3hours paper with your questions--university model
TRANSCRIPT
-
7/25/2019 3hours Paper With Your Questions--university Model
1/4
PART-A: Multiple Choice Questions (10x2=20 Marks)
1. Identifying and selecting suppliers is important responsibility of:
(a)marketing department ( b) purchasing department (c) productiondepartment
2. Supplier's technical ability means:
(a) a supplier have a program of product development
(b) a supplier assist in improving the product.
(c) all of the above.
. Use of more than one supplier for an item is:
(a) Multiple sourcing (b) sole sourcing (c) single sourcing
!. he total ac!uisition cost of an item includes:(a) he price paid (b) the handling and delivery costs (c) all of the
above
". he implementation and control phase of the production planning and control
system" is:
(a) #urchasing and production activity control
(b) Master production schedule
(c) Material re!uirement plan.
#. $ ma%or input to an material re!uirements plan M system is:
)a(he production plan (b) the capacity plan)c(he master production Schedule
$. he time span for hich plans are made is called the:
(a) time fence( b) planning horion (c) time bucket
%. asic concept in *M:
(a)+ocus in the customer (b) supplier partnering (c) all are right
&. ,hich of the folloing is a factor is selecting suppliers.
(a) echnical ability ( b) measurement (c) purchasing
10. -------------------is responsible for planning and controlling materials flo :
(a)Materials management (b) marketing management
(c) #roduction management
PART'-': True or (alse Questions 1"*1=1" Marks)
-
7/25/2019 3hours Paper With Your Questions--university Model
2/4
1. / #urchasing function has tremendous potential to increase profit.
2. / $ good supplier is one that satisfy the buyer's demand of !uality"
!uantity" delivery "and price
. / uyers- suppliers relationship must be close and cooperative.
!. / #urchasing departments are in position to take the lead role in reducing
company's environmental impact.
". / #urchasing is solely the responsibility of the purchasing department.
#. / $ set of priority planning techni!ues for planning component items
belo the end item level is called material re!uirements planning
$. / $ ma%or input to an material re!uirements planning M system is
the master schedule
%. / he time span for hich plans are made is called the planning horion
&. / &e!uesting !uotation is a sales order.
10. / here is no cost associated ith changing production level in chase
strategy.
11. / In make to stock strategy" manufacturers ait until an order is
received from a customer before starting to make the goods.
12. / 0112 inspection means making sample of batch of product and using
it to estimate overall !uality.
1. / Sampling inspection produce result ith 0112 accuracy.
1!. / In the long and short run" manufacturing must devise plans to balance
the demand of the market place ith its resources and capacity.
1". / #riority relates to hat products are needed" ho many are needed
and hen they are needed.
PART-C: +hort Ans,er Questions 2x"=10 Marks)
$3S,4& $35 T*U4SI63S 6375
-
7/25/2019 3hours Paper With Your Questions--university Model
3/4
1. ,hat are the five categories of the purchasing ob%ectives8
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------2. ,hat are the ma%or levels in the manufacturing planning and control system8
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
. 9efne the material reguirements plan
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
!. ,hat is the planning horion8
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------
PART-/: (ill in the 'lank Questions as per the R/+ ien elo,
10x1=10 Marks):0;;;;;;;;;;;;;;;.;is the process of buying.
;;;;;;;;;;;;;.;;;..the process of having suppliers provide
goods and services that are previously provided internally.
?;;;;;;;;;;;;;;;; not having the products the customer ants
hen they are anted.
C3+4 T34 R/+ '45
0 enchmarking otal !uality management? purchasing
@!uality function deploymentA outsourcing
B re!uesting !uotation Ccompetitive bidding01 Stocking out
Best wishes
A6+4R+ T MAT4R7A5+ MA6A84M46T39R+)
PART-A: Multiple Choice Questions (10x2=20 Marks)
0.
-
7/25/2019 3hours Paper With Your Questions--university Model
4/4
>.D
?.$
@.D
A.
B.DC.$
01.D
PART'-': True or (alse Questions 1"*1=1" Marks)
0.
.
?.+@.
A.
B.
C.+
01.+
00.+
0.
0?.
PART-C: +hort Ans,er Questions 2x"=10 Marks)
0 anser page(