4. CONCLUSIONS Regarding the annual scale generation, it is clear that the value computed from historical record is well within the range of the synthetic series values and, in most cases, close to the average from 1000 series computed. This shows that the synthetic series reasonably preserve most of the historical record’s statistics in terms of annual precipitation. Next task for the MDM conclusion is a debug procedure, in order to find what is wrong with the monthly step generation. 1. MONTHLY DISAGGREGATION MODEL - DUM This model is based on a monthly time step, which avoids reproducing zero rainfall sequences what is a rather complicated procedure. By selecting a disaggregation model one take advantage of the fact that in humid regions annual precipitation has an essentially normal distribution. This has the Central Limit Theorem support and also has been successfully verified by many statistical tests. 2. DESCRIPTION OF THE MODEL SYNTHETIC RAINFALL SERIES GENERATION - MDM Heinz D. Fill, André F. Santana, Miriam Rita Moro Mine Contacts: [email protected] REFERENCES: HOMBERGER, G. M., RAFFENSBERGER, J. P., WILBERG, P. L. Elements of physical hydrology, John Opkins, University Press, Baltimore, 1998. KELMAN. J. Modelos estocásticos no gerenciamento de recursos hídricos. In:______. Modelos para Gerenciamento de Recursos Hídricos I . São Paulo: Nobel/ABRH. 1987. p. 387 - 388. ACKNOWLEDGEMENTS: The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/2007-2013) under Grant Agreement N° 212492. Third author also would like to thank “Conselho Nacional de Desenvolvimento Científico e Tecnológico-CNPq” for the financial support. Annual time step precipitation generation Disaggregation in a monthly time step 2.1. Annual Precipitation It has been assumed that total annual precipitation is not serially correlated, but cross correlation among rainfall stations was considered. Also annual precipitation has been assumed to be normally distributed what is supported both by empirical evidence (Homberger et al., 1998) and also by the Central Limit Theorem. So, generation of multisite annual precipitation series is reduced to a multivariate normal distributed random numbers generation. In serially uncorrelated hydrologic variables case, they may be modeled by the equation (Kelman, 1987): Where x(t) is a vector of k (number of sites) cross-correlated random variables, z(t) is a size k independent random variables vector and B is a coefficients matrix, obtained from the sites correlation matrix. Variables are attached to a time index t. 2.2. Monthly Precipitation The chosen method uses disaggregation coefficients computed from historical records. It is called Hydrologic Scenarios Method. For each historical record year, a matrix D j (j=1, 2, …, m) (m = length of historical record) with size k x 12 (k = number of sites) is constructed. Its elements are: 3. MDM’S VALIDATION For MDM validation some synthetic series statistics have been compared to those computed from the historical records on the selected sites within the La Plata Basin. Figure 2 shows their geographical location within the study area. All the algorithms were developed in Matlab (R13, The Mathworks Inc, 2000, under license) software. 3.1. Annual Validation It have been generated 1000 series of 62 year long each one (the same length as the historical record) and the following statistics have been computed: Figure 2: Selected Sites for Validation # Convention Site Name 1 Monte Carmelo 2 Monte Alegre 3 Usina Couro do Cervo 4 Franca 5 Fazenda Barreirinh o 6 Tomazina 7 União da Vitória 8 Lagoa Vermelha Table 1: Sites number convention ) ( . ) ( t t z B x ) ( ) ( ) ( j P j P j d i im im Where P im (j) represents the month m, site i and year j precipitation, while P i (j) is the site i and year j annual precipitation. Given an annual precipitations series, disaggregation proceeds randomly combining each matrix D j with the annual amounts. The model is structured in 2 Modules and performs sequentially the following steps (Figure 1): Compute mean and variance at each site Standardize mean annual precipitation Compute the correlation matrix Compute the coefficient matrix (B) Compute the disaggregation matrices (D j ) Generate k independent standard normal random number Transform standard normal vector into cross correlated random vector, using: Obtain the length m cross correlated annual precipitation series Apply the Hydrologic Scenarios Method to disaggregate annual in monthly precipitation ) ( . ) ( t t z B x Module 1 Module 2 Figure 1: Procedures Sequence in MDM •Mean, Standard Deviation and Skew Coefficient; •Number of consecutive years below/above mean; •Each synthetic series correlation matrix; •Maximum cumulative deficit for 80% of mean. The last item has an important effect on flow regulation studies because influences significantly hydropower generation in well regulated systems, such as the Brazilian interconnected system. Some of the results are shown in Figures 3, 4 and 5; sites convention numbers are expressed in Table 1. 0 500 1000 1500 2000 2500 1 2 3 4 5 6 7 8 9 Site M ean (m m) Minimum Maximum A verage Observed 0 100 200 300 400 500 600 700 1 2 3 4 5 6 7 8 9 Site Standard Deviation (m m) Minimum Maximum A verage Observed 0 500 1000 1500 2000 2500 3000 3500 1 2 3 4 5 6 7 8 9 Site Cum ulative Deficit(m m) Minimum Maximum A verage Observed Figure 3: Validation - Mean Figure 4: Validation – Standard Deviation Figure 5: Validation – Cumulative Deficit 3.2. Monthly Validation In the monthly step mean, standard deviation and autocorrelation seasonal values were computed, for both historical and synthetic values. Besides, analogous procedure of annual validation was followed for synthetic values, with maximum, minimum and average values calculated. The first results, however, showed a discrepancy between the original and generated series for some of the sites. This fact was attributed to some programming bug, which will be revised and fixed soon.

Upload: lindley

Post on 16-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

SYNTHETIC RAINFALL SERIES GENERATION - MDM Heinz D. Fill , André F. Santana, Miriam Rita Moro Mine Contacts: [email protected]. 1. MONTHLY DISAGGREGATION MODEL - DUM - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 4. CONCLUSIONS

4. CONCLUSIONSRegarding the annual scale generation, it is clear that the value

computed from historical record is well within the range of the synthetic series values and, in most cases, close to the average from 1000 series computed. This shows that the synthetic series reasonably preserve most of the historical record’s statistics in terms of annual precipitation.

Next task for the MDM conclusion is a debug procedure, in order to find what is wrong with the monthly step generation.

1. MONTHLY DISAGGREGATION MODEL - DUMThis model is based on a monthly time step, which avoids reproducing

zero rainfall sequences what is a rather complicated procedure. By selecting a disaggregation model one take advantage of the fact that in humid regions annual precipitation has an essentially normal distribution. This has the Central Limit Theorem support and also has been successfully verified by many statistical tests.

2. DESCRIPTION OF THE MODEL

SYNTHETIC RAINFALL SERIES GENERATION - MDM

Heinz D. Fill, André F. Santana, Miriam Rita Moro MineContacts: [email protected]

REFERENCES:HOMBERGER, G. M., RAFFENSBERGER, J. P., WILBERG, P. L. Elements of physical hydrology, John Opkins, University Press, Baltimore, 1998.KELMAN. J. Modelos estocásticos no gerenciamento de recursos hídricos. In:______. Modelos para Gerenciamento de Recursos Hídricos I. São Paulo: Nobel/ABRH. 1987. p. 387 - 388.

ACKNOWLEDGEMENTS:The research leading to these results has received funding from the

European Community's Seventh Framework Programme (FP7/2007-2013) under Grant Agreement N° 212492. Third author also would like to thank “Conselho Nacional de Desenvolvimento Científico e Tecnológico-CNPq” for the financial support.

Annual time step precipitation generation

Disaggregation in a monthly time step

2.1. Annual PrecipitationIt has been assumed that total annual precipitation is not serially

correlated, but cross correlation among rainfall stations was considered. Also annual precipitation has been assumed to be normally distributed what is supported both by empirical evidence (Homberger et al., 1998) and also by the Central Limit Theorem. So, generation of multisite annual precipitation series is reduced to a multivariate normal distributed random numbers generation.

In serially uncorrelated hydrologic variables case, they may be modeled by the equation (Kelman, 1987):

Where x(t) is a vector of k (number of sites) cross-correlated random variables, z(t) is a size k independent random variables vector and B is a coefficients matrix, obtained from the sites correlation matrix. Variables are attached to a time index t.

2.2. Monthly PrecipitationThe chosen method uses disaggregation coefficients computed from

historical records. It is called Hydrologic Scenarios Method.

For each historical record year, a matrix Dj (j=1, 2, …, m) (m = length of historical record) with size k x 12 (k = number of sites) is constructed. Its elements are:

3. MDM’S VALIDATIONFor MDM validation some synthetic

series statistics have been compared to those computed from the historical records on the selected sites within the La Plata Basin. Figure 2 shows their geographical location within the study area.

All the algorithms were developed in Matlab (R13, The Mathworks Inc, 2000, under license) software.

3.1. Annual Validation

It have been generated 1000 series of 62 year long each one (the same length as the historical record) and the following statistics have been computed: Figure 2: Selected Sites for Validation

# Convention Site Name

1 Monte Carmelo2 Monte Alegre3 Usina Couro do Cervo4 Franca5 Fazenda Barreirinho6 Tomazina7 União da Vitória8 Lagoa Vermelha9 Caiuá

Table 1: Sites number convention

)(.)( tt zBx

)(

)()(

jP

jPjd

i

imim

Where Pim(j) represents the month m, site i and year j precipitation, while Pi(j) is the site i and year j annual precipitation. Given an annual precipitations series, disaggregation proceeds randomly combining each matrix Dj with the annual amounts.

The model is structured in 2 Modules and performs sequentially the following steps (Figure 1):

Compute mean and variance at each site

Standardize mean annual precipitation

Compute the correlation matrix

Compute the coefficient matrix (B)

Compute the disaggregation matrices (Dj)

Generate k independent standard

normal random number

Transform standard normal vector into cross correlated

random vector, using:

Obtain the length m cross correlated annual

precipitation series

Apply the Hydrologic Scenarios Method to

disaggregate annual in monthly precipitation

)(.)( tt zBx

Module 1

Module 2

Figure 1: Procedures Sequence in MDM

•Mean, Standard Deviation and Skew Coefficient;•Number of consecutive years below/above mean;•Each synthetic series correlation matrix;•Maximum cumulative deficit for 80% of mean.

The last item has an important effect on flow regulation studies because influences significantly hydropower generation in well regulated systems, such as the Brazilian interconnected system. Some of the results are shown in Figures 3, 4 and 5; sites convention numbers are expressed in Table 1.

0

500

1000

1500

2000

2500

1 2 3 4 5 6 7 8 9

Site

Mea

n (m

m)

Minimum Maximum Average Observed

0

100

200

300

400

500

600

700

1 2 3 4 5 6 7 8 9

Site

Sta

ndar

d D

evia

tion

(m

m)

Minimum Maximum Average Observed

0

500

1000

1500

2000

2500

3000

3500

1 2 3 4 5 6 7 8 9

SiteC

umul

ativ

e D

efic

it (m

m)

Minimum Maximum Average Observed

Figure 3: Validation - Mean

Figure 4: Validation – Standard Deviation

Figure 5: Validation – Cumulative Deficit

3.2. Monthly ValidationIn the monthly step mean, standard deviation and autocorrelation

seasonal values were computed, for both historical and synthetic values. Besides, analogous procedure of annual validation was followed for synthetic values, with maximum, minimum and average values calculated.

The first results, however, showed a discrepancy between the original and generated series for some of the sites. This fact was attributed to some programming bug, which will be revised and fixed soon.