    GETCO / E / 4S-125/ PP - 015 1A / R0 Dt.09.06.2011

    Page 1 of 4

    Control & Relay Protection Philosophy for 400KV CHARANKA Sub Station

    A) Bus Bar Configuration 400kV System : Three Bus (Two Main and One Transfer Bus) 220kV System : Three Bus (Two Main and One Transfer Bus) 66kV System : Two Bus (Two Main Bus)

    Isolator system400kV System : Four isolator configuration (Three Bus isolators and a Line isolator)220kV System : Four isolator configuration (Three Bus isolators and a Line isolator)66kV System : Three isolator configuration (Two Bus isolators and a Line isolator)

    B) Control Voltage

    220V DC

    C) Control & Relay panels

    Control & protection Panels to be mounted in Yard Kiosk

    D) PLCC panels / Communication Panels

    Communication with opposite 220 & 400 KV sub station will be through OPGW. Hencethere is no any PLCC panels

    FOTE (Fibre Optic Terminal Equipment) Panels to be mounted in Control Room Protection Coupler BCU panel to be mounted in Control Room for interface between

    Control & protection Panels and Protection Couplers, through GOOSE commands

    E) Nos. of Bays & Bus Bar Protection

    400 KV System

    Feeder Bay 2 Nos. ICT Bay 2 Nos.

    Bus coupler Bay - 1 No. Transfer Bus Coupler Bay - 1 No. Bus Reactor Bay - 1 No. Bays to be connected to Bus Bar Protection in first phase - 7 Nos. Future bays - 0 Total bays in the Sub Station will be - 7 Nos. Bus Bar Protection

    o Control Unit - 24 Bayso Bay Units - 7 Nos. + 1 No. Spare

    220 KV System

    Feeder Bay 2 Nos. ICT Bay 2 Nos. Transformer Bay - 8 Nos. Bus coupler Bay - 1 No. Transfer Bus Coupler Bay - 1 No. Bays to be connected to Bus Bar Protection in first phase - 14 Nos. Future bays - 0 Total bays in the Sub Station will be - 14 Nos. Bus Bar Protection

    o Control Unit - 24 Bayso Bay Units - 14 Nos. + 1 No. Spare

  • 7/28/2019 51 Charanka Protection Philosophy

    2/4

    GETCO / E / 4S-125/ PP - 015 1A / R0 Dt.09.06.2011

    Page 2 of 4

    66 KV System

    Feeder Bay 35 Nos. Transformer Bays 8 No. Bus Coupler Bays 3 Nos. Bus Sectionalizer Bays 4 nos.

    Bays to be connected in first phase - 50 Future bays - 0 Total bays in the Sub Station will be - 50

    Control Philosophy CHARANKA Sub Station

    System Controlling Device to be Adopted Type of Controlling Device

    400 KV Bay Bay Control Unit BCU with IEC 61850 Protocol

    220 KV Bay Bay Control Unit BCU with IEC 61850 Protocol

    66 KV Bay Bay Control & Protection Unit BCPU with IEC 61850 Protocol

    PROTECTION PHILOSOPHY CHARANKA Sub Station

    A) Transmission Lines Protection

    Line Protection Adopted Type of Relay

    1 Two Distance Protection[shall be of two different make (i.e.

    from different manufacturers) or ofsame make with two differentplatforms with same specifications]-Main-I Protection &-Main II Protection

    Numerical Relays with IEC61850 Protocol

    2 Two Stage Over Voltage Protection- Stage I- Stage II

    - Static Relay- Integrated in Main I &

    Main II Protection

    400 KV Lines

    3 Local Breaker Backup (LBB) Protn. Integrated in Main I Protectionand Bus Bar protection

    1 Two Distance Protection

    [shall be of two different make (i.e.from different manufacturers) or ofsame make with two differentplatforms with same specifications]-Main-I Protection &-Main II Protection

    Numerical Relays with IEC

    61850 Protocol

    2 Two Stage Over Voltage Protection- Stage I- Stage II

    Integrated in Main I & Main IIProtection.

    220 KV Lines

    3 Local Breaker Backup (LBB)Protection.

    Integrated in Main I Protectionand Bus Bar protection

  • 7/28/2019 51 Charanka Protection Philosophy

    3/4

    GETCO / E / 4S-125/ PP - 015 1A / R0 Dt.09.06.2011

    Page 3 of 4

    1 Directional O/C & E/F Protection Integrated in Bay Control &Protection Unit (BCPU) with IEC61850 Protocol

    66 KV Lines

    2 Local Breaker Backup (LBB)Protection.

    Integrated in BCPU

    B) Power Transformer Protection

    Equipment Protection Adopted Type of Relay1 Differential Protection Numerical Relay with IEC61850 Protocol

    2 Restricted Earth Fault Protection Numerical Relays with IEC61850 Protocol

    3 Directional O/C & E/F Protection(on HV & LV side)

    Numerical Relays with IEC61850 Protocol

    4 Over Fluxing Protection- 400KV side

    - 220KV side

    -Integrated in DifferentialProtection

    - Separate static relay

    5 Local Breaker Backup (LBB) Protn.- 400 KV side

    - 220 KV side

    -Integrated in DifferentialProtection and Bus Barprotection

    -Integrated in Dir. O/C & E/FProtection & Busbar protection

    6 Buchholz Relay Integrated in Transformer,

    7 Pressure Relief Device Integrated in Transformer

    8 Oil & Wdg Temp. Alarm & Tripping Integrated in Transformer

    9 OLTC Oil Surge Relay Integrated in Transformer

    400/220 KV Transformer

    10 Oil Level Low Alarm Integrated in Transformer

    1 Reactor Differential Protection Numerical Relay with IEC61850 Protocol

    2 Restricted Earth Fault Protection Numerical Relays with IEC61850 Protocol

    3 Backup impedance protection Numerical Relays with IEC61850 Protocol

    4 Buchholz Relay Integrated in Reactor

    5 Pressure Relief Device Integrated in Reactor

    6 Oil & Wdg Temp. Alarm & Tripping Integrated in Reactor

    400 KV Bus reactor

    7 Oil Level Low Alarm Integrated in Reactor

    1 Differential Protection Numerical Relay with IEC

    61850 Protocol2 Restricted Earth Fault Protection

    (on HV & LV side)Numerical Relays with IEC61850 Protocol

    3 Directional O/C & E/F Protection(HV side)

    Numerical Relays with IEC61850 Protocol

    4 Directional O/C & E/F Protection (LVside)

    Integrated in Bay Control &Protection Unit (BCPU) with IEC61850 Protocol

    220/66KV Transformer

    5 Over Fluxing Protection Integrated in DifferentialProtection

  • 7/28/2019 51 Charanka Protection Philosophy

    4/4

    GETCO / E / 4S-125/ PP - 015 1A / R0 Dt.09.06.2011

    Page 4 of 4

    6 Local Breaker Backup (LBB) Protn.- 220 KV side

    - 66 KV side

    -Integrated in DifferentialProtection and Bus Barprotection

    - Integrated in BCPU

    7 Buchholz Relay Integrated in Transformer

    8 Pressure Relief Device Integrated in Transformer

    9 Oil & Wdg Temp. Alarm & Tripping Integrated in Transformer

    10 OLTC Oil Surge Relay Integrated in Transformer

    11 Oil Level Low Alarm Integrated in Transformer

    C) Bus Coupler Protection

    400 KVBus coupler

    1 Non Directional O/C & E/FProtection

    Numerical Relay with IEC61850 Protocol

    2 Local Breaker Backup (LBB) Protn. Integrated in Non Dir. O/C &E/F Protection and Bus Barprotection.

    1 Non Directional O/C & E/F

    Protection

    Numerical Relay with IEC

    61850 Protocol

    220 KV

    Bus coupler2 Local Breaker Backup (LBB) Protn. Integrated in Non Dir. O/C &

    E/F Protection and Bus Barprotection.

    1 Non Directional O/C & E/FProtection

    Integrated in Bay Control &Protection Unit (BCPU) withIEC 61850 Protocol

    66KV Bus Coupler

    2 Local Breaker Backup (LBB) Protn. Integrated in BCPU

    1 Non Directional O/C & E/FProtection

    Integrated in Bay Control &Protection Unit (BCPU) withIEC 61850 Protocol

    66KV Bus Sectionalizer

    2 Local Breaker Backup (LBB) Protn. Integrated in BCPU

    D) Bus Bar Protection

    400 KV Bus bar 1 Bus Differential Protection(Single scheme)7 Bays, Extendable upto 24 Bays(i. e. Control Unit - 24 Bays)

    Numerical Relay with IEC61850 Protocol

    220 KV Bus bar 1 Bus Differential Protection(Single scheme)14 Bays, Extendable upto 24 Bays(i. e. Control Unit - 24 Bays)

    Numerical Relay with IEC61850 Protocol

    E) Disturbance Recorder & Event Loggers

    Integrated feature of protective relays is used to provide the information about the Disturbance andto log the events.

    F) GPS based Time Synchronizing Equipment

    The Sub station is to be provided with Global Positioning System based Time SynchronizingEquipment to synchronize all the protections.