PTT Exploration and Production Public Company Limited PTTEP Engineering General Specification PEGS Model Review Check List Document No: PEGS-0710-ADM-008 Revision No: 0-0 Revision Date: February 2012

Upload: pham-dang-minh

Post on 24-Nov-2015

1.194 views

Category:

Documents


60 download

DESCRIPTION

3D Model Review Checklist

TRANSCRIPT

  • PTT Exploration and Production Public Company Limited

    PTTEP Engineering General Specification

    PEGS

    Model Review Check List

    Document No: PEGS-0710-ADM-008

    Revision No: 0-0

    Revision Date: February 2012

  • PTT Exploration and Production Public Company Limited

    February 2012 Rev.0-0 Registry UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    Revision History

    Rev Description of Revision Authorised

    by Date

    0-0 New Document

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 TOC UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    TABLE OF CONTENTS

    1.0 Purpose ................................................................................................................... 1

    2.0 Scope ...................................................................................................................... 1

    3.0 Definitions .............................................................................................................. 2

    3.1 Language ............................................................................................................................. 2

    3.2 Terminology ......................................................................................................................... 2

    3.3 Common Acronyms .............................................................................................................. 3

    4.0 References .............................................................................................................. 4

    4.1 PTTEP Internal References .................................................................................................. 5

    4.2 International Standards ........................................................................................................ 5

    4.3 Industry Codes and Standards ............................................................................................. 5

    5.0 TOOLS..................................................................................................................... 6

    5.1 Support Documents and Drawings ....................................................................................... 6

    5.2 3D Model Check List ............................................................................................................ 6

    5.3 Model Review .................................................................................................................... 19

    5.4 Responsibilities .................................................................................................................. 29

    5.5 Comment Tagging .............................................................................................................. 29

    6.0 APPENDICES ........................................................................................................ 30

    Appendix 1. 3D Model Review Comments.................................................................................... 30

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 1 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    1.0 PURPOSE

    The purpose of this specification is to provide the minimum requirements for model review

    check list for checking 3D CAD models for both offshore and onshore facilities on a

    continuous basis and during formal model review. The checklist is general in nature and may

    require modifications for specific project requirements.

    2.0 SCOPE

    The 3D Model Review is intended to provide a complete review of all modelled items,

    including the following:

    1. Check Equipment Arrangement.

    2. Check that all disciplines design input is in accordance with project requirements /

    COMPANY specification including safety, operability and maintainability.

    3. Check Constructability, Operability and Maintainability aspects.

    4. Verify that piping design arrangements/routing are consistent with process

    requirements.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 2 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    3.0 DEFINITIONS

    A number of different terms are commonly used to describe the work stages, processes, and

    approvals which take place during the early stages of a development. This can often be a

    source of confusion so the following section is intended to show the PTTEP preferred

    terminology as used in this document.

    3.1 LANGUAGE

    In this document, the words should and shall have the following meanings:

    Should Indicates a preferred course of action. Should is a non-mandatory word and is not forbidden, but use in the body of the text should be the exception. Where none mandatory terms are used, each paragraph within these clauses shall also have an associated commentary paragraph that provides the rationale for why the stated choices and modifications are appropriate and circumstance under which the stated choices and modifications might be different.

    Shall Indicates a course of action with a mandatory status. The term shall shall be used if a requirement is considered to be necessary to claim compliance with a PEGS document.

    3.2 TERMINOLOGY

    Terminology Description

    3D CAD Model An overall project three dimension computer model comprising of piping equipment (including safety equipment), structural, electrical, instrument and civil design including infrastructures

    Action List Log Document that contains a list of comments/actions to the 3D CAD model during the review

    Approval The authorization in writing given by the COMPANY to the Contractor on a procedure or to proceed with the performance of a specific part of the work without releasing in any way the Contractor from any of his obligations to conform with the technical specifications, requisitions, etc. The words Approve, Approved and Approval shall be construed accordingly

    AutoPLANT Bentleys 3D Design Computer Software

    COMPANY PTT Exploration and Production Public Company Limited

    Contract Documents The material requisitions, material specifications, etc. issued by the COMPANY and attached to the Contract or the Purchase Order

    Contractor Per contract: Contractor The contractor who is a PARTY to this CONTRACT and where the context so requires, any and all SUBCONTRACTORS utilised by CONTRACTOR for the performance of the WORK

    Model File A neutral file exported from PDMS which will be used for Review Reality Software to generate the3D model. Or a neutral file exported from AutoPLANT, which will be used for Navisworks review software to generate the 3D model

    Navisworks Bentleys proprietary computer software that enable the review files for AutoPLANT 3D CAD Model

    PDMS

    Avevas Vantage Plant Design Management System proprietary computer software

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 3 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    Terminology Description

    Review Reality Avevas proprietary computer software that enables the review of a PDMS 3D CAD Model.

    Status File A file that stores the colour definitions, Walk-Through animations (if any), Camera definitions etc.,

    3.3 COMMON ACRONYMS

    Set out below in alphabetical order are common acronyms as found within this document:

    AFC Approved For Construction

    API American Petroleum Institute

    ASME American Society of Mechanical Engineers

    ASTM American Society for Testing and Materials

    AutoPLANT Bentley 3D Design Software

    CAD Computer Aided Design

    CAPEX Capital Expenditure

    EPIC Engineering design, procurement, installation and construction

    HVAC Heating Ventilation and Air Conditioning

    ISO International Standards Organisation

    ISO/TC67 ISO Technical Committee 67

    OPEX Operational Expenditure

    P&ID Process and Instrument Diagram

    PDMS Plant Design Management System

    PEGS PTTEP Engineering and General Specification

    PMT Project Management Team

    PPS Project Particular Specification

    PS Pipe Support

    PTTEP PTT Exploration and Production Company Limited

    QMS Quality Management System

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 4 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    4.0 REFERENCES

    The reference documents listed below, including Industry Codes and Standards and PTTEP

    specifications, form an integral part of this Engineering General Specification. Unless

    otherwise stipulated, the applicable version of these documents, including relevant

    appendices and supplements, is the latest revision published on the effective date of a

    contract.

    The overall order of precedence of the applicable documents shall be:

    1. Applicable Laws, Rules and Regulations

    2. International Rules, Codes, and Regulations

    3. Purchase Order/ Service Order/ Contract Documents (Only applicable for direct

    purchase by COMPANY)

    4. Project Particular Specification (PPS)

    5. COMPANY General Specification

    6. Codes and Standards in reference

    Any conflict between any of the Contract Documents, or between this specification and any

    other Contract Document, shall be reported to PTTEP for decision. In such a case, and

    unless otherwise agreed or decided by PTTEP, it is understood that the more stringent

    requirement shall apply. Exceptions to, or deviations from this specification are not permitted

    unless previously accepted in writing by PTTEP. For this purpose, requests for substitutions

    or changes of any kind shall be complete with all pertinent information required for PTTEP

    assessment. PTTEPs approval, nevertheless, will not, in any way, relieve the responsibility of

    the Contractor to meet the requirements of the industry Codes and Standards referred to and

    amended herein, in the event of conflict.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 5 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    4.1 PTTEP INTERNAL REFERENCES

    Internal documents applicable to this document are indicated in the table below.

    Document Number Document Title

    PEGS-1015-SAF-001 Layout

    PEGS-1015-SAF-005 Escape, Evacuation and Rescue from Fixed Installations

    PEGS-0710-ADM-007 PDMS Standards and Procedures

    PEGS-0710-PIP-001 Piping Design, Fabrication and Installation

    4.2 INTERNATIONAL STANDARDS

    International standards applicable to this document are indicated in the table below i.e. ISO,

    IEC or ITU.

    Document Number Document Title

    ISO 10005 Quality Management System Guidelines for Quality Plans

    4.3 INDUSTRY CODES AND STANDARDS

    Industry codes, standards and regional legislation applicable to this document are indicated in

    the table below.

    Document Number Document Title

    API RP 14J Recommended Practice for Design and Hazards Analysis for Offshore Production Facilities

    API RP 500 Classification of location for Electrical Installation at Petroleum Facilities

    CAP 437 Offshore Helicopter Landing Areas Guidance on Standard

    NFPA 13 Standard for the Installation of Sprinkler System

    NFPA 30 Flammable and Combustible Liquids Code

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 6 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    5.0 TOOLS

    The following listed below are the main software to be used for the internal group and client

    model reviews

    1. Averas PDMS or Review Reality

    2. Bentleys AutoPLANT or Navisworks

    Note: The COMPANY will designate the 3D CAD software to be utilised before the commence

    of the project.

    Reference items, reserved volume, etc, and an operator of the same scale as the model under

    review, will be available. This model operators dimensions will be representative of the

    applicable population.

    5.1 SUPPORT DOCUMENTS AND DRAWINGS

    Prior to model reviews, the following documents of latest revisions shall be prepared and will

    be made available during the model review session. These will be marked as Model Review

    Master.

    1. P&ID

    2. Equipment Layouts

    3. Escape Route Layouts

    4. Equipment List

    5. Line List

    6. Previous model review action list (as applicable).

    The following documents and drawings will be made available during the model review, upon

    request:

    1. Equipment dimensional details.

    2. Instrument Index.

    3. Fire Fighting Equipment Layouts.

    4. Safety Equipment Layouts (including main escape route and muster area)

    5. Mechanical Handling Study.

    5.2 3D MODEL CHECK LIST

    5.2.1 Safety

    1. Any special or specific safety requirements.

    2. Adequacy of coverage and avoidance of dead ends on main access/escape routes.

    3. Emergency exits from rooms and platforms (staircases or ladders), hand railing.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 7 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    4. Location of fire pumps, hydrants, monitor and hose reels, and fire hose cabinets.

    Equipment shall be easily accessible and installed in a position / orientation to enable

    quick operation e.g., opening of cabinet door will not obstruct the access to hydrant.

    5. Emergency shutdown valve locations to optimize the isolated sections.

    6. Spillage containment/collection.

    7. Rain water drainage systems.

    8. Escape routes to muster areas/Boat landing

    9. Area adequacy and equipment arrangement around lifeboat / life raft embarkations to

    prevent obstruction and optimise embarkation time.

    10. Safety shower and eye wash locations.

    11. Location of safety/portable fire fighting equipment. Equipment shall be clearly visible

    and easily accessible.

    12. Deluge and back-up valve station locations.

    13. Fire Truck Station (onshore).

    14. Flare stack, burn pit vocation and sterile zone.

    15. Obstruction or infringement of escape route width or head clearance by structure

    (bracing, beams, piping / cable tray support, etc.) or any equipment (e.g. junction

    boxes, instrument, cable tray, etc.).

    16. Spray/sprinkler nozzle orientation around equipment.

    5.2.2 General Layout and Maintenance

    1. Location of the Vents/ Exhausts in safe area.

    2. Escape routes / maintenance and operations access routes for all equipment

    3. Safety distances between equipments.

    4. Platform arrangement to optimize operational maintenance requirements and provide

    good access and working room around all equipment.

    5. Platform arrangement to optimize adequate and easy access ways for fire fighting

    equipment.

    6. Clearances for operation, maintenance and removal of electrical equipment and

    transformers from each room.

    7. Future expansion provision for future equipment and piping (space and access).

    8. Check valve accessibility both from operation and maintenance point of view. Ensure

    that valves (specifically small bore drain valves) are not located such that, it becomes

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 8 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    liable to be damaged or poses a tripping hazard specific requirement are detailed in

    the engineering standards applicable to the project.

    9. Provision of access / clearance between skid mounted packages or equipment to

    allow for dismantling of any part, special tools or consumables to be used for

    maintenance.

    10. Dropped object protection, equipment or piping containing hydrocarbons below crane

    sweeps.

    11. Hazardous area classification / Non classified equipment.

    12. Fire and gas detectors locations, orientation and coverage.

    13. Over all plant layout and facilities, (utilities, process, storage, loading and unloading

    station, Buildings, Jetties and marine), effluent and waste water treatment and flare

    stock area.

    14. Pipe rack and pipeway layout.

    15. Main and secondary access roads.

    16. Road crossing, trenches and culverts

    5.2.3 Accessibility / Operability / Maintenance

    1. Use of platforms, catwalks stair and fixed ladder.

    2. Use of movable / temporary means: platform, self-elevated platforms and etc.

    3. Compliance with Material Handling Philosophy.

    4. Crane access

    5. Lay down area

    6. Tube bundle removal area

    7. Catalyst and chemical loading area

    8. Cartridge / filter handling, removal and replacement

    5.2.4 Package Units

    Package Units are not normally modelled in detail and are usually shown as a block. Ensure

    the package does not infringe into escape routes or fire / safety equipment. Ensure adequate

    space is available for access and for removal of components of the package units.

    5.2.5 Model Layout

    1. Check that model shows economic and efficient use of the platform area.

    2. Check that electrical equipment is located in accordance with area hazard

    classification.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 9 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    3. Check that access ways, maintenance areas and operation areas are within the

    required minimum dimension. These include main escape routes and muster point

    volumes, withdrawal space and equipment/material handling area.

    4. Check location of particularly noisy equipment, valves etc. in relation to the frequency

    of visits by operating and maintenance personnel to the area.

    5. Check the overall plant layout including unit location between ISBL (Inside Battery

    Limit) and OSBL (Outside Battery Limit)

    6. Check road and road crossing layout

    7. Check drainage system

    5.2.6 Heat Exchangers

    1. Check that the number of shells matches the P&IDs.

    2. Check the arrangement of exchangers and associated piping.

    3. Check if adequate space is allowed for bundle removal and that lifting beam, devits

    and pull beams are provided as necessary. Check that flangeless butterfly valve still

    isolate on tube pulling.

    4. If a vent is required on the exchanger for periodically purging non-condensable

    vapours, it should be readily accessible. The vent should be shown in the model.

    5. Piping for a true counter-current exchanger must be properly shown as counter-

    current.

    6. If different shells of multi shell exchanger have different metallurgies, check if shells

    are properly arranged and labelled.

    7. For air cooler, both single and mixed phase, in service where it is important that the

    outlet temperature be maintained, the piping arrangement must be symmetrical. For

    air cooled condensers, pockets must be avoided in the outlet piping and hot vapour

    by-pass lines. See that elbows rather than tees are used at the ends of the headers.

    Dead legs in capped headers should be reduced to a minimum. Check configuration

    against Process Department Specification and Licensors requirements.

    8. Temperature sensing point for exchangers with hot gas by-pass is to be located in

    the combined process stream outlet manifold.

    9. Check adequate clearance and maintenance access is provided for motors, fan belts

    and A/V hub of air coolers.

    10. Check access for plug removal and tube-cleaning on air coolers.

    11. Check hot equipment/line under air coolers, e.g. fire risk from hot pump, hot lines

    which could affect air temperature to bundle.

    12. Check crane access for removal of bundles.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 10 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    13. Check escape routes from each bank of air coolers are consistent.

    14. Consider access ways between air cooler platforms and adjacent structures to safe

    operators time climbing ladders and provide a safe means of escape.

    15. Check location of break flange on piping at shell and tube exchangers and air coolers

    to facilitate bundle removal.

    5.2.7 Fired Heaters

    1. For fired heaters that have removal spool pieces, temperatures indicators must be

    placed upstream of the removal spool piece on the header outlet side and

    downstream of the removal spool piece on header inlet side.

    2. Check that the correct number of passes are shown and if necessary, check that they

    are symmetrical.

    3. Check that all auxiliary lines are shown and that they are accessible to the operators.

    4. Check that all fined header instrumentation is shown.

    5. For reboilers that are fired headers, check that the total pressure drop in the reboiler

    return line does not exceed the pressure drop that was originally allowed.

    6. In vacuum units, the vacuum transfer line shown on the model must be checked

    against the original layout issued to Process for final hydraulic check.

    7. Check that burner firing valves are located such that burner flames can be observed.

    8. Check adequate escape routes.

    9. Check clearance for burner gun removal.

    10. Check to eliminate dead-legs in heavy fuel oil lines and waste gas lines.

    5.2.8 Vessels

    1. Check that the vessel, including its support, ladders and platforms, is correctly

    modelled.

    2. Check for correct nozzle orientation.

    3. Check attached piping, structures and equipment regarding vessels design loading.

    4. Tangent line elevation is not shown on the model but can be roughly measured.

    Check for consistency with elevation shown on the P&IDs.

    5. Check methods of access to manways and handholes. Should manways be hinged?

    Check direction of cover swing. Beware of adjacent instruments.

    6. Check erection aspects of the vessel. Will it arrive at site in one or more pieces? How

    will it be fitted into any structure? Are lifting attachments adequate and correctly

    positioned?

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 11 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    7. Level gauges and other instruments must be readable from either grade or platform

    and where necessary, readable from a globe or control valve. Check access is

    provided for isolating valves. Check relative elevations of LG, LC, LAH and LAL.

    8. Drums, which have a water boot, must be sloped towards the boot. This is indicated

    by a slope label. Check that location of the boot is opposite from the feed inlet on the

    vessel.

    9. For horizontal vessels, check which is sliding and fixing saddle and relationship with

    main nozzles.

    10. Check if the vessel can be conveniently drained. Check that outlet valves are located

    outside the vessels skirt.

    11. Check that adequate access and escape routes are provided on vessels platforms.

    12. Check location of vent in relation to manhole and steam-out to permit vapour to be

    swept out.

    13. Ensure fuel gas connections are above high liquid level.

    14. Ensure adequate platform area is at location where vessel internals or packing is

    loaded.

    15. Check insulation requirement and thickness.

    16. Check designated laydown areas for chemical / catalyst loading requirements.

    5.2.9 Pumps

    1. Pumps and their spares or common spares should be arranged together in a group

    and should be located reasonably close to the vessel supplying the suction.

    2. Suction line length to be a minimum, with no pockets.

    3. Check location and orientation of valves, not return valves and fire isolation valve in

    suction and discharge line.

    4. Check inlet configuration for double suction pumps to ensure equal distribution of flow

    to both suctions.

    5. Check symmetry of piping on pumps operating in parallel.

    6. Check adequate drains are provided on suction and discharge line and/or pump. Pay

    particular attention to light end/corrosives pumps and allow for safe removal of

    drained material.

    7. Check permanent strainers are correctly located and sufficient clearance allowed for

    cleaning. Check that removable spools and correct support locations are provided on

    temporary strainers.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 12 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    8. Check that all instrumentation associated with pumps is, shown is accessible and

    readable.

    9. Check NPSH on pumps where this is critical.

    10. Check cleaning, flushing, warm up and recirculation facilities.

    11. Check accessibility to the pump for maintenance. Check any special lifting tackle

    required.

    12. Check consistency of piping configuration at pumps throughout the plant.

    13. Check for pump suction line straight length requirements.

    5.2.10 Compressors

    1. Liquid in compressors suction lines must be avoided. Suction lines should have no

    pockets. The suction line should be self-draining back to the knockout drum if

    possible. Where pockets are unavoidable, provisions must be made for automatic

    draining of the liquid.

    2. Check atmospheric suction intake location regarding hazard, contamination,

    reliability, area classification, temperature, etc.

    3. On reciprocating compressors, safety valves must be located upstream of discharge

    block valve.

    4. On reciprocating compressors, pulsation dampeners should be shown on the model.

    5. Check location and orientation of swages, valves, non-return valves and fire isolation

    valves in suction and discharge lines.

    6. Check adequate drains are provided on suction and discharge line and machine.

    7. Check suction and discharge line tracing, acoustic insulation and etc.

    8. Check instrumentation including panel associated with machine.

    9. Check suction and discharge filter, strainers, etc.; location and access for operation

    and maintenance.

    10. Check anti-surge and recycle lines, blow-off line and silencer.

    11. Check machine location in relation to other operating or spare machinery and to its

    control panel.

    12. Check layout or auxiliary systems and pipe work such as Lube Oil, seal oil, filtration,

    cooling water and instrument panels in relation to adjacent equipment, structures,

    pipe work, duct work, underground system, etc.

    13. Check space, headroom and lifting tackle for maintenance of the machine and its

    auxiliary equipment.

    14. Check acoustic hoods, enclosures, silencers and their removal.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 13 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    5.2.11 Other Mechanical Equipment

    For other types of mechanical equipment, it is not possible to be specific on the type of checks

    to be carried out on the model. For some equipment, e.g. blowers, some or all of the checks

    listed under pumps and compressors will apply. For other more specialist equipment, the

    model should be reviewed bearing in mind the function of the equipment and considering

    operation, maintenance, access and safety aspects of the design.

    5.2.12 Piping Layout

    1. All process lines on the model must be checked to see that they agree with the latest

    issue of the P&IDs.

    2. In the critical services listed below, it may be necessary to conduct a detailed

    hydraulic check of the model to ensure against excessive pressure drop. These

    checks must be made initially on layouts and the model reviewed for conformity to the

    approved layout:

    a. Pump Suction Lines

    b. Compressor Recycle Loops

    c. Inlet Lines to Safety Valves

    d. Other critical systems where allowable pressure drop may be limited.

    3. Although several pipe fittings may at times be required for thermal expansion, be alert

    to check for cases where it may be possible to reduce what appears to be an

    excessive amount of pipe fittings. Optimise fittings in suction lines.

    4. Special attention must be given to vapour-liquid mix points in compressor systems.

    Piping must be arranged to avoid backflow of liquid to the compressor. A

    recommended procedure is to have the vapour line taken off the top of the liquid pipe.

    5. Special attention must be given to process lines that require no pockets such as

    two-phase flow, flurry or overhead vapour lines.

    6. Check access to valves and blinds in accordance with frequency of operation and the

    project standards. Where possible, make all valves and blinds accessible from grade

    or platforms.

    7. Check that literal translation of P&IDs has not produced excessive pipe lengths.

    8. A tundish and piping to drain is necessary for some process materials from vents and

    drains, as specified on P&IDs.

    9. Check that piping does not constitute trip or head hazard, nor does it block access as

    far as practical.

    10. Special areas requiring detailed attention:

    a. Slurry lines

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 14 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    b. Corrosive fluids

    c. Fluids which freeze or become very viscous at ambient temperature

    d. Flammable hydrocarbons above their boiling point

    e. Fluids close to crystallisation point

    f. Two phase flow, especially in vertical lines

    11. Check that a suitable length of pipe is provided where adequate mixing is required.

    (chemical injection)

    12. Review start-up recirculation lines to ensure valving is reasonably adjacent.

    13. Check that all atmospheric vents and manhole vents have been piped safe location.

    14. Check that sample points are accessible from deck or a platform. Check also for

    dead legs.

    15. Check that geographic arrangement of lines agrees with P&IDs.

    16. Check location and adequacy of flushing, oil and slop oil. Avoid dead legs where

    practical.

    17. Review location of control valves; particularly, check that:

    a. Control valves not normally operating are free draining

    b. Valves in flashing services are close to downstream equipment, i.e. minimum

    length of larger bore piping

    c. Valves which would cause major process upset if they failed are at deck or

    platform.

    18. Check that flanged connections required for dismantling and maintenance are

    provided and are accessible.

    19. Check location of fire-fighting hydrants, monitors and hose reels.

    20. Review utility piping, especially distribution systems from common headers with

    particular reference to valving of sub-headers and take-offs to ensure an economical

    and practical arrangement is provided. Agree standard hook-ups for utility stations at

    an early stage of the model. Ensure utility headers are independent for independent

    units.

    21. Check hose connection locations and access, especially those handling hazardous

    materials.

    22. Check that hazardous materials lines have minimum number of flanges.

    23. Check that blinds are on the correct side of the valve and accessible.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 15 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    5.2.13 Instrument

    1. P&IDs checks

    Check that all instruments shown on the P&IDs are present on the model and

    identified by tags number (except for TIs and PIs indicated by coloured tag only).

    Apart from identifying presence of instrumentation, the points covered by the

    following paragraphs should be considered.

    2. Accessibility

    Ensure that all instruments shown are accessible both from an operators point of

    view and that of a maintenance engineer. Ensure instruments are not located such

    that they are liable to be damaged or form a tripping hazard. Specific requirements

    are detailed in the Engineering Standard applicable to the Project.

    3. Orifice Flange Sets and In-line Equipment

    Check that Orifice Flange Sets are in the correct line and accessible. Orifice sets with

    close coupled transmitters should be accessible from grade, platform or by ladder.

    Access height above grade or platform may be determined by the Project

    Specification. If the access is by temporary ladder, check that the area beneath the

    orifice assembly is not too congested. Review the straight runs provided for orifice

    plates. If flange sets are in vertical runs, check that the flow direction is correct.

    Check orientation and piping connections for rotameters. Ensure all other in-line

    instrument equipment is correctly orientated and is accessible.

    4. Level displacers

    Check the orientation of Level Displacers and Level Gauge Glasses with respect to

    access/platforms or ladders. Where possible, access to level displacers should be

    from a platform. If an access ladder is provided, check that the instruments are visible

    and serviceable from the ladder.

    Check the height of platforms relative to displacer cases, bearing in mind that the

    instrument case associated with a rotatable head displacer is approximately 30 cm

    above the top side connection of a displacer. Mark up Materials Requisitions for

    instrument orientation i.e. L.H. (left hand) or R.H. (right hand) and the orientation of

    the connection on the displacer chamber.

    5. Temperature and Pressure Tappings

    Check the location of TWs and PIs for accessibility and TI removal. Location of these

    instruments on top of tall columns should be avoided if possible. Check location

    against vessels data sheet.

    6. Control valves

    Check that control valves are installed in the correct line and check their location.

    Control valves should preferably be installed at deck and access platform with the

    pneumatic operator in a vertical position.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 16 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    7. Flow meters

    Check the upstream and downstream straight length requirements. Check access,

    maintenance, calibration and monitoring requirements.

    5.2.14 Structural Steel

    1. Clearance between piping and steel structure should be checked.

    2. Final deck penetration.

    3. Ensure that all bracing shown on structural drawings is shown on the model and that

    piping, equipment, access ways and maintenance areas are clash free.

    5.2.15 PSVs

    1. PSV will usually be provided on the discharge line from turbines and reciprocating

    equipment upstream of any block valves to protect the casing. Check requirements

    with P&IDs.

    2. All PSV discharge lines going to flare must be self-draining to the flare header, which

    may be indicated by an arrow. The length of the discharge line should not be

    excessive.

    3. For safety purposes and for consistency between equipment design pressure and

    PSV set pressure, the PSV must be located reasonably close to the primary item that

    it is protecting.

    4. Check all PSV inlet lines for pressure drop and conformity to the 3 Percent Rule

    given in API RP 520. For situations, which may appear to be very tight, it may be

    necessary to perform a detailed piping take-off of the model in which each length of

    line is measured and every fitting is accounted for.

    5. Check that all PSV discharging to the atmosphere are vented in a safe location. Drain

    (weep) holes to be provided on atmospheric discharges where liquid can accumulate.

    Consider piping drain to safe location.

    6. In an all-liquid system, the set pressure of the safety valve is determined by its actual

    location relative to grade. If the valve is located close to grade, the set pressure will

    be higher than if it is mounted high in the air. The model should be checked for

    consistency between the PSV location and its set pressure.

    7. Where PSV is relieving hazardous (hot, corrosive, noxious) material to atmosphere,

    be very careful in defining safe location and consider effect on area classification.

    8. Check line size where several PSV discharges are combined into one sub-header.

    9. Check platform access is provided for operation and maintenance of PSVs. Ensure

    davits are provided for heavy PSVs at elevated positions. Ensure space available for

    drop out at grade.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 17 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    5.2.16 Utilities

    1. Check the Utility Systems shown on the model against Project standards and Utilities

    P&IDs latest masters. This includes PID notes and standard assembly drawings /

    symbols.

    2. Review the routing of exotic, hazardous and large diameter utility lines.

    3. Check utilities/instruments location and access

    4. Check utilities valves type, location and access.

    5. Check access to utility equipment.

    6. Check location of utility stations relative to user points.

    5.2.17 Civil

    1. Check access road and road crossing layout.

    2. Check pipe rack and pipeways location.

    3. Check rain water drainage, pit, and catch basin.

    4. Check building location / area.

    5. Check underground facilities and trenches.

    6. Check perimeter fence layout

    7. Check culvert location / area.

    8. Check Interceptors and effluent treatment facilities.

    9. Check foundations and pedestal volumes / elevation.

    5.2.18 Storage tanks (Intermediate / Product / Feed stack Tank Farms)

    1. Check bund wall requirements area / volume.

    2. Check drainage system, including rain water and accidentally oily contaminated water

    (AOC).

    3. Check tank to tank spacing requirements and orientation, including sphere and bullet

    tanks.

    4. Check pipeways spacing (location and routing).

    5. Check tank foundation elevation.

    6. Check transfer pump location and suction nozzle elevation.

    7. Check battery limit valve and actuated control valve location and access.

    8. Check tank access including staircase and platforms

    9. Check instrument location and access.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 18 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    10. Check maintenance access, including ramp location (if applicable).

    11. Check bund wall penetration and location.

    12. Check tank farm minimum spacing requirement with reference to plant overall layout.

    5.2.19 Truck loading / unloading station

    1. Check road layout including turning curve and radius.

    2. Check spacing, for multiple loading / unloading bays.

    3. Check loading arm access, platforms, staircase and vertical ladders.

    4. Check vents line routing.

    5. Check structure headroom requirements.

    6. Check Truck loading / unloading minimum spacing requirement with reference to

    plant overall layout.

    5.2.20 Infrastructure (administration building / laboratory / warehouse / central control

    room / electrical room / maintenance shop

    1. Check building location with reference to plant overall layout.

    2. Check allocated area / volume with reference to space requirements.

    3. Check utilities requirements.

    5.2.21 Underground Facilities

    1. Check foundation area, volume and layout.

    2. Check culvert and trench location, slope requirements.

    3. Check storm drain pit and catch basin location and elevation.

    4. Check underground pipe routing (closed / open drain) including slope / free draining

    requirements.

    5. Check underground electrical / instrument cable routing.

    6. Check spacing requirements and elevations between piping, electrical, instrument

    and other facilities.

    7. Check valve pit location and elevation.

    8. Check underground vessels (open / closed drain) location with reference to overall

    plot layout.

    9. Check underground vessels (open / closed drain) elevation.

    5.2.22 Miscellaneous

    1. Review extent of fireproofing and consider any effects on adjacent piping or

    equipment

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 19 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    2. Review locations of electrical/instrument cable trays and consider their effect on

    adjacent equipment.

    3. Check insulation requirements (thickness) represented as volumes on equipments,

    piping and instruments.

    4. Check pipe shoe type for hot and cold insulated lines.

    5.3 MODEL REVIEW

    5.3.1 Model Review Purpose

    The purpose of this document is to provide guidelines on when and how to conduct 3D Model

    Reviews. Formal model reviews will be to ensure that the equipment, piping layout,

    accessibility, maintainability, operations and all other aspects of the design is satisfactory to

    COMPANY requirements. It also enables the COMPANY to review the design in 3D visual

    reality, thus reducing the time for review of 2D general arrangement drawings during the

    detailed modelling phase. Formal Model Reviews will be conducted on a specific design area

    at a schedule time outlined by the project management team. Prior to a formal COMPANY

    model reviews an internal model review shall be conducted with all discipline leads to ensure

    that the design is challenged and that any areas of concern or COMPANY specific issues are

    presented during the formal model review for discussion and acceptance.

    5.3.2 Model Review Participants

    The Contractor shall be responsible for notifying COMPANY and all disciplines of the time and

    venue of the model reviews.

    Each Model Review session will be attended by the following:

    COMPANY Representatives

    1. Process full time

    2. Maintenance full time

    3. Construction full time

    4. Operations full time

    5. Project Engineer(s) full time

    6. Other Disciplines full time/on call

    Contractor Representatives

    1. Project Manager / Engineer(s) full time

    2. PDMS / AutoPLANT Administrator full time

    3. Lead Piping Engineer(s) full time (Unit lead(s) - as required)

    4. Process Engineer(s) full time for process related/on call

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 20 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    5. Mechanical Engineer(s) on call

    6. Instrument/Electrical Engineer(s) on call

    7. Structural Engineer(s) on call

    8. Safety Engineers(s) full time

    9. HVAC on call

    10. Civil Engineer(s) on call

    Lead Piping Engineer will act as the Model Review Leader. He will direct the Model Review

    and lead the Model Review Team through each unit, highlighting the features of the unit.

    The Lead Piping Engineer, Process Engineer and the other Discipline Engineers (on call

    basis) will assist in the Technical Aspects of the Model Review and will explain the design

    considerations employed and answer questions from the COMPANY.

    The PDMS / AutoPLANT Administrator will act as the Model Review Operator. He will handle

    the computer aspects of the Model Review, navigating around each area during the review

    sessions as instructed by the Model Review Leader.

    5.3.3 Review Milestone Stages

    Unless otherwise specified by COMPANY, there will be 3 model reviews conducted at

    milestones of 3D model development as below.

    1st Stage: At approx. 30 % Model progress - 30 % Model Review

    2nd Stage: At approx. 60 % Model progress - 60 % Model Review

    3rd Stage: At approx. 90 % Model progress - 90 % Model Review

    5.3.4 Model Review Aspects

    The overview content of the review will be:-

    1. Safety

    2. Operations

    3. Process compliance

    4. Maintenance

    5. Constructability

    6. Accessibility

    The content and the items to be reviewed at each stage are detailed below.

    5.3.5 30 % Model Review

    The Objective of the 30 % Model Review;

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 21 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    1. To agree the layout of the platform (offshore facilities) / plant (onshore facilities)

    meets the base hazard recommendations, and requirements of the project.

    2. To freeze the location of the main equipment information available.

    3. To identify the primary Operability / Accessibility / Maintainability

    4. To Identify Improvements / Modifications to meet the predominantly the safety and

    Operational Aspects.

    The content of the model will include the following:

    Safety

    1. Safety egress routing volume.

    2. Primary escape routes defined and marked (including secondary where required).

    3. Safety distance between equipment.

    4. HAZID comments

    5. Location of the flares / vents / exhausts in a safe area.

    6. Fire hazard zone / restricted area / impacted area.

    7. Arrangement of the plant to optimize operational maintenance requirements and

    provide good access and working room around all equipment.

    8. Overall plant layout

    9. Location of Fire Truck Station (onshore)

    10. Safe location of Temporary Refuge (TR), Muster Area (on/offshore), Lifeboat

    embarkation area (offshore)

    Structural

    1. All primary and secondary steel framing.

    2. Intermediate platform

    3. Main access stairs

    4. Architectural Items including shelter / stores / technical building / blast wall /

    workshops/ equipment rooms.

    5. Boat landing location

    6. Riser / J tube locations

    7. Miscellaneous jacket / riser protection

    8. Major piperacks

    Mechanical

    1. Location of all major process and utility equipment including HVAC (to data available)

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 22 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    2. Crane reach and handling

    3. Platform crane

    4. Monorails and Davits (to Data available)

    5. Location and orientation of all equipment and other space consuming Items (to data

    available)

    6. Package Unit Location and orientation (to data available)

    7. Equipment withdrawal / Handling areas

    8. Primary Laydown areas / Access Hatches.

    9. Primary Operating Platforms for Valves, Equipment and Maintenance.

    10. Designated laydown areas for chemical / catalyst loading requirements.

    11. The detailing of equipment packages will be in basic block format.

    Piping

    1. Majority of large bore critical process lines, and utility lines.

    Electrical / Instruments

    1. Major Electrical Equipment

    2. Preliminary Main Electrical and Instrument Cable Ladder Routes

    3. Location and Volume of Electrical and Control Rooms

    Reserve Volumes

    1. Primary and Secondary Safety Routes

    2. Maintenance Areas

    3. Access around all equipment

    4. Withdrawal Areas / Handling Areas.

    5. Future Equipment

    Civil

    1. Main and secondary access road layout, including road crossing structures and

    culvert

    2. Crane access for both construction and maintenance activities

    3. Infrastructure volumes Administration building, Laboratory, Central control room,

    Electrical room, Warehouse, Maintenance shop etc.

    4. Pipe rack and pipeway layout

    5. Location of interceptors and effluent treatment facilities

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 23 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    6. Equipments support, foundations and pedestal

    5.3.6 60 % Model Review

    The Objective of the 60 % Model Review.

    1. To identify if any layout modifications have impact on the safety philosophies and

    requirements as previously agreed in the 30 % Model review.

    2. To review the location of secondary fire / safety equipment

    3. To identify if the location of the Main Equipment has been updated

    4. To review the location of Minor equipment.

    5. To review the secondary Operability / Accessibility / Maintainability to the different

    areas.

    6. To Identify Improvements / Modifications to meet the requirement of the project,

    mainly the safety operational aspect.

    The content of the model will include the following:

    General

    1. All 30 % Model Review comments have been incorporated.

    Safety

    1. Safety Egress Routing Volume (Previous comments and changed item only).

    2. Primary Escape Routes defined and Marked (Previous comments and changed item

    only).

    3. Secondary Escape Routes defined and Marked. Ensure escape routes are provided

    at all area, including internal area of large process block, elevated access platforms.

    4. Safety distance between Equipment (Previous comments and changed item only).

    5. Location of Life Boats / Muster Areas / Temporary Refuge (Previous comments and

    changed item only).

    6. Location of the Vents / Exhausts in a Safe Area (Previous comments and changed

    item only).

    7. Fire hazard Zone / Restricted Area / Impacted Area (Previous comments and

    changed item only).

    8. Eye Wash, Safety Shower and all Safety (life saving) Equipment Locations.

    9. Location and review of adequate and easy Access Ways for Fire Fighting Equipment.

    10. Arrangement of the Plant to Optimize Operational Maintenance requirements and

    Provide Good Access and Working Room Around all Equipment.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 24 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    11. Fire water hydrants, monitors, hose reels, cabinets, pumps and deluge valve

    locations and orientation to optimise quick access and deployment of equipment.

    Structural

    1. All Primary and Secondary Steel Framing. (Previous comments and changed Items

    only)

    2. Intermediate Platform(Previous comments and changed Items only)

    3. Main Access Stairs (Previous comments and changed Items only)

    4. Architectural Items Including Shelter / Technical Building / Blast Wall. (Previous

    comments and changed Items only)

    5. Boat Landing Location (Previous comments and changed Items only)

    6. Riser / J Tube Locations (Previous comments and changed Items only)

    7. Miscellaneous Jacket / riser protection (Previous comments and changed Items only)

    8. Access Ladders

    9. Miscellaneous Access / Maintenance Platforms

    10. Support Structures.

    11. Hand Railing.

    12. Deck penetration

    13. Major and minor pipe racks.

    Mechanical

    1. Location of all major process and Utility Equipment including HVAC equipment and

    ducting. (Previous comments and changed Items only)

    2. Mechanical Handling Equipment. (Previous comments and changed Items only)

    3. Platform Crane / Davit / Monorail. (Previous comments and changed Items only)

    4. Package Unit Location and Orientation. (Previous comments and changed Items

    only)

    5. Alignment with initial Materials Handling Study.

    6. Equipment Withdrawal / Handling Areas (Previous comments and changed Items

    only)

    7. Primary Laydown areas / Access Hatches. (Previous comments and changed Items

    only)

    8. Primary Operating Platforms for Valves, Equipment and Maintenance. (Previous

    comments and changed Items only)

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 25 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    9. Secondary Operating Platforms for Valves, Equipment and Maintenance

    10. Location of all secondary process and utility equipment, HVAC equipment and

    Ducting.

    11. Secondary mechanical handling items.

    12. Laydown area for chemical / catalyst loading requirements.

    Piping

    1. Frozen primary Piping Routings (Large bore / Flow Lines / remaining stress critical

    pipework)

    2. Majority of small bore process lines and utility lines including inline instruments and

    instrument tap points.

    a. All process lines (4 NB and Above)

    b. Utility lines (2 NB to 10 NB)

    3. Major and General Pipe Supports to assist clash detection routines.

    4. The detailing of pipe work will extend to showing all auxiliary Items included in the

    P&ID for the specified line sizes.

    5. Piping on pipe rack and pipe ways including expansion loop location.

    Electrical / Instruments

    1. Major Electrical Equipment (Previous comments and changed Items only)

    2. Preliminary layout of overhead cable tray, LV bus duct, and main cable transit blocks

    in each Electrical room.

    3. Lighting for all room and for each deck level.

    4. Packaged Equipment motors, electrical heater and control panels.

    5. Preliminary Main Electrical and Instrument Cable Ladder Routes (Previous comments

    and changed Items only)

    6. Location and Volume of Electrical and Control Rooms (Previous comments and

    changed Items only)

    7. Main Cable Tray, ladder Routing

    8. Main Junction Boxes.

    9. Local Control Panel, Local Junction box and inline mounting instruments.

    10. Field instrument with stanchion according to piping instrument tap point.

    11. Instrument Stands (check for permanent accessibility of instruments)

    12. Lighting

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 26 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    Reserve Volumes

    1. Primary and secondary Escape Routes. (Previous comments and changed Items

    only)

    2. Maintenance Areas. (Previous comments and changed Items only)

    3. Access way around all equipment. (Previous comments and changed Items only)

    4. Withdrawal Areas. (Previous comments and changed Items only)

    5. Flare Radiation Volume. (Previous comments and changed Items only)

    6. Future Equipment (Previous comments and changed Items only)

    7. Future Pipework (Limited to flow lines and major pipe runs)

    Civil

    1. Main and secondary access road layout, including road crossing structures and

    culvert. (Previous comments and changed Items only)

    2. Crane access for both construction and maintenance activities. (Previous comments

    and changed Items only)

    3. Infrastructure Administration building, Laboratory, Central control room, Electrical

    room, Warehouse, Maintenance shop etc.

    4. Pipe rack and pipeway layout. (Previous comments and changed Items only)

    5. Location of interceptors and effluent treatment facilities. (Previous comments and

    changed Items only)

    6. Equipments support, foundations and pedestal. (Previous comments and changed

    Items only)

    7. Underground facilities.

    8. Culvert location / area.

    9. Storm drains, catch basin, and pit.

    10. Trench layout and elevation.

    11. Perimeter / Property fence layout.

    5.3.7 90 % Model Review

    The Objective of the 90 % Model Review;

    1. To ensure final design acceptance by the COMPANY prior to publication of

    construction drawings/documentation.

    2. To ensure that all areas of Operability and accessibility are accepted by the

    COMPANY operations team.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 27 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    3. To ensure the constructability of all components of the project.

    4. To ensure that all the Safety philosophies, safety studies recommendations and

    HAZOP requirements have been incorporated prior to publication of construction

    drawings/documentation.

    5. To ensure that the model reflects project requirements i.e. Exhibit A Scope of Work.

    The content of the model will include the following:

    General

    1. All 60 % Model Review comments have been incorporated.

    Safety

    1. Final Safety Egress Routing Volume (Previous comments and changed item only).

    2. Final Escape Routes defined and Marked (Previous comments and changed item

    only).

    3. Final Safety distance between Equipment (Previous comments and changed item

    only).

    4. Frozen Location of the Flare in a Safe Area (Previous comments and changed item

    only).

    5. Final Fire hazard Zone / Restricted Area / Impacted Area (Previous comments and

    changed item only).

    6. Final Eye Wash, Safety Shower and all Safety (life saving) Equipment Locations

    (Previous comments and changed item only).

    7. Final review of adequate and easy Access Way for Fire Fighting Equipment (Previous

    comments and changed item only).

    8. Arrangement of the Plant to Optimize Operational Maintenance requirements and

    Provide Good Access and Working Room Around all Equipment.

    9. Fire and gas detectors locations, orientations and coverage check (Previous

    comments and changed item only). Ensure small piping / equipment added during

    90% development does not significantly obstruct F&G detector coverage.

    10. All fire fighting equipment (Previous comments and changed item only) and

    spray/sprinkler nozzle orientation on equipment to ensure full coverage on protected

    equipment surface.

    Mechanical

    1. All process and Utility and HVAC Equipment. (Previous comments and changed

    Items only)

    2. Alignment with Final Materials Handling Study

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 28 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    3. Mechanical Handling Equipment. (Previous comments and changed Items only)

    4. Platform Crane. (Previous comments and changed Items only)

    5. The detailing of equipment packages will be in basic block format only and Nozzles of

    diameter 2 NB and below will be modelled. Certified Vendor information should have

    been available by then for inclusion in modelling

    Piping

    1. All Process piping as depicted on P&IDs.

    2. All Utility piping as depicted on P&IDs.

    3. All Pipe Supports.

    4. All underground piping

    5. All sampling connections, corrosion fittings, vents, drains. The detailing of pipe work

    showing all auxiliary items included in the P&ID for the remaining line sizes.

    Electrical / Instruments

    1. Secondary Cable Tray Routing to include up to equipment termination boxes located

    in the electrical rooms and on each Deck level.

    2. Support for main & secondary cable tray.

    3. All Electrical / Instrument Cable Trench

    Reserve Volumes

    1. Maintenance Areas. (Previous comments and changed Items only)

    2. Withdrawal Areas. (Previous comments and changed Items only)

    3. Future Equipment (Previous comments and changed Items only)

    4. Future Pipe work (Previous comments and changed Items only)

    Civil

    1. All main road and secondary access road, including road crossing structures, bridge

    and culvert.

    2. All Infrastructure Buildings, Laboratory, Central control room, Electrical room,

    Warehouse, Maintenance shop and Sheds.

    3. All pipe rack structures and pipeways.

    4. All civil structures Interceptors and effluent treatment facilities.

    5. All major pipe supports, equipment supports, foundations and pedestal.

    6. All underground facilities.

    7. All culverts, storm drains, catch basin and pit.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 29 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    8. All trench layouts.

    9. Perimeter / Property Fence layout.

    5.4 RESPONSIBILITIES

    The 3D model review shall be facilitated by Contractor. Followings are the list of

    responsibilities to be carried out for the review:

    Schedule for model reviews Project Manager

    Prepare documents for Model Reviews Project Engineer

    Distribution of Review Documents, Agenda to the COMPANY

    and Contractor Disciplines

    Project Manager /

    Project Engineer

    Organize Model Review Venue Project Engineer

    Review Tools and Create Model File PDMS / AutoPLANT

    Administrator

    Report Status of 3D CAD Model Lead Piping Engineers

    Report of Hold Items List (if any) Lead Piping Engineers

    Coordination during model review Project Engineer

    Prepare and Summarize Action List Report Project Engineer

    Review, reconcile and distribute Action List Report Project Manager

    Follow up / update Action List Report Project Engineer /

    Lead Piping Engineer

    Archive PDMS/ AutoPLANT Review Models and Status Files PDMS / AutoPLANT

    Administrator

    5.5 COMMENT TAGGING

    During the review session, all comments requiring resolution will be identified and recorded in

    accordance with the checklist, exemplified in Appendix 1. All comments will be downloaded

    and re-formatted in MS Excel for status reporting and control. This will be submitted to the

    Project Manager for review and distribution to disciplines.

    The model will be revised and checked by the responsible discipline and the status of the

    action will be advised to the Model Review Coordinator/ Project Engineer for updating the

    Action List Log. The Action List Log with filled-in correction and modification items regarding to

    comments shall be submitted to COMPANY for approval via Project Engineer/Manager or

    Lead Piping Engineer.

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 30 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    6.0 APPENDICES

    Appendix 1. 3D Model Review Comments

    PTTEP MODEL REVIEW

    COMMENT Project Name

    Commenting group

    Engineer (s) signature (s)

    Date P&ID no Sheet of

    Notes: 1. Relate to the equipment no or rack Column no. 2. Tick further information is required from commenting

    group before making change

    Comment no.

    Line no. Base no. Location on

    model (note 1)

    Comment Info.

    (note 2)

  • Model Review Check List PEGS-0710-ADM-008

    February 2012 Rev.0-0 Page 31 of 31 UNCONTROLLED when printed, visit PTTEP Intranet for latest version

    LAST PAGE INTENTIONALLY BLANK

  • PTT Exploration and Production Public Company Limited

    PEGS User Feedback Form

    Doccument number PEGS-0710-ADM-008 Issued by: 0790 Rev: 0-0 Date of Issue: February 2012

    PEGS User Feedback Form : 1/2

    This section for feedback provider input only

    Details of feedback provider

    Name: Click here to enter text.

    Division/Dept: Click here to enter text.

    Location: Click here to enter text.

    Telephone: Click here to enter text.

    E-mail: Click here to enter text.

    Area of Concern: PEGS Content

    PEGS Relevance

    ISO standard

    Other standards

    Others: (please specify) Click here to enter text.

    Document Title: Click here to enter text. Document I/D: Click here

    Feedback details (when referring to documents, please state chapter and page number where appropriate.)

    Click here to enter text.

    (Please add attachments if required)

  • PTT Exploration and Production Public Company Limited

    PEGS User Feedback Form

    Doccument number PEGS-0710-ADM-008 Issued by: 0790 Rev: 0-0 Date of Issue: February 2012

    PEGS User Feedback Form : 2/2

    This section for PEGS Administrator use only

    Date received: Enter a date. Feedback register updated: Enter date.

    Received by: Enter text Feedback register updated by: Click here

    Form receipt sent: Enter date Feedback Reference # PEGS-FB-00?

    Action taken

    Click here to enter text. Date By Whom

    Click date name

    Click here to enter text. Click date name

    Further Action

    Recommended Action Deadline By Whom

    Click here to enter text. Click name

    Verification of closure of Feedback

    Click here to enter text.

    By: Click here Title: Click here Dept.: Click Date: Click

    Please send this form to PEGS Administrator: Khun Pornpimol Kongkhan ( [email protected] Ext. 4891)

    Back to PEGS Administration DocumentsPEGS-0710-ADM-0081.0 Purpose2.0 Scope3.0 Definitions3.1 Language3.2 Terminology3.3 Common Acronyms

    4.0 References4.1 PTTEP Internal References4.2 International Standards4.3 Industry Codes and Standards

    5.0 Tools5.1 Support Documents and Drawings5.2 3D Model Check List5.2.1 Safety5.2.2 General Layout and Maintenance5.2.3 Accessibility / Operability / Maintenance5.2.4 Package Units5.2.5 Model Layout5.2.6 Heat Exchangers5.2.7 Fired Heaters5.2.8 Vessels5.2.9 Pumps5.2.10 Compressors5.2.11 Other Mechanical Equipment5.2.12 Piping Layout5.2.13 Instrument5.2.14 Structural Steel5.2.15 PSVs5.2.16 Utilities5.2.17 Civil5.2.18 Storage tanks (Intermediate / Product / Feed stack Tank Farms)5.2.19 Truck loading / unloading station5.2.20 Infrastructure (administration building / laboratory / warehouse / central control room / electrical room / maintenance shop5.2.21 Underground Facilities5.2.22 Miscellaneous

    5.3 Model Review5.3.1 Model Review Purpose5.3.2 Model Review Participants5.3.3 Review Milestone Stages5.3.4 Model Review Aspects5.3.5 30 % Model Review5.3.6 60 % Model Review5.3.7 90 % Model Review

    5.4 Responsibilities5.5 Comment Tagging

    6.0 APPENDICESAppendix 1. 3D Model Review Comments