project derived from the experiences of FCYF and CEDRO working with youth at risk. Also Nokia was involved in the planning of the project. Traditionally the planning process for CEDRO considers 3 consecutive steps:

    1. Data gathering by CEDROs field teams through the elaboration of direct diagnosis and evaluation

    of present and actual situation in the areas of intervention with the support of the communities

    representatives. In the present case we have counted with the information provided by youth

    groups after their participation in the previous projects.

    2. The diagnostics and evaluation data have provided the basic ideas necessary to elaborate a new

    proposal based in the previous experience, which points out that focusing in entrepreneurship

    and deepen life skills training would be the most recommendable strategy.

    3. The initial draft of the proposal has been presented between January and March to youth

    representatives and local authorities in Tarapoto and VRAE, to get suggestions and appreciations

    that enrich the final document.

    Since this project is proposed as a specialization of the previous experience, the opinion from youth already taking part in previous projects was mandatory, since the opinion of experienced youth is crucial to better determine the strategies that may have to remain from the initial experience and which changes may enhance the development of the entrepreneurship and life skills training processes. Local governments and public sector was consulted in terms of their support to the activities of the project and to seek compliance with local strategic development plans. Private sector in the intervention zones have had traditionally a discrete role in community development, especially

    http://presupuesto-participativo.mef.gob.pe/portal_pp/html/index.php http://en.wikipedia.org/wiki/Participatory_budgeting

  • 15

    because corporate responsibility even in the whole country is not properly developed and is still related exclusively to philanthropy and punctual activities, and in San Martin and VRAE also because there are not big companies but rather small industries.

    3.5 Describe the most essential problems of the beneficiaries that the Project is meant to address.

    The beneficiaries of the project have already participated in different capacity building activities within CESROs earlier projects, as detailed in 1.12. and 3.2. The aim of this project is to answer the challenges that still hinder the economic sustainability of the youth in order to reinforce the overall sustainability of the results reached with the earlier projects and to transfer the responsibility for the sustainability of the project to the local actors. Within the framework of poverty, low quality of life and deficient education, the problems affecting directly the beneficiaries have been detected by a problem analysis are. The most essential problems that the project seeks to address are the following:

    Young peoples poor technical training, work experience and market oriented skills.

    Gender and age discrimination that difficult youth integration to society and employment market.

    Limited efforts and results on life skills training as provided by formal education system.

    The Peruvian education system makes a strong emphasis on academic aspects and other aspects of human development such as personality, emotional development, life skills, social skills, etc. are equally considered in formal documents and educational plans, but in practice and in the field this aspect of education is not usually well structured or implemented. Most of the schools in Peru dont count with a psychologist as part of the educational team.

    3.6 What are the risks that can compromise the outcome of the Project? How is the Project organisation planning to minimize these risks?

    Logistics risks: The main problem affecting intervention in jungle zones is the difficulty for quick and safe personal and cargo transport due to the bad condition of jungle roads. To avoid a strong impact of this problem over the project we are selecting the intervention zones in terms of their proximity to main roads and highways, which are also the most populated rural towns, ensuring at the same time the completion of numeric goals. Environmental risks: Climatic condition in the jungle can vary rapidly during rainy season and episodes of heavy rain can affect rapidly and harshly the development of open air activities; the strategy to avoid this situation has been always to plan additional support from the community to rapidly count with closed rooms (such as schoolrooms, churches, youth houses, etc.) for activities like workshops, training, artistic activities, etc. In this situation community is always open to help the youth and the previous experience has helped to built strong bonds with local authorities and leaders that have openly expressed their support to the present and future initiatives to support youth. Due to this community commitment, the understanding of leaders and authorities and the involvement of youth parents; other sources of potential risks such as political, social or cultural are

  • 16

    virtually nonexistent.

    3.7 Will the Project create a new institution or procedure or is it going to support some existing structure?

    Following the lessons learned from previous interventions grass-roots organizations and community organizations support and willingness for co-operation is essential. A clear commitment not to establish any form of new organization that may be perceived as competing with local organizations will be formed. This means that also this project will continue working with established community organizations, in this case the youth organizations, and it will strive to reinforce their role in the communities. New organizations will be formed and summoned only in the case that changes in the structures of original youth organizations require it.

    3.8 How and when will the responsibility of the Project be transferred to the local government, local organisation or to the beneficiaries?

    The transfer of responsibilities will be accomplished at three levels:

    1. At regional and local governments level Through specific cooperation agreements with

    local and regional governments where the project will work, seeking the assistance of

    municipalities and regional governments offices related to youth development. Most of the

    support from local governments is in kind (material resources, equipment, or spaces for

    activities). The agreements usually define the time, conditions of use, places, and people

    responsible for the implementation of agreements. In the improbable case where formal

    agreements may take too much time to be signed and should affect the development of work

    with youth, the direct involvement of middle level officers is seeked (non city mayors or

    regional presidents) which are almost always the ones that are in charge of the contact with

    the project representing the highest community authority which are the town or city mayors

    or regional presidents. The youth enterprises will also be constituted as microenterprises

    under the Peruvian regulations and this enables the responsible government institutions at

    the municipal level to provide support for them. The main responsibility of the support for

    youth enterprises will be transferred to the local governmental institutions.

    2. At a community level Special care will be provided to detect and involve community adult

    volunteers, especially local teachers that usually are delighted to support youth development

    initiatives. The project will transfer knowledge, training tools and educational equipments to

    these volunteers to promote the sustainability of the results. The parents of the youth will be

    will be involved as parents and as members of adult community organizations. The aim is that

    they can in the future support the youth especially in exploring channels for financial support

    and achieving to meet the requirements for the support.

    3. At level of youth themselves The project will help strengthen the managerial capacities of

    youth community organizations, especially attending female youth, and it will transfer to t the

    responsibility to carry on the process after the implementation of the project.

  • 17

    The project will provide incipient support for the entrepreneurial activities and social initiatives of

    the youth groups but not a complete funding. The youth can complete their needed business

    capital with resources from their families, by developing fundraisers like the ones they are

    currently running or by seeking for micro credits. Youth groups already have fundraising strategies

    for self-sustainability purposes, usually financial needs of youth groups are not greater than their

    capacity of achieving funds. The support for small businesses aims not only at the survival of the

    youth groups but mainly to the development of businesses initiatives leaded by the youth that

    may also serve as development pole for the whole community, and of course for youth families as

    well. It is crucial that new entrepreneurs do not fully depend on NGOs or charity organizations

    support, which could decrease the sustainability of the project and the activities of the youth.

  • 18

    4. Beneficiaries

    4.1 Who are the direct beneficiaries of the Project? How many are they (approx.)?

    - 650 vulnerable youth organized in 65 youth groups, with equal participation of men and

    women. At least 5 of the groups will be from the native communities of Kechua-Lamisto from

    San Martin and Ashaninka from VRAE. 35 micro enterprises will be supported.

    - Community volunteers

    4.2. Who are the indirect beneficiaries of the Project?

    Approximately 650 families composed of 3,000 members (5 members per youth served) and the communities involved in the project. If the project support applied for is 20.000 or more, please answer the following question:

    4.4 Define the nature of participation in the Project by each group of beneficiaries.

    Youth: The youth have participated in the planning process as detailed in section 3.4., and they will participate in the implementation with focus to two types of skills development: Life skills and entrepreneurial skills.

    Youth will participate actively in the development of social entrepreneurship initiatives proposal and implementing, these initiatives would be evaluated and supported according to the importance for the community according to a criteria defining most relevant issues (environmental concern, cultural identity, public health, youth leadership and civic involvement). The evaluation will be carried out by the youth groups themselves, with support from the projects promoters, according to problem analysis and basic diagnostic done by the groups. Post implementation assessment will be done based in the completion of the objectives and activities proposed in the presented plans.

    Local volunteers: the project will seek the active involvement of community volunteers especially between community leaders that are already relevant for the local youth (teachers, local authorities, involved parents, etc.). These leaders will serve as liaisons between the youth and the local leaders. They will also be trained, depending on their availability, in projects strategies. They will be involved in the training strategy of the project. The volunteers will also provide expertise and training in their specialties for the benefit of the project and the youth groups (for instance the teachers).

    Local authorities: The project will work with the Apus and Jefes (elected native local authorities recognized by the communities), city and town mayor and public officers in order to achieve their collaboration for an adequate development of native and non native youth initiatives. For all purposes of work with native communities, Apus and Jefes have to be consulted and their permission has to be obtained first to get the collaboration of the whole native community, as an example with places for the youth groups to work or to get the permission from the parents to allow youth to participate.

  • 19

    5. Objective, plan of action, monitoring and information Objectives

    5.1 What is the long-term development objective of the Project?

    Young peoples participation on the development is an essential element in poverty reduction. Considering this, the long-term development objective of the project is to contribute to national and regional efforts for the improvement of youth economy and the promotion of youth entrepreneurship, determining young people as key actors in local development.

    5.2 What is the direct objective of the Project? (Limited by the area of implementation and the group of beneficiaries)

    The direct objective of the project is to improve self-sustainability of 65 youth groups through entrepreneurship and strengthen leadership, occupational and life skills of 650 disadvantaged youth in selected localities of the San Martin and VRAE (Apurmac and Ene River Valleys) Regions in Peru. If the project support applied for is 20.000 or more, please answer the following question: (those applying for a smaller amount of support may also answer if they wish)

    5.3. What are the results targeted by this Project?

    Result 1: Young people have obtained knowledge and capacity on entrepreneurship, occupational

    and leadership skills and life skills.

    - Determination of a baseline on leadership, entrepreneurial and life skills (first year).

    - 650 disadvantaged youth organized in at least 65 youth groups, 50 from San Martin region and

    15 from VRAE (Apurmac and Ene River Valleys) region, have benefited from the market

    oriented entrepreneurship trainings. Their skills have improved significantly.

    - 650 disadvantaged youth organized in at least 65 youth groups, 50 from San Martin Region

    and 15 from VRAE (Apurmac and Ene River Valleys) Region, have benefited from life skills

    trainings. Their skills have improved significantly.

    - 150 youth leaders have strengthened their entrepreneurial and leadership skills and are able

    to replicate the acquired knowledge with their peers through the entrepreneurship and

    community service initiatives.

    Result 2: Youth groups self-sustainability and social participation has improved significantly.

    - 65 youth groups have had an opportunity to present fully developed business plans to a

    selection process of 35 micro enterprises.

    - 35 micro enterprises (25 from San Martn Region and 10 from VRAE Region) have been

    supported and in full development by the end of the project with starting resources.

  • 20

    - 65 youth groups have had an opportunity to develop and present social service initiatives and

    195 social service initiatives have been implemented by youth groups by the end of the

    project.

    - Greater inclusion of the youth, especially girls, in the economical and political life of their

    communities has been achieved.

    Result 3: Mode of operation networking between youth groups has been created and networking of

    young people has increased significantly.

    - 65 youth groups count with a youth directory providing information that will help youth keep

    in contact with their peer organizations and other organizations that may support them.

    - Networking with private and public sectors has been promoted to improve youth groups and

    young peoples training, participation and entrepreneurship opportunities. Initial contribution

    and support (in kind and/or financial) for the youth groups entrepreneurial projects have

    been obtained from local sources.

    In addition, mobile technology solutions have been tested and implemented for the benefit of youth entrepreneurship.

  • 21

    Implementation

    5.4 Describe the activities by which the results and immediate objectives are to be accomplished. If possible, please also give a rough timetable (by year) of project implementation.

    The following strategies will encompass the activities developed as part of this project: 1. Training and transfer of methodologies: This will consider the training of youth and also the training of community volunteers. 2. Elaboration of businesses and social development plans: Using learned skills, youth will develop their own plans. 3. Networking: This component includes the establishments of networks supporting youth initiatives, between the youth but also including authorities, community leaders and other businesses, attempting to introduce youth in pre existing production chains.

    Result 1: Young people have obtained knowledge and capacity on entrepreneurship, occupational

    and leadership skills and life skills.

    - Determination of a baseline on leadership, entrepreneurial and life skills (first year). Baseline

    will be determined through surveys developed by projects promoters during the first month

    of the project; all data collected will be analyzed in a report. The indicators for the baseline

    will be developed based on the projects results.

    - Training workshops on youth entrepreneurship, social and economic, and elaboration of

    businesses plans (1 for each issue, during the first and second year). 650 disadvantaged youth

    organized in at least 65 youth groups, 50 from San Martin region and 15 from VRAE (Apurmac

    and Ene River Valleys) region benefit from the market oriented entrepreneurship trainings.

    This training will be developed specifically for this project based on materials previously

    developed by CEDRO. Skills considered for this training will be:

    Achievement motivation and entrepreneurial experience.

    Features and attributes of the enterprising person.

    Vision of future and self confidence.

    Features to manage and run a venture: setting goals, proactivity, leadership and

    self-efficacy.

    Costs and benefits of finishing an education.

    Sources and employment opportunities.

    Vocational guidance and employment opportunities.

    Corporate entrepreneurship: Capital and labour.

    Characteristics of the entrepreneur.

    Success factors: productivity, quality and profitability.

    Business plan: Business Idea.

    Basic marketing strategies.

  • 22

    Production process: flow of operations.

    Saving and investment.

    Sales, costs and earnings

    - Training workshops for the development of life skills (twice a year, first and second year). 650

    disadvantaged youth organized in at least 65 youth groups, 50 from San Martin Region and 15

    from VRAE (Apurmac and Ene River Valleys) Region benefit from life skills trainings. A life skills

    primer already developed by CEDRO will be adapted for the reality of the region), based

    primarily in the following skills (adaptation will be minimal since contents have been already

    used in other parts of the region with success):

    Interpersonal or social skills including communication, skills for

    negotiation/refusal, confidence, cooperation and empathy.

    Cognitive abilities, including solution of problems, understanding of

    consequences, decision making, critical thinking and self-assessment.

    Skills for the control of emotions, including stress, feelings, the control and the

    monitoring staff.

    - Reinforcement training workshops on leadership skills (twice a year, first year). 150 youth

    leaders strengthen their entrepreneurial and leadership skills and are able to replicate the

    acquired knowledge with their peers through the entrepreneurship and community service

    initiatives.

    o This training will be based on the guide Youth organization and leadership for

    development, developed for the training sessions of the previous projects.

    - Printed materials (posters and flyers) for the diffusion of entrepreneurial values and skills

    (during the three years).

    o These support materials used in the diffusion of information, will be designed in

    CEDROs headquarters and printed locally, then sent to intervention zones where the

    promoters will deliver them to youth, schools and other stakeholders.

    - Printed materials (posters and flyers) for the diffusion of life skills and its importance on

    youths development (during the three years).

    o These support materials used in the diffusion of information, will be designed in

    CEDROs headquarters and printed locally, then sent to intervention zones where the

    promoters will deliver them to youth, schools and other stakeholders.

    - Evaluation and monitoring process according to baseline (third year).

    Result 2: Youth groups self-sustainability and social participation has improved significantly.

    Entrepreneurship

    - Convoking and tuning up process of all youth groups plans (1 process per year for 65

    initiatives).

  • 23

    - 65 youth groups have had an opportunity to present fully developed business plans to a

    selection process of 35 micro enterprises which will receive a basic support (non financial,

    equivalent to 400 euros each) for the development of enterprises.

    - Technical assistance and accompanying process for the implementation of small businesses

    plans (continuous process, during second and third years). After the project all of the youth

    groups have developed a microenterprise business plan.

    o This is the continuous support and accompanying of the promoters to the ongoing

    business plans, necessary to control the implementation of plans and to provide advice

    in case that plans needs to be adjusted for a better implementation.

    o Through a competition, the most prominent business plans of 35 youth groups will

    acquire projects material support for the implementation of their plans with the

    perquisite of additional funding obtained from other sources. The remaining youth

    groups will be assisted in exploring alternative sources for funding.

    - Basic support (non financial) with raw materials and basic tools for the implementation of

    youth small businesses plans. (35 plans per youth group, 15 during the first year and 20 during

    second year; 25 from San Martn Region and 10 from VRAE Region).

    o The groups have to ensure also a local contribution for instance from municipalities,

    the community, etc. In the budgeting the micro enterprises will consider CEDRO as one

    of the resources providers only. To enhance the sense of ownership and direct the

    responsibilities to the youth themselves they will be required to provide a counterpart

    of their own, not necessarily money but their volunteer work or what they can

    leverage with fundraisers or direct contributions from parents, churches, schools or

    other contributors to youths efforts.

    - Post plan implementation additional training and reinforcement on entrepreneurship (1

    training during second and third years).

    o This is a post plan implementation training and exit training to reinforce the

    entrepreneurial skills developed as part of the primary training process.

    Social participation

    - Workshops for the development of youth community service plans (1 each year).

    - Basic support (non financial) with raw materials and basic tools for the implementation of 195

    youth community service plans (1 plan per youth group, 65 per year).

    - Technical assistance and accompanying process for the implementation of youth community

    development plans (continuous process during the three years).

    - 65 youth groups develop and present social service initiatives and 195 social service initiatives

    are implemented by youth groups by the end of the project. The project will provide support

    equivalent to 200 (two hundred euros) on equipment or basic resources for each project,

    equipment or resources will be property of youth groups and community for further

    development. These will not be cash contributions, but equipment etc. These training

  • 24

    workshops will help the youth to develop their community services plans; it will work on the

    following skills:

    o Concept of project.

    o Diagnostic and determination of a problem.

    o How to elaborate objectives based on problem analysis.

    o Solutions to problem brainstorming

    o How to elaborate an activities chart.

    o Simple evaluation of activities.

    - Convoking and tuning up process of all youth groups plans (1 process per year for 65

    initiatives).

    - Community service youth projects will be collected and evaluated, if theres need to correct

    some aspects, the projects will be sent back to the groups to make proper amendments with

    the help of their promoters. Once the projects are clear and well stated the support will be

    effective, important aspects are that the projects should clearly include counterpart

    contribution from the youth group and also from a community contributor. Support will be

    acquired locally.

    - Technical assistance and accompanying process for the implementation of youth community

    development plans (continuous process during the three years).

    - Promoters will provide technical assistance to groups for the formulation, implementation and

    evaluation of projects.

    Result 3: Mode of operation networking between youth groups has been created and networking of

    young people has increased significantly.

    - Elaboration of a database and directory of resources and organizations that support youth

    initiatives. (continuous process during the three years)

    o The promoters will provide contact information about organizations and institutions

    that can compromise and provide resources and support of any kind to youth

    initiatives, so this information can be posted and diffused using online databases and

    text messages. This will be a continuous process.

    - Development to secure that 65 youth groups will count with a youth directory providing

    information that will help youth keep in contact with their peer organizations and other

    organizations that may support them.

    - Networking with private and public sectors is promoted to improve youth groups and young

    peoples training, participation and entrepreneurship opportunities. Initial contribution and

    support (In kind and/or financial) for the youth groups entrepreneurial projects will be

    obtained from local sources.

    - Development of a communication platform and contents to provide continuous and relevant

    information on youth development and supporting youth initiatives, provided by CEDRO and

    other partners according to the project goals (Starting in the first half of the first year of the

    project until the end).

  • 25

    - Online database will be designed and uploaded in free hosting services and information

    groups (yahoo groups and facebook) and also will be sent using text messaging services.

    o This will be done based on contact information provided by promoters and databases

    collected , a proposed above, but also to provide continuous information on

    entrepreneurship, life skills, youth news, other funding opportunities, etc. Platform will

    use free services to ensure sustainability of this initiative (facebook, yahoo groups and

    other similar platforms).

    - 10 mobile phones with text messaging capabilities for clustered youth groups according to

    geographical vicinity.

    o Mobile phones will be provided to youth groups to extend information about business

    opportunities, youth initiatives opportunities and contact information on resources.

    - Publication online of the database and in printed journals/directories each for every working

    youth group (Online update process twice a year, March and December. On printed materials

    the update will be once a year. Both processes will be done each year during the three years).

    In addition, mobile technology solutions will be tested and implemented for the benefit of youth entrepreneurship in cooperation between FCYF, Nokia and CEDRO. If the project support applied for is 20.000 or more, please answer the following question:

    5.6 Describe the implementation and monitoring organisation of the Project and the responsibility of each party therein.

    FCYF will be closely involved with the implementation and monitoring throughout the project cycle. CEDRO is responsible for the implementation of the project on the field and will provide financial and programmatic reports as determined by FCYF. Projects staff in the field (named promoters) will be in charge of the implementation of activities with beneficiaries under the supervision of Projects Coordinator, who is the manager defined by CEDRO and ultimately responsible for the implementation and the results of the project. It is also responsibility of CEDROs staff to gather quantitative and qualitative data according to the technical monitoring strategy determined by the project manager along with the staff. Information provided by the monitoring process will be available at FCYF request and will also be provided to CEDROs executive officers for process evaluation. In addition monitoring information will be reported to beneficiaries, being those youth leaders, involved authorities, community leaders, other donors and other stakeholders that may be become involved in the future in the implementation of the proposal. The project participants, community volunteers, donors and other stakeholders participate actively in the project development.

  • 26

    Monitoring

    5.7 How do the responsible persons of the Finnish organisation follow the implementation of the Project and the use of financial resources? How do they participate in its implementation?

    FCYF holds an overall responsibility of the project implementation. The main people in charge of the project management in FCYF are development manager and development cooperation coordinator. On the basis of the project agreement funding will be released only after the review and approval of the narrative and financial reports which will be submitted by CEDRO to FCYF twice a year. CEDRO will also provide FCYF quarterly financial reports and monthly status reports. FCYF will be in regular e-mail (and telephone) contact with CEDRO through exchanging information about the project, its implementation and progress. In addition FCYF will carry out a project monitoring trip once a year.

    5.8 How do the local co-operation Partners follow the implementation of the Project and the use of financial resources?

    The monitoring process will be carried out by the projects Manager and an appointed Monitoring Specialist with the alternative support from CEDROs monitoring and evaluation unit. CEDRO conceives the monitoring process as a permanent process, with consecutive steps:

    Establishment of a situational diagnostics of the intervention areas during the pre project phase.

    Establishment of a baseline that includes a comprehensive database of beneficiaries as part of the projects start.

    Evaluation process through the measurement of qualitative and quantitative advances applying especially designed tools. Process is performed on a monthly basis.

    Data gathered is consolidated, analyzed and used in the elaboration of reports.

    Development and socialization of evaluation results with beneficiaries in order to obtain a feedback that will contribute to the reorientation of actions and to compile lessons and good practices learned.

    Project final measuring process that includes an exit evaluation, systematization of the experience and elaboration of the projects final report.

    The periodicity for data collection is quarterly for financial reports and every six months for technical reports as requested by FCYF. An executive summary will be produced monthly for projects management, stakeholders reporting and CEDROs executive areas. Monitoring tools will be:

    Brief surveys for key referrals: applied on a quarterly basis.

    Pre- and post-test for the training courses: applied in each training activity.

    Activities reporting formats.

  • 27

    Participants lists duly signed.

    Observation records for qualitative assessment: used whenever needed and depending on the activity, mainly for massive activities.

    Audiovisual records, depending on the needs of the activity. The analysis of the information gathered allows:

    A comparison of actual activities versus project planned activities.

    A comparison of results by period.

    An estimation of future results.

    Decision making for minimal changes in the orientation of the project. The information gathered will statistically analyzed, preferably using central and positional tendency measures and systematized in numeric tables, graphs and/or written reports, according to targets and reporting needs. The reports will be presented in compliance with Ministrys formats and FCYF indications. The report to be submitted will include two essential components: Operative Report: showing the results and advances of the implementation at a specific moment of the project, Financial Report: showing the project accounts at a specific moment of the project. This report provides feedback to the persons in charge of the project and lets them know the financial results for a defined period so as to define any necessary reprogramming. As a parallel task, the monitoring data helps gather and systematize information regarding lessons learned. The institutions executives receive progress reports as a result of the monitoring process which helps them make any reprogramming, if necessary.

    5.9 What kind of numerical or other data will be collected on the advancement of the Project?

    Matrix of data collected by Project objectives

    Project objectives Type of data Technique used

    Tool

    1. Young people have obtained knowledge and capacity on entrepreneurship, occupational and leadership skills and life skills.

    Quantitative and qualitative data will be used to measure baseline, impact-oriented monitoring, and evaluation of final results.

    Direct report. Surveys. Structured observation.

    Report formats for each training activity. Lists of participants. Pre-post tests. Observational reports. Audiovisual record.

    2. Youth groups self-sustainability and social participation has

    Quantitative and qualitative data will be used to determine

    Surveys. Structured observation.

    Questionnaires to key informers. Observation formats

  • 28

    improved significantly. increase in both indicators (self sustainability and social participation).

    Focus groups.

    developed by projects staff. Periodical youth meetings.

    3. Mode of operation for networking between youth groups has been created and networking of young people has increased significantly.

    Quantitative and qualitative data.

    Contacts information gathering. Database hosting. Phone Messaging.

    Elaboration and publications of database, online and printed. Messaging report and statistics.

    5.10 Where and how will the accounting and audit of the Project be arranged?

    Audits will be carried out by international audit companies in Finland and Peru. Auditing process will be developed according to FCYF requirements, according to governmental standards and regulations and meet the highest standards in Peru. For auditing purposes, external auditing agencies with international prestige are convoked and selected after a bid process. Financial reports, as well as operative, will be provided to donor depending on a jointly fixed timeline; the development of the reports will follow exactly the templates and information requirements provided by FCYF.

    5.11 Will the organisation evaluate the Project during its implementation or afterwards? If the answer is yes, please describe how it will be carried out.

    FCYF will evaluate the project through reports and annual monitoring visits. CEDROs project evaluation systems The purpose of CEDROs Project Evaluation System is to maintain an information system that allows:

    1. The identification of goals, results and impact achieved in each phase of a project, submitting timely reports with necessary and adequate information.

    2. A management and feedback instrument for the Executive Director and the Technical Assistance Unit.

    3. The availability of a database that provides realistic goals for future phase of the ongoing projects.

    The specific objectives of the Evaluation System can be defined as:

  • 29

    1. A tool to provide project stakeholders (funding source, executors and beneficiaries) with periodic statistical reports that reflect progress and impact achieved to date on the target population.

    2. A tool to integrate the information received from the institutions units involved in the development of project activities, providing a comprehensive perspective of the whole.

    3. A tool that allows the periodical comparison of project progress, identifying areas or programs that require further strengthening.

    4. A tool that provides all parties involved access to the consolidated information and timely feedback on process goals achieved.

    The process implies the development of several sequential and supplementary processes, adequately adapted to the needs of the area of intervention. These sequential steps could be described as follows:

    1. Definition of basic supplies (human resources, materials, equipment and services) based on methodology of intervention and administration implemented by the programs.

    2. Process implementation to achieve goals set forth in the annual action plan. Processes are developed through an integral set of activities.

    3. Implementation and management actions generate goods and/or services that are delivered to the target population as intervention products.

    4. The delivery of products to the target population generates an impact, understood as the change on the core problem brought about by the program.

    5. Results and impact are evaluated using specific methodologies with the continuous and direct participation of the beneficiaries.

    With respect to the selection of indicators, the Project Evaluation System uses effect and effectiveness indicators that are included in the logical frame matrix built. To accomplish a comprehensive vision of the programs and projects evolution, it is necessary to have different information sources: 1. Monthly reports issued by the promoters from every intervention zone, responsible for the

    execution of specific aspects of the project, using specially designed formats. 2. Supporting information on activities developed, including lists of participants, pictures, newspaper

    clippings, databases, publications, etc. 3. Field supervisions of concrete actions developed and both quantitative and qualitative

    evaluations.

  • 30

    Information

    5.12 Describe how the organisation will inform about the Project. Give details on the goals, target groups, information material and information channels.

    FCYF updated its communication strategy in 2010. The foundation will intensify its efforts in increasing the awareness of its development cooperation work among the key stakeholders and the general public. FCYF will inform its stakeholders (Finnish and international NGOs, donors, corporate partners and other organisations, public officials, researchers and others) and the Finnish in general about the project, about its execution, its outcomes and significance to the sustainable development efforts in Paraguay through the following media:

    Internet: FCYFs homepage (www.slns.org; www.nuori.fi), e-Newsletters, linked homepages of FCYFs national and international partners.

    Printed media

    Seminars, conferences and workshops (either organized or attended by FCYF) CEDROs Communication Strategy: Objectives: Achieve project recognition as a viable proposal to improve the lives of young people. Gain the cooperation of the stakeholders and the communities Assist the project's sustainability. Recipients Selected Public and Private Institutions of the Community District Organizations Direct and indirect beneficiaries NGOs General Public Strategies Presenting the project to various stakeholders. Develop leaflets with information about the project Distribute summary information on youth events to unfold. Distribute posters and leaflets with information about the project Use social networks to disseminate activities

    6. Free-form description of the Project and its operation (optional: if the other questions in this form are not suitable or sufficient to describe the Project, please use this space to give additional information)

  • 31

    6. Budget

    Budget Peru Nokia 2012 2013 2014 Total

    1. Personnel costs (Appendix 1)

    Salaries and related costs of Finnish personnel 13950 14649 15381 43980

    Travel and accommodation of Finnish personnel 0 0 0 0

    Salaries and related costs of local personnel 38178 38178 38178 114534

    Other personnel costs 0 0 0 0

    Value of Finnish voluntary work 0 0 0 0

    Personnel costs, subtotal 52128 52827 53559 158514

    2. Activity costs (e.g. training) (Appendix 2) Fees of hired experts 50100 50600 50600 151300

    Other costs 27920 29920 21920 79760

    Activity costs, subtotal 78020 80520 72520 231060

    3. Materials, procurements and investments (Appendix 3) Procurement of materials and appliances 5610 2700 2700 11010

    Construction 0 0 0 0

    Other procurements 0 0 0 0

    Value of donated goods 0 0 0 0

    Materials, procurements and investments, subtotal 5610 2700 2700 11010

    4. Operation and maintenance (Appendix 4)

    Operation costs 1200 1200 1200 3600

    Maintenance costs 600 600 600 1800

    Operation and maintenance, subtotal 1800 1800 1800 5400

    5. Monitoring, evaluation and information (Appendix 5) Personnel costs and external services 19072 18769 22963 60804

    Travel and accommodation 10370 10384 13458 34212

    Other costs 3000 3000 3000 9000 Information costs in Finland (max. 5 % of total project costs) 10000 10000 10000 30000

    Monitoring, evaluation and information, subtotal 42442 42153 49421 134016

    Total implementation costs 180000 180000 180000 540000

    6. Administrative costs (Appendix 6) Salaries and related costs of administrative personnel 10000 10000 10000 30000

    Office costs 3000 3000 3000 9000

    Fund-raising costs (excluding information costs) 4500 4500 4500 13500

    Statutory audit costs of the Finnish organisation 2500 2500 2500 7500

    Value of Finnish voluntary work in administration 0 0 0 0

    Total administrative costs 20000 20000 20000 60000

    Total project costs 200000 200000 200000 600000

    Administrative costs as a % of total costs (max. 10%) 10,00 10,00 10,00 10,00

  • 32

    Financing plan 2012 2013 2014 Total

    1. Self-financing (Appendix 7) Cash contributions 30000 30000 30000 90000

    Voluntary work and material donations 0 0 0 0

    Total self-financing 30000 30000 30000 90000

    Self-financing as a % of total project costs 15,00 15,00 15,00 15,00

    2. Project support from the Ministry for Foreign Affairs Earlier allocation of project support

    0 0 0

    New/additional application 170000 170000 170000 510000

    Total financing 200000 200000 200000 600000

  • 33

    8. Development objectives and cross-cutting themes of the Project

    8.1. What is/are the development objective(s) of the Project? Mark one main objective and max. 3 other significant objectives:

    Main objective Other objective

    x Abolishing extreme poverty and famine

    Extending elementary education to all

    x Improvement of gender equality and the situation of women

    Diminishing infant mortality

    Improving the health of pregnant women

    Work against HIV/Aids

    Work against malaria and other significant illnesses

    x Sustainable development of the environment

    Access to clean water

    Improving living conditions in the slums

    x Improving the working conditions of the private sector and increasing economic interaction

    x Advancing democracy human rights and good governance

    Advancing the state of peace and security

    Developing a just and regulated international trade and financial system

    Solving the debt problem of developing countries using national and international means

    x Bringing the benefits of using new technology and especially information technology to developing countries in co-operation with the private sector

    x None of the above. Other explain. Promoting youth entrepreneurship and young people as key actors in local development.

    If the project support applied for is 20.000 or more please answer the following question:

    8.2 How does the Project plan take into account the Poverty Reduction Strategy Paper (PRSP) or other equivalent national plans of the developing country concerned? If it has not been taken into account please justify:

    The project will contribute to the achievement of the Millennium Development Goals, especially on the following goals: Objective 1: Eradicate extreme poverty and hunger. Youth employment and young peoples participation in the development are essential elements in poverty reduction. The project seeks to promote youth groups economic sustainability, entrepreneurship and young people as the key actors in local development.

  • 34

    Objective 3: Promote gender equality and empower women.

    The project will aim at promoting the gender equality by encouraging the equal participation of both young women and men, and by giving special emphasis to the participation of young women.

    Objective 8: Develop a global partnership for development

    The project will contribute particularly to the achievement of the Target 16: Develop decent and productive work for youth. The project will also contribute to the Target 18 of the same MDG: In cooperation with the private sector, make available the benefits of new technologies, especially information and communications technologies. The project will enhance young peoples knowledge on new technologies needed for the successful entrepreneurship. Perus Poverty Reduction Strategy was approved in 2004. Its main focus is:

    Development of human capabilities, with a focus on children below 2 years.

    Promotion of economic and productive opportunities and capacities.

    The establishment of a social protection safety net for vulnerable groups.

    Budget protection of 6 priority social programs.

    Emphasis on civil society participation in design, implementation and monitoring of poverty reduction programs.

    This Project contributes particularly to the development of human capabilities and to the promotion of economic and productive opportunities. Indigenous people are among the most vulnerable in Peru and directing part of the Project activities especially to indigenous youth, the Project will also contribute to their social protection.

    8.3. Cross-cutting themes of development policy

    The dvelopmen policy program of the Finnish government contains a number of cross-cutting themes that are to be taken into account in all development activities.

    Instructions: In the column "impact" please mark a sign as advised below according to the impact this Project is estimated to have. Justify with one sentence the most important positive and negative impacts of the Project.

    Options:

    ++ significant positive impact

    + positive impact

    0 no impact

    - negative impact

    Themes Impact Justification/Additional information

    Impact on the Environment

    Access to clean water and 0

  • 35

    sanitation

    Environmental distress (soil, water, atmosphere, waste) 0

    Protection of biodiversity +

    Sustainable use of natural resources (incl. Energy, consumption, erosion) 0

    Reducing gender inequality

    Division of work between men and women ++

    The project will promote equal participation of men and women

    Women's access to income and their right to possess +

    Women's participation in decision making ++

    The project will foster women participation in decision making processes.

    Sexual health and reproductive rights 0

    Reducing violence +

    Equal opportunities to education +

    Supporting the most vulnerable groups (the disabled, ethnic or religious minorities, aboriginals, children)

    The most vulnerable groups as members of the community (the attitudes towards the most vulnerable) ++ The project will improve opportunities for native youth.

    Empowerment of the most vulnerable groups ++ The project will empower vulnerable youth.

    Equal rights of the most vulnerable groups ++

    The project will promote equal access to economic development opportunities.

    Good governance and enhancing democracy

    Reducing corruption 0

    Strengthening the local skills on good governance 0

    Transparency of financial management and information (among implementors) +

    Improving information exchange in the civil society +

    Improving involvement in the civil society +

  • 36

    9. Signatures Place and date Place and date Signature Signature Name in capitals Name in capitals Position Position Appendices

    Any applicable agreements, requests for assistance, authorisations, etc.