4.0.1Background
MinistryofInfrastructureDevelopmentandReconstructionoftheNorthernProvincehastheresponsibilityofcreatingormaintainingInfrastructureassets.Inordertoachievethistwo main Engineering Departments, Road Development Department and BuildingsDepartmentcameunderthisministry.
Themainobjectivesoftheinfrastructuresectoristorestoretheservicestoauseableandmaintainable condition, develop the services tomeet the demands of the foreseeablefuture,ensurethattheservices,oncerestoredanddeveloped,areaffordable,sustainedandmaintained.
RationalNorthernProvincehasbeenabattleground since1983and thepopulationofNorthernProvincehassufferedfromtheconsequencesofthewar.InMay2009theterrorismwasdefeated and the thirty year conflict was brought to an end. The conflict has causeddamages to Infrastructure and stagnation in development. Hundreds of thousandInternally Displaced Persons (IDPs) have been resettled and their homes need to berehabilitated or re constructed. Schools and community facilities, basic infrastructureespecially access, agriculture infrastructure, and most other needs requires completerehabilitationorreconstruction. InMay2009Government launchedVadakinVasanthamprogrammetoaddresstheseissues.
TheEngineeringSectorhas a greater responsibility in rebuilding the area for revivalofeconomy and normalcy to return. Northern Provincial Council has three EngineeringDepartmentstolookafterthreedifferentengineeringdisciplines.
Department of Irrigation looks after all the tanks and channels and engageextensivelyinrehabilitationworks.
DepartmentofBuildingsdotheconstructionandmaintenanceofallGovernmentBuildingsexcepttheschoolbuildings.
DepartmentofRoadDevelopmentlooksaftertheprovincialroadsandalsohelpsLocalGovernmentintheirroadrehabilitationworks.ProvincialroadDevelopmentDepartment has 2000km of Provincial Roads and LocalGovernment has about5800Kmofruralroads.
-
8/6/2019 (4) Infrastructure Development
3/70
4.1 BUILDINGS
-
8/6/2019 (4) Infrastructure Development
4/70
BUILDINGS
170
4.1.1 Background
Department of Buildings is a vital Arm of the Northern Province. They construct,
Rehabilitate,Refurbish,andmaintainallprovincialcouncilbuildingsandalsomostofthe
centralownedbuildingsassetsexceptthebuildingscomingunderministryofeducation.
In2009theyundertookworksoverRs.1200Mn.andspeciallyfacilitatedthehealthsector
andthecooperativesectorwhichwereveryessentialatthattimeforresettlement.
In2010,theydidconstructionworksforavaluemorethanRs.1350Mn.throughtwenty
five funding sources for provincial and central institutions. They also didworks under
VadakinVasanthamprogrammeforhealth,administrationandagriculturesectors.Three
storiedwardcomplexatMannar,Admpanhospital,sixunitsdoctorsquartersinVavuniya,
RDHSoffice inVavuniya,D.SofficeNallur,VocationaltrainingcentreSandilipaiaresome
ofthebuildingstheyhavedone.
In2011totheyaredoingworksoverRs.1500Mn.andundertheConflictAffectedRegion
EmergencyProject (CAREP)theyare rebuilding thePublicAdministrationbuildings fora
totalvalueofRs.900Mn.inallfivedistricts.
The institutions have highlighted the details of the buildings thatwere constructed by
buildingsdepartment.
-
8/6/2019 (4) Infrastructure Development
5/70
BUILDINGS
171
-
8/6/2019 (4) Infrastructure Development
6/70
4.2 TRANSPORT
-
8/6/2019 (4) Infrastructure Development
7/70
TRANSPORT
172
4.2.1 Background
ThethirtyyearwarhastotallydevastatedthetransportsectorwasrevivedthroughtheVadakin
VasanthamProgramme.MinistrygotallocationofRs.2.0Mn in2009,Rs.4.0Mn in2010&Rs
15.0Mn.in2011underPSDG.
Rs. 1.0 Mn. was spent to rehabilitate the Vavuniya bus stand by Department of Local
Government and 107 nos. road signs were procured by Road Development Department for
Rs.1Mn.andin2009.
In 2010, got an allocation of Rs 4.0 Mn under PSDG and fund were allocated to Local
GovernmentDepartmenttorehabilitatetheChavakachcheriBusstand.
The
Ministry
has
allocated
Rs.15Mn.
in
2011
to
the
Department
of
Local
Government
and
the
followingworksareundertakenbywiththem.
1. RehabilitationofChanganaiBusStand 4.0Mn2. RehabilitationofMannarBusStand 1.0Mn3. Rehabilitationof PachchilaipalaiBusStrand 5.0Mn4. ProvidingMullaithivuBusStand 5.0Mn
ChavakachcheriBusStand
-
8/6/2019 (4) Infrastructure Development
8/70
4.3 TOURISM
-
8/6/2019 (4) Infrastructure Development
9/70
-
8/6/2019 (4) Infrastructure Development
10/70
TOURISM
174
TheMinistryhasallocatedRs.30Mn.underPSDGtoDepartmentofLocalGovernmentandtheyhaveundertakenthefollowingworksin2011
1. ProvidingPublicHallatKurikadduvan2. ProvidingRestareaToiletandBathatCasuarinaBeach3. ProvidingToilets&BathroomsatChaddyBeach4. ProvidingToilets&BathroomsatKeerimalai5. ProvidingtouristGuides&SignBoards.6. ProvidingPark&amenitiesatMannar.
AccessRoadtoCasuarinaBeach
-
8/6/2019 (4) Infrastructure Development
11/70
TOURISM
175
Governmentwasalsokeen inrehabilitatingsomeofthereligiousplaces.MinistryofEconomicDevelopmentgaveRs.220Mn. to rehabilitate the roads in ThiruketheeswaramTemplearea.This was a crash programme which was done in three months before the annual templefestival. Hon. Governor of Northern Province monitored the progress and the works werecompletedwithinthespecifiedtimeandtheannualfestivalwascelebratedinagrandscaleafteralonglapse.
ThiruketheeswaramTemplearea
-
8/6/2019 (4) Infrastructure Development
12/70
TOURISM
176
MurukandyTempleissituatedatthemidwayofA9roadanditwasacustomaryformostofthepassengers passing this temple stopover here for worship and rest.On the guidance of theHon.Governorareawasrehabilitated,toiletsparkingfacilitiesminishopswerecreatedandnowthepeoplepassingbyareenjoyingthefacilities.
MurukandyTemplearea
-
8/6/2019 (4) Infrastructure Development
13/70
4.4 ROAD
-
8/6/2019 (4) Infrastructure Development
14/70
ROAD
177
4.4.1 Background
N o r t h e r n P r o v i n c e ( N P ) h a s a b o u t 1 , 9 6 0 k m P r o v i n c i a l R o a d s a n d 7 6 0 0 k m o f r u r a l r o a d s . R o a d
D e v e l o p m e n t D e p a r t m e n t ( R D D ) o f N o r t h e r n P r o v i n c i a l C o u n c i l ( N P C ) i s r e s p o n s i b l e f o r t h e
c o n s t r u c t i o n a n d m a i n t e n a n c e o f 1 , 9 6 0 k m o f C , D c l a s s e s o f r o a d s o f w h i c h 1 1 1 5 . 9 6 k m a r e
p a v e d a n d s e a l e d a n d t h e b a l a n c e a r e g r a v e l e d r o a d s .
Provincial Roads District wise Details(Km)
J K
M
V
y
M
T
L
T
2 8 3 4 3 2 8 4 2 2 2 3 3 2 4 1966.80
Provincial Roads Summary(Km)
h e C & D c l a s s e s o f r o a d s i n t h e N P s e r v e a s l i n k r o a d s l i n k i n g t h e t r u n k & m a i n r o a d s ( A & B
c l a s s e s - N a t i o n a l H i g h w a s ) a n d t h e R u r a l R o a d s ( o c a l G o v e r n m e n t r o a d s , I r r i g a t i o n r o a d s a n d
C o m m i s s i o n s r o a d , F i s h e r s r o a d s e t c . ) .
h e r o a d n e t w o r k i n t h e N P i s g r e a t l d e b i l i t a t e d d u e t o t h e a r m e d c o n f l i c t , n e e d s s i g n i f i c a n t
r e h a b i l i t a t i o n a n d r e c o n s t r u c t i o n . h e n e e d f o r i n t e r v e n t i o n s t e m s f r o m t h r e e p r o b l e m s ,
d a m a g e s d u e t o c o n f l i c t , d e t e r i o r a t i o n d u e t o l a c k o f m a i n t e n a n c e , a n d s t a g n a t i o n i n
d e v e l o p m e n t a n d i m p r o v e m e n t o f r o a d n e t w o r k . h e c o n f l i c t i n t h i s r e g i o n h a s c a u s e d
s t a g n a t i o n i n d e v e l o p m e n t o f a l l i n f r a s t r u c t u r e s i n N o r t h a n d s t a n d a r d o f h i g h w a p r o v i s i o n l a g s
b e h i n d t h e n a t i o n a l s t a n d a r d . F o r t h e r o a d s i n t h e N o r t h a c a r r i a g e w a s h o u l d e r a n d v e r g e
w i d t h s a r e g e n e r a l l l e s s t h a n t h e n a t i o n a l s t a n d a r d . h e r e i s a n e e d t o f i l l 0 e a r s d e v e l o p m e n t
g a p b e t w e e n t h e s t a n d a r d o f r o a d s i n t h e N o r t h a n d t h a t o f t h e r e s t o f t h e c o u n t r .
Type of SurfaceClass
Metall GravellTotal
C 983.19 540.96 1524.15
D 132.77 309.88 442.65
Total 1115.96 850.84 1966.80
-
8/6/2019 (4) Infrastructure Development
15/70
ROAD
178
h e r o a d s s t e m a l t h o u g h l a r g e l i n a d e q u a t e p r i o r t o t h e c o n f l i c t , w a s m a i n t a i n e d r e a s o n a b l
w e l l b t h e r e s p e c t i v e r o a d a u t h o r i t i e s . B u t c u r r e n t l a l l p a v e m e n t s u r f a c e s h a v e d e t e r i o r a t e d ,
s o m e s e a l e d r o a d s u r f a c e s h a v e e n t i r e l d i s a p p e a r e d . D u r i n g t h e c o n f l i c t l i t t l e o r n o
m a i n t e n a n c e w o r k w a s c a r r i e d o u t . R i d i n g c o n d i t i o n s a r e p o o r , v e h i c l e - o p e r a t i n g s p e e d a r e l o w
a n d v e h i c l e o p e r a t i n g c o s t s h i g h .
R D D c o n t i n u e d t o m a k e a l l p o s s i b l e e n d e a v o u r s t o r e p a i r t h e s e r o a d s . A p a r t f r o m t h e C
& D c l a s s e s o f r o a d s i n N P , R D D h a s b e e n c a l l e d u p o n t o d o w o r k s f o r t h e r u r a l r o a d s . h e r e a r e
f r e q u e n t r e q u e s t s f r o m o c a l A u t h o r i t i e s a n d a n d D e p a r t m e n t e v e r e a r t o r e p a i r t h e i r r o a d s
t h a t c o m e u n d e r t h e i r p u r v i e w .
4.4.2 Achievement
I n - o r d e r t o m i t i g a t e t h e s i t u a t i o n P r o v i n c i a l R o a d D e v e l o p m e n t D e p a r t m e n t w a s t a k i n g a l l
n e c e s s a r a c t i o n s i n t h e p a s t f e w e a r s t o r e c o n s t r u c t d a m a g e d b r i d g e s a n d t o r e h a b i l i t a t e o r
i m p r o v e s o m e o f t h e r o a d s . R D D h a s b e e n r e h a b i l i t a t e d a r o u n d 1 0 0 k m r o a d s i n t h e l a s t 3
e a r s .
h e G o v e r n m e n t l a u n c h e d m a s s i v e r e s e t t l e m e n t p r o g r a m m e f o r I D P u n d e r V a d a k k i n
V a s a n t h a m P r o g r a m m e i n a l l f i v e d i s t r i c t s o f t h e p r o v i n c e f r o m t h e e a r 0 0 9 . I n o r d e r t o
e x p e d i t e t h e r e s e t t l e m e n t p r o g r a m m e a n d i m p r o v e r e s t o r e v i l l a g e s i n t e r c o n n e c t i v i t a n d
a c c e s s t o m a r k e t , e d u c a t i o n a n d h e a l t h o f t h e r e s e t t l e d a n d c o n f l i c t a f f e c t e d p e o p l e .
h eS
u m o f R s 0 0 . 8
M
i l l i o n , 3
0M
i l l i o n & 1 5 0 M
i l l i o n w a s a l l o c a t e d u n d e r P S
D G t o i m p r o v e t h e
P r o v i n c i a l r o a d s s t r u c t u r e s i n J a f f n a , K i l i n o c h c h i , M u l l a i t h i v u , V a v u n i a a n d M a n n a r D i s t r i c t s
R e s p e c t i v e l 0 0 9 , 0 1 0 & 0 1 1 .
A s u m o f R s . 0 M i l l i o n w a s a l l o c a t e d t o i m p r o v e 5 . 0 6 k m a c c e s s r o a d s t o h i r u k k e t h e e s w a r a m
e m p l e i n M a n n a r D i s t r i c t b M i n i s t r o f E c o n o m i c D e v e l o p m e n t .
I n a d d i t i o n t o a b o v e , P r o j e c t I m p l e m e n t a t i o n u n i t o f t h e N o r t h e r n R o a d D e v e l o p m e n t
D e p a r t m e n t ( N P R D D ) i s i m p l e m e n t i n g t h e f o l l o w i n g P r o j e c t s t o r e h a b i l i t a t e w i t h p r o v i n c i a l r o a d s
a n d M u n i c i p a l a n d U r b a n C o u n c i l s r o a d s i n N o r t h e r n P r o v i n c e . D e t a i l s a t t a c h e d .
-
8/6/2019 (4) Infrastructure Development
16/70
ROAD
179
Projects for road sector
Nam
e of
the
Proje
ct
Funded
by
Project Areas Loan Amount
(Mn)
Provincial
Component
(Mn)
Commencement Completion
NRCP G O SL &
A
B
L
V
y
,
M
U
S $
3 0 0
U
S $
2 3 J 2 0
0
J 2 0
CARE G O SL &
A
B
L
J , K
, M
, V
y
,
M
U
S $ 8 2 4
U
S $ 3 4 J 2 0 0
2 0 2
PRP W d
B
k
L
J
U
S $ 0 0 0
U
S $ 2 0 0 M
2 0 0 M
2 0
N R C P - N o r t h e r n R o a d C o n n e c t i v i t P r o j e c t
C A R E - C o n f l i c t A f f e c t e d R e g i o n E m e r g e n c P r o j e c t
P R P - P r o v i n c i a l R o a d p r o j e c t
Vadakkin Vasantham Program
Source of fund PSDG
DISTRICT 2009 2010 2011
JaffnaKillinochchi
Mullaitivu
Vavuniya
Mannar
Total
Details of Works
District Jaffna Year - 2009
Name of the Road Location D.S Division Expenditur
e (Mn)1 Impts. to Chempan Kadduvan road 0.00-1.00 Sankanai 2.14
2 Impts. to Analaitivu Central Road. 0.00-1.80 Kyts 3.70
3 Impts. to Thirunelveli-Puthur Road 4.50-8.65 Kopai 2.97
5 Impts. to Meesalai Varany road - 1.25-2.00 Chavakachcher
i
2.21
6 Reh of Maveli Periyathurai Road 0.00-6.00 Delft 1.55
7 Reh of Sarapiddy road 1.00-2.00 Delft 2.59
8 Reh ofWeeravani Watharawathai
road
1.00-3.00,
4.30-4.50
Kopai 1.32
9 Reh of Atchuvely Navakiri road 0.00-3.83 Kopai 0.73
-
8/6/2019 (4) Infrastructure Development
17/70
ROAD
180
10 Reh of Kondavil Irupalai road 2.40-5.80 Kopai 0.45
11 Reh of Idaikadu school Road 0.00-1.00 Kopai 4.04
12 Reh of Erlalai Kadduwan Road. 0.00-1.00 Thellipalai 2.80
13 Reconstruction of culvert alongKachchai Ketpeli Elephantpass
Road
Chavakachcheri
0.92
14 Reconstruction of culvert along
Puloly Hospital Vallipuram Road
Point Pedro 0.95
15 Reconstruction of culvert along
Sivan Kovil Road.
Karainagar 0.95
16 Reconstruction of culvert along
Nunavil -Sarasalai Road
2.80,3.20 Chavakachcher
i
0.59
17 Reconstruction of culvert along
Manipay Inuvil Annankai Road.
Uduvil 0.69
18 Reconstruction of culvert along
Kokuvil Kondavil Road.
Nallur 0
19 Reconstruction of passenger Jetty at
Nagapooshani East Coast Road,
Nainativu.
2.70-5.10 Velanai 18.29
20 Impts. to Approach Road to
Selvachannithy Road
0.00-0.80 Point Pedro 1.61
21 Impts. to Widening of Road
Nagapoosani East Coast Road
0.00-1.25 Velanai 2.16
22 Reconstruction of retaining wall
along Polikandy -Navindil -
Karanavai Road
Karaveddy 1.87
23 Construction of side drain on
Polikandy -Navindil -Karanavai
Road
0.60-0.87 Chavakachcher
i
3.87
24 Repairs to Kachchai Ketpeli
Elephantpass Road
2.25-3.70 Chavakachcher
i
9.37
25 Reconstruction of Retaining Walland Re-metalling on Mirusuvil
Ushan Ketpeli Road
1.875-2.625 Chavakachcheri 3.92
26 Impts. to Weeravani
Watharawathai Road
4.30-5.50 Kopai 0.88
27 Widening Uraithivu Solanodai
Irupiddy Road
0.00-1.00 Velanai 4.58
28 Repairs to Allaipiddy Mankumban
Road
2.00-4.70 Velanai 4.24
Grant Total 79.95
-
8/6/2019 (4) Infrastructure Development
18/70
ROAD
181
District Kilinochchi Year - 2009
District Mannar Year - 2009
S/No Road Name Location D.S
Division
Expenditure
(Mn)
1 Impts. to Pesalai -
Vyaiyadipannai Road
0.00-0.50 Mannar 4.78
2 Impts. to Thalaimannar-village
Road
0.00-0.50 Mannar 4.79
3 Impts. to Erukkalampity
Amaippadukkai Road
0.00-1.01 Mannar 4.83
4 Impts. to Thiruketheswaram
Road
0.00-1.30 Manthai 4.37
5 Reh of Pallamadhu - Alkadively
Road
3.50-6.50 Manthai 4.22
6 Reh of Nanaddan -
Periyapulavely - Potkerny Road
0.00-7.25 Musali 4.10
7 Reh of Vankalai -
Sirunavatkulam Road
0.32-1.00 Mannar 4.93
8 Reh of Uiyalankulam
Manalkulam Nanattan Road
0.00-3.00 Mannar 1.89
9 Reh of Murunkan Nanattan Road 0.00-1.30 Manthai 0.94
10 Construction of 915 dia meter
7.32m long three raws hume pipe
culvert on Thiruketheeswaram
Road
2nd km Manthai 0.91
11 Reh of Uyilankulam -
Alkadively Road
0.00-1.76 km Manthai 1.98
12 Reh of on Uyilankulam -
Alkadively Road
1.76, 1.97 &
2.0-6.00 km
Manthai 1.98
Grant Total 39.73
* - Above Work was Completed
S/No Name of the Road Name Location D.S Division Expenditure (Mn)
1 Impts. to Iranaimadu AccessRoad
0.00-3.50 Karachchi 14.61
Grant Total 14.61
-
8/6/2019 (4) Infrastructure Development
19/70
ROAD
182
District Vavuniya Year - 2009
S/No Road Name Location D.S
Division
Expenditure
(Mn)
1 Impts. to Sinthamanipillaiyar
kovil Road
0.30-0.45 Vavuniya 1.90
2 Impts. to Puthoor Palamoddai
Road
3.50-3.90 Vavuniya 2.85
3 Impts. to Pandivirichchan
Andiyarpuliyankulam Road
5.5- 6.30 VCK 4.66
4 Reh of Mahilankulam
Pallamadhu road
0.00-1.70 Vavuniya 3.32
5 Reh of Poovarasankulam
Cheddikulam Road
6.00-6.60 VCK 4.63
6 Reh of ChalambaikulamThanthirimalai Road 0.00 -1.00 VCK 1.11
8 Reh of Mahilankulam
Pallamadu Road
0.00-
0.70
Vavuniya 4.99
10 Reh of Park Road 0.00 -
0.30
Vavuniya 2.99
11 Reh of Poovarasankulam
Cheddikulam Road
6.00 -
6.70
VCK 4.72
12 Drainage System on
Ananthakumarasamy
Resettlement Village - Zone I13 Additional Drainage System on
Ananthakumarasamy
Resettlement Village - Zone I
VCK 6.5
14 Drainage System on
Arunachchalam Resettlement
Village - Zone III
VCK 5.6
15 Additional Drainage System on
Arunachchalam Resettlement
Village - Zone III
16 Drainage System onArunachchalam Resettlement
Village - Zone IV
VCK 11.46
17 Additional Drainage System on
Arunachchalam Resettlement
Village - Zone IV
18 Repairs to Kalnatinakulam
Asikulam Road
0.00 -
0.40
Vavuniya 1.89
19 Reh of Poovarasankulam
Cheddikulam Road 7th km.
6.00 -
7.00
VCK 9.91
Grant Total 66.53
-
8/6/2019 (4) Infrastructure Development
20/70
ROAD
183
PSDG- 2010
District :- Jaffna
S .
Name of the
Road
DS Division Location Cost
LKR
(Mn)1 Reh of Mirusuvil Ushan
KetpelyChavakachcheri 0.0-1.85 0.70
2 Reh of Mylapulam Road. Velanai 0.0-2.0 5.80
3 Reh of Mandaitivu LoopRoad.
Velanai 0.0-1.16 6.20
4 Reh of Columbuthurai
Ariyalai Sea Beach Road
Jaffna 0.0-0.92 5.80
5 Reh of Ushan
Vidathatpalai road
Chavakachcheri 1Nos 1.50
6 Reh of Eluthumadduwal
Kilalyl road
Chavakachcheri 1Nos 2.00
7 Reh of NavaladyThikkam road
Karaveddy 2Nos 2.00
8 Reh of CheddiyarmadamSankarathai Chankanai
Piranpattu road
Chankanai 1Nos 1.00
9 Reh of Anthananthidal -Kapputhu Road
Karaveddy 1.20
10 Reh of Nunavil -SarasalaiRoad
Chavakachcheri 0.80
11 Reh of St SebastiyanKannakaia Amman Road
Kayts 2.00
12 Reh of Uduppidy -Malisanthy -Alvai Road Karaveddy 1.00
13 Impts to Piranpaththai
Pandatherippu road
Sandilipay 0.0-1.87 4.20
14 Impts to KantharodaiUduvil Road
Uduvil 0.0-0.75 5.00
15 Impts to KokkuvilKondavil road
Nallur 0.2-1.2 3.
16 Impts to Navaladdy -Thikkam Road
Point Pedro 0.0-1.5 4.20
17 Reh of Kaithady Juntionto Kaithady north Road
Chavakachcheri 0.0-3.22 2.00
18 Reh of Mannipai InuvilAnnankai Road
Nallur 0.0-4.7 3.
19 Reh of Thumpalai Road Point Pedro 0.58-1.7 2.00
20 Reh of PannalaiKeerimalai Road
Tellipalai 0.0-2.0 2.00
21 Reh of Puloly HospitalVallipuram road
Point Pedro 0.0-2.22 2.00
22 Reh of Navali New road Sandilipay 0.0-2.38 2.00
23 Reh of Chavakacheri
Nunavil Road
Chavakachcheri 0.0-2.04 2.00
24 Reh of Vadaliyadaipu
Maluvai road
Chankanai 0.0-4.43 2.60
25 Reh of Naguleswaryroad
Tellipalai 0.0-3.0 2.00
-
8/6/2019 (4) Infrastructure Development
21/70
ROAD
184
26 Reh of Varani -Iyatalai -Virali Road
Karaveddy 2.0-5.31 2.00
27 Reh of NaranthanaiKarampan road
Kayts 1.0-2.0 1.50
28 Impts to Approach Road
to Governor's Bungalow
Jaffna 0.0-1.6 8.40
29 Impts to CasoorinaBeach Road.
Karainagar 10.00
Sub Total 88.5
District :- Kilinochchi
Name of the Road DSDivision
Location
Cost
LK
R(Mn
)
1 Reh of Sithankurichchi Road Poonakary 0.0-0.7 8.00
2 Reh of Akkarayan-SkanthapuramRoad
Karachchi 0.0-0.75 8.00
3 Reh of Nachchikuda Fisheries Road Poonakary 0.0-1.0 12.00
4 Reh of Culverts on Vanneri-Pandiveddy Road
Karachchi 0.0-1.16 1.60
5 Reh of culverts on Vanneri L BBranch Chl.Bund Road
Karachchi 0.0-1.79 2.20
6 Reh of Culverts on Veravil -Valaippadu Road
Poonakary 0.0-2.42 1.50
7 Reh of Chempankundu PalaviKiranchi Road
Poonakary 3.20
8 Impts to Taylor Road Karachchi 0.0-1.25 11.60
9 Impts to Approach Road to publicBuilding (Ariviyal nagar premises)
Karachchi 4.50
10 Reh of causewayon Vaddakachchi
Puliyampokkanai Road
Kandawalai 7.50
Sub Total 60.10
-
8/6/2019 (4) Infrastructure Development
22/70
ROAD
185
District :- Mullaithivu
Name of the Road DS Division LocationCost LKR
(Mn)
1 Rehof Vannivilankulam PanankamamRoad
Manthai East 2.0-3.5 10.30
2 Reh of Murukandy Pillaiyar Kovil Thunukai 13.0-14.25 15.00
3 Reh of Vattapalai Temple Road Mullaitivu 0.0-2.01 6.00
4 Reh of Poovarasankulam ThunukkaiRoad
Manthai East 25.8-51.5 0.60
5 Reh of OlumadhuPulumachchinathakulamAmpakamamRoad
Oddusuddan 0.0-7.25 0.40
6 Reh of Oddusuddan Thaddamalai
Road
Oddusuddan 0.0-4.83 0.75
7 Reh of Thunukkai Alankulam Road Thunukkai 0.0-2.81 0.25
8 Impts to Kandalveli OddaruthakulamRoad
Manthai East 0.0-1.25 11.50
9 Impts to Nagapaduvan Path Road Thunukai 13.0-27.37 8.00
Sub Total 52.80
District :- Vavuniya
Name of the Road DS Division Location Cost LKR(Mn)
1 Reh of Chalambaikulam
Thanthirimalai Road
V.C.K 0.0-1.0 1.80
2 Reh of Kudiyirippu - PoonthootamRoad
Vavuniya 0.0-0.3 7.30
3 Reh of Kanakarayankulam District
Boundry Road
Vavuniya North 0.0-1.0 9.60
4 Reh of Approach Road Vavuniya 9.80
5 Impts to Poovarsankulm - ChettikulamRoad ( Causeway )
VCK 5.0-6.0 2.00
6 Impts to Pandikethakulam -
Mariyadithakulam Road
Vavuniya 0.0-2.0 13.52
7 Impts to Poovarsankulm - ChettikulamRoad
Vavuniya 4.5-8.2 13.65
Sub Total 57.67
-
8/6/2019 (4) Infrastructure Development
23/70
ROAD
186
District :- Mannar
Name of the Road DS Division LocationCost LKR
(Mn)
1 Reh of Nanattan Periyapulveli PotkernyRoad
Nanattan 0.34-1.0 7.5
2 Reh of Akathimurippu VeppankulamRoad
Madhu 0.0-1.0 9.00
3 Reh of Uiyalankulam Manalkulam
Nanattan road
Mannar 0.0-8.0 3.10
4 Impts toPeriyapulathusenai PotkernyBandaeavely Road
Musali 0.0-1.25 14.50
5 Reh of Thalvupadu - Thrapuram Road Mannar 0.0-7.45 5.00
6 Reh of PiramalankulamParappukadanthan Road
Madhu 9.6-13.1 9.63
7 Reh of Uyilankulam - Adampan Road 2 to 3 1.20
8 Reh of Vellankulam - ThevanpiddyRoad
1.00
Sub Total 50.93
-
8/6/2019 (4) Infrastructure Development
24/70
ROAD
187
Kilinochchi District
Rehabilitation of Akkarayan - Skanthapuram Road (0.00-0.875 km)
Rehabilitation of Nachikuda Fisheries Road (0.00-0.91 km)
Improvements to Taylor Road (0.00-1.25km)
-
8/6/2019 (4) Infrastructure Development
25/70
ROAD
188
Improvements to Kandalveli
Oddaruthakulam Road (0.00-1.39 km)
Rehabilitation of Vannivilankulam
Panankamam Road 2.00-3.45 km
Mullaithivu District
-
8/6/2019 (4) Infrastructure Development
26/70
ROAD
189
MahilankulamPalla Madhu (0.00 13.60 )
Puthoor- Palamoddai Road (0.00 28.00)
Vavuniya District
-
8/6/2019 (4) Infrastructure Development
27/70
ROAD
190
Uyilankulam Manalkulam Nanaddan Road
(0.00 8.00)
Coolyshed Road (0.00 0.80)
Mannar District
-
8/6/2019 (4) Infrastructure Development
28/70
ROAD
191
Thalvupadhu Tharapuram (0.00 8.45)
-
8/6/2019 (4) Infrastructure Development
29/70
ROAD
192
Special Project Under Vadakkin Vasantham
Rehabilitation of Thirikethewaram temple Road Works
Source of Fund - Ministry of Nation building
Allocation - 220 Million
District - Mannar
S.No. Name of the Road Location (Km) Cost LKR (Mn)
1 Rehabilitation of Thiruketheeswaram Road 0.00-0.50 16.53
2 Rehabilitation of Thiruketheeswaram Road 0.50-1.00 15.54
3 Rehabilitation of Thiruketheeswaram Road 1.00-1.50 17.62
4 Rehabilitation of Thiruketheeswaram Road 1.50-2.00 15.58
5 Rehabilitation of Thiruketheeswaram Road 2.00-2.50 17.386 Rehabilitation of Thiruketheeswaram Road 2.50-3.00 17.36
7 Rehabilitation of Thiruketheeswaram Road 3.70 - 4.06 19.88
8 Rehabilitation of Thiruketheeswaram Road 3.00 - 3.70 40.12
9 Rehabilitation of Thiruketheeswaram Road 0.00 - 0.93 60.00
Total 220.00
Thiruketheeswaram temple road after construction
-
8/6/2019 (4) Infrastructure Development
30/70
ROAD
193
Construction of Casoorina Beach Approach Rood
Source of Fund - Ministry of Infrastructure and Development and Reconsruction
Allocation - 20 Million
District - Jaffna
Casoorina beach approach road after construction
Reconstruction of Nayinathivu Jetty
Source of Fund - PSDG
Allocation - 18 Million
District - Jaffna
Rehabilitation of Murukandy Temple Premises
Source of Fund - PSDG
-
8/6/2019 (4) Infrastructure Development
31/70
ROAD
194
Allocation - 15 Million
District - Jaffna
Murukandy pillaiyar temple after construction
-
8/6/2019 (4) Infrastructure Development
32/70
ROAD
195
PSDG 2011
A s u m o f R s 1 5 0 M i l l i o n w a s A l l o c a t e d u n d e r P S D G t o i m p r o v e s R o a d s t r u c t u r e s i n J a f f n a ,
K l i n o c h c c h i , M u l l a i t h i v u , V a v u n i a a n d M a n n a r D i s t r i c t s .
PSDG Jaffna District Work-2011
S.
No
Road Name Location D.S.Division Expenditure Allocation
1 Reh of Pungudutivu AmmanKovil Road
1.90 -2.68 Velanai 0.87 5.00
2 Impts to Meesalai NorthSorth Road
3.23 - 4.25 Chavakacheri 1.16 5.00
3 Impts to Uduvil SandilipayRoad
0.00 - 3.74 Uduvil 0.31 2.00
4 Impts to Thampaddy
Periyapulam Road
0.00 - 0.74 Kayts 0.54 3.00
5 Impts to Kalasalai Road 0.00 - 1.55 Nallur 0.83 2.95
6 Impts to Varani
KudathanaiRoad
2.30 - 2.80 Chavakacheri 0.07 5.00
7 Impts to pannalai Keerimalai
Road
2.25 - 3.20 Telliplai 0.14 5.00
8 Reh of Kothalawela Chanel
Road
- Sandilipay 0.14 2.00
9 Reh of Chavakacheri Ducth
Road
0.00-4.00 Chavakacheri 1.66 3.25
10 Reh ofChulipuramChankanai Road
0.00-4.19 Chankanai 1.48 2.27
11 Reh of Ampanai Alaveddy
road
0.00-2.14 Telliplai 0.75 1.20
12 Reh of PanaveddyVadakkamparai Road 0.00 - 1.85 Chankanai 0.641.00
Total 40.00
*
W o r k i n p r o g r e s s
-
8/6/2019 (4) Infrastructure Development
33/70
ROAD
196
PSDG Kilinochchi District Work-2011
S.No Road Name Location D.S.Division Expenditure Allocation
1 Impts to Wilson Road 1.55-2.40 Karachchi 0.008 1.50
2 Impts to Kennady Road 0.00-1.90 Karachchi 0.018 2.80
3 Impts to Approach road to
Cattle farm
0.0-3.50 Karachchi 0.088 5.00
4 Impts to ChemmankunduPalavi Kiranchci Road
21.00-
31.00
Poonagari 0.02 3.50
5 Impts to Alakaratnam Road 4.03-7.63 Karachchi 0.11 4.00
6 Impts to of GovernorsBungalow Approach Road
0.45-1.35 4.5 4.7
7 Constructon Vented causeway
on Alakaratnam Road
4.03-
11.45
Karachchi Tender
Called
4.5
8 Constructon of Causeway onAlakaratnam Road
- Karachchi Tender
Called
1.20
9 Construction of Culvert
Alakaratnam Road
- Karachchi Tender
Called
1.30
Total 30.00
*W o r k i n p r o g r e s s
PSDG Mullaitivu District Work-2011
S.N
o
Road Name Location D.S.Division Expenditure Allocation
1 Improvement of
Mulliyavalai
Vatapalai Road
0.00-2.81 Mullaitivu 0.011 3.00
2 Improvement ofsinnaththankadu vaddu
vaikal Road
0.00-2.01 Mullaitivu TenderCalled
2.50
3 Improvement of
Poovarasamkulam
Thunukai Road
25.80-51.50 Manthai East 0.24 4.50
4 Improvement to
vannivilankulam
Panankamam Road
3.45-7.00 Manthai East Tender
Called
2.70
5 Improvement of Vattapalai
kappapilavu
puthukudiyiruppu Road
0.00-1.00 Mullaitivu 0. 46 0.80
-
8/6/2019 (4) Infrastructure Development
34/70
ROAD
197
6 Improvement to Kandalveli
oddaruththakulam Road
1.39-2.66 Manthai East Tender
Called
1.80
7 Improvement to
Nagapaduvan path Road
13.00-22.00 Thunukkai Tender
Called
1.00
8 Improvement toSilavaththai Thachchanveli
Road
0.00-1.20 Mullaitivu 0.71 1.60
9 Improvement to
thanniyootu
Kumunamunai Alampil
Road
0.00-13.83 Mullaitivu Tender
called
3.60
10 Improvement toOddusuddan
Puthukkidiyiruppu
Maththalan Road
3.00-7.00 Odd/Puthukkudiyi
ruppu
0.59 4.00
11 Conetruction of Culverts
on
Vattapalai temple Road
1.00-2.01 Mullaitivu Tender
Called
1.00
12 Construction of Causeway
on Oddusuddan Kilikadu
Road
0.00-2.00 Oddusuddan Tender
Called
3.00
13 Construction of Culverts
on Olumadhu
Pullmachchinaithikulam
Ampakamam Road
0.00-7.25 Oddusuddan Tender
Called
0.50
Total 30.00*
W o r k i n p r o g r e s s
PSDG Vavuniya District Work-2011
Road Name Location D.S.Division Expenditure Allocation
1
Improvement of Road
Poovarasankulm -Cheddi
Kulam
Cheddiyarkulam Road
0.00-
12.08
Vavuniya 0.012 4.50
2
Improvement of Nedunkerny
Koolankulam road
0.00-
15.60
Vavuniya(N) Tender Called 0.50
3
Improvement of Koolankulam
Maralillupaikulam
0.0013.60 Vavuniya(N) Tender Called 0.50
4
Improvement of Nainaimadu
Samalankulam road
0.00-
12.80
Vavuniya(N) Tender Called 0.50
5
Improvement of
Chalanbaikulam
Thanthirimalai
0.00-0.8 Vengalached 0.057 0.50
-
8/6/2019 (4) Infrastructure Development
35/70
ROAD
198
6
Impovement of Mamadu -
Karunkaikulam road
0.00-
13.60
Vavuniya(S) 0.32 2.00
7
Improvement of Maniyarkulam
Pirapamadu road
0.00-8.00 Vavuniya(S) Tender Called 1.00
8Improvement ofSinnaputhukulam road
0.00-6.88 Vavuniya 0.20 1.00
9
Improvement of Kalnatikulam -
Asikulam road
0.00-4.16 Vavuniya 0.12 0.50
10
Improvement of Kudiyirupu -
poonthoddam road
0.00-2.70 Vavuniya 0.72 2.00
11
Improvement of Malikai
Chemamadu
road
0.00-2.81 Vavuniya Tender Called 0.50
12
Improvement of Navatkulam -Maraiyadithakulam road
0.00-9.60 Vavuniya Tender Called 1.00
13
Improvement of Approach road
Vavuniya Division
0.00-7.20 Vavuniya 0.16 0.50
14
Improvement of
Mathavuvaithakulam
Kanthpuram road
0.00-0.3 Vavuniya 0.81 5.00
15
Improvement of
Poovarasankulam
Thunukai road
0.00-
10.80
Vavuniya 0.012 4.00
16
Improvement of Ulukulam -
Varikudiyoor road
0.00-
10.40
Vavuniya(S) Tender Called 1.00
Total 25.00
*W o r k i n p r o g r e s
-
8/6/2019 (4) Infrastructure Development
36/70
ROAD
199
PSDG Mannar District Work-2011
S.No Road Name Location D.S.Division Expenditure Allocation
1 Improvement of Uyilankulam -
adampan road
0.00-
5.65
Mannar Tender
Called
2.00
2 Improvement of Kovitkulam-Athimooddai road
0.00-
6.00
Manthai 0.007 3.50
3 Improvement of
Marichchukaddy
Uvaiyadikulam
0.00-
3.65
Musali 0.007 2.50
4 Improvement of
Kaddaddyivaial
Ramyankulam
0.00-
17.00
Manthai 0.039 4.50
5 Improvement of Madhu
palampiddiya road
0.00-
8.85
Madhu 0.007 2.75
6 Improvement of Mahilankulam
-
Pallamadu road
14.00-
590
Madhu 0.007 3.75
7 Improvemen of Pllamadu -
Vidaththalthivu road
0.00-
1.60
Manthai 0.2 2.00
8 Improvement of
Periyapulathuchenai
Potkerni - Bandaraveli road
0.80-
2.80
Musali Tender
Called
2.00
9 Construction of new Structures
atPoovarasankulam -Thunukai
road
Madhu 0.009 2.00
Total 25.00
*W o r k i n p r o g r e s s
-
8/6/2019 (4) Infrastructure Development
37/70
ROAD
Foreign Funded Projects
Northern provincial council road projectsR
e
h
a
b i l i
t
a
t
i
o n
P
r o v
i
n c
i
a
R
oa
d
s
i
s c u r r e n
t
y
i
m p e m e n
t
e
d b
y
N
or
t
h
e r n
P
r o v
i
n c
i
a
C
o u n c
i
t
h
r o u g
h R
oa
d D
e ve o p m e n
t
f
j
F
j
A
L
A
( M
)
( M
)
N R C P G O S & D B
oa n
V
a v u n
i
y a
,
a n n a r
U S
$
1 7 3
.
0 0 U S
$
2 1
.
3 7
C R E G O S & D B
oa n
J
a
na
,
K i l i
n o c
h
c
h i
,
u a
i
t
h i
v u
,
V
a v u n
i
y a
,
a n n a r
U S
$
1 6 8
.
2 4 U S
$
3 7
.
1 4
P R P W
or
d B
a n
k
oa n
J
a
na
U S
$
1 0 5
.
0 0 U S
$
2 1
.
0 0
N R C P
-
N
or
t
h
e r n
R
oa
d C
o n n e c
t
i
v
i
t
y
P
r o
e c
t
C R E
-
C
o n
i
c
t
e c
t
e
d R
e g
i
o n
E
m e r g e n c y
P
r o
e c
t
P R P
-
P
r o v
i
n c
i
a
R
oa
d
pr o
e c
t
O b
e c
t
i
ve o
t
h
e pr o
e c
t
s a r e a
i
me
d
a
t
i
m pr o v
i
n g a c c e s s
t
o s o c
i
o
e c o n o m
i
c ce n
t
e r s
i
n
N
or
t
h
e r n p r o v
i
n ce s
t
h
r o u g
h
t
i
m pr o v e
d
r oa
d i
n
r a s
t
r u c
t
ur e
-
8/6/2019 (4) Infrastructure Development
38/70
ROAD
201
Northern road connectivity project (NRCP)
E x e c u t i n g A g e n c y : M i n i s t r y o f L o c a l G o v e r n m e n t a n d P r o v i n c i a l C o u n c i l
I m p l e m e n t i n g A g e n c y : N o r t h e r n P r o v i n c i a l C o u n c i l ( N P C ) N P R D D
A D B L o a n N o : 2 6 3 9 - S R I
P r o j e c t N o : 4 2 2 5 4
D a t e o f E f f e c t i v e n e s s : J u n e 2 0 1 0
C l o s i n g D a t e : J u n e 2 0 1 5
C r e d i t A m o u n t : U S $ 1 7 3 m i l l i o n
P r o v i n c i a l C o m p o n e n t : U S $ 2 5 . 0 8 m i l l i o n
( 8 9 % - A D B , 1 1 % - G o v e r n m e n t )
T e c h n i c a l A s s i s t a n c e : U S $ 0 . 5 6 m i l l i o n
-
8/6/2019 (4) Infrastructure Development
39/70
ROAD
202
Northern road connectivity project (NRCP)
Wo r k s i n P r o g r e s s
Package Name Of the RoadLocation
(Km)
TotalLength(Km)
ContractAmount
(Mn)T h a l i m a n n a r V i l l a g e R o a d 0 . 0 - 0 4 . 0 0
P e s a l a i - V a u a d i p a n a i R o a d 0 . 0 0 2 . 0 0
O
l a i t h o d u v a i R o a d 0 . 0 - 0 5 . 0 0
K a r i s a l R o a d 0 . 0 - 0 0 . 8 0
01
T h o d d a v e l i - M a l u p a d i R o a d 0 . 0 - 0 3 . 6 5
1 5 . 4 5 3 6 9 . 7
02P e r i y a m u r i p p u R o a d 0 . 0 - 2 6 . 5 0
2 6 . 5 0 3 6 8 . 9
M u r u n g a n - N a n a d d a n R o a d 0 . 0 - 0 1 . 8 0
U y i l a n k u l a m - M a n a d a k u l a m N a n a d d a n
R o a d
0 . 0 - 0 0 . 9 5
M a n n a r - T h a i v a p a d u - T h a r a n p u r a m
R o a d
0 . 0 - 0 1 . 3 5
S o u t h B a r R o a d 0 . 0 - 0 1 . 5 0
P a l l i m u n a i B e a c h R o a d 0 . 0 - 0 0 . 9 5
E s p l n a d e R o a d 0 . 0 - 0 0 . 5 4
A p p r o a c h R o a d t o P u b l i c B u i l d i n g 0 . 0 - 0 2 . 3 0
P u t h u k a m a m R o a d 0 . 0 - 0 2 . 0 5
03
V a n k a l a i - S i r u n a v a t k u l a m R o a d 0 . 0 - 0 2 . 6 8
1 7 . 3 2 3 3 1 . 8
P a n d i c h u r i c h c h a n - A n d i y a p u l l e y a n k u l a m
R o a d
0 . 0 - 0 9 . 6 0
I n t p e r i y a k u l a m - P u t h o o r R o a d 0 . 0 - 0 6 . 0 0 04
C h e d d i k u l a m - T h u d a r i k u l a m R o a d 0 . 0 - 1 0 . 4 0
2 6 . 0 0 3 1 4 . 2
M a d h u k a n d a l - I r e t p e r i y a k u l a m R o a d 0 . 0 - 1 5 . 2 0
05M a h a y a n k u l a m - P a l l e m a d u R o a d 0 . 0 - 1 3 . 6 0
2 8 . 8 0 3 4 8 . 7
P u t h o o r - P a l a m o d a i R o a d 0 . 0 - 2 4 . 0 0
06 M a n k u l a m - M a r u t h a m a d h u -
M i n g e t t i g a m a R o a d
0 . 0 - 0 3 . 2 0
2 7 . 2 0 3 1 7 . 3
-
8/6/2019 (4) Infrastructure Development
40/70
ROAD
203
Northern road connectivity project (NRCP)
Project area Mannar
Project area Vavuniya
-
8/6/2019 (4) Infrastructure Development
41/70
ROAD
204
Pesalai - Vauadipanai Road (0.0-2.0Km) Package 01 Before Construction
Olaithoduvai Road (0.0-5.0Km) Package 01 Before Construction
District: Mannar
Thalaimannar Village Road (0.0 - 4.0Km) Package 01 Before Construction
-
8/6/2019 (4) Infrastructure Development
42/70
ROAD
205
Karisal Road (0.0-8.0Km) Package 01 Before Construction
Veppankulam Periyamurippu Road (0.0 26.5Km) Package No 02 Before Construction
Thoddaveli- Malupadi Road (0.0-3.65Km) Package 01 Before Construction
-
8/6/2019 (4) Infrastructure Development
43/70
ROAD
206
Murungan Nanaddan Road (0.0 1.8Km) Package No 03 Before Construction
Uyilankulam- Manadakulam Nanaddan Road - (0.0 0.95Km) Package No 03 Before Construction
Thalvupadu - TharanpuramRoad (0.0 1.35Km) Package No 03 Before Construction
-
8/6/2019 (4) Infrastructure Development
44/70
ROAD
207
South Bar Road (0.0 1.5Km) Package No 03 Before Construction
Approach Road to Public Building (0.0 2.3Km) Package No 03 Before Construction
Puthukamam Road (0.0 2.5Km) Package No 03 Before Construction
-
8/6/2019 (4) Infrastructure Development
45/70
ROAD
208
Veppankulam - Periyamurippu Road
(0.0 26.5Km) Package No 02 ongoing works
Veppankulam - Periyamurippu Road
(0.0 26.5Km) Package No 02 Before
Construction
Vankalai Sirunavatkulam Road (0.0 2.68Km) Package No 03 Before Construction
Olaithoduvai Road (0.0 0.5Km) Package No 01 Ongoing works
-
8/6/2019 (4) Infrastructure Development
46/70
ROAD
209
Pandichurichchan - Andiyapulleyankulam Road - (0.0 9.6Km) Package No 04 Before Construction
Madukandal - Iretperiyakulam Road (0.0 15.2Km) Package No 05 Before Construction
Mahaiyamkulam - Pallemadu Road (0.0 13.6Km) Package No 05 Before Construction
District: Vavuniya
-
8/6/2019 (4) Infrastructure Development
47/70
-
8/6/2019 (4) Infrastructure Development
48/70
ROAD
211
Madukandal - Iretperiyakulam Road (0.0 15.20Km) Package No 05 Ongoing works
LaboratoryPandichurichchan - Andiyapulleyankulam Road
(0.0 9.6Km) Package No 04 Ongoing works
-
8/6/2019 (4) Infrastructure Development
49/70
ROAD
212
Provincial roads project
Key features of the project
E x e c u t i v e A g e n c y M L G P C
I m p l e m e n t i n g A g e n c y N o r t h e r n P r o v i n c i a l C o u n c i l
D a t e o f E f f e c t i v e n e s s M a r c h 3 1 2 0 1 0
C l o s i n g D a t e M a r c h 3 1 2 0 1 5
C r e d i t A m o u n t U S $ 1 0 5 M i l l i o n
N o r t h e r n P r o v i n c i a l c o m p o n e n t s U S $ 2 1 M i l l i o n
( 1 0 0 % B a n k F i n a n c i n g )
-
8/6/2019 (4) Infrastructure Development
50/70
ROAD
213
Jaffna district provincial road project ( WORLD BANK )
Packages Name of the RoadLocation
(km)Total Length
(km)
Estimate Cost(Mn)LKR
Kalviyankadu Kokuvil Road 0.0-3.22
Kondavil Irupalai Road 0.0-5.801
Manipai-Inuvil-Annankai Road 0.0-4.70
13.72 488
Thirunelweli-Kopai Road 0.0-1.80
Thirunelweli-Puttur Road 0.0-3.88
Thirunelweli-Puttur Road 0.0-6.092
Atchuvely-Navakiri road 0.0-3.83
15.60391
Puliankinathady-Punnalaikadduwan Road 0.0-3.33
Mallakam-Punnalaikadduwan Road 0.0-6.983
Uduvil-Sandilipay Road 0.0-3.74
14.05 415
Mavali-Periyathuarai Road 0.0-7.25
East Coast Road 0.0-3.22
Eruvellai road
0.0-3.22
4
Vallai Road 0.0-4.83
18.52 498
Sivan Kovil Road 0.0-3.22
Velanai-Suruvil Fisheries Road 0.0-2.905
Mandaithivu Road 0.0-6.25
12.37 242
Nelliady-Karanavai Road 0.0-2.73
Udupiddy Malisanthi Alavi Road 0.0-8.456
Puloly Hospital-Vallipuram Road 0.0-2.22
13.40 375
Meesalai-Varany Road 0.0-5.89
Manalkadu-Karaiyoor fisheries Road 0.0-3.147
Mirusuvil-Government School Road 0.0-3.22
12.25 251
Total Length 99.91 2660
T e n d e r s U n d e r E v a l u a t i o n
-
8/6/2019 (4) Infrastructure Development
51/70
ROAD
214
Provincial roads project ROAD MAP
Kokuvil Kalviyankadu Road -0.0 3.2km (Package No: 1) Before
Selected Roads
-
8/6/2019 (4) Infrastructure Development
52/70
ROAD
215
Kokuvil Kalviyankadu Road - (Package No: 1) Before Construction
Kondavil Irupalai Road 0.0 5.8km (Package No: 1) Before Construction
-
8/6/2019 (4) Infrastructure Development
53/70
ROAD
216
Conflict affected region emergency project (CAREP)
Key features of the project
E x e c u t i n g A g e n c y : - M i n i s t r y O f E c o n o m i c D e v e l o p m e n t
I m p l e m e n t i n g A g e n c y : - N o r t h e r n P r o v i n c i a l C o u n c i l ( N P C ) - N P R D D
D u r a t i o n :
D a t e o f E f f e c t i v e n e s s : - J u n e 2 0 1 0
C l o s i n g D a t e : - J u n e 2 0 1 3
T o t a l C r e d i t A m o u n t
A D B : - U S $ 1 5 0 M i l l i o n
G
O
S L : - U S $ 1 8 . 2 4 M i l l i o n
C r e d i t A m o u n t F o r P r o v i n c i a l & L o c a l G o v t . R o a d s : - U S $ 3 7 . 1 4 M i l l i o n
( 8 9 % - A D B , 1 1 % - G
O
S L )
Conflict affected region emergency project (CAREP)1 .
L o c a l G o v e r n m e n t R o a d P a c k a g e s ( L G )
2 .
P r o v i n c i a l R o a d s L a r g e P a c k a g e s ( P L )
3 .
P r o v i n c i a l R o a d s S m a l l P a c k a g e s ( P S )
-
8/6/2019 (4) Infrastructure Development
54/70
ROAD
217
Local government road packages
J a f f n a L o c a l G o v e r n m e n t R o a d s
Package Name of the Roads Location (Km)
Total
Length
(km)
Estimate
Cost
LKR(Mn)
Vembady Veethy 0.0-0.835
Front Lane 0.0-0.506
Hospital Road 0.0-3.035
2nd
Cross Road 0.0-0.797
Beach Road 0.0-2.200
Circular Veethy 0.0-0.560
4
th
Cross Street 0.0-0.732Pannai Chest Clinic Veethy 0.0-0.360
01
Bankshall Veethy 0.0-1.085
10.11 239.5
3rd
Cross Street 0.0-0.829
Mahatma Gandhi Veethy 0.0-0.225
6
th
Cross Street 0.0-0.300St. James Maha Vidyalaya Veethy 0.0-0.313
Water Tank Veethy 0.0-0.276
Water Tank 1 st Cross Street 0.0-0.135
St Patrick's Veethy 0.0-0.704
St.Sebastian Veethy 0.0-0.270
Mount Carmel Veethy 0.0-0.555
Park Road 0.0-0.220
Cathedral Veethy 0.0-0.463Temple Road 0.0-2.680
David Veethy 0.0-0.620
Convent Veethy 0.0-0.465
Martin Lane 1st Veethy 0.0-0.278
Martin Lane 0.0-0.254
Press Lane 0.0-0.305
Guruso Veethy 0.0-0.445
02
Ananthan Vadaly Veethy 0.0-2.133
11.47 223.3
-
8/6/2019 (4) Infrastructure Development
55/70
ROAD
218
Point Pedro Urban Council
Package Name of the Roads Location (Km
Total
Length(km)
Estimate
CostLKR(Mn)
Sivan Kovil Pannai Veethy 0.0-0.868
Central West Veethy 0.0-0.175
Pasaiyoor 4th
Lane 0.0-0.332
Abubakkar Veethy 0.0-0.760
College Road 0.0-0.590
Muslim College Road 0.0-1.163
Seenivasagama Veethy 0.0-0.578
Kannathidy Road 0.0-0.560
Mathews Veethy 0.0-0.610
Navalar Road 0.0-4.800
Karuththar Veethy 0.0-1.612
Kilner College Lane 0.0-0.454
Clock Tower Road 0.0-0.490
03
Rajasingam Road 0.0-0.709
13.701 252.7
Package Name of the Roads Location (Km
Total
Length(km)
Estimate
CostLKR(Mn)
1 st Cross Street 0.0-0.315
2 nd Cross Street 0.0-0.531
4 th Cross Street 0.0-0.600
Thumpalai veethy 0.0-0.474
V.m veethy 0.0-1.202
College road 0.0-0.430
Thampasiddy road 0.0-0.520
Udayar veethy 0.0-1.037
Yahhovalai lane 0.0-0.597
Oruthanai veethy 0.0-0.550
Kathiraveapillai veethy 0.0-0.742
04
Viyapanmoolai veethy 0.0-0.460
7.458 131.8
-
8/6/2019 (4) Infrastructure Development
56/70
ROAD
219
Valvettithurai Urban Council
Package Name of the Roads Location (KmTotal Length
(km)
Estimate
Cost
LKR(Mn)
Vavini Veethy 0.0-1.480Unthuwathai 2 nd lane link road 0.0-0.380
Unthuwathai 2 nd lane 0.0-0.323
Unthuwathai lane 0.0-1.470
Unthuwathai 1 st lane 0.0-0.224
Vavinii Veethy 1 st lane 0.0-0.156
Gnanatheni lane 0.0-0.080
Vevil pillayar drainage Road 0.0-0.160
Kampan Cheddy road 0.0-0.178
Vevil pillayar Road 0.0-0.488
Vevil lane 0.0-0.147
Malliyodai lane 0.0-0.184
Venayagar school front road 0.0-0.105
Sivapura road 0.0-0.392
Segandy lane 0.0-0.235
Periyan tharai lane 0.0-0.374
Manan kanai road & Samathanai Road 0.0-1.100
Kappal beach udayar road 0.0-0.270
Sivan murugaian lane 0.0-0.080
05
Udayam manal Veethy 0.0-0.428
8.254 132.2
Chavakachcheri Urban Council
Package Name of the Roads Location (KmTotal Length
(km)
Estimate Cost
LKR(Mn)
1 st mile 1 st, 2 nd Road 0.0-1.443
Perumkulam Sankathanai Road 0.0-0.797
Peerampalam Thaddatheru Road(connection road) 0.0-1.280
Kalikovil Road 0.0-0.245
Old Road (Palam Veethy) 0.0-1.105
Church Road 0.0-0.549
Vinasiththampi Veethy 0.0-0.404
Meenachchi Amman Veethy 0.0-2.525
Veerapaththirar Veethy 0.0-0.283
06
Amman kovil Lane 0.0-1.245
9.876 215.5
-
8/6/2019 (4) Infrastructure Development
57/70
ROAD
220
Jaffna Municipal Council roads
-
8/6/2019 (4) Infrastructure Development
58/70
ROAD
221
Jaffna Municipal Council roads
hospital road (0.0 3.035)km
package 01 before construction water tank veethy (0.0 0.276)kmpackage 02 before construction
Abubakkar road(0.0 0.76)km
package 03 before construction)
-
8/6/2019 (4) Infrastructure Development
59/70
ROAD
222
Point Pedro Urban Council Roads
Valvettithurai Urban Council Roads
Udayar veethy (0.0 1.037)km
package 04 before construction
Kappaludayar road(0.0 0.27)km
package 05 before construction
-
8/6/2019 (4) Infrastructure Development
60/70
ROAD
223
Vavuniya Urban Council
Package Name of the Roads Location (Km
Total Length
(km)
Estimate
CostLKR(Mn)
Mill Road 0.0-0.308
Tharmalingam Road 0.0-0.147
Kandasamy Kovil Road 0.0-0.335
1st
Cross Street Road 0.0-0.522
2nd
Cross Road 0.0-0.563
Soosaipillarkulam Road 0.0-0.413
Market Circular Road 0.0-0.583
Y.M.C.A. Lane 0.0-0.249
Kathiresan Road 0.0-0.520
Goods Shed Road 0.0-0.800
Kithul Road 0.0-0.175
Hospital Road 0.0-0.174
Madathady Road 0.0-0.219
Tank road 0.0-0.174
Cemetery Road 0.0-0.599
Convent Road 0.0-0.312
07
Urban Council Road 0.0-0.405
6.498 233.3
-
8/6/2019 (4) Infrastructure Development
61/70
ROAD
224
Vavuniya UC roads
-
8/6/2019 (4) Infrastructure Development
62/70
ROAD
225
Mannar Urban Council
Package Name of the Roads Location (KmTotal Length
(km)
Estimate Cost
LKR(Mn)St.Lucia's Road 0.0-0.516
Amman Kovil Road 0.0-0.537
Uppukulam Road 0.0-1.015
Bank of Ceylon to Moor Street 0.0-1.072
Ds Office Road 0.0-0.272
Field Street Road 0.0-0.871
Convent Road 0.0-0.350
Minor Seminary Road 0.0-0.713
Saultern Street Road 0.0-1.246
08
Kulanthi Jessu Kovil Road 0.0-0.960
7.552 144.8
-
8/6/2019 (4) Infrastructure Development
63/70
ROAD
226
Mannar Urban Council Roads
-
8/6/2019 (4) Infrastructure Development
64/70
ROAD
227
Kilinochchi district provincial roads
NO Package No Name of the RoadsLocation
(Km)
Estimate
Cost
LKR(Mn)
1 PL1 Murukandy Akkarayankulam Vanerikulam Road 0.0-10.00 241.3
2 PL3 Puthumurippu Access Road 0.0-8.10 198.7
Total 18.10
-
8/6/2019 (4) Infrastructure Development
65/70
ROAD
228
Mullaithivu district provincial roads
NOPackage
NoName of the Roads
Location
(Km)
Estimate
Cost
LKR(Mn)
1 PL4 Kokavil Thnukkai Road 0.0-10.00 290.8
2 PL5 Kokavil Thnukkai Road 0.0-12.00 275.0
3 PS2 Thunukkai Thenniyakulam Road 0.0-2.50 47.2
4 PS3 Thunukkai Thenniyakulam Road 0.0-2.50 56.5
Total 27.00
-
8/6/2019 (4) Infrastructure Development
66/70
ROAD
229
Vavuniya district provincial roads
NOPackage
NoName of the Roads
Location
(Km)
Estimate
Cost
LKR(Mn)
1 PL6 Rambaikulam - Palamoddai Road 0.0-9.60 196.4
2 PS5 Palamoddai - Moondumurippu Road 0.0-5.00 111.9
Total 14.60
-
8/6/2019 (4) Infrastructure Development
67/70
ROAD
230
Mannar district provincial roads
NOPackage
NoName of the Roads
Location
(Km)
Estimate
Cost
LKR(Mn)
1 PS7 Uyilankulam - Atkaattiveli Road 0.0-3.00 74.8
2 PS8 Uyilankulam - Atkaattiveli Road 0.0-2.94 65.1
3 PS9 Pallamadhu - Alkadively Road 0.0-3.00 59.7
4 PS10 Pallamadhu - Alkadively Road 0.0-3.58 70.2
5 PL7 Manthai - Parappukadanthan Road 0.0-11.86 278.8
Total 24.38
-
8/6/2019 (4) Infrastructure Development
68/70
ROAD
231
Kilinochchi provincial roads
Mulllaithivu provincial roads
Puthumurippu access road(0.0 8.10)km
package pl3 before construction
Murukandy akkarayan kulam vannerikulam
(0.0 10.) km package pl1 before construction
Kokavil thunukai road (0.0 10.0)km
package pl4 before construction
Thunukai thenniyankulam road(0.0 2.50)km
package ps2 before construction
-
8/6/2019 (4) Infrastructure Development
69/70
ROAD
232
1st cross street(0.0 0.335)km
package 07 before construction
Mill road (0.0 0.308)km
package 07 before construction
Kulanthai Jesu kovil road(0.0 0.516)km
package 08 before construction
Mannar Urban Council Roads
Vavuniya Urban Council Roads
Madathady road(0.0 0.219)km
package 07 before constructionSoosaipillayarkulam road(0.0 0.219)km
package 07 before construction
Uppukulam road(0.0 1.015)km
package 08 before construction
-
8/6/2019 (4) Infrastructure Development
70/70
ROAD
Bank of Ceylon to moor street (0.0 1.072)km
package 08 before construction