Process For SCFT
Vodafone 3G NSN Gujarat Project_Version1
Step 1 – Physical Audit
• Start Physical audit for Site before Carry out SCFT. • Need to fill Physical audit form at Site. ( Please collect Form in Hard Copy from
Coordinator )• Draw Terrace Layout on reverse of the page.• Take Photos as given below.
1. Building Photo2. Antenna FINAL Tilt Photos of all sectors3. Terrace layout photo which drawn on reverse of Hard Copy Page4. Sector Clutter Photo
Teleysia Network Pvt Ltd ___________________________ Vodafone 3G Gujarat
3G Site ID CityAddress
Latitude / longitude Plan___________________________Actual___________________ AMSL
Tower Hgt / Building Hgt
BTS Type
Tower type & Height
Sector Sec-1 Sec-2 Sec-3
Planned Observed Final Planned Observed Final Planned Observed Final
GSM Radiation Height
Azimuth
M Tilt
E Tilt
Total Tilt
WCDMA Antenna Type
Antenna Mount Type
Feeder Cable installed (Y/N)
Feeder Cable Length (in m)
No Of ports of AntennaRemarks:
Engineer Name Varified By
Date Date
Signature Signature
Hard Copy of Physical Audit
Step 2 – SCFT
Stationary Test
• 3G-3G Voice call ( 3 calls each with 30 sec duration )• 3G-3G Video Call ( 3 calls each with 30 sec duration )• 3G-3G SMS ( 3 SMS )• PS Data Download ( FTP DL PS ) and take snap shot ( 1) • PS Data Upload ( FTP UP PS ) and take snap shot ( 2 )• HS Data Download ( FTP DL HS ) and take Snap shot ( 3 )• HS Data upload ( FTP UL HS ) and take snap shot ( 4 )• Web Browsing ( HTTP ) in PS and take snap shot ( 5 )• Web Browsing ( HTTP ) in HS and take snap shot ( 6 )• Ping to FTP Server 10.11.208.138 3 times and note down average latency in
msec and take snap shot ( 7 )
Repeat above procedure in all sectors
We have made Command sequence for Voice Video and SMS please use that during SCFTAlso install Net per sec to see data speedPS, HS and Ping needs to be done by Command Prompt
FTP server – 10.11.208.138Username – vijayPassword – v1jay!@#
During performing Voice Video and SMS please note down below mentioned parameter.
Stationary test will be carried out at 80-100 m distance from site in main lobe.
SECTOR 1 SECTOR 2 SECTOR 3
Pilot
RxLev (Stationary)
BLER (Stationary)
Ms Tx Pwr (Stationary)
EcNo (Stationary)
RSCP (Stationary)
AMR Codec Rates
Maximum active set
ADJS, ADJG, ADJW Neighbour List
Default Parameters
PS Data Download ( FTP DL PS ) and take snap shot ( 1)
PS Data Upload ( FTP UP PS ) and take snap shot ( 2 )
HS Data Download ( FTP DL HS ) and take Snap shot ( 3 )
HS Data upload ( FTP UL HS ) and take snap shot ( 4 )
Web Browsing ( HTTP ) in PS and take snap shot ( 5 )
OPEN 3 to 4 Browser and Surf Net
Web Browsing ( HTTP ) in HS and take snap shot ( 6 )
OPEN 3 to 4 Browser and Surf Net
Take Snap shot of Ping to FTP Server 3 times and attached ( 7 )
Movable Test
Check Softer Handover in Clockwise and Anticlockwise and take snap shot at every instantof Handover
For example if you are in 1st sector and handover is happened to same site or neighbour siteTake a snap shot of that event and rename as Sec1 3G-3G Soft Handover.
We need to check handover in all sectors and taking snap shot as shown in next slide.
We also need to check 3g-2g Handover ( IRAT Handover ) in all sectors and take snap shotFor the same as shown in next to next slide.
Sec 1 3G-3G Soft Handover
Sec 1 3G-2G IRAT Handover
When you are performing IRAT Handover after successful handover to 2G take snap shotand disconnect voice and data call.
During the return to site cell reselection is possible from 2G to 3G without locking the cell
Please check because the same parameter we need to note down in report
Sector 1 Sector 2 Sector 3
Reselection to 3G after 2G CS
Reselection to 3G after 2G PS
Now SCFT will complete and ensure to rename all the log files appropriate and Submit the report and log files to coordinator