500 ton chiller project
DESCRIPTION
TRANSCRIPT
![Page 1: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/1.jpg)
500 ton Air-Cooled Water Chiller Project
![Page 2: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/2.jpg)
Items to be Accomplished
1. Determine if Thermal Oxidizer needs to be upgraded1. Determine if Thermal Oxidizer needs to be upgraded
2. Demolish Existing Control Room from center of Process 2. Demolish Existing Control Room from center of Process
3. Address Water Hammer Issues 3. Address Water Hammer Issues
4. Receive Project Authorization and Submit AFE by March 4. Receive Project Authorization and Submit AFE by March
![Page 3: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/3.jpg)
Actions Involved for Success
Automation
Thermal Oxidizer
Relocated
200 ton Chiller
Relocated
Engineering Support
Demolition of Existing Piping
500 ton Chiller500 ton ChillerCommunication
Cooperation
![Page 4: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/4.jpg)
Progress Diagram
Phase 1Phase 1 Phase 2Phase 2 Phase 3Phase 3
Engineering
Planning
Site Assessment
Scope
Discipline Support
Design
Pipe Racks Phases I - III
Thermal Oxidizer Unit
Platforms for Chillers
Concrete Work
New Chilled Water Pipe Runs
Construction
Pipe Racks
Platforms
Relocating Equipment
Demolishing Existing Structures and Piping
![Page 5: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/5.jpg)
Costs of Project
New 500 ton Chiller$153,000
New Thermal Oxidizer$375,000
Steel StructuresDesign/Construct
$250,000
Automation$550,000
Piping Installation$750,000
Concrete Work$50,000
![Page 6: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/6.jpg)
What is Used for this Project
Fiberglass Handrails
Fiberglass Grating
Fiberglass Ladder with Rolled Cage
UV Protected
Corrosion Resistant
![Page 7: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/7.jpg)
What is Used for this Project
16,500 Gallon Storage Vessel for the 500 ton Chiller
New Thermal Oxidizer with 10 GPM Capacity
![Page 8: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/8.jpg)
Phase I Pipe Rack
![Page 9: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/9.jpg)
Platform for 500 ton Chiller
![Page 10: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/10.jpg)
Timeline for Chiller Project
![Page 11: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/11.jpg)
Timeline for Chiller Project
![Page 12: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/12.jpg)
Timeline for Chiller Project
![Page 13: 500 Ton Chiller Project](https://reader036.vdocument.in/reader036/viewer/2022081801/54b727664a7959fe1e8b4625/html5/thumbnails/13.jpg)
Items to Make the Project a Success
Thermal Oxidizer: Why do we need to upgrade from 1 GPM to 10 GPM? Runoff water from rain and condensation are the sources the TO unit burns.
Condensation will end with the new insulated chilled water pipes.
Water hammering will cease due to new steam piping.
Communication between the new chillers and between the chillers and boilers.
Automating all valves. Temperature controllers installed.
Safety of operators increase.
New system linked to emergency connection to city water.