3rd grade slide 6-h.w.pdf

44
A1 Concrete Materials 12 4 10 m/ sec Foundation Soil 7 4 10 m/ sec B1 Concrete 11 6 10 m/ sec Foundation 7 4 10 m/ sec 20 m 30 m

Upload: chenar-salam

Post on 14-Jul-2015

82 views

Category:

Education


0 download

TRANSCRIPT

A1

Concrete Materials 124 10 m/ sec

Foundation Soil 74 10 m/ sec

B1

Concrete 116 10 m/ sec

Foundation 74 10 m/ sec

20 m

30 m

A2

Dam Body 72.7 10 m/ sec

Filter 31.8 10 m/ sec

B2

Dam Body 64 10 m/ sec

Filter 44.8 10 m/ sec

A3

Concrete 111 10 m/ sec

Foundation 7 65 10 m/ sec 1.8 10 m/ secH vK K

B3

Concrete 111 10 m/ sec

Foundation 5 56 10 m/ sec 3 10 m/ secH vK K

A4

Filter 33 10 m/ sec

Dam Section 6 67.5 10 m/ sec 2.7 10 m/ secH vK K

B4

Filter 45 10 m/ sec

Dam Section 7 77.5 10 m/ sec 2.7 10 m/ secH vK K

A5

Concrete Dam 111 10 m/ sec

Foundation 6

1

5

2

1 2 10 m/ sec

2 1.6 10 m/ sec

Layer K

Layer K

B5

Concrete Dam 101 10 m/ sec

Foundation Soil 7

1

6

2

1 4 10 m/ sec

2 3 10 m/ sec

Layer K

Layer K

A6

Dam Body 63 10 m/ sec

Filter 44 10 m/ sec

B6

Dam Body 63 10 m/ sec

Filter 31 10 m/ sec

A7

Dam Body 63 10 m/ sec

B7

Dam Body 63 10 m/ sec

Filter 31.4 10 m/ sec

A8

Dam Body 76 10 m/ sec

B8

Dam Body 76 10 m/ sec

Filter 31.4 10 m/ sec

A9

Soil 441 10 Inch/ sec

B9

Soil 67 10 m/ sec

A10

Concrete Dam 1140 10 / secinch

Permeable Sand 340 10 / secinch

B10

Concrete Dam 111 10 m/ sec

Permeable Sand 41 10 m/ sec

A11

Concrete Dam 111 10 m/ sec

Soil 0.002 cm/sec

B11

Concrete Dam 101 10 m/ sec

Soil 0.002 cm/sec

A12

Concrete Dam 117 10 m/ sec

Foundation Soil 31 10 cm/ sec

B12

Concrete Dam 111 10 m/ sec

Foundation Soil 31 10 cm/ sec

A13

Dam Section 5 51 10 mm/ sec 3 10 mm/ secH vK K

B13

Dam Section 5 59 10 mm/ sec 1 10 mm/ secH vK K

A14

Dam Section 59.0 10 m/ sec

Filter 41.4 10 m/ sec

B14

Dam Section 53.0 10 m/ sec

A15

B15

A16

B16

A17

Concrete 124 10 m/ sec

Foundation 74 10 m/ sec

B17

Concrete 116 10 m/ sec

Foundation 59.2 10 m/ sec

25 m

22 m

A18

Dam Body 72.7 10 m/ sec

Filter 34 10 m/ sec

B18

Dam Body 64 10 m/ sec

Filter 44 10 m/ sec

A19

Concrete 111 10 m/ sec

Foundation 7 65 10 m/ sec 1.8 10 m/ secH vK K

B19

Concrete 111 10 m/ sec

Foundation 5 56 10 m/ sec 3 10 m/ secH vK K

A20

Filter 33 10 m/ sec

Dam Section 6 67.5 10 m/ sec 2.7 10 m/ secH vK K

B20

Filter 45 10 m/ sec

Dam Section 7 77.5 10 m/ sec 2.7 10 m/ secH vK K

A21

Concrete Materials 113.8 10 m/ sec

Foundation Soil 6

1

5

2

1 3 10 m/ sec

2 5.6 10 m/ sec

Layer K

Layer K

B21

Concrete 101 10 m/ sec

Foundation Soil 7

1

6

2

1 3 10 m/ sec

2 3.8 10 m/ sec

Layer K

Layer K

A22

Dam Body 63 10 m/ sec

Filter 44 10 m/ sec

B22

Dam Body 63 10 m/ sec

Filter 31.7 10 m/ sec

A23

Dam Body 63 10 m/ sec

B23

Dam Body 63 10 m/ sec

Filter 52.4 10 m/ sec

A24

B24

Dam Body 63 10 m/ sec

Filter Materials 42.4 10 m/ sec

A25

Soil 45 10 m/ sec

B25

Soil 37 10 m/ sec

A26

Concrete Dam 111 10 m/ sec

Permeable Sand 31.8 10 m/ sec

B26

Concrete Dam 111 10 m/ sec

Permeable Sand 41 10 m/ sec

A27

Concrete Dam 111 10 m/ sec

Foundation Materials 0.002 cm/sec

B27

Concrete Dam 111 10 m/ sec

Foundation Materials 0.002 cm/sec

A28

Concrete Dam 117 10 m/ sec

Foundation Materials 31 10 cm/ sec

B28

Concrete Dam 126 10 m/ sec

Foundation Materials 31 10 cm/ sec

A29

Foundation Soil 5 51 10 mm/ sec 3 10 mm/ secH vK K

Concrete Dam 126 10 m/ sec

B29

Foundation Soil 5 59 10 mm/ sec 1 10 mm/ secH vK K

Concrete Dam 126 10 m/ sec

A30

Dam Section 59.0 10 m/ sec

Filter Materials 49.0 10 m/ sec

B30

Dam Section 53.0 10 m/ sec

A31

B31

A32

B32

A33

Filter 33 10 m/ sec

Dam Section 6 67.5 10 m/ sec 2.7 10 m/ secH vK K

B33

Filter 45 10 m/ sec

Dam Section 7 77.5 10 m/ sec 2.7 10 m/ secH vK K

A34

Dam Body 63 10 m/ sec

Filter 44 10 m/ sec

B34

Dam Body 63 10 m/ sec

Filter 39 10 m/ sec

A35

Concrete 112 10 m/ sec

Foundation Soil 2 35 10 cm/ sec 1.6 10 cm/ secH vK K

B35

Concrete 112 10 m/ sec

Foundation Soil 5 65 10 m/ sec 7 10 m/ secH vK K

A36

Concrete Dam 118 10 m/ sec

Foundation Soil 6

1

5

2

1 2 10 m/ sec

2 1.6 10 m/ sec

Layer K

Layer K

B36

Foundation Soil 41.6 10 m/ sec

Concrete Dam 111 10 m/ sec

A37

Foundation Soil 4 41 10 mm/ sec 1 10 mm/ secH vK K

Concrete Dam 118 10 m/ sec

B37

A38

B38

A39

B39

Soil 45 10 m/ sec

A40

Concrete 112 10 m/ sec

Foundation Soil 55 10 m/ secK

B40

Concrete Dam 126 10 m/ sec

Foundation Soil 10-3 Cm/sec

A41

Soil 31.7 10 m/ sec

B41

Concrete Dam 111 10 m/ sec

Foundation Soil 0.002 cm/sec

A42

Concrete Dam 111 10 m/ sec

Foundation Soil 0.002 cm/sec

B42

Concrete Dam 118 10 m/ sec

Foundation Soil 6

1

5

2

1 2 10 m/ sec

2 1.6 10 m/ sec

Layer K

Layer K

A43

Soil 37 10 m/ sec

B43

Concrete 111 10 m/ sec

Foundation 6 55 10 m/ sec 1.8 10 m/ secH vK K

A44

Dam Body 61 10 m/ sec

Filter 34 10 m/ sec