432 Series Filler Pull-Out Instructions Step 1. Measure scribe rail thickness and length per your specific cabinetry. See fig 1 Step 2. Install scribe rails to filler pull-outs using small finish nails or brads. See fig 2 Note: align scribe rails with front edge of filler pull-out. Align scribe rail to upper section of base cabinet lower mounting strap or lower section of wall cabinet lower mounting strap. See figs. 3a–b Figure 1 Figure 2 Figure 3a Wall Cabinet Figure 3b Base Cabinet Top Scribe Rail is nailed to bottom edge of top section Bottom Scribe Rail is nailed to edge of bottom section Top Scribe Rail is nailed to edge of top section Bottom Scribe Rail is nailed to edge of bottom section I-432 6-05

Upload: others

Post on 21-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 432 Series Filler Pull-Out Instructions - Lowes Holidaypdf.lowes.com/installationguides/090713071169_install.pdf · 2012. 9. 10. · 432 Series Filler Pull-Out Instructions Step 1

432 Series Filler Pull-Out Instructions

Step 1. Measure scribe rail thickness and length per your specific cabinetry. See fig 1

Step 2. Install scribe rails to filler pull-outs using small finish nails or brads. See fig 2

Note: align scribe rails with front edge of filler pull-out. Align scribe rail to upper section of base cabinet lower mounting strap or lower section of wall cabinet lower mounting strap. See figs. 3a–b

Figure 1

Figure 2

Figure 3aWall Cabinet

Figure 3bBase Cabinet

Top Scribe Rail is nailed to bottom edge of top section

Bottom Scribe Rail is nailed to edge of bottom section

Top Scribe Rail is nailed to edge of top section

Bottom Scribe Rail is nailed to edge of bottom section

I-432 6-05

Page 2: 432 Series Filler Pull-Out Instructions - Lowes Holidaypdf.lowes.com/installationguides/090713071169_install.pdf · 2012. 9. 10. · 432 Series Filler Pull-Out Instructions Step 1

Step 3 (Base Cabinets). Pre-drill 3/16 inch holes 3/8 inch down from top of cabinet and also 27-3/4” down from top of cabinet. (See fig 4a–d). Repeat with other adjacent cabinet.

Step 4. Mount filler cabinet pull-out to adjacent cabinet 1. See Fig. 5a–b

Step 6. Remove front mounting strap. See Fig 7a–b

Step 7. Attach face frame and onlays (not provided) See Fig. 8–9

Figure 4a Figure 4b

Figure 5a

Step 5. Mount filler cabinet pull-out to adjacent cabinet 2.See Fig. 6

Figure 6

Figure 8 Figure 9

Figure 7a Figure 7b

Wall Cabinet

From inside the adjacent cabinet screw the 432 cabinet top.

Screw 432 cabinet bottom from below adjacent cabinet.

Base Cabinet

From inside and above the adjacent cabinet floor screw the 432 cabinet bottom.

Screw 432 cabinet top from above adjacent cabinet.

Figure 4dWall Cabinet

Figure 4cBase Cabinet

Figure 5b

“Changing the way you think about cabinet organization!”

Questions about installation visitwww.rev-a-shelf.com

or call customer service at 1-800-626-1126

Filler CabinetBase CabinetScribe Rail Meets Face Frame