5.2.6 chapter 3 - concrete works

16
8/12/2019 5.2.6 CHAPTER 3 - Concrete Works http://slidepdf.com/reader/full/526-chapter-3-concrete-works 1/16 TAKING OFF QUANTITIES FOR BUILDING & CIVIL ENGINEERING WORKS

Upload: chahtul

Post on 03-Jun-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 1/16

TAKING OFF QUANTITIES FOR BUILDING &CIVIL ENGINEERING WORKS

Page 2: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 2/16

Concrete is the most important material inconstruction because its cost is very cheapand easily obtained compare to othermaterials.

The following tables show the appropriateunit of measurement for those items includedin the above section of work.

Reference should be made to the Standard

Method of measurement ( Clauses 5278) formore detailed information on the preparationof bill of quantities.

Page 3: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 3/16

Page 4: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 4/16

Page 5: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 5/16

Page 6: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 6/16

The items for concrete include supply,placing in forms or Shuttering vibrating and

curing.

Shuttering is measured by the area ofconcrete, which requires support duringsetting.

The items for shuttering include supply anderection, including all necessary struts andbearer, treatment before concreting and

removal when the concrete has set.

Page 7: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 7/16

Page 8: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 8/16

Page 9: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 9/16

Page 10: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 10/16

Page 11: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 11/16

  Example 4.1 Mass Concrete Of Retaining Wall 

Prepare taking off sheet and bill of quantitiesfor mass concrete retaining wall with 30 m

length as shown in Figure 4.1(All measurement in mm)

Page 12: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 12/16

1.8 m 

Figure 4.1 : Plan View And Cross Section OfRetaining Wall 

1.8m

1.8 m

Grade 7

Grade 15

Page 13: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 13/16

The dimension sheet shall include

(i) Concrete work :◦ Mass concrete for foundation and mass concrete

for wall.

◦ Placing of concrete for foundation and placing ofconcrete for wall. Concrete for wall thickness  

500mm shall be separate from concrete for wallthickness > 500mm.

(ii) Ancillaries work which comprise of :◦ Formwork for fair finishes and formwork for

rough finishes.◦ Inserts such as land drain and ashes in

continuous pocket.

Page 14: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 14/16

  Example 4.2 slab 

Prepare taking off sheet and bill of for the

slab shown in Figure 4.2 with the thickness ofslab 300 mm. The dimension sheet shallinclude concrete work (mass concrete forslab) and reinforcement (bottom only).

Figure 4.2 : Plan View Of Slab

Page 15: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 15/16

  Example 4.3 Beam

The following example illustrates the method

of preparing a taking off sheet and BQ for thereinforcement of the r.c beam (6 units) asshown in Figure 4.3

Figure 4.3 :Cross Section of Beam

GROUND BEAM

For column & beam

Page 16: 5.2.6 CHAPTER 3 - Concrete Works

8/12/2019 5.2.6 CHAPTER 3 - Concrete Works

http://slidepdf.com/reader/full/526-chapter-3-concrete-works 16/16