Ordinary Meeting of Council 09 June 2021
4.10 NEW JUNCTION - DESIRABILITY AND CAPABILITY FOR THE CITY TO INVOKE THE SUNSET CLAUSE
Ward: (Midland/Guildford Ward) (Business and Tourism Services)
Disclosure of Interest: Nil
Authorised Officer: (Executive Manager Planning and Development)
Cr Zannino declared an impartiality interest in Item 4.10 - New Junction - Desirability and Capability for the City to Invoke the Sunset Clause as previous business partners own land on The Crescent, Midland.
KEY ISSUES
• Council at its Ordinary Meeting of 12 May 2021, which was concluded on 19 May 2021 resolved unanimously to:
1) Not proceed with borrowing the $6,595,000 or transferring the $100,000 from reserve for public works on Midland Oval in the 2021/22 Budget (both part of the anticipated $50 million required over the following ten years for capital expenditure).
2) Direct the CEO to report back to Council at the June Council meeting on the desirability and capacity of the City of Swan to invoke the ‘sunset’ clause as provided in the Business Plan on the basis that the venture has been unable to “raise the funds required through market rate sales” required to justify any further expenditure for construction of Public Works.
3) Direct the CEO at a future meeting of Council to present “an alternative strategy to resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants”, as provided for in the approved Business Plan.
4) Before providing an ‘alternative strategy’ for funding of the Midland Oval Commercial venture back to Council, undertake public consultation on the draft ‘alternative strategy’ and provide a summary of this feedback to Council.
• The purpose of this report is to respond to resolution 2) above.
• An analysis of the broader context of the Business Plan identifies that it was anticipated to progress with the construction of the Public Works not only to put in place the amenity needed to then progress the commercial activities (sale of land), but also to, through the subdivision process, create the lots to sell.
Ordinary Meeting of Council 09 June 2021
• An operational funding model for the acquisition/construction of public infrastructure to enable the availability of land for sale was to date applied through the City’s normal business planning and budgetary processes.
• Notwithstanding the above, the 3 tiered approach required under Section 5.3 Development Rationale of the Business Plan clearly sets out a process for Council to consider when determining funding strategies linked to certain stages of the development. At the end of each delivery stage, prior to accepting a funding strategy for the next delivery stage of the project the Council should consider these options including the possibility of invoking the sunset clause prior to further development.
• With the project approaching the end of a stage whereby the New Junction Road and Weeip Park have been delivered, and no further project funding has been assigned for the 2021/22 budget, it is desirable to commence a Program review, that will address the need for a ‘sunset date’ to be considered, as part of the delivery program going forward.
• The capacity of the City to envoke the sunset clause will be informed by the outcome of such a Program review.
It is recommended that the Council note this report on the desirability and capacity of the City to invoke the ‘sunset’ clause as provided in the Business Plan and resolve that officers conduct a Program review of the New Junction Implementattion Program of which the outcomes will inform “an alternative strategy to resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants” as required to be reported on by Council in its Resolution 3) of 12 May 2021.
BACKGROUND
Council at its Ordinary Meeting of 12 May 2021, which was concluded on 19 May 2021 resolved unanimously to:
1) Not proceed with borrowing the $6,595,000 or transferring the $100,000 from reserve for public works on Midland Oval in the 2021/22 Budget (both part of the anticipated $50 million required over the following ten years for capital expenditure).
2) Direct the CEO to report back to Council at the June Council meeting on the desirability and capacity of the City of Swan to invoke the ‘sunset’ clause as provided in the Business Plan on the basis that the venture has been unable to “raise the funds required through market rate sales” required to justify any further expenditure for construction of Public Works.
3) Direct the CEO at a future meeting of Council to present “an alternative strategy to resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants”, as provided for in the approved Business Plan.
4) Before providing an ‘alternative strategy’ for funding of the Midland Oval Commercial venture back to Council, undertake public consultation on the draft ‘alternative strategy’ and provide a summary of this feedback to Council.
Ordinary Meeting of Council 09 June 2021
The purpose of this report is to respond to resolution 2) whereby the desirability and capacity of the City of Swan to invoke the ‘sunset’ clause as provided in the Business Plan be reported on, on the basis that the venture has been unable to “raise the funds required through market rate sales” required to justify any further expenditure for construction of Public Works.
‘Sunset Clause’ Context - Midland Oval Redevelopment Precinct Business plan
The 24 October 2018 Council approved Midland Oval Redevelopment Precinct Business Plan (The Business Plan) in Section 5.3 Development Rational identifies that:
The precinct will be developed in stages, and according to market demands. Land will not be released if the market is too low, so as to ensure optimal returns on investment.
In the event that council resolves to proceed with the construction of public works, it will need to have achieved appropriate funding through prior sales revenue in the first instance. As a fall-back option, council will determine a sunset date by which it must raise the funds required through market rate sales within the precinct, or other commercial means. Finally, if council can not achieve the sales required by the sunset date then council will need to resolve an alternative strategy or resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants.
It is this last paragraph that is reflected in Resolution 2) of Council’s May 2021 decision, and if unpacked requires the following 3 tiered approach to address funding for construction of Public Works:
1. Determine in the first instance if appropriate funding through prior sales revenue have been achieved;
2. If not, a fall-back option, whereby Council determines a sunset date by which it must raise the funds required through market rate sales within the precinct, or other commercial means has to be agreed; and
3. Finally, if Council cannot achieve the sales required by the sunset date then Council will need to resolve an alternative strategy or resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants.
Broader context to this section of the Business Plan can be found in various places in the Business Plan for example in Section 5.2 Funding Strategy where it is identified that funding for major works can be achieved through projected City cash flows and that borrowings are anticipated to be required, in Section 6.2 Implementation Steps where it is proposed that the development proceed with the public open space and public amenity in the initial stages of construction and in Section 7.3 Wider Financial Implications to Council where it is identified that the forecast budgets for acquisitions and major construction works can be funded through projected City cash flows and borrowings:
Section 5.2 Funding Strategy
The current forecast budgets for acquisitions and major construction works amounts to approximately $68.8 million within the next ten years. This can be funded through projected City cash flows, and borrowings will be required.
Ordinary Meeting of Council 09 June 2021
Section 6.2 Implementation Steps
It is proposed that the development proceed with the public open space and public amenity in the initial stages of construction. Thereafter, a business case will be prepared for each of the civic buildings presented with a financial analysis for Council decision…
Section 7.3 Wider Financial Implications to Council
The current forecast budgets for acquisitions and major construction works amounts to approximately $42 million within the next ten years. This can be funded through projected City cash flows and borrowings.
From the above it can be concluded that it was always anticipated to progress with the construction of the public open space and road infrastructure not only to put in place the amenity needed to then progress the commercial activities (sale of land), but also to, through the subdivision process, create the lots to sell.
Considering that any subdivision approval requires a lot to be fully serviced with water, electricity and road access, it follows that capital expenditure will be required to create the lots that are the subject of sale revenue as referenced in Section 5.2 Funding Strategy. It is for this reason that the Business Plan considered that borrowings will be required before lots can be made available in the market. Notwithstanding the above it needs to be read in conjunction with Section 5.3 Development Rationale whereby a 3 tiered process for funding of public works is suggested.
Desirability and Capacity of the City of Swan to Invoke the ‘Sunset’ Clause
The first stage of Public Works (New Junction Road and Weeip Park) was approved through specific Council Resolutions.
Since then an operational funding model for the acquisition/construction of public infrastructure to enable the availability of land for sale was applied and communicated through the City’s normal business planning and budgetary processes.
The operational funding model currently applied trough the Long Term Financial Plan and Budgetary process, proposes for cash flow requirements that are based on forward estimates for capital works and the sale of land, to include a mixture of Strategic Development Reserve and loan funds. Proceeds from land sales will be added to the Strategic Development Reserve which will enable the direct funding of projects and provide a sinking fund for the repayment of loans raised to meet the cash flow needs of the projects.
The process has operationally been managed through the City’s normal business planning and budgetary processes within the following guidelines:
• Capital outlays and sale proceeds will be reviewed at least annually and included in the long term financial plan,
• Civil infrastructure such as roads, drainage and public open space will be budgeted for through the usual annual budgeting processes,
• Any acquisitions or capital outlays that are not accommodated, either amounts or timing, and not budgeted through the annual budget process will required separate authorisation from Council,
Ordinary Meeting of Council 09 June 2021
• Funds applied from the Strategic Development Reserve shall be in accordance with the Council’s authorised purpose,
• Contributions and grants for various components of civil infrastructure will be held in the Strategic Development Reserve or applied to capital projects in the financial year the capital works are undertaken,
• Funding arrangement will be reviewed and included in the long term financial plan.
Notwithstanding the above and the fact that the Business Plan considered that borrowings are anticipated, the 3 tiered approach required under Section 5.3 Development Rationale is, from a project management point of view desirable to form part of an Assurance process that would include a Program Review, at the end of each delivery stage, prior to accepting a funding strategy for the next delivery stage of the project.
Such a Program review will provide assurance to officers and Council that plans for delivery of outcomes remain achievable, the risk management is effective and that the program remains on track, with effective issue management in place.
As the Midland Junction project program is now reaching the end of an approved stage where the construction of New Junction road and Weeip Park is approaching completion, a Program Review within the broad framework of the Business Plan as approved in 2018, is desirable to confirm that:
• The program assumptions remain unchanged (or require revisiting)
• The key stakeholders have a common understanding of desired outcomes and that the program is likely to achieve them
• The program’s sponsors are satisfied with the effectiveness of the program
• Any lessons learned have been or can be transferred to the next stage of delivery
• The program is still affordable (Check against Business Plan and specifically the 3 tiered approach required under Section 5.3 Development Rational and confirm the funding strategy)
• Any other factors that could affect success (Technical or otherwise) be identified and addressed
• Program controls are effective
The City’s capacity to envoke the ‘sunset clause’ relies on the outcome of the desirable Program review. It should also be noted that now that there is no proposed capital improvements for public works scheduled for the 2021/22 Financial Year, there is no requirement at this point in time to invoke the sunset date.
Ordinary Meeting of Council 09 June 2021
CONCLUSION
Although the approved Business Plan considered that borrowings would be needed to deliver Public Works, the 3 tiered approach required under Section 5.3 Development Rational of the Business Plan is desirable to form part of an Assurance process that would include a Program Review, at the end of each delivery stage, prior to accepting a funding strategy for the next delivery stage of the project.
With the project approaching the end of a stage whereby the New Junction Road and Weeip Park have been delivered, it is desirable to commence a Program review, that will address the need for a ‘sunset date’ as envisaged in the Business Plan, as part of the delivery program.
The capacity of the City to envoke the sunset clause will be informed by the outcome of such a Program review. It is therefore recommended that a Program review be conducted and that the outcomes thereoff inform “an alternative strategy to resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants” as required to be reported on by Council in its Resolution 3) of 12 May 2021.
ATTACHMENTS
Midland Oval Redevelopment Precinct Business Plan
STRATEGIC IMPLICATIONS
The City’s Strategic Community Plan 2021 – 2031 includes the following relevant objectives:
E2.1 Advocate and attract business and investment opportunities
E1.1 Actively support and develop thriving local businesses and centres
B1.1 Create community places to live, relax and work
B2.1 Manage current and future assets and infrastructure
G1.2 Engage, communicate and consult with our community and stakeholders
STATUTORY IMPLICATIONS
Statutory reporting on the Business Plan obligations in line with s3.59 of the Local Government Act 1995 is done yearly through the Annual Report, the Budget and the Annual Compliance Audit Return.
The proposed Mid Program review is desirable from a project management point of view to form part of an Assurance process and is not a requirement under the Local Government Act 1995.
Ordinary Meeting of Council 09 June 2021
FINANCIAL IMPLICATIONS
As indicated in the report.
VOTING REQUIREMENTS
Simple majority
RECOMMENDATION
That the Council resolve:
1) To note the report on the desirability and capacity of the City of Swan to invoke the ‘sunset’ clause as provided in the Business Plan; and
2) That officers conduct a Program review of the New Junction Implementation Program with the outcomes thereoff to inform “an alternative strategy to resolve the funding shortfall through other means such as borrowings, public private partnerships, joint ventures or grants” as required to be reported on by Council in its Resolution 3) of 12 May 2021.
CARRIED EN BLOC
Midland Oval Redevelopment Precinct Business Plan
DOCUMENT CONTROL
Version History
Version Summary of Changes Document Status and Notes Date published
1 Document written Final Version for Executive Review 2 August 2017
2and other required detail
Version review for Executives prior to OCM March 2018
3 Updated to include corporate format and SCP omissions outlined within the Business Plan relate to the Masterplan endorsed 30 January
May 2018
Authorisation
BUSINESS CASE APPROVAL:
PROJECT MANAGER:
EXECUTIVE SPONSOR:
Document to be read in-conjunction with the following documents:• • • Midland Oval Redevelopment Masterplan
2
Midland Oval Redevelopment Precinct Business Plan
Contents Executive Summary 41 Introduction and Local Government Act Business Plan Requirements 51.1 Local Government Act Business Plan requirements 51.1.1 Advertising of the Business Plan 1.1.2 Submissions 71.2 Local Government Act - Business Plan Process 72 72.1 72.2 Strategic Direction 82.2.1 92.2.2 Strategic Community Plan 2017-2027 92.2.3 Corporate Business Plan 102.2.4 Midland Local Area Plan 102.2.5 Midland Activity Centre Structure Plan 102.2.6 Planning Scheme Amendment 119 112.2.7 Midland Public Domain Strategy 112.2.8 Economic Development Strategy 2017-2022 112.2.9 Local Commercial and Activity Centres Strategy 112.2.10 112.2.11 Council Policy 112.2.12 Summary of Strategic Direction 122.2.13 133 The Precinct 143.1 Precinct Boundaries 143.2 Ownership 143.2.1 City of Swan Property 143.2.2 Private Property 144 Primary Project Objectives 154.1 154.2 Midland Oval Redevelopment Masterplan 4.2.1 Midland Oval Redevelopment Masterplan Objectives 175 Project Strategy 195.2.1 Business Case 195.2.2 Development Deliverables 195.1 Financial Considerations 195.1.1 Development Costs 195.1.2 Analysis of Scenarios 205.1.2.1 205.1.2.2 20
5.1.2.3 205.2 Funding Strategy 205.3 Development Rationale 206 Project Program 216.1 216.2 Implementation Steps 226.3 Project Timeline 226.4 Professional Guidance 227 Financial Assessment 237.1 Commercial analysis approach 237.2 Assumptions 237.2.1 Expenses estimates 237.2.2 Income estimates 237.3 238 Statement of Project Impact 248.1 Financial Impact 248.2 Economic Impact 9 279.1 279.2 2710 Governance 2810.1 Governance structure 2810.2 Project documents 2810.3 Existing Business Plans 2810.4 2811 List of References 29
3
Midland Oval Redevelopment Precinct Business Plan
Executive SummaryThe City of Swan prepared a Midland Oval Redevelopment Masterplan (MORM) which was
scale. The MORM will connect roads and open space with a strong bond to the surrounding
Midland Oval has been central to community life since its opening in 1901 and throughout a
through to other central destinations.
essence of Midland Oval and the role it has played for more than 100 years as the community’s
Oval will unite its people and places and celebrate the local way of life. Signalling a new urban
Activation will have a primary focus on layout and infrastructure to support daily uses such as
developments with a built form rhythm that references the development pattern in the
lighting of buildings during the night.
direct full time equivalents (FTEs) upon completion of the proposed development for new
In accordance with s3.59 of the Local Government Act 1995a Business Plan in regard to major land transactions which may occur through future
employing the earliest practical sequencing.
any joint venture proposals which may arise in the future. These decisions are subject to further business case and feasibility analysis, as required for Council decision.
4
Midland Oval Redevelopment Precinct Business Plan
in accordance with The Act.
being generated from all private development. The increased population generated by the
enable the City to provide additional community facilities within the Midland CBD. The
1 Introduction and Local Government Act Business Plan Requirements
1.
and the Midland passenger and freight rail lines all leading into Midland2. The catchment area
catchment and employee base. The area is an established mixed-use area and includes
Recognised by the State Government as a strategic metropolitan centre3.
To celebrate Midland’s proud history and embody its potential as a commercial and residential
The City of Swan has prepared a Midland Oval Redevelopment Masterplan (MORM) which was adopted by Council on 30 January 2017 (refer Appendix A) and guides the development and
Local Government Act 1995 (The major land transactions
for future disposals or acquisitionsdisposals or acquisitions that are required to be advertised for a period of not less than six
at this stage. The Business Plan has been developed to comply with The Act which will require the City to provide annual reporting on any major land transactions relating to land within the redevelopment precinct.
1.1 Local Government Act Business Plan requirements
The business plan is to include an overall assessment of the major trading undertaking or major land transaction and is to include details of -
a) its expected effect on the provision of facilities and services by the local government.
a possible redevelopment of Midland Recreation Ground. The site had been
in the 1980s and 1990s. Purpose-built sporting establishments developed in
years.
There will be no adverse effect on existing facilities and services within the immediate area. Any additional facilities provided by the City of Swan will be to service the growing population. Infrastructure upgrades will be provided to ensure that the load that the development will place on existing infrastructure
5
Midland Oval Redevelopment Precinct Business Plan
is accommodated by the development. The adopted MORM will have a very
into consideration the demand for vibrancy and security and family unity to accommodate the needs of the City of Swan by providing large public open space
accommodate the growth of Midland being a Major Regional Centre.
b) its expected effect on other persons providing facilities and services in the district.
The proposed development will bring a new era of apartment living into an
opportunity for residents to live within close proximity to existing and proposed
bring a mix of both vibrant and tranquil spaces allowing residents and visitors
family and friends. The increased residential population plus visitors will attract a much broader and larger customer base adding to the local economy. Land
c)
fully developed and the necessary property acquisitions and disposals of land parcels have been completed. This is further outlined within Section 8 of this Business Plan.
opportunities in Midland. The estimated direct output from Midland Oval is
d) its expected effect on matters referred to in the local government’s current plan prepared under section 5.56.
The MORM has been prepared in line with the activity centre structure plan for the Midland CBD and in accordance with State Planning Policy 4.2 Activity Centres for Perth and Peel.
Planning for the redevelopment of the precinct has been outlined in the City’s Strategic Community Plans and Long Term Financial Plans for a number of years.
e) the ability of the local government to manage the undertaking or the performance of the transaction.
The City has an experienced team of professionals capable of managing the proposed transaction. The City will contract the services of required
relevant professionals (further outlined in section 7 of this business plan). A
properties will be a Sale and Development Agreement which will provide for milestones to ensure the City meets the satisfactory outcome and ensures no
f) Other matters of which details are required to be given.
be advertised separately in line with s3.59 of The Act. The Major Trading
line with s3.59 of the Local Government Act.
1.1.1 Advertising of the Business PlanThe Act sets out the City’s requirements to advertise the business plan as outlined below (as
(4) The local government is to -
a) give Statewide public notice stating that –
i. the local government proposes to commence the major trading
notice or into a land transaction that is preparatory to that major land
ii. a copy of the business plan may be inspected or obtained at any
iii.
AND
b) make a copy of the business plan available for public inspection in accordance with the notice.
6
Midland Oval Redevelopment Precinct Business Plan
are exemplary development which is intended to illustrate the broad built form and design intent of Council. All development will be subject to due statutory process and approvals in accordance with the Planning and Development Act 2005 at the appropriate time.
1.1.2 SubmissionsSubmissions on the City’s proposal are invited from members of the public.
whether to proceed with the Business Plan. Submissions must be received by 2pm 31 August 2018 and lodged to the City of Swan
2 Midland Square Midland WA 6056
swan.wa.gov.au
1.2 Local Government Act - Business Plan ProcessThe business plan will be advertised for public comment for a period of 3 months (The Act requires a minimum of 42 days) in state and local newspapers. Information will be
The public will have the ability to attend a virtual reality session to immerse themselves into the precinct development.
Once public submissions have closed a report will be presented to Council for decision.
precinct.
1
2
3
4
Public Advertising (min. 42 days)
Business Plan available at Administration Centre, Leisure and Library Centres
Public comment period closes - 3 month comment period
Council Report
Council Decision Reporting as per LGA (1995)
2 Project Background
2.1 Project History
direction to proceed with the project.
7
Midland Oval Redevelopment Precinct Business Plan
2.2 Strategic Direction
Planning commenced in the 1970s and by the 1980s new facilities to replace what was
the community.
The project is aligned with wider strategic direction set out by the State Government and
made by the City over the many years of planning and relocating sports to purpose built facilities.
Identity Connected Diversity
• Midland Oval Precinct will be an iconic destination with
active community spaces with high quality streets-capes and built form.
• Midland Oval Precinct will be well connected to surround-
contemporary urban space and form while recognising the unique characteristics and history of the site and surrounds.
• Midland Oval Precinct will promote legibility and permeability through and beyond the precinct.
• frontages will encourage activation through the Pre-cinct as well as along Cale
and through to Midland traditional town centre.
• Incorporate a range of land
capitalise on investment
urban village.
• Midland Oval Precinct incorporates a major public and civic space along Cale
will provide a gateway for
activation. This will be well supported by interface of built form and land use.
Vibrant Enduring Safe
• Midland Oval Precinct is an inclusive and socially
public spaces and civic
a range of highly visible community events and activities.
• Spaces are adaptable to community and civic needs.
• A strong urban structure -
sity of public open space to accommodate changing economic and social con-ditions.
•
adaptable to changing com-munity needs.
• Midland Oval Precinct encourages community participation and designs
active (both day and night)
and passive surveillance to minimise impacts of crime.
The City has been involved in a range of studies and exercises which relate to the revitalisation
Midland’s Revitalisation Charrette and the 2007 Enquiry by Design process entitled Midland
had become increasingly recognised as a catalyst for the reinvigoration of the entire Midland CBD. The numerous proposals received in the past 50 years have either not been supported
had such a fragmented ownership it would become too onerous to gain the consensus of all participants for any development. The City of Swan recognised the social and economic
precinct.
8
Midland Oval Redevelopment Precinct Business Plan
2.2.1 State Planning Framework
The Directions 2031 and Beyond and State Planning Policy 4.2 Activity Centres for Perth and
development.
planning for Perth and Peel in order to accommodate a forecast population of 3.5 million
within the Midland strategic metropolitan centrewhile maximising use of existing infrastructure. As detailed in Perth and Peel @3.5million
of the sub-region’s total population by 2050.
The City of Swan’s population and housing forecasts indicate that the City’s population will
2.2.2 Strategic Community Plan 2017-2027
community over the next 10 years and is our principal strategy and planning document. The clear direction set by Council ensures asset and service provision is focused to meet the
The Strategic Community Plan aims to align with the Western Australian Government’s challenge in its ‘Directions 2031 and Beyond: Metropolitan Planning Beyond the Horizon’
the near future.
Economic
MORM Response - impetus to the local economy and strengthen Midland as a Strategic Metropolitan Centre.
economic impact on the broader economy. The construction phase has the potential to
economy. The operational phase of the development is also expected to contribute positively
anchor of activity within the City of Swan.1
Natural Environment
Built Environment
9
the built form to adhere to strict design guidelines to accomplish the best design possible. One of the advantages of owning the majority of land ensures that Council has authority of
proud of.
Social
Governance
transactions for future disposals or acquisitions.
2.2.3 Corporate Business PlanThe City’s Corporate Business Plan translates the aspirations of the Strategic Community Plan into operational priorities. Each of the City’s business units also has in place an annual business unit plan that sits under and informs the Corporate Business Plan.
The Corporate Business Plan and all business unit plans are reviewed on an annual basis to ensure the City remains adaptive and responsive to the changing external environment and community need.
The primary objectives of the project aim to deliver on components of the Strategic Community Plan.
2.2.4 Midland Local Area Plan
giving it a large customer catchment and employee base. Midland Place incorporates the
commercial and residential land uses.
In the provision for the project, the themes above have guided the development of the planning and design work.
2.2.5 Midland Activity Centre Structure PlanThe MORM is consistent with the City of Swan’s Midland Activity Centre Structure Plan (MACSP). The layout of the precinct has been incorporated into the City of Swan’s MACSP which was endorsed by Council and the Western Australian Planning Commission in 2018.
10
Midland Oval Redevelopment Precinct Business Plan
2.2.6 Planning Scheme Amendment 119
2.2.7 Midland Public Domain Strategy (Draft)The MORM proposes public domain improvements within the precinct and these will align with the City’s broader strategy to improve the public domain throughout Midland. The
towards the revitalisation of the public domain in Midland.
2.2.8 Economic Development Strategy 2017-2022
population-servicing industries.
engagement.
The project aims to deliver on components of the City’s Economic Development Strategy.
2.2.9 Local Commercial and Activity Centres StrategyThe City’s Local Commercial and Activity Centres Strategy recognises the important role that Midland plays as the Strategic Metropolitan Centrenorth-east region of metropolitan Perth and a large rural hinterland.
2 by 2031.
implementation of the MORM.
2.2.10 Midland Access and Parking Strategy
2.2.11 Council PolicyAll relevant Council policy will be considered as the development progresses. Any variations
for more than 100 years as the community’s recreational and social focal point.
11
2.2.12 Summary of Strategic Direction
SPP 4.2
Economic Development
Strategy
Midland Access & Parking Strategy
Local Commercial &
Activity Centres Strategy
Public Domain Strategy
Midland Activity Centre Structure
Plan
Planning Scheme Amdt 119
Investment Funds Policy
Policy
Economic
Natural Environment
Built Environment
Governance
Strategic & Policy Framework
City of Swan Strategic
Community Plan
State Planning Framework
Social
DAIP
Midland oval placemaking
strategy
Public Health Plan (draft)
12
2.2.13 City of Swan Civic and Community Facilities Needs Assessment
KEY ELEMENTS FUNCTIONALITY AREA (Gross sqm) COMMENTS
1Building or civic ceremonies
Civic precinct
2Administration Building with Apartments
-
within the Midland Activity Centre
Community Purpose Building
-
Community amenity
Community amenity Green landscape experience fostering strong community and social connections.
Community amenitycelebrate the Midland way of life.
TOTAL
13
Midland Oval Redevelopment Precinct Business Plan
3 The Precinct
of Swan and the Metropolitan Redevelopment Authority (MRA). The Midland Activity Centre
Midland as a Strategic Metropolitan Centre
Midland Redevelopment Authority (now the Metropolitan Redevelopment Authority) in consultation with relevant government agencies and the community that resulted in a strong
new hospital provides extended services for the regional area and highlights the importance
required to provide an residential densities, thereby supporting public transport investment, improving
throughout Midland. It is a critical item of infrastructure that is driving Midland’s future
train station location at Cale Street (replacing the current station) will strengthen this north-south alignment. The new station will enable greater access to Midland and its services being
and retail nodes.
The vision statement for Midland’s activity centre as a Strategic Metropolitan Centre
Midland has the opportunity and the ability to become a thriving city in its own right, serving Perth’s eastern region, Perth hills, the Avon Arc and beyond. Midland can deliver an attractive, affordable, productive and sustainable city living environment beside the rivers in the eastern corridor.
3.1 Precinct Boundaries
3.2 Ownership
3.2.1 City of Swan Property
3.2.2 Private Property
ownership in the Precinct to ensure that the redevelopment is coordinated and delivers a quality built environment for the community. To this end a number of property acquisitions have been successfully negotiated.
The City will continue to purchase property to deliver the outcomes of the redevelopment. Property required for public open space or new road reserves will be compulsorily acquired if
4 Primary Project Objectives Midland is 25 minutes from the Perth CBD and 10 minutes from Perth’s international and
Valley and the Wheatbelt. Midland CBD’s catchment stretches far beyond the City of Swan’s
Planning and development to accommodate this growth continues strengthening Midland as a Strategic Metropolitan Centre. Major transformation projects include a regional hospital/health campus, University campus, Railway Square, Midland Sale-yards,
around the CBD and close to the Midland train station. There is also a mandate to expand
14
Midland Oval Redevelopment Precinct Business Plan
hatched - council owned
15
Midland Oval Redevelopment Precinct Business Plan
the tourism sector within the precinct by encouraging further increases in accommodation offerings and venues that would encourage visitation growth.
The City of Swan and the Metropolitan Redevelopment Authority have invested heavily in
new residents and visitors to Midland.
history as a place for community activity since the early 1900s. With redevelopment schemes
1980s and 90s.
space and public open space (POS). The precinct is to be lively and safe and have a strong sense of place.
outcome which is attractive to suitable developers for the purpose of achieving the above
4.1 Council’s Goal, Project Objectives and Deliverables
regional development.
• •
• •
and scale.
for Midland and strengthen Midland’s role as a strategic metropolitan centre.
New Civic Identity
•
• • • A generous amount of high quality public space.
Iconic Heart
•
•
•
public spaces to support the history of the place and create a unique identity for the
•
Sticky Edges
•
• Activated building edges support movement through and beyond the Precinct. In
• engage strong pedestrian activity.
Woven Context
•
•
•
• The Precinct will establish itself as both iconic and unique while recognising surrounding
• Midland Oval Precinct will have a strong sense of community identity delivered in a
16
Midland Oval Redevelopment Precinct Business Plan
Economic Viability
• • Appropriate density and scale to reinvigorate surrounding areas and leverage current
redevelopment potential.
building and land use provide the foundation that reinforces the vision and goals of the City.
The purpose of the Midland Oval Redevelopment Project is to complete the planning and
opportunity for Council to deliver a number of new community facilities within the precinct.
• Public open spaces• Community facilities• Residential development• Mixed use development• • Commercial development
4.2 Midland Oval Redevelopment MasterplanThe City appointed an independent architectural consultancy to prepare the draft MORM. The
commit to further public consultation for the public open space once detailed design phase
4
1.9ha.
developedand optimisation of the site.
The MORM puts the development in good stead to complement other major projects within
and a new medical university set to open in 2019.
desired land use and built form for the precinct. Detailed context and technical outlines are outlined in the Midland Oval Redevelopment Masterplan Report.
4.2.1 Midland Oval Redevelopment Masterplan ObjectivesThe MORM is a strategic document that describes the City’s objectives and vision for the
• • • Accessible to public transport•
opportunities• A place where residents and users feel a strong sense of connection and ownership• The ability to accommodate a larger residential population where people can live
• Attraction for high quality investment• A boost for the economic wellbeing of new and existing businesses.
17
Colonnade frontages
to piazza
Sub-precinct
BoundaryResidential Civic Mixed useCommercial Carparking/
Commercial
Hotel & Serviced
Apartments Retail Public Art Location
* Buildings shown are indicative onlyNorth 0 50m2010
Residential ParkResidential Park
Juniper LinkJuniper Link
Land Uses KeyLand Uses Key
PiazzaPiazza
Retained existing
significant trees
Retained existing
significant trees
Civic Precinct. May include Mixed
use retail / commercial podium /
residential over
Civic Precinct. May include Mixed
use retail / commercial podium /
residential over
Mixed-use retail / commercial
podium residential over
Mixed-use retail / commercial
podium residential over
Residential apartmentsResidential apartments
Mixed-use retail / hospitality
podium Residential over
Mixed-use retail / hospitality
podium Residential over
Retail PromenadeRetail Promenade
Signalled intersection Cale
St and The Crescent
Signalled intersection Cale
St and The Crescent
Mixed-use retail /
commercial podium
commercial over
Mixed-use retail /
commercial podium
commercial over
Community green space Community green space
Mixed-use retail /
commercial podium
commercial over
Mixed-use retail /
commercial podium
commercial over
Community PurposeCommunity Purpose
Retained existing
significant trees
Retained existing
significant trees
Signalled intersection at
shared street
Signalled intersection at
shared street
Piazza stage and
outdoor screen
Piazza stage and
outdoor screen
Multi Deck Car park
& retail edge
Multi Deck Car park
& retail edge
The Masterplan
18
Midland Oval Redevelopment Precinct Business Plan
5 Project Strategy
5.2.1 Business Case
in order to enable Council to consider all options around the major project. This considered the project cost and revenue expectations under various scenarios developed by the City for the redevelopment of the Midland Oval Precinct. The scenarios consider the development
3. Community Purpose Building.
All civil works, streetscaping, Midland Park (8729sqm), Residential Park (4716sqm) and the Piazza (5606sqm) are components of the Public Realm work and will be developed under EVERY scenario.
5.2.2 Development Deliverables
Sub-precinct Proposed use
A
B -
C
D
E
Fuse
public open space development with all other parcels of land expected to be sold. The public
and divested.
Scenario 1 Scenario 2 Scenario 3 Scenario 4
Public Open Space & Civil Infrastructure
Develop Develop Develop Develop
Construct & Operate
Construct & Sell
Construct & Sell
Construct & Operate
Council Cham--
tration Building & Apartments
Develop & Sell Apartments
Develop & Sell Apartments
Development (Sell Land)
Development
Community Building
Develop Develop Development
Develop
Scenarios 1 and 2
Scenario 2.
Scenario 3
Scenario 4
5.1 Financial Considerations
5.1.1 Development CostsThe indicative construction cost of the City’s Core Facilities was based on Ralph Beattie
19
5.1.2 Analysis of Scenarios
5.1.2.1 Multi Deck Car Park*
If Council chooses to maintain and operate the asset they will receive a return through
value as well as future rateable income.
5.1.2.2 Civic Chambers and Administration Building*
• • • Construct the multi-purpose building.
40 apartments above. Within the commercial component is where the Council will have their Administration building and Council Chambers.
building is constructed) of the existing administration building.
5.1.2.3 The Community Building*
short term or to hold for a later date.
5.2 Funding Strategy
case and feasibility analysis for council consideration.
site awaits demolition and development. The income from future land sales and rateable income have also been included in the analysis. Operations and maintenance costs have been assumed for all the owned sites.
studies will enable the City to directly disclose the amount of funding required either by cash
sought and considered throughout all stages of the development.
5.3 Development Rationale
if council can not achieve the sales required by the sunset date then council will need to resolve an alternative strategy or resolve the funding shortfall through other means such as
and the facilitation of residential development. The residential development will provide the populace required to activate and attract further investment into the precinct.
by retail and commercial.
one or two staged approach for the construction is optimal.
and council resolution in order to proceed. This will be in accordance with the City’s facility
20
Midland Oval Redevelopment Precinct Business Plan
planning process. It would be expected that public amenity would be provided in and around 6 Project Program
6.1 Project Definition Plan
Plan
Feasibility Study (internal document onlystudies.
below.
PHASE 1Pre-Planning
Mid
lan
d O
val R
edev
elop
men
t
PHASE 2Masterplan & Land Use Feasibility
PHASE 3Planning & Design
PHASE 4Implementation
PHASE 5Close-Out
Preparation of Project Definition Plan
Reactivation of Midland Oval and Commercialisation Committee
Establishment of Project Team
Preparation of concept plan
Preparation of Land Use Feasibility Study
Preparation of Master Plan
Stakeholder Consultation Site Investigation Financial and
Market Analysis Approval
Review Project Plan
Confirm Core Design Team Prepare Concepts Prepare Detailed
DesignsPrepare Detailed Design Documentation
Obtain Development Approvals
Forward Works Construction Tender Construction Operations Marketing
Handover
21
Midland Oval Redevelopment Precinct Business Plan
6.2 Implementation StepsIt is proposed that the development proceed with the public open space and public amenity
6.3 Project Timeline
reduce the impact on council resources.
6.4 Professional GuidanceThe following team of professional consultants have been appointed by the City to assist
Goods/Services Consultant
DESIGN
Placematch
Landscaping Strategy AECOM
Consultation Estill and Associates
DETAILED DESIGN
Landscaping
Public Art Apparatus
TPG - Placematch
Economic Feasibility Colliers International
Design Guidelines Cox Architects
Acoustics Marshall Day Acoustics
REGULATORY
Planning Scheme McLeods
Subdivision Statewest Surveys
LAND SALES
Staging and Land Sales Release Strategy Colliers International
Sales TBC
Legal Advice
CIVIL DESIGN AND WORKS
Design
22
Midland Oval Redevelopment Precinct Business Plan
7 Financial Assessment
7.1 Commercial analysis approach
approximate total acquisition expenditure (i.e. including existing purchases) is estimated to
arise in the future. These decisions are subject to further business case and feasibility analysis.
designs have been prepared and costed for tender. Upon completion of all the relevant
modelling has considered. These will be published within future reporting of this Business
7.2 Assumptions
7.2.1 Expenses estimates
have been provided by construction cost consultants and quantity surveyors. The construction
costs for the buildings being developed have been supplied by quantity surveyors. Additional fees and margins as a percentage of the base construction cost estimates have been
the development.
costs of the respective buildings have been considered in the analysis. These have been assumed as a percentage of the base construction costs.
7.2.2 Income estimates
considered in the analysis.
Existing rental income from 12 of the lots owned have been factored into the analysis up until the buildings are demolished and properties cleared.
Expected sales proceeds are included in the analysis from the sale of certain lots. These proceeds are in nominal terms and have been escalated in the analysis.
income rates have been based on comparable City of Swan developments.
7.3 Wider financial implications to Council
Escalation rates based on the Consumer Price Index (CPI) growth forecasts for Perth and sourced from the Department of Treasury’s Economic Forecasts. The general escalation rates applied are set out below.
Escalation Rates
2017/18 2018/19 2019/20 2020/21
CPI Forecast
23
Midland Oval Redevelopment Precinct Business Plan
The Discount Rate estimates calculated are shown below.
Key Project Cost Elements Project Cost Elements
Real Discount Rate
with the MORM are completed and the necessary property acquisitions and disposals of
the City to provide additional community facilities within the Midland CBD.
borrowings.
Estimated Asset Valuation
Asset valuation is the process of assessing the value of an item of worth that produces cash
prior to purchasing insurance for an asset.
8 Statement of Project Impact
8.1 Financial Impact
2043). This captures recurrent operating and maintenance costs and revenue as well as the capital expenditure.
• using the discount rate above
• time period
Scenario 1 Scenario 2 Scenario 3 Scenario 4
Public Open Space & Civil Infrastructure
Develop Develop Develop Develop
Construct & Operate
Construct & Sell
Construct & Sell
Construct & Operate
Administration Building & Apartments
Develop & Sell Apart-
ments
Develop & Sell Apart-
ments
-ment (Sell
Land)
-
Land)
Community Building Develop Develop -ment
Develop
10 YEARS
Est Asset Value
15 YEARS
Est Asset Value
20 YEARS
Est Asset Value
24
Midland Oval Redevelopment Precinct Business Plan
Scenario 1 - Developed & Owned by the City
Scenario 2 - Developed & Owned by the CityDeveloped & Sold by the City
Scenario 3 - Developed & Owned by the City Developed & Sold by the City
Scenario 4 - Developed & Owned by the CityCommunity Building.
AUD $’000 Scenario 1 Scenario 2 Scenario 3 Scenario 4
10 YEARS
Demolition
Civil Infrastructure
Public Open Space
Council Chambers & Administration Building
Community Building
Other Costs
Land Acquisitions
Remaining Lot Sales
Existing Rental Income from remaining lots
Rateable income from remaining lots
TOTAL
AUD $’000 Scenario 1 Scenario 2 Scenario 3 Scenario 4
15 YEARS
Demolition
Civil Infrastructure
Public Open Space
Council Chambers & Administration Building
Community Building
Other Costs
Land Acquisitions
Remaining Lot Sales
Existing Rental Income from remaining lots
Rateable income from remaining lots
TOTAL
AUD $’000 Scenario 1 Scenario 2 Scenario 3 Scenario 4
20 YEARS
Demolition
Civil Infrastructure
Public Open Space
25
AUD $’000 Scenario 1 Scenario 2 Scenario 3 Scenario 4
Council Chambers & Administration Building
Community Building
Other Costs
Land Acquisitions
Remaining Lot Sales
Existing Rental Income from remaining lots
Rateable income from remaining lots
TOTAL
The Public Open Space and Council Chambers and Administration Building have the highest
Scenarios 1 and 2 development. Scenarios 3 and 4 construction of the Council Chambers and Administration Building. In Scenario 3
in Scenario 2.
is constructed and operated by the City.
8.2 Economic Impact
the complete build period. The cost components were categorised by Input Output Industry
Direct employment generated through the construction phase of the project totals 254 FTE
construction and development stage through facilitation of numerous jobs once completed.
The modelling estimated the precinct’s value to the economy at full build out. The estimated
expected to have a positive economic impact on the broader economy.
26
Midland Oval Redevelopment Precinct Business Plan
9 Risk
9.1 Risk Identification and Analysis
Ref# Type Likeli-hood
Consequence Residual risk rating
2
Repu
tatio
n
EngagementThe City’s reputation will be negatively impacted due to community dissat-isfaction with the Project
3 Possible
10
Gov
erna
nce
Project changesChanges to project scope and outcomes throughout project leading to design and contractor varia-tions and delays
3 Possible
11
Cons
truc
tion
Injury or death during construc-tion
-formance during construction leading to incident or major accident during con-struction
5 Severe
12
Cons
truc
tion Contractor failure
Main contractor or major sub-contrac-tor insolvency result-
delays
3 Possible
9.2 Risk Evaluation and Treatment
Risk# Short Risk Descrip-tion
Treatment Details
Projected
Likeli-hood
Conse-quence
Rating
2
Engage-ment
1.1 Communi-cation Plan
3 Possible
1.2 Social Me-dia Strategy
10
Project changes
1.1 Project Manager
3 Possible
1.2 Council Reporting
11
Injury or death during construc-tion
1.1 Appoint-ment of expe-rienced Project Manager for the construc-tion phase
1 Rare 5 Severe 5 Medium
12
Contrac-tor failure
1.1 Involve-ment of Man-ager Finance in assessment of construction tenders
8 Medium
27
Midland Oval Redevelopment Precinct Business Plan
10 Governance
10.1 Governance structure
• The City’s internal Business Case •
• Overall Contractual regulation by the City as Vendor via contract documentation as
•
• The City’s Procurement Policy Guidelines and Governance.
10.2 Project documents
falling under this Business Plan will require formal documentation. The various documentation
•
• Design and construction drawings for the public realm (including new road and utility infrastructure)
• Licences for public realm and development sites)
•
10.3 Existing Business Plans
future associated reporting will now be incorporated into the subject Business Plan and associated reporting.
10.4 Probity and benchmarking
process and assessment.
28
Midland Oval Redevelopment Precinct Business Plan
11 List of References
1.
2.
3. 2015.
4.
5.
.
6. ‘Frequently Asked Questions - Midland Oval Redevelopment Masterplan’Accessed 14 February 2017
7.
8. Midland Oval Economic Impact Estimate Update
9. Consultancy Report Midland Oval Masterplan: Land Economics Feasibility Advice and Delivery Strategy
10. City of Swan - Midland Oval: Place Making Strategy
11. Midland Activity Centre Structure Plan
12. Directions 2031 and Beyond
13. State Planning Policy 4.2 Activity Centre for Perth and Peel
14. Perth and Peel @ 3.5 million
29
Midland Oval Redevelopment Precinct Business Plan