3bse062592 en integrated process and power automation
TRANSCRIPT
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
1/65
ABB GroupMay 5, 2010 | Slide 13BSE062592
Electrical Integration with System 800xA
Integrated Process and Power AutomationABB Open Control Systems 2010-05-05
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
2/65
ABB GroupMay 5, 2010 | Slide 23BSE062592
Outline
What is Electrical Integration?
ABBs solution: Integrated Process and Power Automation
Customer benefits
References
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
3/65
ABB GroupMay 5, 2010 | Slide 33BSE062592
Outline
What is Electrical Integration?
ABBs solution: Integrated Process and Power Automation
Customer benefits
References
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
4/65
ABB GroupMay 5, 2010 | Slide 43BSE062592
What is Electrical Integration?
Electrical Integration is the integration of ProcessAutomation and Power Automation into one system
Process Automation
Process Instrumentation
Measurement and control ofpressure, temperature, flow
Process Electrification
Monitoring and control of motors,pumps, fans
Power Automation
Substation Automation
Protection, monitoring andcontrol of generators,transformers, switchgear
Power Management
Advanced control of power
distribution
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
5/65
ABB GroupMay 5, 2010 | Slide 53BSE062592
What is Electrical Integration?Electrical components in the plant
Power Generation
Transformer
Transformer
Generator
Protection &Control IED
Protection& ControlIED
VariableSpeedDrive
VariableSpeedDrive
MotorController
LVSwitchgear
Transformer
Transformer
Gridconnection
Protection &Control IEDs
Protection &Control IED
LV
MV
HV
Motors
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
6/65
ABB GroupMay 5, 2010 | Slide 63BSE062592
What is Electrical Integration?Electrical components in the plant
Power Generation
Transformer
Transformer
Generator
Protection &Control IED
Protection& ControlIED
VariableSpeedDrive
VariableSpeedDrive
MotorController
LVSwitchgear
Transformer
Transformer
Gridconnection
Protection &Control IEDs
Protection &Control IED
LV
MV
HV
Motors
ProcessAutomation
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
7/65
ABB GroupMay 5, 2010 | Slide 73BSE062592
What is Electrical Integration?Electrical components in the plant
Power Generation
Transformer
Transformer
Generator
Protection &Control IED
Protection& ControlIED
VariableSpeedDrive
VariableSpeedDrive
MotorController
LVSwitchgear
Transformer
Transformer
Gridconnection
Protection &Control IEDs
Protection &Control IED
LV
MV
HV
Motors
Power
Automation
ProcessAutomation
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
8/65
ABB GroupMay 5, 2010 | Slide 83BSE062592
What is Electrical Integration?Users of Electrical Integration
Power Plants
Where power is generated
Process Plants
Where power is consumed to run theprocess
Power Generation
Power ConsumptionPowertransmissionand distribution
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
9/65
ABB GroupMay 5, 2010 | Slide 93BSE062592
What is Electrical Integration?Objectives of Electrical Integration
Power Plants
Optimized utilization of generating
capacity
Process Plants
Oil & Gas
Maximize production keep the process running
Pulp & Paper, Metals & Mining
Manage electricity as a raw material cost
Power Generation
Powertransmissionand distribution
Power Consumption
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
10/65
ABB GroupMay 5, 2010 | Slide 103BSE062592
Electrical IntegrationTraditional approach
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
11/65
ABB GroupMay 5, 2010 | Slide 113BSE062592
Electrical IntegrationTraditional approach
Many protocols,lack of globalstandard
Separate systemfor powerautomation
Organizationalbarriers among
process and powerdepartment
Device specificsolutions ofintegration into DCS
A lot of hardwiringneeded
Lack of informationfrom electricaldevices
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
12/65
ABB GroupMay 5, 2010 | Slide 123BSE062592
Outline
What is Electrical Integration?
ABBs solution: Integrated Process and Power Automation
Full Plant Integration with System 800xA
Electrical Integration Based on Open Standards
Complete Portfolio from ABB
Customer benefits
References
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
13/65
ABB GroupMay 5, 2010 | Slide 133BSE062592
Electrical IntegrationTraditional approach
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
14/65
ABB GroupMay 5, 2010 | Slide 143BSE062592
Integrated Process and Power AutomationElectrical Integration with System 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
15/65
ABB GroupMay 5, 2010 | Slide 153BSE062592
Integrated Process and Power AutomationElectrical Integration with System 800xA
Full PlantIntegration withSystem 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
16/65
ABB GroupMay 5, 2010 | Slide 163BSE062592
Integrated Process and Power AutomationElectrical Integration with System 800xA
ElectricalIntegrationBased on OpenStandards
Full PlantIntegration withSystem 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
17/65
ABB GroupMay 5, 2010 | Slide 173BSE062592
Integrated Process and Power AutomationElectrical Integration with System 800xA
ElectricalIntegrationBased on OpenStandards
Full PlantIntegration withSystem 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
18/65
ABB GroupMay 5, 2010 | Slide 183BSE062592
Integrated Process and Power automationFull Plant Integration with System 800xA
Commoninformation
management
Centralized
Historian andData Archiving
Common assetmanagement
Commonsystem
architecture
Common engineering Commonoperations
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
19/65
ABB GroupMay 5, 2010 | Slide 193BSE062592
Integrated Process and Power AutomationElectrical Integration Based on Open Standards
System 800xA fully supports open standards for bothProcess and Power Automation
Power Automation
IEC 61850
Process Electrification
Profibus, Profinet, Modbus, Modbus TCP, DeviceNet
Process Instrumentation
Foundation Fieldbus, Hart, Wireless Hart, Profibus
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
20/65
ABB GroupMay 5, 2010 | Slide 203BSE062592
Integrated Process and Power AutomationElectrical Integration Based on Open Standards
What is IEC 61850?
Global standard for substation automation systems
Benefits
Provides interoperability between Protection & ControlIEDs (Intelligent Electronic Devices)
Open and flexible standard for future extensions
Future proof by choice of Ethernet based communicationfor cost effective, fast and reliable data transmission
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
21/65
ABB GroupMay 5, 2010 | Slide 213BSE062592
Integrated Process and Power AutomationElectrical Integration Based on Open Standards
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
22/65
ABB GroupMay 5, 2010 | Slide 223BSE062592
Integrated Process and Power AutomationComplete Portfolio from ABB
Main Electrical
Contractor
Main Automation
Contractor
Integrated Process and Power Automation
ControlSystem
HV/MV
PowerDistri-bution
LV
PowerDistri-bution
Intelli-
gentSwitch-gears
Drives Motors SafetySystems TelecomSystems
Intelli-gent
FieldInstru-ments
Analyzers ConsultingServices
Expertise andConsulting services
O li
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
23/65
ABB GroupMay 5, 2010 | Slide 233BSE062592
Outline
What is Electrical Integration?
ABBs solution: Integrated Process and Power Automation
Customer benefits
Reduced Investment Costs
Improved Operator Effectiveness
Reduced Maintenance Costs
Increased Plant Availability
References
C B fi
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
24/65
ABB GroupMay 5, 2010 | Slide 243BSE062592
Customer BenefitsReduced Investment Cost
C t B fit
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
25/65
ABB GroupMay 5, 2010 | Slide 253BSE062592
Customer BenefitsReduced Investment Cost
C t B fit
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
26/65
ABB GroupMay 5, 2010 | Slide 263BSE062592
Customer BenefitsReduced Investment Cost
C stomer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
27/65
ABB GroupMay 5, 2010 | Slide 273BSE062592
Customer BenefitsReduced Investment Cost
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
28/65
ABB GroupMay 5, 2010 | Slide 283BSE062592
Customer BenefitsReduced Investment Cost
Reduced system footprint by one integrated system
Reduced wiring with Ethernet based solutions
Shortened project execution and commissioning time by using
standardized control logic, libraries and testing
Reduced project risk by choosing ABB with complete portfolio,experience and know how in both power and automation
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
29/65
ABB GroupMay 5, 2010 | Slide 293BSE062592
Customer BenefitsImproved Operator Effectiveness
Power groupProcess group
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
30/65
ABB GroupMay 5, 2010 | Slide 303BSE062592
Process group Power group
Customer BenefitsImproved Operator Effectiveness
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
31/65
ABB GroupMay 5, 2010 | Slide 313BSE062592
Process group Power group
Customer BenefitsImproved Operator Effectiveness
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
32/65
ABB GroupMay 5, 2010 | Slide 323BSE062592
Process group Power group
Customer BenefitsImproved Operator Effectiveness
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
33/65
ABB GroupMay 5, 2010 | Slide 333BSE062592
Process group Power group
Customer BenefitsImproved Operator Effectiveness
Same operator interface for process and power group enablescollaboration
Consistent operating philosophy reduces risk of errors
Common access point for both process and power data providesfaster error analysis
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
34/65
ABB GroupMay 5, 2010 | Slide 343BSE062592
!
"
Customer BenefitsReduced Maintenance Costs
*Survey completed by ARC Advisory Group
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
35/65
ABB GroupMay 5, 2010 | Slide 353BSE062592
!
"
Customer BenefitsReduced Maintenance Costs
*Survey completed by ARC Advisory Group
Typical AssetManagement areas*
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
36/65
ABB GroupMay 5, 2010 | Slide 363BSE062592
!
"
Customer BenefitsReduced Maintenance Costs
*Survey completed by ARC Advisory Group
Extending AssetManagement into
electrical equipment
Typical AssetManagement areas*
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
37/65
ABB GroupMay 5, 2010 | Slide 373BSE062592
Customer BenefitsReduced Maintenance Costs
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
38/65
ABB GroupMay 5, 2010 | Slide 383BSE062592
Custo e e e tsReduced Maintenance Costs
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
39/65
ABB GroupMay 5, 2010 | Slide 393BSE062592
Reduced Maintenance Costs
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
40/65
ABB GroupMay 5, 2010 | Slide 403BSE062592
Reduced Maintenance Costs
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
41/65
ABB GroupMay 5, 2010 | Slide 413BSE062592
Reduced Maintenance Costs
ProcessInstrumentation
Substationequipment
ProcessElectrification
equipment
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
42/65
ABB GroupMay 5, 2010 | Slide 423BSE062592
Reduced Maintenance Costs
ProcessInstrumentation
Substationequipment
ProcessElectrification
equipment
Common user environment for operations & maintenance
Relevant actionable provided to the right person includingoperators, engineers, and maintenance personnel
Troubleshoot problems more quickly
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
43/65
ABB GroupMay 5, 2010 | Slide 433BSE062592
Reduced Maintenance Costs
Customer Benefits
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
44/65
ABB GroupMay 5, 2010 | Slide 443BSE062592
Reduced Maintenance Costs
Customer BenefitsC
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
45/65
ABB GroupMay 5, 2010 | Slide 453BSE062592
Reduced Maintenance Costs
Customer BenefitsR d d M i C
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
46/65
ABB GroupMay 5, 2010 | Slide 463BSE062592
Reduced Maintenance Costs
Reveal previously hidden critical plant equipment status
Electrical device health information is lost with legacy systemintegration methods
With IEC 61850 and open fieldbus standards, the hidden criticalplant electrical equipment health is now revealed
Customer BenefitsR d d M i t C t
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
47/65
ABB GroupMay 5, 2010 | Slide 473BSE062592
Reduced Maintenance Costs
Customer BenefitsR d d M i t C t
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
48/65
ABB GroupMay 5, 2010 | Slide 483BSE062592
Reduced Maintenance Costs
Customer BenefitsR d d M i t C t
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
49/65
ABB GroupMay 5, 2010 | Slide 493BSE062592
Reduced Maintenance Costs
Maintain only one interface to CMMS
Maintenance planning more efficient
Single source for maintenance analysis
Spend less time planning & more time doing
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
50/65
ABB GroupMay 5, 2010 | Slide 503BSE062592
Increased Plant Availability
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
51/65
ABB GroupMay 5, 2010 | Slide 513BSE062592
Increased Plant Availability
System 800xA is widely used as integrated orstandalone Power Management System
Power Management Systems is used for
industrial plants with
In-plant generation
Critical Loads
Insufficient reliability of grid supply Typical Power Management functionality: Fast
load shedding
Ensure at any time the availability of electrical
power to all critical loads in the plant
Switching off non-essential loads in case of ashortage of power in the plant
Typical response time: < 100 ms
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
52/65
ABB GroupMay 5, 2010 | Slide 523BSE062592
ABB GroupMay 5, 2010 | Slide 52
Increased Plant Availability
2.2 1.8 1.8 2.13.3
2.50.1
1.5
7.2
5.7
MW MWMW MW
MW
MW
MW
Hz
kV
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
53/65
ABB GroupMay 5, 2010 | Slide 533BSE062592
ABB GroupMay 5, 2010 | Slide 53
Increased Plant Availability
2.2 1.8 1.8 2.13.3
2.50.1
1.57.2
5.7
MW MWMW MW
MW
MW
MW
Hz
kV
Generator trip
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
54/65
ABB GroupMay 5, 2010 | Slide 543BSE062592
ABB GroupMay 5, 2010 | Slide 54
Increased Plant Availability
0.0 1.8 1.8 2.13.3
2.50.1
1.54.8
3.9
MW MWMW MW
MW
MWMW
Hz
kV
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
55/65
ABB GroupMay 5, 2010 | Slide 553BSE062592
ABB GroupMay 5, 2010 | Slide 55
Increased Plant Availability
0.0 1.8 1.8 2.13.3
2.50.1
1.54.8
3.9
MW MWMW MW
MW
MWMW
Hz
kV
Fast load shedding
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
56/65
ABB GroupMay 5, 2010 | Slide 563BSE062592
ABB GroupMay 5, 2010 | Slide 56
Increased Plant Availability
0.0 1.8 1.8 2.13.3
2.50.1
1.54.8
3.9
MW MWMW MW
MW
MWMW
Hz
kV
Fast load shedding
Customer BenefitsIncreased Plant Availability
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
57/65
ABB GroupMay 5, 2010 | Slide 573BSE062592
ABB GroupMay 5, 2010 | Slide 57
Increased Plant Availability
0.0 1.8 1.8 2.13.3
2.50.1
1.54.8
3.9
MW MWMW MW
MW
MWMW
Hz
kV
Fast load shedding
Avoidance of black-outs with System 800xA based
Power Management SystemsFaster load shedding than hardwired with IEC 61850
high speed protocol
Quality monitored load shedding signals
Reconfiguration without rewiring
Integrated Process and Power AutomationElectrical Integration with System 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
58/65
ABB GroupMay 5, 2010 | Slide 583BSE062592
Electrical Integration with System 800xA
Integrated Process and Power AutomationElectrical Integration with System 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
59/65
ABB GroupMay 5, 2010 | Slide 593BSE062592
Electrical Integration with System 800xA
ElectricalIntegrationBased on OpenStandards
Full PlantIntegration withSystem 800xA
Integrated Process and Power AutomationElectrical Integration with System 800xA
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
60/65
ABB GroupMay 5, 2010 | Slide 603BSE062592
Electrical Integration with System 800xA
ElectricalIntegrationBased on OpenStandards
Full PlantIntegration withSystem 800xA
Reduced Investment Costs
Improved Operator Effectiveness
Reduced Maintenance Costs
Increased Plant Availability
Outline
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
61/65
ABB GroupMay 5, 2010 | Slide 613BSE062592
What is Electrical Integration?
ABBs solution: Integrated Process and Power Automation
Customer benefits
References
Repar Refinery, Petrobras, Brazil
Flsj Hydro Power Station, E.ON. Sweden
Integrated Process and Power AutomationReferences
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
62/65
ABB GroupMay 5, 2010 | Slide 623BSE062592
Global Installations Across All Industries
Oil, Gas, Petrochemical
Power Generation
Metals and Mining
Chemical
Pulp and Paper
Integrated Process and Power AutomationREPAR Refinery, Petrobras, Brazil
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
63/65
ABB GroupMay 5, 2010 | Slide 633BSE062592
y, ,
Customers need
Refinery process control and power management
Single plant interface, integrated operations and maintenance
ABB solution
Full Plant Integration with System 800xA
Integrated Process Automation and Power Management System
Electrical Integration Based on Open Standards
IEC 61850 integration of ABB and Schweitzer Protection & Control IEDs
Complete Portfolio from ABB
DCS, PMS, IEDs
Customers benefits
30% less engineering hours due to reuse of engineering data
15% savings in installation time with standardization of solution
20% savings in training costs with improved visibility of onesystem
Integrated Process and Power AutomationFlasjo Hydro Power Plant, E.ON, Sweden
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
64/65
ABB GroupMay 5, 2010 | Slide 643BSE062592
j y
Customers need
Hydro power plant process control and substation automation
High availability unmanned station with remote operations
ABB solution
Full Plant Integration with System 800xA
Integrated Process Automation and Substation Automation System
Electrical Integration Based on Open Standards
IEC 61850 integration of ABB Protection & Control IEDs
Complete Portfolio from ABB
DCS, SAS, LV Switchgear, IEDs
Customers benefits
Cost effective solution, short installation time
Standardized concept for coming hydro power renewals
Reduced maintenance costs with remote access to plant data
-
8/13/2019 3BSE062592 en Integrated Process and Power Automation
65/65