42 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
43Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3. Pier Set.
44 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Aerial - South East Aerial - North East
3.1 Key Ferry Infrastructure Components Perspectives
45Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.2 Key Ferry Infrastructure Components
Ferry infrastructure
Gangway
Guide pile marker
Pontoon
Fender dolphin
Breakwater
+ + +
46 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.3 Key Ferry Infrastructure Components
Queen’s Wharf Break water Gangways
+ +
47Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Pontoon Fender dolphins Guide pile markers
Existing fender piles on the outer
western edge of Queens Wharf to
be removed. Refer to T&T drawingsExisting sections of the concrete upstand
on wharf edge to be removed.
Existing sections of the concrete upstand
on wharf edge to be removed.Existing sections of the concrete upstand
on wharf edge to be removed.
Wharf Edge
SHED 10
SHARED PATHWAY
QUEENS WHARF
Wh
arf
Ed
ge
CLOUD
Rail lines shown dashed
Surveyor to confirm if there
are any existing bollards in
this area that need to be
relocated from these areas.
01 Ground Floor Plan Exis
Scale: 1:500
48 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.4 Pier Existing and Demolition Plan.
Existing Ground Floor Plan1:500
Existing fender piles on the outer
western edge of Queens Wharf to
be removed. Refer to T&T drawingsExisting sections of the concrete upstand
on wharf edge to be removed.
Existing sections of the concrete upstand
on wharf edge to be removed.Existing sections of the concrete upstand
on wharf edge to be removed.
Wharf Edge
SHED 10
SHARED PATHWAY
QUEENS WHARF
Wh
arf
Ed
ge
CLOUD
Rail lines shown dashed
Surveyor to confirm if there
are any existing bollards in
this area that need to be
relocated from these areas.
01 Ground Floor Plan Exis
Scale: 1:500
49Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
900
Typical Pile Marker
- refer to drawing 3.14
Proposed Break Water, refer to
engineers drawings.
Balustrading around Pontoon
QUEENS WHARF
Berth 1Berth 6
Berth 5Berth 4
Berth 3Berth 2
Gangway 2Gangway 3 Gangway 1
CLOUD
West
Permanent seating
Temporary seating
ABC
PONTOONShown for information design by
others, refer to Engineers drawings
PONTOONShown for information design by
others, refer to Engineers drawings
Typical Gangways - refer to drawings 3.8-3.11Balustrading along Queens Wharf
edge, between Gangway shelters
Rail lines shown dashed, all seating elements
to be spaced at least 200mm from lines
Typical Balustrade -
refer to drawings 3.15
East
A
A
01 Ground Floor Plan Proposed Pier
Scale: 1:50050 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.5 Pier Proposed Plan.
Proposed Plan1:500
Balustrades
900
Typical Pile Marker
- refer to drawing 3.14
Proposed Break Water, refer to
engineers drawings.
Balustrading around Pontoon
QUEENS WHARF
Berth 1Berth 6
Berth 5Berth 4
Berth 3Berth 2
Gangway 2Gangway 3 Gangway 1
CLOUD
West
Permanent seating
Temporary seating
ABC
PONTOONShown for information design by
others, refer to Engineers drawings
PONTOONShown for information design by
others, refer to Engineers drawings
Typical Gangways - refer to drawings 3.8-3.11Balustrading along Queens Wharf
edge, between Gangway shelters
Rail lines shown dashed, all seating elements
to be spaced at least 200mm from lines
Typical Balustrade -
refer to drawings 3.15
East
A
A
01 Ground Floor Plan Proposed Pier
Scale: 1:50051Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3,260 AVD-46
-
-1,330 AVD-46
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
MLWS Sea Level
Seabed Level Varies
Bert
h 1
Gangway 3 Gangway 2 Gangway 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
3,260 AVD-46
2,860 AVD-46
-
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
Seabed Level Varies
Gangway 3 Gangway 2 Gangway 1
Bert
h 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
Maximum High Tide
Sea Level
3,260 AVD-46
1,650 AVD-46
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
Gangway 3
Seabed Level Varies
MHWS Sea Level
Gangway 2 Gangway 1
Bert
h 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
52 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.6 Pier West Elevations.
West Elevation Mean Low Water Springs1:500
West Elevation Mean High Water Springs1:500
West Elevation Maximum High Tide1:500
(Including 50yr Sea Level Rise + 100yr storm tide)
3,260 AVD-46
-
-1,330 AVD-46
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
MLWS Sea Level
Seabed Level Varies
Bert
h 1
Gangway 3 Gangway 2 Gangway 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
3,260 AVD-46
2,860 AVD-46
-
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
Seabed Level Varies
Gangway 3 Gangway 2 Gangway 1
Bert
h 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
Maximum High Tide
Sea Level
3,260 AVD-46
1,650 AVD-46
9,260 AVD-46
6,0
00
Pontoon
Queens Wharf
Gangway 3
Seabed Level Varies
MHWS Sea Level
Gangway 2 Gangway 1
Bert
h 1
Bert
h 2
Bert
h 6
Bert
h 5
Bert
h 4
Bert
h 2
53Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3,260 AVD-46
2,860 AVD-46
-
3,260 AVD-46
3,860 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
Seabed Level Varies
Pontoon
Gangway 1 Gangway 2 Gangway 3
Maximum High Tide
Sea Level
3,260 AVD-46
-1,330 AVD-46
-
Queens Wharf
Seabed Level Varies
Pontoon
MLWS Sea Level
Gangway 1 Gangway 2 Gangway 3
3,260 AVD-46
1,650 AVD-46
-
Queens Wharf
Seabed Level Varies
MHWS Sea Level
Queens Wharf Queens Wharf Queens Wharf
Gangway 1 Gangway 2 Gangway 3
54 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.7 Pier East Elevation.
East Elevation1:500
3,260 AVD-46
2,860 AVD-46
-
3,260 AVD-46
3,860 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
Seabed Level Varies
Pontoon
Gangway 1 Gangway 2 Gangway 3
Maximum High Tide
Sea Level
3,260 AVD-46
-1,330 AVD-46
-
Queens Wharf
Seabed Level Varies
Pontoon
MLWS Sea Level
Gangway 1 Gangway 2 Gangway 3
3,260 AVD-46
1,650 AVD-46
-
Queens Wharf
Seabed Level Varies
MHWS Sea Level
Queens Wharf Queens Wharf Queens Wharf
Gangway 1 Gangway 2 Gangway 3
55Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Typical Pile Marker
- refer to drawing 3.14
Relocatable Seating
Permanent Seating + lightingGangway shelter
Access ramp
Access ramp
Typical Balustrade
- refer to drawing 3.15
Berth 5
Berth 4
PONTOONShown for information design by
others, refer to Engineers drawings
Cloud
A
B
West
East Buses
Commuters
A
B
Separation provided by relocatable custom furniture, or other
temporary traffic measures as part of cruise ship traffic
management plan
Rail lines shown dashed, all seating elements
to be spaced at least 200mm from lines
CLOUD
01 Ground Floor Plan Proposed Gangway
Scale: 1:200
56 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.8 Gangway Proposed Plan.
Gangway Proposed Plan1:200
design per engineers drawings 3,500 7,000 3500 3500 - 5500
Rails RailsPontoon
Cloud
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Seabed Level Varies
Integrated lighting
in furniture
Rail lines shown in red, all
seating elements to be spaced
at least 200mm from lines
S16 Sec - MLWS
Scale: 1:200#LayID
Section A: Traffic Management1:200
57Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.9 Queens Wharf West Traffic Management
3,260 AVD-46
-1,330 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
MLWS Sea Level
Gangway 2
3,260 AVD-46
1,650 AVD-46
3,260 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
MHWS Sea Level
Gangway 2
E-08 Gangway West Eleva - MLWS
Scale: 1:200#LayID
E-09 Gangway West Eleva - MHWS
Scale: 1:200#LayID
3,260 AVD-46
-1,330 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
MLWS Sea Level
Gangway 2
3,260 AVD-46
1,650 AVD-46
3,260 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
MHWS Sea Level
Gangway 2
E-08 Gangway West Eleva - MLWS
Scale: 1:200#LayID
E-09 Gangway West Eleva - MHWS
Scale: 1:200#LayID
58 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.10 Gangway Elevations.
Gangway West Elevation Mean High Water Springs1:200
Gangway West Elevation Mean Low Water Springs1:200
Fixed framed glazing
Fixed framed glazing
Bottom landing
Bottom landing
Glass balustrades
Glass balustrades
Gangway structure
Gangway structure
Composite clad steel canopy
Composite clad steel canopy
Concrete main support columns
Concrete main support columns
Concrete decks
Concrete decks
Concrete structural support
Concrete structural support
Timber clad columns
Timber clad columns
Aluminium columns
Aluminium columns
3,260 AVD-46
2,860 AVD-46
-
9,260 AVD-46
6,0
00
Queens Wharf
Seabed Level Varies
Gangway 2
Maximum High Tide
Sea Level
E-07 Gangway West Eleva - Maximum Highest Tide
Scale: 1:200#LayID
3,260 AVD-46
-1,330 AVD-46
-
9,260 AVD-46
6,0
00
Queens Wharf
Gangway 2
Seabed Level Varies
MLWS Sea Level
E-10 Gangway East Eleva - MLWS
Scale: 1:200#LayID 59Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Fixed framed glazing
Fixed framed glazing
Bottom landingGlass balustrades Composite clad steel canopy
Composite clad steel canopy
Concrete main support columns
Concrete decks Concrete structural support
Timber clad columns
Timber clad columns
Aluminium columns
Aluminium columns
Gangway West Elevation Maximum High Tide1:200 (Including 50yr Sea Level Rise + 100yr storm tide)
Gangway East Elevation 1:200
3,260 AVD-46
1,650 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
Gangway 2
MHWS Sea Level
-1,330 AVD-46
3,260 AVD-46
9,260 AVD-46
Gangway 2
Queens Wharf
MLWS Sea Level
S12 Sec - MHWS
Scale: 1:200#LayID
S11 Sec - MLWS
Scale: 1:200#LayID
3,260 AVD-46
1,650 AVD-46
9,260 AVD-46
6,0
00
Queens Wharf
Gangway 2
MHWS Sea Level
-1,330 AVD-46
3,260 AVD-46
9,260 AVD-46
Gangway 2
Queens Wharf
MLWS Sea Level
S12 Sec - MHWS
Scale: 1:200#LayID
S11 Sec - MLWS
Scale: 1:200#LayID
60 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Section C - Mean Low Water Springs1:200
Section C - Mean High Water Springs1:200
3.11 Gangway Sections.
Fixed framed glazing
Fixed framed glazing
Bottom landing
Bottom landing
Glass balustrades
Glass balustrades
Gangway structure
Gangway structure
Composite clad steel canopy
Composite clad steel canopy
Concrete main support columns
Concrete main support columns
Concrete decks
Concrete decks
Concrete structural support
Concrete structural support
3,260 AVD-46
5m
9,260 AVD-466,0
00
Queens Wharf
5m min ceiling height for
shelter to allow clearance for
gangway at max high tide
Maximum High Tide
Sea Level
2,860 AVD-46
S10 Sec - Maximum Highest Tide
Scale: 1:200#LayID
61Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Section C - Maximum High Tide1:200 (Including 50yr Sea Level Rise + 100yr storm tide)
Fixed framed glazing
Bottom landing Glass balustradesGangway structure Composite clad steel canopy
Concrete main support columns
Concrete decksConcrete structural support
3,260 AVD-46
6,0
00
9,260 AVD-46
Varies 3500 7000 3500 3500 - 5500
Pontoon
Queens WharfQueens Wharf
Pontoon
Cloud
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Bert
h 5
Maximum High Tide
Sea Level
Seabed Level Varies
2,860 AVD-46
-
S1 Sec - Maximum Highest Tide
Scale: 1:200#LayID
62 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.12 Pier Sections.
Section A - Maximum High Tide1:200 (Including 50yr Sea Level Rise + 100yr storm tide)
Fender marker Concrete support structure
Concrete deck Bottom landingGangway structure Permanent seatingBreakwater: shown for information,
design by others.refer to Engineers drawings
Pontoon: shown for information,
design by others.refer to Engineers drawings
3,260 AVD-46
-1,330 AVD-46
9,260 AVD-46
6,0
00
Varies 3500 7000 3500 3500 - 5500
Queens Wharf Queens Wharf
Pontoon
Cloud
MLWS Sea Level
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Bert
h 5
Seabed Level Varies-
3,260 AVD-46
9,260 AVD-46
6,0
00
3500 - 550035007,478 8013500Varies
Queens WharfQueens WharfPontoon Cloud
MHWS Sea Level
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Bert
h 5
Seabed Level Varies
1,650 AVD-46
-
S2 Sec - MLWS
Scale: 1:200#LayID
S3 Sec - MHWS
Scale: 1:200#LayID
63Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
Section A - Mean Low Water Springs1:200
Fender marker Concrete support structure
Concrete deck Bottom landingGangway structure Permanent seatingBreakwater: shown for information,
design by others.refer to Engineers drawings
Pontoon: shown for information,
design by others.refer to Engineers drawings
3,260 AVD-46
-1,330 AVD-46
9,260 AVD-46
6,0
00
Varies 3500 7000 3500 3500 - 5500
Queens Wharf Queens Wharf
Pontoon
Cloud
MLWS Sea Level
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Bert
h 5
Seabed Level Varies-
3,260 AVD-46
9,260 AVD-46
6,0
00
3500 - 550035007,478 8013500Varies
Queens WharfQueens WharfPontoon Cloud
MHWS Sea Level
Commuter
Zone
(incl separation).
Bus
ZoneSheltered
GangwayAccess rampPontoons
Bert
h 5
Seabed Level Varies
1,650 AVD-46
-
S2 Sec - MLWS
Scale: 1:200#LayID
S3 Sec - MHWS
Scale: 1:200#LayID
64 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.13 Pier Sections.
Section A - Mean High Water Springs1:200
Fender marker Concrete support structure
Concrete deck Bottom landingGangway structure Permanent seatingBreakwater: shown for information,
design by others.refer to Engineers drawings
Pontoon: shown for information,
design by others.refer to Engineers drawings
Fender Marker 3D
Scale: 1:100
6,0
00
6,0
25
3,302
A
3,297
1,1
00
566
01 South Eleva
Scale: 1:100
01 Ground Floor Plan
Scale: 1:100
65Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.14 Fender Pile Marker
Fender Pile Marker Elevation1:100
Fender Pile Marker Plan1:100
Fender Pile Marker 3D
1,1
00
900-1
,000
100
Balustrade vertical x2
steel plate @ 1,500 cts
15mm laminated
safety glass
Steel fixing plate welded
to vertical steel plate
Balustrade sizing
to meet structural
requirements
100
150
75
Steel fixing plate welded
to vertical steel plate
15mm laminated
safety glass
Balustrade vertical x2 steel plate @ 1,500 cts
Handrail above shown dashed
fixed to vertical steel element
15mm laminated
safety glass
Handrail fixed to
balustrade post
65
Balustrade vertical x2
steel plate @ 1,500 cts
15mm laminated
safety glass
Balustrade vertical x2 steel
plate @ 1,500 cts
Fixing plate welded to
vertical steel balustrade
Edge of pontoon
01 Balustrade sec
Scale: 1:5
02 Balustrade eleva
Scale: 1:5
03 Balustrade plan details
Scale: 1:5
04 Balustrade plan details
Scale: 1:5
1,1
00
900-1
,000
100
Balustrade vertical x2
steel plate @ 1,500 cts
15mm laminated
safety glass
Steel fixing plate welded
to vertical steel plate
Balustrade sizing
to meet structural
requirements
100
150
75
Steel fixing plate welded
to vertical steel plate
15mm laminated
safety glass
Balustrade vertical x2 steel plate @ 1,500 cts
Handrail above shown dashed
fixed to vertical steel element
15mm laminated
safety glass
Handrail fixed to
balustrade post
65
Balustrade vertical x2
steel plate @ 1,500 cts
15mm laminated
safety glass
Balustrade vertical x2 steel
plate @ 1,500 cts
Fixing plate welded to
vertical steel balustrade
Edge of pontoon
01 Balustrade sec
Scale: 1:5
02 Balustrade eleva
Scale: 1:5
03 Balustrade plan details
Scale: 1:5
04 Balustrade plan details
Scale: 1:5
66 Downtown Ferry Basin Redevelopment Stage 1 | Auckland Transport | REV E | November 9, 2018
3.15 Balustrade Details
Balustrade Section1:5
Balustrade Plan Details1:5
Balustrade Plan Details1:5
Balustrade Elevation1:5