Application ofTQM
for SMEs
![Page 2: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/2.jpg)
Where are we?
Are we a traditional Manufacturing company
• Process layouts?
• High Inventory – Inventory considered as Asset?
• Very high setup time?
• Low variety, high volume?
• Big EBQ batch sizes?
• Long Lead time?
• Inward focus not customer focus?
• High manufacturing cost?
• Low Profit margins?
![Page 3: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/3.jpg)
What do we need to do immediately
Make it:
• Better
• Cheaper
– In Manufacturing
– New Product Introduction
– Information flow
![Page 4: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/4.jpg)
Efficient Manufacturing System
How?
þ Balanced use of people, equipment and material that gives us the lowest manufacturing cost
þ Lowest manufacturing cost assumes all waste is eliminated
![Page 5: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/5.jpg)
The Fundamentals
þ Workers, Supervisors, and managers work together to create continuous flow
• Engaging the work force
• Eliminating waste
• Reducing resources
• Reducing fluctuations
• Improving safety and ergonomics
• Striving for perfection
þ • Management owns the process
þ • Employees are responsible for continuous improvement
![Page 6: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/6.jpg)
Concept of 3 M
![Page 7: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/7.jpg)
MURI – STRAIN
MURA – INCONSISTENCY / IMBALANCE
MUDA – WASTE
3 MU’s
![Page 8: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/8.jpg)
Reduce Cost
Material Cost
EnergyCost
Processing Cost
Others
Cost Price
Processing
Conveyance
Inspection
Stagnation
Useful Job from customer point of view
MUDA
Worthless Job does not increase value to the process
Decided by manufacturing method
Actual movement for Reducing Cost
Remove MUDA
![Page 9: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/9.jpg)
l MUDA of Overproduction
l MUDA of Stock
l MUDA of Conveyance (Transport)
l MUDA of Waiting
l MUDA of Operation Itself
l MUDA of Movement of Worker
l MUDA of Production of Inferior goods
Types of MUDA
MUDA Monster
Profit
![Page 10: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/10.jpg)
Over Production is the Worst MUDAl Increase Raw Material Purchasing
( MUDA of Stock)
l Increase Workers
l Add Machines
Loose Money
Neces-ary
Q’ TY
Over Production
Meaningless Increase of Efficiency10 Workers : 100 Products
10 workers : 120 Products
Necessary Q TY : 100
Over Production
Store House Conveying Equipment Bin
Additional ware House
LooseMoney l Conveyance
l Interest Rate
Moving Material which is not Required
![Page 11: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/11.jpg)
MUDA of Transportation (Case 1)
This worker is changing parts to new pallet.Loading
Transfer
![Page 12: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/12.jpg)
MUDA of Waiting
While Fill water in A C
Do other job
Bad case Waiting until a can is filled
![Page 13: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/13.jpg)
MUDA of Movement
Worker go to take a tool repeatedly:- To the rack every time
Shortage of a Tool
bit/SocketSmall bag
For small part and tool bits
![Page 14: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/14.jpg)
Visual Control
Find out Futility
Do Not Light
To be Carefull with work
Warning Lamp
To Rewrite again and again Standard work sheet
Kanban
Crazy Production
Futility
To Decrease Number of Kanban
1 2 3 4
![Page 15: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/15.jpg)
Why to Uncover MUDA
Contro
l by sig
htObey standard work
B C D EA
It is possible for supervisor to observe many process
Due to hung standard working sheet
understand
l Cycle Time
l Job Order
l Standard Number
Standard Work
WarningLamp
Kanban
![Page 16: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/16.jpg)
Concept of 5S
![Page 17: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/17.jpg)
ELEMENTS OF 5S
Comprises of 5 Simple Steps
•Seiri - sorting out, no unnecessary items
•Seiton - systematic arrangement, prefixed location for prefixed quantity before & after use
•Seiso - spic and span, easy to clean
•Seiketsu - standardization
•Shitsuke - self discipline
![Page 18: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/18.jpg)
BEFORE SEIRI PH 2BEFORE SEIRI
AFTER SEIRI PH 1AFTER SEIRI
Mahindra &Mahindra Ltd.
Automotive Sector
Mumbai Machine No. 1774
Transmission P.S
![Page 19: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/19.jpg)
Mahindra & Mahindra Ltd. – Automotive Sector, Mumbai Machine No. – 1662 ( Axle P.U.)
1. NO DIRT2. CHIPS DIRECTED3. VISIBLE OPEN
1. DIRT 2. CHIP3. GUARDS4. NO VISIBILITY
BEFORE 1-S AFTER 1-S
![Page 20: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/20.jpg)
Mahindra & Mahindra Ltd. – Automotive Sector , Mumbai Machine No. – 1726 (Engine P.U.)
AFTERBEFORE
Before Machine No. 1726 PH 2 Before Machine No. 1726 PH 1
![Page 21: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/21.jpg)
A rational, orderly and methodical
arrangement of all items weuse, re-work or write off.
STEP II
SYSTEMATIC ARRANGEMENT
![Page 22: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/22.jpg)
MARKING OF AISLES
PAINTING OF FLOOR INTHE SHOP
![Page 23: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/23.jpg)
BEFORE 5S
![Page 24: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/24.jpg)
SHADOW BOARDS FOR GAUGES
![Page 25: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/25.jpg)
LOCATION FOR FORKLIFT MAINTENANCE
SHADOW BOARD FOR TOOL FORKLIFT TYRE STORAGE
HAND TRUCK MAINTENANCE AREA\
![Page 26: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/26.jpg)
2S
• Worktable was too wide.• Parts stand was too far away.• Parts were laid out
horizontally, makingthem hard to see and reach.
• Worktable was made smaller(two-thirds width reduction).
• Parts were put within closer reach.• Parts were laid out on a slant,
making them easier to see and reach.
Before Improvement After Improvement
Worktable(two-thirds width reduction)
Worktable
Partsstand
Parts
Workpiece
Workpiece
Parts
Parts stand (slanted)
![Page 27: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/27.jpg)
SET IN ORDER
Operator returns tool without having to step back or look
Tools Kept Close at Hand and Stored in the Order Used
![Page 28: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/28.jpg)
SET IN ORDER
• Plastic sheets were kept onthe rack behind the operator.
• The operator was forced toturn around each time heneeded a plastic sheet.
• The turning motion requiredfour seconds.
• Now plastic sheets are hungon a hook in front of operator.
• The operator does not have to turn around.
• Four seconds of motion waste are eliminated.
Before Improvement After Improvement
Plastic sheetsfor packaging
Workpiece
Conveyor Conveyor
![Page 29: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/29.jpg)
![Page 30: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/30.jpg)
2S
Standard-ization of
wherethings are
kept
Machinerystandardization
Operationstandardization
Set in Order
CommunicationStandardization
Inventorystandardization
Clerical processstandardization
Drawingstandardization
1. Set in Order Is the Core of Standardization
![Page 31: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/31.jpg)
Mahindra & Mahindra Ltd. – Automotive Sector , Mumbai Machine No. – 1662 ( Axle P.U.)
1. Proper – single touch pick uparrangement
2. Not to search
1. No Place for Gauges, Toolings 2. To Search.
BEFORE 2 – S AFTER 2 - S
![Page 32: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/32.jpg)
AFTER
Cleaning
Deburring
Grinder# 2
Grinder# 1
Loader
Heattreatment
Roller
OUTIN
SET IN ORDER
1
2
3 45
6
![Page 33: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/33.jpg)
Understanding how to prevent things from getting dirty
and ensuring tip top condition
(Done with the objective of inspecting for problems and taking faster
corrective actions)
SPIC & SPAN
![Page 34: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/34.jpg)
What? • Is wrong
• Is causing the problem
When? • Does it happen
Where? • Is the problem (Location)
Who? • Does it
• Is responsible for it
Why? • Does it happen
• Does he do it this way and
How? • Else could it be done
• Do we improve the situation
5W + 1H
![Page 35: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/35.jpg)
SPIC & SPAN
•• One is Best– One page memo– One day Processing– One location Files– One copy Filing
• Reduce no of Tools– Reduce no. of bolt sizes– Use of winged nuts– Consolidate kinds of oil– Combine various tools into one– Any others...
If there’s Lesser No. of Items there is Lesser to Clean
![Page 36: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/36.jpg)
Standardization is the result that exists when the first three pillars – sort, Set-in-order and
Shine are properly maintained
– The Place degenerates very quickly if we do not standardize
STEP IVSTANDARDIZATION
![Page 37: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/37.jpg)
Examples of Visual Control
– Warning lights
– Transparent windows
– Colour coding
– Labels
– Position marks
– Okay marks
– Make spaces transparent
– Visualise conditions
– What is where chart
– Who is where chart
– Inspection Labels
– How much of ‘what’ chart
![Page 38: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/38.jpg)
1. Unneeded items begin pilling up as soon as sorting is completed.
2. No matter how well Set in Order is planned and implemented, tools and jips do not get returned to their designated places after use.
3. No matter how dirty equipment becomes, little or nothing is done to clean it.
4. Items are left protruding into walkways, causing people to trip and get injured.
5. Dirty machines start to malfunction and produce defective goods.
SELF DISCIPLINE OR SUSTAINHere are some of the things that happen in a
company when commitment to the five pillars is not sustained.
![Page 39: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/39.jpg)
ADVANTAGES OF
5S(Contd.)
– Better preventive maintenance– Higher employee involvement– Reduction in errors/defects due to standardized
procedures– Consistent and better quality product– Higher productivity– Lesser accidents– Higher employee morale– More time for improvement activities
![Page 40: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/40.jpg)
5S – Implementation Strategies
![Page 41: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/41.jpg)
Organisation structure
• Steering committee
• Appoint a coordinator
• Set up an audit team
• Training of all
• Implement 1s by red tag campaign
![Page 42: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/42.jpg)
1s: Red Tagging Activity
![Page 43: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/43.jpg)
5S RADAR CHART
0
5
10
15
20
2S ORGANIZIN
G
1S CLEARING
UP
5S TRAINING & DISCIPLINE
4S STANDARDIZI
NG
3S CLEANING
•Date
•Section
•Month
•Marks
•100
•80
•60
•40
•20
Gra
ph
![Page 44: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/44.jpg)
5 S Audit Sheet - Shop floorS.N. 1S Sorting Out (SEIRI) Out of 1 2 3 4 51 Floor Cleanliness - free from dust, oil, mud etc 402 General Cleanliness inside factory - Walls, pillars, pipelines are clean without scaling, paint peeling marks, strains etc.203 Cleanliness of containers/pallets - free from dust, oil. Container/pallet in painted condition and free from damages.404 Cleanliness of parts - free from dust, oil (dry condition) 305 Cleanliness of Jigs, Fixtures - free from dust, oil 206 Unused/Excess material removed to separate place, away from work area 207 No mix up of parts in pallets, containers, trays etc 30
TOTAL FOR 1S2001S SCORE = ( TOTAL / 2)100
S.N. 2S Set limits and Systemise(SEITON) Out of 1 2 3 4 51 Gangway - Marking is clear and no material in the Gangway. 302 Use of right pallet / container, trays etc. 303 Right pallets, containers, trays etc in right location 304 Right component in right containers/pallets etc 205 Location of tools for easy to retrieve 106 Only calibrated jigs/fixtures are used 207 Proper shadow board for tools. 408 Proper storage of housekeeping tools. ( Broom, Brush , Small Shovel , Tool for cleaning at Heights ) 20
TOTAL FOR 2S2002S SCORE = ( TOTAL / 2)100
S.N. 3S Shine equipment (SEISO) Out of 1 2 3 4 51 Container identification and traceability available 502 Parts identification and traceability available 303 Plant and Equipment available in clean condition - all sides 304 Preventive maintenance schedule available and effective 505 Chip/Swarf collection and disposable system available. 10
TOTAL FOR 3S303S SCORE = ( TOTAL / 2)200
S.N. 4S Search Time Elimination (Seiketsu) 100 1 2 3 4 51 Retrieval of tools, document is easy ( ask for documents , related tools ) Out of2 Andon Lights On Machines Are Available And Effective 503 Localized Shadow Boards, Tools Available For Cleaning And Maintenance And Effective 304 Easy To See And Inspect Facility Available On Machines And Equipment's 505 Pre-Fixed Quantity Per Container / Pallets Is In Practice 40
TOTAL FOR 4S304S SCORE = ( TOTAL / 2)200
S.N. 5S Standardize Practice & Discipline (Shitsuke) 100 1 2 3 4 51 People are aware for " 5S " requirement and their doing their role ( ask 2-3 people ) Out of2 Availability of operating Standards ( Operation sheet , work instructions ) and are effective 503 Activities are done as per schedule ( Audit , Action on NC products etc. ) 504 Appropriate legible Visual Control System In Practice ( area names , displays ) 50
TOTAL FOR 5S505S SCORE = ( TOTAL / 2)200
100
.Current Month :-
![Page 45: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/45.jpg)
Sl. Criteria Scores Defects Rectification RemarksNo. (1 - 10)
I. HOUSE KEEPING1) Are aisles large enough?marked? Clear?2) Are Parts and tools stored safely after use.3) Are floors uneven and slippery.4) Are Fire fighting equipments adequate, accessible and serviced.5) Is lighting adequate.6) Is general ventilation sufficient.7) Does electrical service appearadequate?8) Are windows or doors in safe condition.9) Are steps, platforms, paths in safecondition.10) Are safety signs adequate and in good condition.11) Are First Aid facilities available.
II. MATERIAL HANDLING:1) Are wheels in good condition.2) Are handles and frame in tight condition.3) Are Fork lift lifting cylinders in good condition.4) Are hoist hooks, chain pulleys and chains tested.5) Are trays in good condition.
III. LADDERS, STAIRWAYS,BENCHES &CHAINS:1) Are Guard rails or hand rails provided.2) Are footsteps not slipping and cracked.3) Is extension ladder ropes in good condition. 4) Are ladders inspected regularly.
IV. HAND TOOLS & MISCELLANEOUS:1) Are hand tools defective.2) Are hand tools properly stored?3) Are Goggles, respirators and personal protective equipmentsavailable at necessary places.
V. EQUIPMENT:1) Are danger points adequately guarded?(I.e, Rotation, Pinch or hip,Belts, Cutting edges, Hot Surfaces, Open flames etc.,)2) Are Operating controls positioned forsake use?3) Is there adequate work space for operator to work safely?4) Are all operating controls clearly identified? (I.e, Valve, Switches, instruments etc., )
Contd..2
Safety Audit Checklist
![Page 46: 5s & 3 M](https://reader033.vdocument.in/reader033/viewer/2022052301/555a2f43d8b42ab3088b50ce/html5/thumbnails/46.jpg)
c Criteria Scores Defects Rectification RemarksNo. (1 - 10)
5) Are safety alarm properly identified and tested regularly.6) Are all pressure vessels are tested and rated regularly.7) Are the equipment inspected regularly to prevent failure due tocorrosion?8) Does wiring appear to be in good condition.9) Does piping appear to be in good condition. 10) Are all safety relief devices in good condition.11) Are all equipments properly grounded.12) Are drop lights and extension guards in good condition.
VI. PROCESS:1) Is safe guard for toxic vapour adequate?2) Are safe storage for diesel, turpentine and clensol etc.,?3) Is there any risk the Operator to get affected by molten metalspillage.
VII.GENERAL:1) Are operation instructions available in a written, legible, easilyidentified form.
Date: