3G Node B solutions for UP (West)
For internal use only3 © Nokia Siemens Networks /
Assumptions
• All Sites of UP (West) handed over to NSN are RFAI.•All Sites will be provided with additional Poles for 3G antenna.
For internal use only4 © Nokia Siemens Networks /
RF Scenarios
Scenario 1 – OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Scenario 2 – OD Classic On RTT (System Module & RF Module on Pole)
Scenario 3 – ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)
Scenario 5 – ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Scenario 6 – ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Scenario 7 – ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
For internal use only5 © Nokia Siemens Networks /
Scenario 1- System Module inside the Out door Transmission Rack & RF Module on Pole
Proposed 3G System Module inside the Outdoor Transmission Rack & RF Module on Pole.New 3G antenna needs to be added.
For internal use only6 © Nokia Siemens Networks /
Scenario 1 – OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
BB1PP
Existing 2G Outdoor
Proposed 3 G FSMD
Sect 1 Sect 2
Sect 3
Additional 3G Antenna
Existing 2G Antenna
FRGP
Note the Jumper cable can be of Max. 7 mtrs. length
Jumper Cable
Feeder Cable
Optical Cable
Power Cable
Outdoor Trx Rack
Jumper Cable towards RF Module
Less than 25 kg weight for the RF module to mounted on Pole for 3 SectorsExtreme Flexible NodeB deploymentBetter coverageNo MHA No long Feeders
OVP
OVP
For internal use only7 © Nokia Siemens Networks /
Scenario 1 – OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System Module inside the Outdoor Transmission Rack and RF Module On Pole. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole and feeder Routing for Two sectors 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only8 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only9 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only10 © Nokia Siemens Networks /
Scenario 2- OD Classic On RTT (System Module & RF Module on Pole)
Proposed 3G System Module & RF Module on Pole.New 3G antenna needs to be added.
For internal use only11 © Nokia Siemens Networks /
Scenario 2 – OD Classic On RTT (System Module & RF Module on Pole)
BB1 BB2PP
Door
Existing 2G BTS
Sect 1 Sect 2 Sect 3
Additional 3G Antenna
Existing 2G Antenna
Proposed 3G FSMD & FRGP
RTT
DDF
Note the Jumper cable can be of Max. 7 mtrs. length
Jumper Cable
Power CableE1/Ethernet Cable
Less than 25 kg weight for the RF module to mounted on Pole for 3 SectorsExtreme Flexible NodeB deploymentBetter coverageNo MHA No long Feeders Zero Footprint
For internal use only12 © Nokia Siemens Networks /
Scenario 2 – OD Classic On RTT (System Module & RF Module on Pole)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System Module and RF Module On RTT. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only13 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only14 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only15 © Nokia Siemens Networks /
Scenario 3 – ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Proposed 3G System Module Inside Existing Transmission rack & RF Module on Pole.New 3G antenna needs to be added.
For internal use only16 © Nokia Siemens Networks /
BB1 BB2PP
Door
Existing 2G Indoor BTS
Proposed 3G FSIA
Sect 1 Sect 2 Sect 3
Additional 3G Antenna
Existing 2G Antenna
FRGP
Scenario 3 – ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Existing TX Rack
RTT/GBT
Note the Jumper cable can be of Max. 7 mtrs. length
No additional footprint inside the shelter.Use of existing 19” rack. Triple RF Unit on Pole and System Module Indoor,• No additional feeder• Better coverage
OVP
For internal use only17 © Nokia Siemens Networks /
Scenario 3 – ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System Module Inside Existing Transmission Rack and RF Module On Pole. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only18 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only19 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only20 © Nokia Siemens Networks /
Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)
Proposed 3G System Module & RF Module on Pole where Existing 3G is Outdoor.New 3G antenna needs to be added.
For internal use only21 © Nokia Siemens Networks /
Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)
Existing 2G Outdoor
Sect 1 Sect 2 Sect 3
Additional 3G Antenna
Existing 2G Antenna
BB1PP
Proposed 3G FSMD & FRGP
Note the Jumper cable can be of Max. 7 mtrs. length
DDF
Jumper Cable
Feeder Cable
Optical Cable
Power Cable
E1/Ethernet Cable
Less than 50 Kg weight for the entire Node B!Extreme Flexible Node B Deployment Zero Foot Print
For internal use only22 © Nokia Siemens Networks /
Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System Module and RF Module On Pole. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only23 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only24 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only25 © Nokia Siemens Networks /
Scenario 5 – ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Proposed 3G System Module inside the shelter Tx rack.RF Module would be installed on the Pole.2G Antenna needs to be swapped with Dual or Tri-band antenna.
For internal use only26 © Nokia Siemens Networks /
Scenario 5 – ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
BB1 BB2PP
Door
Existing 2G Indoor
Proposed 3G FSIA
Sect 1 Sect 2 Sect 3
Swap of 2G antenna with
Dual Band Antenna
Existing 2G Antenna
FRGP
Day Activity
Night Activity
Existing TX Rack
No additional footprint inside the shelter.Use of existing 19” rack. Triple RF and System Module Inside Tx Rack,• No tower loading• Better coverage
OVP
For internal use only27 © Nokia Siemens Networks /
Scenario 5 – ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System Module inside the shelter Tx rack and RF Module On Pole. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Swapping of 2G Antenna & Installation of 3G – Night Activity 3 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only28 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only29 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only30 © Nokia Siemens Networks /
Scenario 6 – ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Proposed 3G System & RF Module inside the Existing BTS Room in the existing Transmission Rack.New 3G antenna needs to be added.
For internal use only31 © Nokia Siemens Networks /
Scenario 6 – ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
BB1 BB2PP
Door
Existing Indoor BTS
Proposed 3G FSIA & FRGP Modules inside
Existing Tx Rack
Sect 1 Sect 2 Sect 3
Additional 3G Antenna
Existing 2G Antenna
Existing Tx Rack
No additional footprint inside the shelter.Use of existing 19” rack. Triple RF and System Module Inside Tx Rack,• No tower loading• Better coverage
For internal use only32 © Nokia Siemens Networks /
Scenario 6 – ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2 Installation Of System & RF Module in the Existing Transmission rack beside existing BTS. 2 Hours - Day 2
3 Routing of Feeder Cable 2 Hour - Day 2
4 Routing of Power and Fiber Cable from System Module to RF Module 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only33 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only34 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only35 © Nokia Siemens Networks /
Scenario 7 – ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Proposed 3G System module inside the Transmission rack & Single RF Module on Pole.New 3G antenna needs to be added.
For internal use only36 © Nokia Siemens Networks
Scenario 7 – ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
BB1 BB2PP
Door
Existing 2G Indoor
Proposed 3G FSIA
Sect 1 Sect 2
Sect 3
Additional 3G Antenna
Existing 2G Antenna
FRGG
Jumper Cable
Feeder Cable
Optical Cable
Power Cable
FRGG
FRGG
Note the Jumper cable can be of Max. 7 mtrs. length
Existing Tx rack
For internal use only37 © Nokia Siemens Networks /
Scenario 7 – ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Sr. No. Activity Duration
1 Material Delivery-- 3G Antenna & Node B Day 1
2Installation Of System Module inside the shelter Transmission rack and Single RF Modules On sector Poles. 2 Hours - Day 2
3 Routing of Power Cable to System Module 1 Hour - Day 2
4 Routing of Power and Fiber Cables from System Module to RF Modules 1 Hour - Day 2
5 Ethernet Cable Routing From DDF to System Module 1 Hour - Day 2
6 Installation of 3G Antenna On Pole. 2 Hours - Day 2
7 Connecting the Jumpers from RF Module to Antenna 0.5 Hours -Day 2
For internal use only38 © Nokia Siemens Networks /
Commissioning, Integration and Acceptance testing of Node B
Sr. No. Activity Duration
1 Powering The Node B 0.5 Hours - Day 3
2 Commissioning of Node B 0.5 Hours - Day 3
3 Integrating of Node B with RNC 1 Hour - Day 3
4 Acceptance Testing 3 Hours - Day 3
For internal use only39 © Nokia Siemens Networks /
Reverse Logistics
Sr. No. Activity Duration
1 Dismantling of Unused Antenna 2 Hours - Day 3
2 Packing of Extra Material at site 2 Hours - Day 3
3 Transportation of packed unused material to warehouse 2 Hours - Day 3
For internal use only40 © Nokia Siemens Networks
MW Scenario Idea UP-West
For internal use only41 © Nokia Siemens Networks
MW Scenario Idea UP-West
Scenario 1 : 2 New SDH Hybrid+ 1 New PDH Hybrid
Scenario 2 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
Scenario 3 : 2 New SDH Hybrid Links
Scenario 4 : 2 New SDH Hybrid, 2 New PDH Hopper
Scenario 5 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
Scenario 6 : Existing Single PDH Hopper
Scenario 7 : 2 PDH (1 New Hybrid+1 Existing Hopper)
Scenario 8 : 3 New Flexi Hybrid + 1 New PDH Hopper
Scenario 9 : 2 New SDH Hybrid, 1 New PDH Hopper
Scenario 10: 2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)
Scenario 11: 1 New PDH Hybrid
For internal use only42 © Nokia Siemens Networks
Scenario-1
Scenario-2
Scenario-3Scenario-4
Scenario-5
Scenario-6
Scenario-7
Connectivity Cluster-1
For internal use only43 © Nokia Siemens Networks
Scenario-8
Scenario-9
Scenario-11
Connectivity Cluster-2
For internal use only44 © Nokia Siemens Networks
Scenario-10
Connectivity Cluster-3
For internal use only45 © Nokia Siemens Networks
2GBTS
E1/T1
FlexihybridFlexihybrid
Flexihybrid (2+0)Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 1
SADARBZR(POP Location)
• 2 New SDH Hybrid+ 1 New PDH Hybrid
AI_MOHANPURAArjun
A_BALU GANJ
For internal use only46 © Nokia Siemens Networks /
Scenario – 1 NEW SDH
Sr. No. Activity Duration Outage/ Non Outage
1 ODU & Antenna Installation. 2 Hours - Day 2Non Outage
2 IF Cable Laying and termination 1 Hour - Day 2Non Outage
3 Hybrid IDU Installation in 19” Rack. 0.25 Hour -Day 2Non Outage
4 Power Cable Laying & termination. 0.25 Hour -Day 2Non Outage
5 DDF Block Installation, E1 & Ethernet Termination. 0.25 Hour -Day 2Non Outage
6 Commissioning Near End and Far End 0.25 Hour -Day 2Non Outage
7 Link Alignment 2 Hours - Day 2Non Outage
8 E1 Patching and testing 0.5 Hour - Day 2Non Outage
9 Acceptance Testing 2 Hours - Day 2Non Outage
For internal use only47 © Nokia Siemens Networks
2GBTS
RRI
FlexihybridFlexihybrid
FIU19
Flexihybrid (2+0)Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 1.1
SADARBZR(POP Location)
2 New SDH Hybrid+ 1 New PDH Hybrid
AI_MOHANPURAArjun
A_BALU GANJ
For internal use only48 © Nokia Siemens Networks /
Scenario – 1.1 NEW SDH/PDH
Sr. No. Activity Duration Outage/ Non Outage
1 ODU & Antenna Installation. 2 Hours - Day 2Non Outage
2 IF Cable Laying and termination 1 Hour - Day 2Non Outage
3 Hybrid IDU Installation in 19” Rack. 0.25 Hour -Day 2Non Outage
4 Power Cable Laying & termination. 0.25 Hour -Day 2Non Outage
5 DDF Block Installation, E1 & Ethernet Termination. 0.25 Hour -Day 2Non Outage
6 Commissioning Near End and Far End 0.25 Hour -Day 2Non Outage
7 Link Alignment 2 Hours - Day 2Non Outage
8 E1 Patching and testing 0.5 Hour - Day 2Non Outage
9 Acceptance Testing 2 Hours - Day 2Non Outage
For internal use only49 © Nokia Siemens Networks
2GBTSFIPA
FlexihybridFlexihybrid
FIU19
Flexihybrid (2+0)
Scenario 2
AI_MOHANPURA (2G Site)
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
PDH Hopper
PDH Hopper
SADARBZR SHAHGANJ
BaluIDGAH
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
For internal use only50 © Nokia Siemens Networks /
Scenario – 2 Existing PDH with FIU & EPIU
Sr. No. Activity Duration Outage/ Non Outage
1 New FIU with EPIU Installation in 19” Rack. 0.5 Hours - Day 2Non Outage
2 Power Cable Laying & termination. 0.5 Hours - Day 2Non Outage
3 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours - Day 2Non Outage
4 Configuration of FIU 0.5 Hours - Day 2Outage
5 E1 Testing 0.5 Hours - Day 2Outage
6 Traffic Shifting 0.5 Hours - Day 2Outage
8 Acceptance Testing 1 Hour - Day 2Outage
For internal use only51 © Nokia Siemens Networks
2GBTSFIFA
FlexihybridFlexihybrid
FIU19 + FB3/FB4
Flexihybrid (2+0)
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Scenario 2.1
AI_MOHANPURA (2G Site)
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
PDH Hopper
SADARBZR SHAHGANJ
Balu
PDH Hopper
IDGAH
For internal use only52 © Nokia Siemens Networks /
Scenario – 2.1 Existing PDH with FIU & EPIU + FB3/FB4
Sr. No. Activity Duration Outage/ Non Outage
1 New FIU with EPIU & FB3/FB4 Installation in 19” Rack. 0.5 Hours - Day 2Non Outage
2 Power Cable Laying & termination. 0.5 Hours - Day 2Non Outage
3 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours - Day 2Non Outage
4 Configuration of FIU 0.5 Hours - Day 2Outage
5 E1 Testing 0.5 Hours - Day 2Outage
6 Traffic Shifting 0.5 Hours - Day 2Outage
8 Acceptance Testing 1 Hour - Day 2Outage
For internal use only53 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
Flexihybrid (2+0)
Scenario 3
SHAHGANJ
2 New SDH Hybrid Links
NodeB
FTIB
ManasAI_MOHANPURA
E1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only54 © Nokia Siemens Networks /
Scenario – 3 NEW SDH
Sr. No. Activity Duration Outage/ Non Outage
1 ODU & Antenna Installation. 2 Hours - Day 2Non Outage
2 IF Cable Laying and termination 1 Hour - Day 2Non Outage
3 Hybrid IDU Installation in 19” Rack. 0.25 Hour -Day 2Non Outage
4 Power Cable Laying & termination. 0.25 Hour -Day 2Non Outage
5 DDF Block Installation, E1 & Ethernet Termination. 0.25 Hour -Day 2Non Outage
6 Commissioning Near End and Far End 0.25 Hour -Day 2Non Outage
7 Link Alignment 2 Hours - Day 2Non Outage
8 E1 Patching and testing 0.5 Hour - Day 2Non Outage
9 Acceptance Testing 2 Hours - Day 2Non Outage
For internal use only55 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
Flexihybrid (2+0)
Scenario 3.1
SHAHGANJ
2 New SDH Hybrid Links
NodeB
FTIB
ManasAI_MOHANPURA
FIU19
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only56 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
Flexihybrid (2+0)
Scenario 4
Manas2 New SDH Hybrid, 2 New PDH Hopper
NodeB
FTIB
FIU19
PDH Hopper
PDH Hopper
T_Sivaji
T_Anjani puram
SHAHGANJArjunE1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only57 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
Flexihybrid (2+0)
Scenario 4.1
Manas2 New SDH Hybrid, 2 New PDH Hopper
NodeB
FTIB
FIU19
PDH Hopper
T_Sivaji
T_Anjani puram
SHAHGANJArjun
FIU19
PDH Hopper
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only58 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
Scenario 5
Arjun 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
PDH Hopper
PDH Hopper
NodeB
FTIB
Manas SADARBZR
A_Kedar Nagar
A_Arjun Nagar
E1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only59 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
PDH Hopper
FIU19
PDH Hopper
Scenario 5.1
Arjun 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
NodeB
FTIB
Manas SADARBZR
A_Kedar Nagar A_Arjun Nagar
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only60 © Nokia Siemens Networks
2GBTSFIFA
PDH Hopper
Scenario 6
A_Arjun Nagar
Existing Single PDH Hopper
NodeB
FTFB
FTFB
Arjun
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
For internal use only61 © Nokia Siemens Networks
2GBTSFIPA
PDH Hopper
Scenario 6.1
A_Arjun Nagar
Existing Single PDH Hopper
NodeB
FTIB
FIU19
Arjun
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
For internal use only62 © Nokia Siemens Networks
Scenario 7
A_BALU GANJ2 PDH (1 New Hybrid+1 Existing Hopper)
2GBTSFIPA
FlexihybridPDH Hopper
FIU19
Flexihybrid (1+0)
NodeB
FTIB
SADARBZRA_Adresh Nagar
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
For internal use only63 © Nokia Siemens Networks
Scenario 7.1
A_BALU GANJ2 PDH (1 New Hybrid+1 Existing Hopper)
2GBTSFIFA
FlexihybridPDH Hopper
FIU19
Flexihybrid (1+0)
NodeB
FTIB
SADARBZRA_Adresh Nagar
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
For internal use only64 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
PDH Hopper
Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
Scenario 8
Sanjay Complex-BKamlangr Entry
Nehru
Akriti
SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper
E1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only65 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
PDH Hopper
Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
Scenario 8.1
Sanjay Complex-BKamlangr Entry
Nehru
Akriti
SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only66 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
Scenario 9
WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper
PDH Hopper
NodeB
FTIB
AkritiKhandari
Khandari 1
E1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only67 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid
FIU19
Flexihybrid (2+0)
Scenario 9.1
WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper
PDH Hopper
NodeB
FTIB
AkritiKhandari
Khandari 1
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only68 © Nokia Siemens Networks
Scenario 10
2GBTSIP-10
IP-10
FIU19
CERAGON-IDU
PDH Hopper
Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
ECI-BG-20 Mux
Delhi Gate
RAJA_KI_MANDIA_Loha mandi
A_TRANSPORT NGR SEC-4
Hariparvat
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)
E1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only69 © Nokia Siemens Networks
2GBTS
FIU19
CERAGON-IDU
PDH
Fiber
MUX
NodeB
FTIB
FLEXIHYBRID 1+0
Flexihybrid
ECI-BG-20 Mux
IP-10IP-10
PDH Hopper
Flexihybrid
RAJA_KI_MANDIA_Loha mandi
A_TRANSPORT NGR SEC-4
Hariparvat
Scenario 10.1
Delhi Gate
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only70 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid (1+0)
Scenario 11
1 New PDH Hybrid
NodeB
FTIB
Gandhi
Kamlangr EntryE1/T1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
For internal use only71 © Nokia Siemens Networks
2GBTSFlexihybrid
Flexihybrid (1+0)
Scenario 11.1
1 New PDH Hybrid
NodeB
FTIB
Kamlangr Entry
Gandhi
FIU19
RRI
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
For internal use only72 © Nokia Siemens Networks
Sr. No POP Site A Site Name_A 2G/ 3G_A BTS Type ID/ OD Site B Site Name_B 2G/ 3G_B Link Status Priority Tx ScenarioRF
Scenarios
1 3209 SADARBZR 2G+3G ULTRASITE ID 3252 Arjun 2G+3G New Hybrid SDH P1 Scenario-12 3252 Arjun 2G+3G ULTRASITE ID 3236 Manas 2G+3G New Hybrid SDH P2 Scenario-53 3236 Manas 2G+3G ULTRASITE ID 3207 SHAHGANJ 2G+3G New Hybrid SDH P2 Scenario-44 3207 SHAHGANJ 2G+3G ULTRASITE ID 895 AI_MOHANPURA 2G New Hybrid SDH P2 Scenario-35 895 AI_MOHANPURA 2G FLEXI EDGE ID 3209 SADARBZR 2G+3G New Hybrid SDH P1 Scenario-26 3252 Arjun 2G+3G ULTRASITE ID 3297 A_Arjun Nagar 2G+3G Existing FlexiHopper P2 Scenario-57 3252 Arjun 2G+3G ULTRASITE ID 3296 A_Kedar Nagar 2G+3G Reuse FlexiHopper P3 Scenario-58 3236 Manas 2G+3G ULTRASITE ID 3244 T_Sivaji 2G+3G Reuse FlexiHopper P3 Scenario-49 3236 Manas 2G+3G ULTRASITE ID 3256 T_Anjani puram 2G+3G Reuse FlexiHopper P3 Scenario-4
10 895 AI_MOHANPURA 2G FLEXI EDGE ID 3224 IDGAH 2G+3G Reuse FlexiHopper P3 Scenario-211 895 AI_MOHANPURA 2G FLEXI EDGE ID 3240 Balu 2G+3G Existing FlexiHopper P2 Scenario-212 3209 SADARBZR 2G+3G ULTRASITE ID 3042 A_BALU GANJ 2G+3G New Hybrid PDH P1 Scenario-113 3042 A_BALU GANJ 2G+3G FLEXI EDGE ID 3045 A_Adresh Nagar 2G Existing FlexiHopper P2 Scenario-714 3045 A_Adresh Nagar 2G FLEXI EDGE ID 3048 HI_Chhipitola 2G Reuse FlexiHopper P3
15 3200 SANJAYCPLX 2G+3G ULTRASITE ID 3242 Akriti 2G+3G New Hybrid SDH P1 Scenario-816 3242 Akriti 2G+3G ULTRASITE OD 3205 WHITEHOUSE 2G+3G New Hybrid SDH P1 Scenario-917 3205 WHITEHOUSE 2G+3G ULTRASITE ID 3237 Khandari 2G+3G New Hybrid SDH P1 Scenario-918 3200 SANJAYCPLX 2G+3G ULTRASITE ID 3279 Sanjay Complex-B 2G New Hybrid PDH P3 Scenario-819 3200 SANJAYCPLX 2G+3G ULTRASITE ID 3238 Nehru 2G+3G Reuse FlexiHopper P3 Scenario-820 3200 SANJAYCPLX 2G+3G ULTRASITE ID 3265 Kamlangr Entry 2G+3G New Hybrid PDH P1 Scenario-821 3265 Kamlangr Entry 2G+3G ULTRASITE OD 3245 Gandhi 2G+3G New Hybrid PDH P2 Scenario-1122 3242 Akriti 2G+3G ULTRASITE OD 3251 Shah mkt 2G New Hybrid PDH P3 Scenario-123 3205 WHITEHOUSE 2G+3G ULTRASITE ID 392 Khandari 1 2G+3G Reuse FlexiHopper P3 Scenario-924 3237 Khandari 2G+3G ULTRASITE ID 3258 Vidya 2G+3G Reuse FlexiHopper P3 Scenario-925 3237 Khandari 2G+3G ULTRASITE ID 3261 Khandari A 2G New Hybrid PDH P2 Scenario-926 3261 Khandari A 2G ULTRASITE ID 3053 A_MAYAPURI 2G New Hybrid PDH P3 Scenario-3
SAD
AR
BZR
SAN
JAYC
PLX
Link Details
For internal use only73 © Nokia Siemens Networks
MW Scenario Idea Haryana
For internal use only74 © Nokia Siemens Networks
Existing 1 PDH,1 NEW PDH Hops
Existing 1 PDH Hop
1 SDH, 1 NEW PDH
Existing 2 PDH Hops
1 NEW PDH Hop
PDH Replace with Flexi Hybrid
1 NEW HYBRID, 1 UPGRADE TO HYBRID
MW Scenario Idea Haryana
Scenario 1 :Scenario 2 :Scenario 3 :Scenario 4:Scenario 5:Scenario 6:Scenario 7:
For internal use only75 © Nokia Siemens Networks
Scenario 4
Scenario 2
Cluster 1
For internal use only76 © Nokia Siemens Networks
Scenario 6
Scenario 7
Cluster 2
For internal use only77 © Nokia Siemens Networks
Scenario 5Scenario 3
Scenario 1
Cluster 3
For internal use only78 © Nokia Siemens Networks
NodeB
2GBTS
FTIB
FIPA
Scenario 1
FIU 19
PDH PDH
Option 1 : Existing FB interface Option 2 : Existing E1 interface
PDH PDH
NodeB
2GBTS
FTFB
FIFA
FTFBEIPU Card
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Towards Samrat Woolen Mill Towards Samrat Woolen MillTowards Noorwala
Towards Noorwala
Barshat Road
Existing 1 PDH,1 NEW PDH Hops
For internal use only79 © Nokia Siemens Networks /
Scenario – 1 Existing PDH with FIU & EPIU
Sr. No. Activity Duration Outage/ Non Outage
1 New FIU with EPIU Installation in 19” Rack. 0.5 Hours - Day 2Non Outage
2 Power Cable Laying & termination. 0.5 Hours - Day 2Non Outage
3 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours - Day 2Non Outage
4 Configuration of FIU 0.5 Hours - Day 2Outage
5 E1 Testing 0.5 Hours - Day 2Outage
6 Traffic Shifting 0.5 Hours - Day 2Outage
8 Acceptance Testing 1 Hour - Day 2Outage
For internal use only80 © Nokia Siemens Networks
Scenario 2
1 Existing PDH Hop
NodeB
2GBTS
FTFB
RRI NodeB
2GBTS
FTIB
E1T1
FTFB
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
PDH PDH
Towards Pachranga Towards Pachranga
Sethi Chowk
FIU 19
For internal use only81 © Nokia Siemens Networks /
Scenario – 2 Existing PDH with FTFB
Sr. No. Activity Duration Outage/ Non Outage
1 FTFB Installation in NodeB. 0.5 Hours- Day 2 Non Outage
2 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours- Day 2 Non Outage
3 IF Cable Replacement with IF Connectorisation at Antenna end. 0.5 Hours- Day 2 Outage
4 Coaxial cable connectivity from FTFB to existing FIFA/RRI. 0.5 Hours- Day 2 Outage
5 Commissioning Near End and Far End 0.5 Hours- Day 2 Outage
6 E1 Testing 0.5 Hours- Day 2 Outage
7 Acceptance testing 1 Hour -Day 2 Outage
For internal use only82 © Nokia Siemens Networks
• 1 SDH, 1 NEW PDH
2GBTS
RRI
Ceragon IP-10
FIU19
Ceragon-IDU
PDH
Fiber MUX
FTFB
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
ECI-BG-20 Mux
Scenario 3
Towards Samrat Woolen Mill
Towards Bichpuri
Yamuna Enclave
For internal use only83 © Nokia Siemens Networks /
Scenario – 3 Existing PDH with FIU & EPIU
Sr. No. Activity Duration Outage/ Non Outage
1 New FIU with EPIU Installation in 19” Rack. 0.5 Hours - Day 2Non Outage
2 Power Cable Laying & termination. 0.5 Hours - Day 2Non Outage
3 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours - Day 2Non Outage
4 Configuration of FIU 0.5 Hours - Day 2Outage
5 E1 Testing 0.5 Hours - Day 2Outage
6 Traffic Shifting 0.5 Hours - Day 2Outage
8 Acceptance Testing 1 Hour - Day 2Outage
For internal use only84 © Nokia Siemens Networks
• 1 SDH, 1 NEW PDH
2GBTSE1T1
Ceragon IP-10
FIU19
Ceragon-IDU
PDH
Fiber MUX
FTFB
Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card
ECI-BG-20 Mux
Scenario 3.1
Towards Samrat Woolen Mill
Towards Bichpuri
Yamuna Enclave
For internal use only85 © Nokia Siemens Networks /
Scenario – 3.1 Existing PDH with FIU & EPIU
Sr. No. Activity Duration Outage/ Non Outage
1 New FIU with EPIU Installation in 19” Rack. 0.5 Hours - Day 2Non Outage
2 Power Cable Laying & termination. 0.5 Hours - Day 2Non Outage
3 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours - Day 2Non Outage
4 Configuration of FIU 0.5 Hours - Day 2Outage
5 E1 Testing 0.5 Hours - Day 2Outage
6 Traffic Shifting 0.5 Hours - Day 2Outage
8 Acceptance Testing 1 Hour - Day 2Outage
For internal use only86 © Nokia Siemens Networks
NodeB
2GBTS
FTIB
E1T1
Scenario 4
Existing 2 PDH Hops
FIU 19
PDH PDH
Option 1 : Existing FB interface Option 2 : Existing E1 interface
PDH PDHNodeB
2GBTS
FTIB
RRI
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Towards SukhdevnagarTowards Sukhdevnagar
Towards Sethi Chowk
Pachranga
FIU 19
Towards Sethi Chowk
For internal use only87 © Nokia Siemens Networks
Scenario 5
1 NEW PDH Hop
NodeB
2GBTS
FTFB
RRI NodeB
2GBTS
FTFB
E1T1
FTFB
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Towards Yamuna Enclave
Bichpuri
FIU 19
Towards Yamuna Enclave
PDHPDH
For internal use only88 © Nokia Siemens Networks /
Scenario – 5 NEW PDH
Sr. No. Activity Duration Outage/ Non Outage
1 ODU & Antenna Installation. 2 Hours - Day 2Non Outage
2 IF Cable Laying and termination 1 Hour - Day 2Non Outage
3 Hybrid IDU Installation in 19” Rack. 0.25 Hour -Day 2Non Outage
4 Power Cable Laying & termination. 0.25 Hour -Day 2Non Outage
5 DDF Block Installation, E1 & Ethernet Termination. 0.25 Hour -Day 2Non Outage
6 Commissioning Near End and Far End 0.25 Hour -Day 2Non Outage
7 Link Alignment 2 Hours - Day 2Non Outage
8 E1 Patching and testing 0.5 Hour - Day 2Non Outage
9 Acceptance Testing 2 Hours - Day 2Non Outage
For internal use only89 © Nokia Siemens Networks
NodeB
2GBTS
FTIB
E1T1
Scenario 6
PDH Replace with Flexi Hybrid
FLEXIHYBRID 1+0
NodeB
2GBTS
FTIB
RRI
FLEXIHYBRID 1+0
Option 1 : Existing FB interfaceOption 1 : Existing E1 interface
Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card
Towards Lal Bati Panipat Towards Lal Bati Panipat
Gur Mandi Panipat
FIU19 FIU19
For internal use only90 © Nokia Siemens Networks /
Scenario – 6 PDH TO SDH
Sr. No. Activity Duration Outage/ Non Outage
1 Hybrid IDU Installation. 0.5 Hours- Day 2 Non Outage
2 New FIU Installation in 19” Rack. 0.5 Hours- Day 2 Non Outage
3 Power Cable Laying & termination. 0.5 Hours- Day 2 Non Outage
4 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours- Day 2 Non Outage
5 ODU Replacement with IF Connectorisation at Antenna end. 0.5 Hours- Day 2 Outage
6 Coaxial cable connectivity from FIU to existing RRI. 0.5 Hours- Day 2 Outage
7 Commissioning Near End and Far End 0.5 Hours- Day 2 Outage
8 E1 Testing 0.5 Hours- Day 2 Outage
9 Traffic Shifting on new Flexi Hybrid Hop 0.5 Hours- Day 2 Outage
10 Acceptance testing 1 Hour -Day 2 Outage
For internal use only91 © Nokia Siemens Networks
• 1 NEW HYBRID, 1 UPGRADE TO HYBRID
2GBTS
RRI
Flexihybrid Upgrade to Hybrid
FIU19
Flexihybrid (2+0)
NodeB
FTIB
Scenario 7
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Towards Ashram Road
Towards Gur Mandi Panipat
Lal Bati Panipat
For internal use only92 © Nokia Siemens Networks /
Scenario – 7 PDH TO SDH
Sr. No. Activity Duration Outage/ Non Outage
1 Hybrid IDU Installation. 0.5 Hours- Day 2 Non Outage
2 New FIU Installation in 19” Rack. 0.5 Hours- Day 2 Non Outage
3 Power Cable Laying & termination. 0.5 Hours- Day 2 Non Outage
4 DDF Block Installation, E1 & Ethernet Termination. 0.5 Hours- Day 2 Non Outage
5 ODU Replacement with IF Connectorisation at Antenna end. 0.5 Hours- Day 2 Outage
6 Coaxial cable connectivity from FIU to existing RRI. 0.5 Hours- Day 2 Outage
7 Commissioning Near End and Far End 0.5 Hours- Day 2 Outage
8 E1 Testing 0.5 Hours- Day 2 Outage
9 Traffic Shifting on new Flexi Hybrid Hop 0.5 Hours- Day 2 Outage
10 Acceptance testing 1 Hour -Day 2 Outage
For internal use only93 © Nokia Siemens Networks
Sr No
Node IDPop
Location
Priority
Site_A_NameSite Type
BTS Type
Flexi/Ultra Site_B Link Status Site Name_B 2G/
3G_B Tx Scenario
1 PNP141
Samrat Woolen
Mill
P1Samrat Woolen Mill GBT Indoor ULTRASITE Samrat Woolen Mill 3G Connected on Fiber
2 PNP142P2
Barshat Road RTT Outdoor FLEXI EDGE PNP141 Existing PDH Samrat Woolen Mill 3G Scenario 1
3 PNP159P2
Babarpur RTT Outdoor ULTRASITE PNP141 Existing PDH Samrat Woolen Mill 3G Scenario 2
4 PNP169P2
Yamuna Enclave GBT Indoor ULTRASITE PNP141Existing Ceragon
IP-10 Samrat Woolen Mill 3G Scenario 3
5 PNP182P2
Narula_Panipat RTT Indoor ULTRASITE PNP141 Existing PDH Samrat Woolen Mill 3G Scenario 4
6 PNP184P2
Jawahar_Panipat GBT Indoor ULTRASITE PNP141 Existing PDH Samrat Woolen Mill 3G Scenario 1
7 PNP3513P3
Kabri Road GBT Indoor ULTRASITE 3503 Existing PDH 3G Scenario 4
8 PNP3520P3
Siddharth Nagar RTT Indoor ULTRASITE PNP182 Existing PDH Narula_Panipat 3G Scenario 2
9 PNP3523P3
Barsat Road RTT Outdoor FLEXI EDGE PNP184 New PDH Jawahar_Panipat 3G Scenario 5
10 PNP346P3
Bichpuri RTT Indoor ULTRASITE PNP169 New PDH Yamuna Enclave 3G Scenario 5
11 PNP3580P3
Kabri GBT Indoor FLEXI EDGE 3513 Existing PDH Kabri Road 3G Scenario 2
12 PNP51P3
Noorwala GBT Outdoor FLEXI EDGE PNP142 NEW PDH Barshat City 3G Scenario 5
13 PNP144P2
Gur Mandi Panipat RTT Indoor ULTRASITE PNP153 Upgrade to hybrid Lal Bati, Panipat 3G Scenario 6
14 PNP153
Sukhdevnagar
P2Lal Bati, Panipat RTT Outdoor ULTRASITE PNP3524 New Hybrid Ashram Road 3G Scenario 7
15 PNP347P2
Ashok Vihar GBT Indoor ULTRASITE PNP348 Existing PDH Sukhdevnagar 3G Scenario 4
16 PNP348P1
Sukhdevnagar RTT Indoor FLEXI EDGE 3G Connected on Fiber
17 PNP3510P3
Sethi Chowk RTT Indoor ULTRASITE PNP3516 Existing PDH Pachranga 3G Scenario 2
18 PNP3516P2
Pachranga RTT Indoor ULTRASITE PNP348 Existing PDH Sukhdevnagar 3G Scenario 4
19 PNP3524P2
Ashram Road RTT Indoor ULTRASITE PNP153Existing Ceragon
IP-10 Lal Bati, Panipat 3G Scenario 7
20 PNP3525P2
Adarsh Nagar Panipat RTT Indoor ULTRASITE PNP3524 Upgrade to hybrid Ashram Road 3G Scenario 6
21 PNP3581P3
Indira Colony RTT Indoor FLEXI EDGE PNP347 Existing PDH Ashok Vihar 3G Scenario 2
22 PNP3518P3
Patel Nagar Panipat RTT Indoor ULTRASITE PNP182 Existing PDH Narula_Panipat 3G Scenario 2
For internal use only94 © Nokia Siemens Networks /
3G Core Upgrades for UP (West) & Haryana
For internal use only95 © Nokia Siemens Networks
UP-West Network – User Plane (3G Phase1)
Meerut ZoneAgra Zone
Moradabad Zone
VAS Zone
MGW
4
MGW
12
MGW
9
MGW
14
MGW
11
MGW
8
MGW
7
GMGW
4
GMGW
5
MSS
4
MSS
3
GCS
3
MSS
2
MSS
5
GMGW
3
GCS
2
GMGW
2
GCS
1
GMGW
1
MGW
5
SCP
SMS
MGW
17
MSS
8
MGW
16MGW
10
MSS
6
MGW
2
MGW
1
MSS
1
User Plane over IP
User Plane over TDM
MGW
6
MGW
13
Dehradun Zone
MSS
7
MGW
15
HLR2
HLR1
HLR3
Agra RNC
D’dun RNC
Mbd RNC
Mrt RNC
MGW
18MSS
9
For internal use only96 © Nokia Siemens Networks Presentation / Author / Date
Haryana Network – User Plane (3G Phase1)
Ambala Zone
Sonipat Zone
Hissar Zone
MGW
1
MSS
1
HLR1
VAS Zone
SCP
SMS
MGW
4
MSC
1
MSC
2
TDM Mesh
TDM Mesh
User Plane over IP
User Plane over TDM
MSS
2MGW
3
MGW
5
GCS
1
GMGW
1
Amb RNC
Soni RNC
Hiss RNC
MGW
3
MSS
6
For internal use only97 © Nokia Siemens Networks
Core 2G Nodes Rollout Plan – UP(West)
Node Project Site Node Name RFS Date Duration Current Status
MGW Exp 12K U4 to 20K U4 UDAAN Moradabad MGW14 10-Sep-10 3days Delivered Onsite
MGW Exp 12K U4 to 20K U4 UDAAN Dehradun MGW15 10-Sep-10 3days Delivered Onsite
MSS M14 600K UDAAN Moradabad MSS09 17-Sep-10 24 days Installation In Progress
MGW 20K Model U4 HW ** UDAAN Moradabad MGW18 10-Sep-10 24 days Installation In Progress
GMGW 20K Model U4 HW ** UDAAN Meerut GMGW07 10-Sep-10 18 days Delivered Onsite
** The duration mentioned includes Installation , C&I ,Acceptance Testing & Live Cutover
Core 2G Nodes Rollout Plan – Haryana
Node Project Site Node Name RFS Date Duration Current Status
MSS M14 600K** UDAAN Ambala MSS03 29-Sep-10 24 days In Transit
MGW 20K Model U4 HW ** UDAAN Ambala MGW07 30-Sep-10 24 days In Transit
For internal use only98 © Nokia Siemens Networks
Details of Activities & Timelines for various CORE rollouts.
MGW/GMGW Expansion 12K U4 to 20K U4 (3 Days):
• Creation of Units(TCU, ISU,IWS1, MXU), Diagnosis of new Units,
IP Allocation, VMGW Creation
• NIWU shifting
MSS 600K/MGW 20K (24 Days):
• The duration mentioned includes Installation , C&I ,Acceptance Testing & Live Cutover
GMGW (18 days):
• The duration mentioned includes Installation , C&I ,Acceptance Testing & Live Cutover
Power & Space Requirements :
NETWORK ELEMENT Max No. Of Rack(s) Cabinet Cabinet Size(WxDxH) Estimated/Rated Power In
WattsTypical/Operating Power In
WattsMCB/Fuse
Requirements/RackMGW Exp 12K to 20K 1 CAMC 600x600x2100 mm 4800 2100 2x100A
NETWORK ELEMENT Max No. Of Rack(s) Cabinet Cabinet Size(WxDxH) Estimated/Rated Power
In WattsTypical/Operating Power
In WattsMCB/Fuse
Requirements/RackMGW U4 20K/GMGW 3 CAMA 600x600x2100 mm 4800 2300 2x100A
CAMB 600x600x2100 mm 4800 2200 2x100A CAMC 600x600x2100 mm 4800 2100 2x100A
NETWORK ELEMENTMax No. Of
Rack(s) Cabinet Cabinet Size(WxDxH)Estimated/Rated Power
In WattsTypical/Operating Power
In WattsMCB/Fuse
Requirements/RackRNC 2 RNAC 600x600x2100 mm 4800 2600 2X125A RNBC 600x600x2100 mm 4800 2800 2X125A