Services:
Project Management Services
Basic Engineering and Design covering allengineering disciplines, GMS/SCADA andtelecoms. Engineering review ofcontractors/vendors
Procurement services for 16 no contractsand involving both pre and post contractmanagement and expediting
SSouth Sumatra to West Java (Phase 2) Onshore Gas Pipeline Project
Management Services Project– Indonesia
For the SSWJ Project Phase II (onshore pipelines), PGN had GSA with Pertamina and ConocoPhillips to purchase natural gas from the gas fields in South Sumatera and deliver via a highpressure gas pipeline transmission system to a distribution network at Muara Bekasi /Rawa Maju inorder to support demand growth in West Java.Penspen undertook the PMC services together with local partner PT Petrotechindo Utama.
GAS
Profile:
• 196km of 36” diameter high pressure natural
gas pipeline from Grissik to Pagardewa.
• 270km of 32” diameter high pressure naturalgas pipeline from Pagardewa to LabuhanMaringgai.and 4km of 28” dia. Pipeline fromPertamina Receiving point to Pagardewa.
• 34km of 32” diameter high pressure natural gas
PT Perusahaan Gas Negara(Persero)- (PGN)
Construction Management and Supervision Integration of overall Pipeline Management
System Commissioning supervision and assistance
Operational assistance
40098A
p pe ne rom uara e as o awa a u
• 2 no. metering stations; 17 no. sectional valvestations; 6 no. stations including pig traps, tie-infacilities, receiving facilities, sump tanks and
slug catchers, buildings and roads. Stationsrelied on gas engine generator or mains supplyand with diesel generator stand-by facilitie
• GMS/SCADA with GM and PM; VSAT,microwave, VHF and fibre opticcommunications facilities.
TM
Copyright © 2012 Penspen Limited. All rights reservedPenspen and the Logo are registered trademarks of Penspen Limited