4th technical meeting - wp7
TRANSCRIPT
Project SLOPE1
WP 7 – Piloting the SLOPE demonstrator
Technical Meeting 5 Jul 16
Project SLOPE
T.7.3 – Trials and validation cycle
Trento, July 2016
Kühmaier Martin, Pichler Gerhard, Kastner Maximilian Institute of Forest EngineeringUniversity of Natural Resources and Life Sciences, Vienna
Picchi GianniCNR IVALSA
Umberto di StasoFondazione Graphitech
Technical Meeting 5 Jul 16
Contents of the presentation
1. Overview
2. Introduction
3. Survey site Annaberg
4. Performed activities on the survey site I
5. Survey site Montesover (Sover)
6. Performed activities on the survey site II
7. Prospective plans for the harvesting demo
8. Time study Sover
9. Deliverable D7.031
Technical Meeting 5 Jul 16
1. Overview
• Status: in progress• Length: until month 36• Involved Partners Leader: BOKU Participants: GRAPHITECH, CNR, COMBOLAB, MHG, BOKU,
GRE, TRE, ITENE Aim: Trials and validation of the SLOPE system on survey sites
in Austria and Italy• Outputs: Deliverables D7.031, D7.032, D7.04 and D7.05
Technical Meeting 5 Jul 16
2. Introduction
• The objective of this task is to validate the new SLOPE system in a mountainous forest scenario
• The new system will be currently tested in Sover (Italy) and in Annaberg (Austria) in autumn 2016
• The efficiency of the SLOPE system will be measured by methods which were explained in D7.02
• This should lead to the strengths and weaknesses of the new system and support improvement
Technical Meeting 5 Jul 16
Technical Meeting 5 Jul 16
Deliverables Progress
100 100
0 0 0 0
75
00
10
20
30
40
50
60
70
80
90
100
D7.0
1 Pr
otoc
ol fo
rth
e de
finiti
on o
fev
alua
tion
met
hodo
logy
(BO
KU)
D7.0
2 Pr
otoc
ol fo
rth
e ex
perim
enta
lde
sign
of
dem
onst
ratio
nac
tiviti
es (B
OKU
)
D7.0
4 De
mo
repo
rtfo
r qua
lity
cont
rol
(BO
KU)
D7.0
5 De
mo
repo
rtfo
r tim
ber s
uppl
ype
rfor
man
ce &
ERP
(CN
R)
D7.0
6 Re
port
s and
man
uals
for o
ff-th
e-jo
b tr
aini
ng (C
NR)
D7.0
7 M
anua
ls,
guid
elin
es a
ndle
arni
ng p
acka
ges
for o
n-th
e-jo
btr
aini
ng (C
NR)
D7.0
31 D
emo
repo
rtfo
r dat
a co
llect
ion
I(G
RAPH
ITEC
H)
D7.0
32 D
emo
repo
rtfo
r dat
a co
llect
ion
II(M
HG)
Deliverables Status
3. Survey site Annaberg
• Study site is located in the Austrian province Salzburg, in the village Annaberg im Lammertal
• Survey area (8 ha) lies on Promberg (905 m - 1144 m)• SLOPE harvesting area (0.42 ha; 1031 m - 1128 m)
Technical Meeting 5 Jul 16
3. Survey site Annaberg
• SLOPE harvesting area (0.42 ha; first section): first 200 m x 30 m section is the SLOPE harvesting area UAV+TLS survey was performed in autumn 2015 northwest exposed slope range of 60 % - 100 % small flatter part in the upper sector 30 % - 60 % 90 % spruce; 10 % firs and larches spread over the harvesting area 80 years old stock: 466 m3
number of stems: 345 basal area: 34.8 m2
mean dbh: 33.7 cm mean hight (hLorey): 30.2 m yield class spruce: 15.4 m3/ha/year
Technical Meeting 5 Jul 16
3. Survey site Annaberg
• SLOPE harvesting area (0.42 ha; first section): Preliminary clearing: Extraction of about 115 RFID marked trees
(150 m3) → this is about a third of the standing trees
• Additional harvesting area ÖBF agreement (second section): Also 200 m x 30 m about half a hectare Same forest stand characteristics Another 115 trees (150 m3)
• In total over the whole harvesting area of 400 m x 30 m about 230 trees (about 300 m3), which should be extracted during the SLOPE
demo in autumn 2016 in AustriaTechnical Meeting
5 Jul 16
Survey areaSLOPE harvesting area
Additional harvesting area ÖBF agreement
Technical Meeting 5 Jul 16
4. Performed activities on the survey site I
• Selection of the cable line in SAGIS and generating GPS coordinates (survey area, SLOPE harvesting area)
• Marking corner points and borders of the survey area and harvesting area with colour spray on the basis of GPS data in Annaberg
• Marking cable line adapted on terrain conditions with marking tape• Making a complete enumeration for the SLOPE harvesting area
Technical Meeting 5 Jul 16
4. Performed activities on the survey site I
Marking harvesting treeswith white colour spray
UAV survey by COASTWAY 05.10.-09.10.2015
TLS survey by TREEMETRICS 02.11.-06.11.2015
Technical Meeting 5 Jul 16
4. Performed activties on the survey site I
• RFID tree marking and angle count sampling in Annaberg by BOKU 14.06.2016-15.06.2016
Technical Meeting 5 Jul 16
5. Survey site Montesover (Sover)
• Study site is located in the Italian province of Trento, in the territory of the municipality of Sover
• Survey area (10 ha) lies on Montesover (880 m - 1360 m)• SLOPE harvesting area (0.93 ha; 920 m - 1025 m)
Technical Meeting 5 Jul 16
5. Survey site Sover
• SLOPE harvesting area (0.93 ha): UAV survey was performed in summer 2014 TLS survey was performed in summer 2015 north exposed slope range of 70 % - 100 % landing area downhill on area close to public road 85 % spruce; 15 % larches and firs Main strata about 90 years old stock: 297 m3
number of stems: 182 basal area: 34.8 m2
mean dbh: 42.7 cm mean hight (hLorey): 21.2 m
Technical Meeting 5 Jul 16
5. Survey site Sover
• SLOPE harvesting area (0.93 ha): Maturity harvest (selective cutting): Extraction of 91 RFID marked trees
(Just Picea abies was marked) Other trees (including other species) will be extracted during the
operations
Technical Meeting 5 Jul 16
6. Performed activities on the survey site II
RFID marking and tag model testing
10.10.2014
Technical Meeting 5 Jul 16
6. Performed activities on the survey site II
RFID update all tested types changed to SLOPE model
17.04.2016
TLS survey and additional RFID marking03-07.08.2015
UAV survey28-31.07.2014
Technical Meeting 5 Jul 16
6. Performed activities on the survey site II
RFID replacement after felling25.06.2016
Felling of trees, cableway installation
24-25.06.2016
Technical Meeting 5 Jul 16
• Extracting trees with a modified Tecno carriage (RFID scanning unit) and processing trees with an modified ARBRO 1000 (RFID scanning/marking, determining timber quality)
• Performing a time study for the new SLOPE system (modified carriage and processor head) and a cost calculation for the performance evaluation
7. Prospective plans for the harvesting demo
Technical Meeting 5 Jul 16
8. Time study
Greifenberg Tecno carriage:• Integrated RFID tag reader effects on productivity
• Time study is done in the progress time procedure
• A mobile computer called ALGIZ 7 (with time study software) is used for recording the different working steps and the consumed time
• Determination of the time consumption of the single working cycle elements happens with Microsoft Excel
• Calculating productivity
Technical Meeting 5 Jul 16
8. Time study
ARBRO processor head:• Is able to determine timber quality effects on productivity
• Has integrated sensors, RFID reader to scan the tree and an RFID marker to staple new RFID tags on each produced log effects on productivity
• The time study will be video based
• The process will be recorded with a small action cam which is mounted on the cab of the excavator
• With a special time study software from METLA (Ari Lauren) Finland the video material will be analysed to calculate productivity
Technical Meeting 5 Jul 16
8. Scenarios for Austrian demo
• Scenario 1• Pre-Felling of 250 trees by ÖBf• Extracting of 250 trees by Greifenberg tower yarder• Processing of 250 trees by SLOPE processor• Estimated time consumption: 1 month
• Scenario 2• Pre-Felling of 250 trees by ÖBf• Extracting of 250 trees by Greifenberg tower yarder• Processing of 250 trees by ÖBf processor• Pre-Felling of 50 trees by ÖBf, extracting and storing next to road• Marking of 50 trees with RFID tag • Processing of 50 trees by SLOPE processor• Estimated time consumption: 1 week
• Scenario 3• ?
Technical Meeting 5 Jul 16
Technical Meeting 5 Jul 16
9. Deliverable 7.031
• Deliverable 7.031 – Demo Report for Data Collection I• Due date: M27• Gives an overview of all collected data until the first demo
phase. The documentation will also include metadata information to allow an assessment of data quality.
• Updated with the real collected data right after the first pilot tests
Technical Meeting 5 Jul 16
• D.7.031 Structure1. Metadata Inventory2. Metadata Statistics3. Metadata Collection After the First Pilot Demonstration
9. Deliverable 7.031
Technical Meeting 5 Jul 16
• Metadata Inventory• Contains all the metadata related to information collected
until the first Pilot Demonstration in Sover
9. Deliverable 7.031
Technical Meeting 5 Jul 16
• Metadata Inventory• 65 Metadata collected, equally distributed by the 3 test
case scenarios (Sover, Piscine, Annaberg)
9. Deliverable 7.031
Technical Meeting 5 Jul 16
• Metadata Inventory
9. Deliverable 7.031
Technical Meeting 5 Jul 16
• Expected Metadata Collection After the First Pilot Demonstration• Contains all the metadata related to information that are expected
to be collected in these days (133 measurements)
• Mainly sensors information
• To be confirmed after the first pilot
9. Deliverable 7.031
Contact info
Martin Kühmaier: [email protected] Picchi: [email protected]
Umberto di Staso: [email protected] Pichler: [email protected]
Maximilian Kastner: [email protected]
Thank you for your attention!!
Technical Meeting 5 Jul 16
References & Picture sources
ZAMG, 2015. Climate data Abtenau:• http://www.zamg.ac.at/fix/klima/oe71-00/klima2000/klimadaten_oesterreich_1971_frame1.htm
(22.12.2015)
Last downloaded on 22.06.2016:• http://www.holz-broeker.de/images/ansicht-luftbild-saegewerk-schnittholz.jpg• http://www.riebli-forst.ch/weitere-dienstleistungen/holztransporte/• http://www.dronelife.com/cms/sites/default/files/product/eBee_0.jpg• http://www.woodbusiness.ca/images/heads-arbro.jpg• http://www.blaueberge.at/region-sommer.html#!lightbox[annaberg]/1/• http://www.greifenberg.it/teleferiche/siberian/gallery_6.jpg• http://www.greifenberg.it/carrellipescanti/tecnoextremepower/gallery_1.jpg
Gianni Picchi: picture Annaberg UAV survey and Montesover survey site Maximilian Kastner: picture ALGIZ 7 mobile computer Franz Holzleitner: picture Action cam mounted on a cab
Technical Meeting 5 Jul 16
SLOPEIntegrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas
Technical Meeting 5 Jul 16
WORK PACKAGE 7: PILOTING THE SLOPEDEMONSTRATOR
FONDAZIONE GRAPHITECH
Technical Meeting 5 Jul 16
Deliverables Progress
100 100
0 0 0 0
75
00
10
20
30
40
50
60
70
80
90
100
D7.0
1 Pr
otoc
ol fo
rth
e de
finiti
on o
fev
alua
tion
met
hodo
logy
(BO
KU)
D7.0
2 Pr
otoc
ol fo
rth
e ex
perim
enta
lde
sign
of
dem
onst
ratio
nac
tiviti
es (B
OKU
)
D7.0
4 De
mo
repo
rtfo
r qua
lity
cont
rol
(BO
KU)
D7.0
5 De
mo
repo
rtfo
r tim
ber s
uppl
ype
rfor
man
ce &
ERP
(CN
R)
D7.0
6 Re
port
s and
man
uals
for o
ff-th
e-jo
b tr
aini
ng (C
NR)
D7.0
7 M
anua
ls,
guid
elin
es a
ndle
arni
ng p
acka
ges
for o
n-th
e-jo
btr
aini
ng (C
NR)
D7.0
31 D
emo
repo
rtfo
r dat
a co
llect
ion
I(G
RAPH
ITEC
H)
D7.0
32 D
emo
repo
rtfo
r dat
a co
llect
ion
II(M
HG)
Deliverables Status
Technical Meeting 5 Jul 16
T.7.3 Trials and Validation Cycle
• Deliverable 7.031 – Demo Report for Data Collection I• Due date: M27• Gives an overview of all collected data until the first demo
phase. The documentation will also include metadata information to allow an assessment of data quality.
• Updated with the real collected data right after the first pilot tests
Technical Meeting 5 Jul 16
T.7.3 Trials Recommendation and validation cycle
• D.7.031 Structure1. Metadata Inventory2. Metadata Statistics3. Metadata Collection After the First Pilot Demonstration
Technical Meeting 5 Jul 16
T.7.3 Trials Recommendation and validation cycle
• Metadata Inventory• Contains all the metadata related to information collected
until the first Pilot Demonstration in Sover
Technical Meeting 5 Jul 16
T.7.3 Trials Recommendation and validation cycle
• Metadata Inventory• 65 Metadata collected, equally distributed by the 3 test
case scenarios (Sover, Piscine, Annaberg)
Technical Meeting 5 Jul 16
T.7.3 Trials Recommendation and validation cycle
• Metadata Inventory
Technical Meeting 5 Jul 16
T.7.3 Trials Recommendation and validation cycle
• Expected Metadata Collection After the First Pilot Demonstration• Contains all the metadata related to information that are expected
to be collected in these days (133 measurements)
• Mainly sensors information
• To be confirmed after the first pilot
Technical Meeting 5 Jul 16
Thanks
GRAPHITECH
Fondazione GraphitechVia Alla Cascata 56C38123 Trento (ITALY)
Phone: +39 0461.283396Fax: +39 0461.283398