50t street aretcwed.reapplications.com/filecabinet/property/031733... · 2007. 3. 16. · subtotals...

4
Mark McCann Partner 780 917 8328 [email protected] Gary Killips Partner 780 917 8332 [email protected] Suite 2700, TD Tower 10088 102 Avenue Edmonton, AB T5J 2Z1 www.cwedm.com PHASE 1 - FULLY LEASED 50 STREET 167 AVENUE MANNING DRIVE MATT BERRY NBHD HOLLICK KENYON NBHD BRINTNELL NBHD CY BECKER NBHD Aerial - Sept. 2015 “PHASE 2” MCCONACHIE NBHD PROPERTY FEATURES • Phase I - 100% leased • Situated in a high growth area with a 20% population increase since 2009 • Retail draws in the immediate area include: Sobeys, Shoppers Drug Mart,  ATB, Royal Bank, Scotiabank, TD Bank, Western Cellars, along with numerous service related retailers • Easy access to Anthony Henday Drive and Manning Drive • Join Dairy Queen, Lube City, CIBC, The Vision Gallery, Manning Pizza, Brintnell Dental Clinic, Pretty Nails & Spa, First Line Nutrition, KFC, Nagoya Japanese Restaurant, and Edmonton Public Library • Immediate population exceeds 25,000 people (2014) • Future population at full build-out is estimated at 33,405 people • Est. Op Cost: $10.75/sq. ft. (2016) Retail Bays For Lease - From ±1,000 SF - “NOW LEASING PHASE 2” JOIN SAVE ON FOODS OPENING FALL 2016 “NOW UNDER CONSTRUCTION” 50th Street Market SEC of 50 Street & 167 Avenue, Edmonton, AB FOR LEASE Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question. Mar. 1, 2016

Upload: others

Post on 25-Jun-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 50t Street aretcwed.reapplications.com/filecabinet/Property/031733... · 2007. 3. 16. · Subtotals 15,365 18,284 33,405 Miller 3,122 3,217 4376 Ebbers Industrial 0 0% 2419 Casselman

Mark McCannPartner 780 917 8328 [email protected]

Gary KillipsPartner 780 917 8332 [email protected]

Suite 2700, TD Tower10088 102 AvenueEdmonton, AB T5J 2Z1 www.cwedm.com

P H A S E 1 - F U L LY L E A S E D

5 0 S T R E E T

167

AV

EN

UE

M A N N I N G D R I V E

MATT BERRY NBHD

HOLLICK KENYON NBHD

BRINTNELL NBHD

CY BECKER NBHD

Aerial - Sept. 2015

“PHASE 2”

MCCONACHIE NBHD

PROPERTY FEATURES• Phase I - 100% leased

• Situated in a high growth area with a 20% population increase since 2009

• Retail draws in the immediate area include: Sobeys, Shoppers Drug Mart,  ATB, Royal Bank, Scotiabank, TD Bank, Western Cellars, along with numerous service related retailers

• Easy access to Anthony Henday Drive and Manning Drive

• Join Dairy Queen, Lube City, CIBC, The Vision Gallery, Manning Pizza, Brintnell Dental Clinic, Pretty Nails & Spa, First Line Nutrition, KFC, Nagoya Japanese Restaurant, and Edmonton Public Library

• Immediate population exceeds 25,000 people (2014)

• Future population at full build-out is estimated at 33,405 people

• Est. Op Cost: $10.75/sq. ft. (2016)

Retail Bays For Lease - From ±1,000 SF - “NOW LEASING PHASE 2”

JOIN SAVE ON FOODS

OPENING FALL 2016

“NOW UNDER CONSTRUCTION”

50th Street MarketSEC of 50 Street & 167 Avenue, Edmonton, AB

FOR LEASE

Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.Mar. 1, 2016

Page 2: 50t Street aretcwed.reapplications.com/filecabinet/Property/031733... · 2007. 3. 16. · Subtotals 15,365 18,284 33,405 Miller 3,122 3,217 4376 Ebbers Industrial 0 0% 2419 Casselman

Mark McCannPartner 780 917 8328 [email protected]

Gary KillipsPartner 780 917 8332 [email protected]

Suite 2700, TD Tower10088 102 AvenueEdmonton, AB T5J 2Z1 www.cwedm.com

POPULATIONS

S I T E

2,743

4,2095,585 5,747

NEIGHBOURHOOD NAME

2012 Municipal Census 

Populations

2014 Municipal Census 

Populations

Projected / or Actual Build out populations per 

NASPBrintnell 5,177 5,747 5,534

Hollick Kenyon  5,211 5,585 6,180

Matt Berry 4,080 4,209 5,014

McConachie 897 2,743 12,028

Cy Becker 0 0% 4,924

Subtotals 15,365 18,284 33,405

Miller 3,122 3,217 4376

Ebbers Industrial 0 0% 2419CasselmanFormerly MacLeod East & West

2,3143,684

(6,266 +/‐) from previous NASP3,405

Subtotals 8,841 6,901 13,061

TOTALS 24,206 (2012) 25,185 (2014) 46,466

As of January 20‐15

2014 Population

Population increaseof 30% since 2012

TRAFFIC COUNT

Location Traffic Count

Manning Drive 27,100 VPD (2013)

167 Avenue 8,100 VPD (2013)

50 Street 13,100 VPD (2013)

AERIAL LOCATOR

Aerial - Sept. 2015

P H A S E 2

167

AVEN

UE

5 0 S T R E E T

MATT BERRY NBHD

HOLLICK KENYON NBHD

MCCONACHIE NBHD

BRINTNELL NBHD

50th Street MarketSEC of 50 Street & 167 Avenue, Edmonton, AB

FOR LEASE

Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.Mar. 1, 2016

Page 3: 50t Street aretcwed.reapplications.com/filecabinet/Property/031733... · 2007. 3. 16. · Subtotals 15,365 18,284 33,405 Miller 3,122 3,217 4376 Ebbers Industrial 0 0% 2419 Casselman

Mark McCannPartner 780 917 8328 [email protected]

Gary KillipsPartner 780 917 8332 [email protected]

Suite 2700, TD Tower10088 102 AvenueEdmonton, AB T5J 2Z1 www.cwedm.com

50TH STREET MARKETSEC OF 50 STREET & 167 AVENUEEDMONTON, ABRETAIL SPACE FOR LEASEFROM 1,000 SQ. FT.

CRU BUILDING #6

CRU BUILDING #7

CRU BUILDING #5

UNIT 1NAGOYA

JAPANESERESTAURANT

UNIT 21,082 SF

UNIT 31,090 SF

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

A CB

01b

10

T.O. SPANDREL 102'-3" 0.69 m

0602a 03a03b

01a1110

06

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

01b

02b06

07a

09b

01b

02a 02b09a

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

T.O.STOREFRONT 109'-0" 2.74 m

1 6

T.O. SPANDREL 102'-3" 0.69 m

03a0506 02a

U/S ROOF DECK 114'-10" 4.52 m

2 4

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

1010 01b01a11

02a02b02b 060403b

07b 07a

5

09a

3

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

16

T.O. CANOPY 113'-0" 13.00 m

01b11 1001a

24

T.O. STONECLADDING 107'-2" 2.18 m

06 01b01b

01b01b01b 01a01a 1111

0808 09b 09b09a02a 02b

07b

3'-9" 29'-3" 4'-0" 31'-0" 4'-0" 19'-3" 3'-9" 3"3"

29'-3" 11'-8" 19'-4" EQ EQ

5 3

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

AC B

03a

T.O. CANOPY 113'-0" 13.00 m

02a 01b 06

01b 02 10 01a

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

06 02b 02a 02b

10 07a 07b01a 01b

15

07b

03a 03b

1 6

A

C

B

2 4

3,021 SF

280.7 m²

UNIT 3

BUILDING AREA

UNIT 1UNIT 2UNIT 3MECH.ELEC.

60

'-0"

30'-0

"30

'-0"

25'-0" 18'-6" 16'-6" 17'-6" 17'-6"

95'-0"

7,620 mm 5,639 mm 5,029 mm 5,334 mm 5,334 mm

28,956 mm

18,2

88 m

m

9,14

4 m

m9

,144

mm

GENERAL COMMERCIALSPECIALTY COFFEE

1,514 SF

140.7 m²

UNIT 1

5

GENERAL COMMERCIAL

1,012 SF

94.0 m²

UNIT 2

3

92 SF

8.5 m²

MECH.92 SF

8.5 m²

ELEC.

8'-0

"

10'-0" 7 1/4" 10'-0"301U

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

AC B

T.O. CANOPY 113'-0" 13.00 m

U/S ROOF DECK 114'-10" 4.52 m

T.O. HI PARAPET 118'-9" 5.72 m

FLOOR CONSTRUCTIONCONCRETE FLOOR SLABVAPOUR BARRIER2" RIGID INSULATION AT PERIMETERCOMPACTED GRAVEL

ROOF CONSTRUCTIONGRAVEL BALLASTLOOSE LAID EPDM MEMBRANEMIN. R20 ISO RIGID INSULATION (MIN. 2 LAYERS)METAL DECK (SLOPED TO DRAIN)

OWSJ SLOPED TO DRAIN

SIDEWALK

SIDEWALK

LANDSCAPING

SLOPE DOWNSLOPE DOWN

SCALE:

DRAWN BY:

CHECKED:

PROJECT No:

SHEET No.

VANCOUVER, BCEDMONTON, ABTORONTO, ON

604.669.4041780.424.4041416.340.8441

NOTES

PLOT

TED:

FILE

PAT

H:

SHANGHAI, CN 86.21.3313.0665

4/2/

2015

11:

20:3

4 AM

1/8" = 1'-0"

16520 - 50 STREET NW, EDMONTON, AB, T5Y 0L2

C:\U

sers

\Jen

nife

rC\D

ocum

ents\

1992

RVT

2012

Edm

onto

n Pi

lot S

ound

CRU

6-R3

_Jen

nife

rC.rv

t

6-DP2.1ND

HL

PILOT SOUND SHOPPINGCENTRE - CRU BUILDING #6

CRU 6 - FLOOR PLAN -ELEVATIONS - SECTION -PERSPECTIVES

1992CONSTRUCTIONNORTH

SCALE: 1/8" = 1'-0"

EAST ELEVATIONSCALE: 1/8" = 1'-0"

SOUTH ELEVATION

SCALE: 1/8" = 1'-0"

NORTH ELEVATIONSCALE: 1/8" = 1'-0"

WEST ELEVATION

SCALE: 1/8" = 1'-0"

FLOOR PLAN

1,514 SF 140.7 m²1,012 SF 94.0 m²3,021 SF 280.7 m²

92 SF 8.5 m²92 SF 8.5 m²

5,731 SF 532.4 m²

EXTERIOR FINISH LEGEND:01a EXTERIOR INSULATION FINISHING SYSTEM

AS SPEC. - COLOR: PPG 314-5 "JUTE"

02a MANUFACTURED STONE MASONRYFINISH, COLOR: COLORADO BUFF

03b BLACK ANODIZED ALUM. STOREFRONTC/W BLACK ANODIZED ALUM. INSULATEDSPANDREL PANELS

04 BLACK ANODIZED ALUM. STOREFRONTDOOR C/W CLEAR DBL. GLAZED SEALEDUNITS, LAMINATED GLAZING AS SPEC.

05 CONCRETE UPSTAND, SANDBLASTED

06 LIGHT FIXTURE, SEE ELECTRICAL.

07a ARCHITECTURAL STEEL FRAME, SW 6991"BLACK MAGIC"

08 PAINTED METAL DOOR, COLOR TOMATCH PPG 314-5 "JUTE"

09a VERTICAL REVEAL/JOINT

10 PREFABRICATED CORNICE C/WPREFINISHED METAL FLASHING, COLOR:BLACK

11 SIGNAGE, BY TENANT

12 HEIGHT RESTRICTOR C/W CONCRETEBASE

01b EXTERIOR INSULATION FINISHING SYSTEMAS SPEC. - COLOR: PPG 515-6 "PATCHES"

13 PREFINISHED METAL FLASHING, COLOR:BLACK

09b HORIZONTAL REVEAL/JOINT

14 BOLLARD - "SAFETY YELLOW"

FRONT BUILDING PERSPECTIVE

REAR BUILDING PERSPECTIVE

03a BLACK ANODIZED ALUM. STOREFRONTC/W CLEAR DBL. GLAZED SEALED UNITS

02b MANUFACTURED STONE MASONRY CAP

07b STEEL FRAME C/W VINYL FABRICCANOPY. (CANOPY SUPPORT GIRTSFIXED THROUGH SUITABLE EXT.GRADEPLYWOOD WITHIN WALL CAVITY -SHADED GREY ON ELEVATION); REFER TOSECTION DETAIL. CANOPY COLOUR TOMATCH DQ RED.

15 BLACK ANODIZED ALUM. "DRIVE-THRU"WINDOW C/W CLEAR DBL. GLAZEDSEALED UNITS

TOTAL BUILDING AREA:

REVISIONS / ISSUES DATEISSUED FOR DEVELOPMENT PERMIT MAY xx, 2013

16 HOSE BIBB

17 F.D. SIAMESE CONNECTION

18 THRU WALL FLASHING AT HORIZ. REVEAL

SCALE: 1/8" = 1'-0"

BUILDING SECTION

NAT

ION

AL

CO

FFEE

(PEN

DIN

G)

UNIT 21,012 SF

UNIT 33,021 SF

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

A CB

01b

10

T.O. SPANDREL 102'-3" 0.69 m

0602a 03a03b

01a1110

06

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

01b

02b06

07a

09b 02a 02b

01b01b

01b

01a

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

T.O.STOREFRONT 109'-0" 2.74 m

1 7

T.O. SPANDREL 102'-3" 0.69 m

03a0506 02a

U/S ROOF DECK 114'-10" 4.52 m

4 6

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

101010 01b 01b 01b01a 01a11 11 1111

02a02b 02a 02a02b02b 06

07a

04 0403a 03a03b 03b

11

5

0602b 0403a 03b

07a

0403a 03b06 03b

11 11

2 3

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

17

10

T.O. CANOPY 113'-0" 3.96 m

01b 0806

01b11

02a

1001a

46

T.O. STONECLADDING 107'-2" 2.18 m

02b 060606 01b 01b01b01b

01b01b01b 01a01a 11

080808 0808 09b09b09b 09a 09a02a 02b

07b

5

11 01a

23

DRIVE-THRU WINDOW,SEE SPEC.

WALL AT ANGLE TO VIEWFRONT PARAPET BEYOND

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

AC B

T.O. CANOPY 113'-0" 3.96 m

02a 06

01b 1010 01a 11

T.O. STONECLADDING 107'-2" 2.18 m

T.O. HI PARAPET 118'-9" 5.72 m

06 02b 02a 02b

10 07a01a 01b07b

03a 03b 0606 01b09b

01b

WALL AT ANGLE TO VIEW

1 7

A

C

B

4 6

989 SF

91.9 m²

UNIT 4

93 SF

8.6 m²

MECH.93 SF

8.7 m²

ELEC.

BUILDING AREA

UNIT 1UNIT 2UNIT 3UNIT 4UNIT 5UNIT 6MECH.ELEC.

60

'-0"

30

'-0"

30

'-0"

33'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0"

123'-0"

10,058 mm 5,486 mm 5,486 mm 5,486 mm 5,486 mm 5,486 mm

37,490 mm

18,2

88

mm

9,14

4 m

m9

,144 m

m

GENERAL COMMERCIALRESTAURANT

10'-0"

8'-0

"

3,048 mm

2,4

38

mm

1,811 SF

168.2 m²

UNIT 1

GENERAL COMMERCIAL

989 SF

91.9 m²

UNIT 3

GENERAL COMMERCIAL

5

3,048 mm10'-0"

2 3

GENERAL COMMERCIAL GENERAL COMMERCIAL

3'-9"

1,082 SF

100.5 m²

UNIT 21,082 SF

100.5 m²

UNIT 51,087 SF

101.0 m²

UNIT 6

FINISH FLOOR 100'-0" 0.00 m

T.O. PARAPET 116'-8" 5.08 m

AC B

T.O. CANOPY 113'-0" 3.96 m

U/S ROOF DECK 114'-10" 4.52 m

T.O. HI PARAPET 118'-9" 5.72 m

FLOOR CONSTRUCTIONCONCRETE FLOOR SLABVAPOUR BARRIER2" RIGID INSULATION AT PERIMETERCOMPACTED GRAVEL

ROOF CONSTRUCTIONGRAVEL BALLASTLOOSE LAID EPDM MEMBRANEMIN. R20 ISO RIGID INSULATION (MIN. 2 LAYERS)METAL DECK (SLOPED TO DRAIN)

OWSJ SLOPED TO DRAIN

SIDEWALK

SLOPE DOWNSLOPE DOWN

SIDEWALKLANDSCAPING

SCALE:

DRAWN BY:

CHECKED:

PROJECT No:

SHEET No.

VANCOUVER, BCEDMONTON, ABTORONTO, ON

604.669.4041780.424.4041416.340.8441

NOTES

PLO

TTED

:FI

LE P

ATH

:07

/07/

2015

11:

02:0

7 AM

1/8" = 1'-0"

D:\

Proj

ects

\199

2 Pi

lot S

ound

CRU

7-A

RCH

-(20

15)_

R3 K

FC_

norm

andy

ck36

54.r

vt

7-DP2.1ND

HL

PILOT SOUND SHOPPINGCENTRE - CRU BUILDING #7

16520 - 50 STREET NW, EDMONTON, AB, T5Y 0L2

CRU 7 - FLOOR PLAN -ELEVATIONS - SECTION -PERSPECTIVES

1992CONSTRUCTIONNORTH

SCALE: 1/8" = 1'-0"

EAST ELEVATIONSCALE: 1/8" = 1'-0"

SOUTH ELEVATION

SCALE: 1/8" = 1'-0"

NORTH ELEVATIONSCALE: 1/8" = 1'-0"

WEST ELEVATION

SCALE: 1/8" = 1'-0"

FLOOR PLAN

1,811 SF 168.2 m²1,082 SF 100.5 m²

989 SF 91.9 m²989 SF 91.9 m²

1,082 SF 100.5 m²1,087 SF 101.0 m²

93 SF 8.6 m²93 SF 8.7 m²

7,226 SF 671.3 m²

EXTERIOR FINISH LEGEND:01a EXTERIOR INSULATION FINISHING SYSTEM

AS SPEC. - COLOR: PPG 314-5 "JUTE"

02a MANUFACTURED STONE MASONRYFINISH, COLOR: COLORADO BUFF

03b BLACK ANODIZED ALUM. STOREFRONTC/W BLACK ANODIZED ALUM. INSULATEDSPANDREL PANELS

04 BLACK ANODIZED ALUM. STOREFRONTDOOR C/W CLEAR DBL. GLAZED SEALEDUNITS, LAMINATED GLAZING AS SPEC.

05 CONCRETE UPSTAND, SANDBLASTED

06 LIGHT FIXTURE, SEE ELECTRICAL.

07a ARCHITECTURAL STEEL FRAME, SW 6991"BLACK MAGIC"

08 PAINTED METAL DOOR, COLOR TOMATCH PPG 314-5 "JUTE"

09a VERTICAL REVEAL/JOINT

10 PREFABRICATED CORNICE C/WPREFINISHED METAL FLASHING, COLOR:BLACK

11 SIGNAGE, BY TENANT

12 HEIGHT RESTRICTOR C/W CONCRETEBASE

01b EXTERIOR INSULATION FINISHING SYSTEMAS SPEC. - COLOR: PPG 515-6 "PATCHES"

13 PREFINISHED METAL FLASHING, COLOR:BLACK

09b HORIZONTAL REVEAL/JOINT

14 BOLLARD - "SAFETY YELLOW"

FRONT BUILDING PERSPECTIVE

REAR BUILDING PERSPECTIVE

03a BLACK ANODIZED ALUM. STOREFRONTC/W CLEAR DBL. GLAZED SEALED UNITS

02b MANUFACTURED STONE MASONRY CAP

07b STEEL FRAME C/W VINYL FABRICCANOPY. (CANOPY SUPPORT GIRTSFIXED THROUGH SUITABLE EXT.GRADEPLYWOOD WITHIN WALL CAVITY -SHADED GREY ON ELEVATION); REFER TOSECTION DETAIL. CANOPY COLOUR TOMATCH DQ RED.

15 BLACK ANODIZED ALUM. "DRIVE-THRU"WINDOW C/W CLEAR DBL. GLAZEDSEALED UNITS

TOTAL BUILDING AREA:

16 HOSE BIBB

17 F.D. SIAMESE CONNECTION

18 THRU WALL FLASHING AT HORIZ. REVEAL

SCALE: 1/8" = 1'-0"

DP-BUILDING SECTION

REVISIONS / ISSUES DATEISSUED FOR DEVELOPMENT PERMIT JULY 8, 2015

UNIT 11,800 SF. UNIT 2

1,085 SFUNIT 3992 SF

UNIT 4991 SF

UNIT 51,085 SF

UNIT 61,090 SF

CONSTRUCTION PHOTOS

Save On Foods (Opening Fall 2016)

CRU 5 CRU 6 CRU 7

50th Street MarketSEC of 50 Street & 167 Avenue, Edmonton, AB

FOR LEASE

Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.Mar. 1, 2016

Page 4: 50t Street aretcwed.reapplications.com/filecabinet/Property/031733... · 2007. 3. 16. · Subtotals 15,365 18,284 33,405 Miller 3,122 3,217 4376 Ebbers Industrial 0 0% 2419 Casselman

Mark McCannPartner 780 917 8328 [email protected]

Gary KillipsPartner 780 917 8332 [email protected]

Suite 2700, TD Tower10088 102 AvenueEdmonton, AB T5J 2Z1 www.cwedm.com

SITE PLAN

PRETTY NAILS & SPA

FIRST LINE NUTRITION

CRU 3CRU 6

BAYS FROM ±1,000 SF

AVAILABLEFALL 2016

BAYS FROM ±1,000 SF

AVAILABLEFALL 2016

CRU 1

CRU 7

BRINTNELLDENTAL CLINIC

CRU 5

Opening Fall 2016“Now Under

Construction”

NATIONAL COFFEE(PENDING)

BAYS FROM±1,000 SF

AVAILABLEFALL 2016

NAGOYAJAPANESE

RESTAURANT

PHASE 2NOW LEAS ING

Site Plan Oct. 13, 2015

PHASE 1 100% LEASED

- AVAILABLE

50th Street MarketSEC of 50 Street & 167 Avenue, Edmonton, AB

FOR LEASE

Cushman & Wakefield Copyright 2015. No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question.Mar. 1, 2016