4 anr eard by ykobayashi 22feb2016
TRANSCRIPT
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
1/17
7th ADB Business Opportunities Fair
16 March 2016
Environment, Natural Resources, and Agriculture
Sector --- East Asia
By: Yoshiaki Kobayashi; Senior Water Resources Specialist;Environment, Natural Resources, and Agriculture Division; East Asia
Department
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
2/17
Environment, Natural Resources, and
Agriculture Sector
Sector
People’s Republic of China (PRC)
Mongolia (MON)
Countries
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
3/17
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
4/17
EARD Portfolio (including Loans,
Grants, TAs, and Others) Amount (Excluding Counterpart Funds) Number
($ million)
Total: 12,056 Total: 261
Transport;5,453 ; 45%
Environment,
NaturalResources,
andAgriculture;2,875 ; 24%
Social; 1,770; 15%
Energy;1,564 ;
13%
Others;394 ; 3%
Transport; 55;21%
Environment,Natural
Resources,and
Agriculture;60; 23%
Social; 48;18%
Energy; 28;11%
Others; 70;27%
EARD = East Asia Department
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
5/17
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
6/17
Environment, Natural Resources,
Agriculture Sector Portfolio for East Asia
(Loans and Grants, and TAs; by Country)Loan and Grants TAs(Number) (Number)
Total: 31 Total: 29REG = regional
Loans andGrants
(PRC); 27;
87%
Loans andGrants
(MON); 4;13%
TAs (PRC);21; 72%
TAs (MON);7; 24%
TAs(REG); 1;
4%
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
7/17
Environment, Natural Resources,
Agriculture Sector Portfolio for East Asia
(TAs; by Type)(Number)
Total: 29
CDTA = capacity develoment technical assistance, PATA = policy and advisory technical assistance,
PPTA = project preparatory technical assistance, R- = regional.
PPTA; 8; 28%
PATA; 10; 35%
CDTA; 10; 34%
R-PATA; 1; 3%
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
8/17
Opportunities for Ongoing Loans,
Grants, and TAs
Type No. Country Name General Description Estimated
Contract
Value
($ million)
Selection
Method
Advertisement
Loan 2980 PRCShaanxi Weinan Luyang Integrated Saline
Land Management Project
5 consultants to support training and study tours 0.23 SP Q3 2016
Loan 3054 PRC Anhui Huainan Urban Water SystemsIntegrated Rehabil itation Project
Sus tainable urban water and lake m anagem ent 0.50 QCBS Q1-2 2016
Study on water resources protection and control
meas ures around the reservoir areas
0.55 QCBS Q1-2 2016
Development of water resources protection and
development action
0.80 QCBS Q1-2 2016
Resettlement and social monitoring 0.19 CQS Q1-2 2016
Strengthening non-structural measures on Qing
River integrated management
0.76 QCBS Q1-2 2016
Loan 3336 PRC Hunan Dongjiang Lake Environmental
Protection and Integrated Utilization Project
Project implementation management support 2.10 QCBS Q1 2016
CQS = consultants' qualifications s election, QCBS = quality- and cost-based s election, SP = shopping.
Loan 3277 PRCHubei Enshi Qing River Upstream
Environment Regabilitation Project
Loan 3114 PRC
Guangdong Chaonan Water Resources
Development and Protection
Demons tration Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
9/17
Opportunities for Ongoing Loans,
Grants, and TAsType No. Country Name General Description Estimated
Contract
Value
($ million)
Selection
Method
Advertisement
Training in ecotourism 0.10 CQS Q2 2016
Water quality sampling 0.10 CQS Q2 2016
Financial audit 0.04 LCS Q1 2017
Waste management specialist (international) 0.07 ICS Q2 2016
14 individual national consltants (field
coordinator, implementation specialist,procurement specialist, geographic information
system specialist, eco-tourism specialist, waste
management specialist, livestock and pasture
management specialist, agricultural processing
specialist, income generation specialist,
protected area specialis t, rural finance
specialist, social and gender specialist, etc.)
0.69 ICS Q1-2 2016
A consulting firm for the TA 0.88 QCBS Q1-2 2016
3 individual consultants (technical sustainable
land management investment advisor,monitoring and data management specialist,
and procurement specialist)
0.18 ICS Q1- 2016
TA 8874 MONSustainable Forest Management to Improve
Livelihood of Local Communities Project
Resource persons TBD SSS TBD
Grant 9183 MON
Integrated Livelihoods Improvement and
Sustainable Tourism at Khuvsgul Lake
National Park Project
TA 8872 PRC
Sustainable and Climate-Resilient Land
Management in Western Region Project
CQS = consultants' qualifications s election, ICS = individual cons ultant selection, LCS = least cost selection, QCBS = quality- and cost-based s election,
SP = shopping, SSS = single source selection, TBD = to be determined.
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
10/17
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Lending Pipeline, 2016-2018
Country Amount
($ million)2016 Firm
PRC150.0
PRC 100.0
PRC 150.0 PRC 100.0
PRC150.0
2016 Stand-by and 2017 Firm
PRC
150.0
PRC100.0
Jiangxi Xinyu Kongmu River Watershed Flood Control and
Environmental Improvement Project
Heilongjiang Jiamusi Irrigation and Drainage System Modernization
Project
Shanxi Urban-Rural Water Source Protection and Environmental
Demonstration Project
Project Name
Henan Hebi Qihe River Basin Environment Improvement and
Ecological Conservation Project
Fujian Farmland Sustainable Utilization and Demonstration Project
Shandong Groundw ater Protection ProjectXinjiang Kelamayi Ecological Forest Infrastructure Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
11/17
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Lending Pipeline, 2016-2018
Country Amount
($ million)2017 Firm
PRC 100.0
MON 50.0
MON 20.0
2017 Stand-by and 2018 Firm
PRC150.0
2018 Firm
PRC200.0
2018 Stand-by
PRC300.0
Guizhou High Efficiency Water Utilization Demonstration in Rocky
Desertification Area Project
Yangtze River Economic Belt Industrial Transformation and
Integrated Environmental Rehabilitation Project
Integrated Environmental Rehabilitation in the Yangtze River
Project
Project Name
Shanxi Inclusive Agricultural Value Chain Development Project
Agri-businesses Development Project
Tuul River Improvement Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
12/17
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Lending Pipeline, 2016-2018
Country Amount
($ million)2016 Firm
PRC150.0
PRC 100.0
PRC 150.0 PRC 100.0
PRC150.0
2016 Stand-by and 2017 Firm
PRC
150.0
PRC100.0
Jiangxi Xinyu Kongmu River Watershed Flood Control and
Environmental Improvement Project
Heilongjiang Jiamusi Irrigation and Drainage System Modernization
Project
Shanxi Urban-Rural Water Source Protection and Environmental
Demonstration Project
Project Name
Henan Hebi Qihe River Basin Environment Improvement and
Ecological Conservation Project
Fujian Farmland Sustainable Utilization and Demonstration Project
Shandong Groundw ater Protection ProjectXinjiang Kelamayi Ecological Forest Infrastructure Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
13/17
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Nonlending Pipeline (Grant), 2016
Country Amount($ million)
2016 Firm
MON3.0
MON2.8
MON 3.0
2016 Stand-by
MON 2.5
Dzud Disaster Response Project
Sustainable Vegetable Farming for Smallholders Project
Project Name
Strengthening Community Resilience to Dzud and Forest and
Steppe Fires Project
Managing Soil Pollution in Ger Areas Through Improved On-site
Sanitation Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
14/17
Nonlending Pipeline (PPTA), 2016
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Country Amount
($ million)
2016 Firm
PRC 0.50
MON 1.20
PRCPRC
Yangtze River Economic Belt Industrial Transformation andIntegrated Environmental Rehabilitation in the Yangtze River
PPTA Name
Shanxi Inclusive Agricultural Value Chain Development Project
Sustainable Toursim Development Project
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
15/17
Nonlending Pipeline (PPTA), 2016
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
16/17
Nonlending Pipeline (Non-PPTA), 2016
Note: Projects are indicative, pending ADB Management and Board approval, and approval timelines are
subject to change.
Country Type TA Name Amount
($ million)
2016 Firm
MON CDTAConservation and Storage of Forest Seed Genetic
Funds
0.50
PRC R-CDTAPromoting South-South Cooperation in Flood Risk
Management
0.55
2016 Stand-by
PRC PATAThe Research of PPP Model and Value for Money in
China
0.40
PRC PATA A Study on the Forest and Wetland Ecological Functional
Coupling and Development Degrees in the Region
0.10
PRC PATAThe Research on Constructing Adaptive AgriculturalDemonstration Zone in Huaihe River Economic Belt in
Anhui
0.40
-
8/19/2019 4 ANR EARD by YKobayashi 22Feb2016
17/17