  • 8/6/2019 5th Running Civil Works ,Baluwatar

    1/43

    Nepal Government

    Ministry of Physical Planning & works

    Department of Urban Development & Building Construction

    Building Construction Maintenance DivisionAnamnagar

    ABSTRACT OF COSTProject:- Contruction of Meeting Hall

    Site:- PM Quatar, Baluwatar, KTM.

    S.N Description of Work Quantity Unit Rate Rs. Per Amount (NR

    1 1

    - sqm 20.00 sqm -

    2 2

    - cum 1,000.00 cum -

    3 3- job 20,000.00 job -

    4 4 Earthwork in excavation in ordinary soils - cum 150.00 cum -

    5 5

    #REF! cum 100.00 cum #REF!

    6 6

    - sqm 800.00 sqm -

    7 7

    - cum 6,000.00 cum -

    8 8 Local flat brick soling work with sand filling. - sqm 500.00 sqm -

    9 9

    #REF! Cum 10,000.00 Cum #REF!

    10 10

    #REF! sqm 500.00 sqm #REF!

    11 11

    - sqm 500.00 sqm -

    12 12

    - sqm 500.00 sqm -

    13 13

    - MT 100,000.00 MT -

    14 14

    - sqm 1,500.00 sqm -

    Itemno.

    Site preparation work with cleaning and disposal ofdebrises, uprooting roots, solid wastes etc. all complete

    Dismantling of RCC work including disposal of thedebris out of site as per instruction

    Cutting and stacking all existing rusted iron rods exceptLAP all complete works as per instruction

    Earth filling in 150 mm thick layer,watering,rammingincluding supply of filling material from outsides allcomplete

    0.5 mm CGI sheet roofing with proper shape & size, allnecessary nails, screws, bolts , nuts washers, J of Lhooks etc as per drawing & instruction all complete.

    Plain cement Concrete (PCC) in 1:3:6 ratio forfoundations, flooring and walls with approved quantityof cement and sand and crushed stone aggregateinccluding mixing, laying, curing etc all complete inapproval of site engineer.

    Plain cement Concrete (PCC) for RCC works(1:1.5:3)for slab/lintels with approved quantity of cement andsand and crushed stone aggregate including mixing,laying, curing etc all complete in approval of site

    Formwork, shuttering, centering with 19mm thickwaterproof ply for slab with steel pipe proopping,scaffolding, staging, supporting inclusive of wedgingand cutting holes for utilization till support if fullyunyielding nett.

    Formwork, shuttering, centering with 19mm thickwaterproof ply for column, necessary propping,scaffolding, staging, supporting inclusive of wedgingand cutting holes for utilization till the support if fullyunyielding nett.

    Formwork, shuttering, centering with 19mm thickwaterproof ply for beam with steel pipe proopping,scaffolding, staging, supporting inclusive of wedgingand cutting holes for utilization till support if fullyunyielding nett.

    For steel reinforcement bar of fe 415/500 gradeincluding straightening, cleasing, cutting, binding&fixing in position with annealed tying binding wire asper drawing, design & instruction all complete.

    0.5mm colour GI plain sheet for ridge cover on roofingincluding fixing in proper shape & size with allnecessary rails, screws, bolts & nuts washers, J & Lhooks etc as per drawing & instruction all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    2/43

    15 15

    - cum 8,000.00 cum -

    16 16

    - cum 8,000.00 cum -

    17 17

    #REF! cum 120.00 cum #REF!

    18 18

    - cum 1,400.00 cum -

    19 20

    #REF! sqm 5,500.00 sqm #REF!

    20 21

    - kg 120.00 kg -21 22

    - kg 100.00 kg -

    22 23

    #REF! sqm 2,500.00 sqm #REF!

    23 25

    #REF! sqm 200.00 sqm #REF!

    24 27

    - sqm 250.00 sqm -

    25 36

    #REF! cum 12,000.00 cum #REF!

    26 45

    #REF! cum 8,000.00 cum #REF!

    27 47

    #REF! sqm 2,500.00 sqm #REF!28 48

    #REF! sqm 1,000.00 sqm #REF!

    29 49 Clay tile ridge roofing work with all complete #REF! r m 300.00 r m #REF!

    30 51- kg 120.00 kg -

    31 52 Rubble masonary filling work in foundation. - cum 5,000.00 cum -

    32 53- sqm 100.00 sqm -

    33 56

    #REF! sqm 5,000.00 sqm #REF!

    Good quality local chimney made Brickwork in 1:6 C/Smortar up to ground floor in perfect line level finisheincluding wetting the bricks, racking the joints andcuring the work for at least 7 days all complete.

    Plain cement Comcrete (PCC) in 1:2:4 ratio forfoundation,flooring and walls with approved quallity ofcement and sand and crushed stone aggregateincluding mixing, laying, curing etc all completeinapproval of site engineer.

    Earth filling in 150 mm thick layer, watering, rammingincluding supply of filling materials within compound allcomplete

    Sand filling including supply of filling materials,watering, ramming etc all complete.

    Aluminium casement door of section with naturallyanodized color section(101x45x1.1) with 5mm thickapproved tinted colored glass all complete.

    M.S. blackpipe roof truss with I.S or B.S.sectionincluding jointting, fixing,erection and primer paintingwith all necessary M.S bed plates, shoe angles, anchorbolts leas sheeting as per drawing and instruction all

    complete.M.S. blackpipe purlin with I.S or B.S.section including jointting, fixing,erection and primer painting with allnecessary M.S bed plates, shoe angles, anchor boltsleas sheeting as per drawing and instruction allcomplete.

    Supplying and laying of good quallity Marble in cementSand Mortar (1:2) ratio with approved colour on floors,skirting and walls all complete.

    12.5mm thick cement sand plaster in (1:4) ratio on wallof good finish including racking the joint, wetting ofsurfaces & curing the work all complete.

    12.5mm thick cement sand plaster in (1:4) ratio onceiling of good finish including racking the joint, wettingof surfaces & curing the work all complete.

    Machine made Brickwork in 1:4 C/S mortar insuperstructure in perfect line level finishincludingwettingthe bricks, racking the joints and curingthe workfor at least 7 days all complete.

    Good Quality local chimney made Brickwirk in 1:4 C/Smortar up to ground floor in perfect line level finisheincluding wetting the bricks, racking the joints andcuring the work for at least 7 days all complete.

    Fitting & fixing of water resistance gypsum boarddesign false ceiling with all necessary hanger, angles,

    hooks nut bolt all complete.Machine made clay tiles on roofing including fixing inproper shape and size as per drawing and instructionall complete.

    Fabrication and Fixing of I.S or B.S Standard ironsection with one coat primer painting all complete

    Supplying and laying of one laying of 500 gaugepolythene sheet on prepared surface.

    Aluminium casement windows of section with naturallyanodized color section(54x38x1.1) with 5mm thickapproved tinted colored glass all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    3/43

    34 57

    - cum 12,000.00 cum -

    (37,256.16

    (65,749.56

    Sub total #REF!

    VAT (13%) #REF!

    Grand Total #R

    Machine made Brickwork in 1:4 c/s mortar up to groundfloor in perfect line level finish including wetting thebricks ,racking the joints and curing the work for at least7 days all complete.

    additional amount deduction fromsecond bill

    deduct 5% of 2nd running bill trussamountdeduct 5% of 2nd. running bill Purlin

    amount

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    4/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    5/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    6/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    7/43

    olb s'g} cfO6dln:6 eGbf aflx/sf]lbg k/]df sf]8df*

    lbg'xf]nf /Description, Unit /

    Unit rate df;DjlGwt 8f6flbg'xf]nf . o;l/

    lbOPsf 8f6fbill /comparative chartdf cfk}m j:g] 5g\ .

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    8/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    9/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    10/43

    Nepal Government

    Ministry of Physical Planning & works

    Department of Urban Development & Building Construction

    Building Construction Maintenance Division

    Anamnagar

    Measurement Book

    Project: Construction of Incomplete MEETING HALL,TOILET & CANTEEN Building

    Site: Rt.HPMQuarter,Baluwatar.Ktm.

    Contract No:-7/066/067

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    A: CIVIL WORKS

    1 1 sqm

    Upto to Previous Bill 2670.026

    2 2 cum

    Upto to Previous Bill 12.283

    3 3 job

    Upto to Previous Bill 1.000

    4 4 Earthwork in excavation in ordinary soils cum

    Upto to Previous Bill 73.415

    i. Canteen Block

    F1 9.0 1.500 1.500 1.200 24.300

    F2 1.0 1.850 1.850 1.200 4.107

    Tie Beam 2.0 8.950 0.400 0.900 6.4442.0 5.950 0.400 0.900 4.284

    2.0 4.100 0.400 0.900 2.952

    Sub-Total 115.502

    5 5 cum

    Upto to Previous Bill 101.663

    i. Canteen Block

    F1 9.0 1.500 1.500 0.900 18.225 (1.2-0.3=0.9m)

    F2 1.0 1.850 1.850 0.900 3.080

    In Room 1.0 11.48 5.48 0.43 26.737

    1.0 3.12 4.46 0.43 5.898

    Deduction for Tie Beam & Wall 2.0 11.48 0.23 1.30 -6.865

    4.0 5.02 0.23 1.30 -6.004

    2.0 2.77 0.23 1.30 -1.656

    1.0 4.55 0.23 1.30 -1.360

    Sub-Total 139.717

    6 6 sqm

    Upto to Previous Bill 1101.948

    7 7 cum

    WorkNo.

    ItemNo.

    Site preparation work with cleaning and disposalof debrises, uprooting roots, solid wastes etc. allcomplete

    Dismantling of RCC work including disposal of

    the debris out of site as per instruction

    Cutting and stacking all existing rusted iron rodsexcept LAP all complete works as perinstruction

    300 mm forclearance

    L=11.25-

    2*1.15=8.95

    Earth filling in 150 mm thicklayer,watering,ramming including supply offilling material from outsides all complete

    (H=1.6-0.9-0.075

    0.05-0.15=0.425m

    0.5 mm CGI sheet roofing with proper shape &size, all necessary nails, screws, bolts , nutswashers, J of L hooks etc as per drawing &instruction all complete.

    Plain cement Concrete (PCC) in 1:3:6 ratio forfoundations, flooring and walls with approvedquantity of cement and sand and crushed stone

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    11/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    Upto to Previous Bill 4.107

    i. Canteen Block

    F1 9.0 1.150 1.150 0.075 0.893

    F2 1.0 1.500 1.500 0.075 0.169

    Tie Beam

    Along Grid 1-1 & 2-2 2.00 10.350 0.230 0.075 0.357 =11.55-4*.3=10.35

    Along Grid 3-3 1.00 3.950 0.230 0.075 0.068 l=4.25-0.3=3.95

    Along Grid a-a & b-b 2.00 7.650 0.230 0.075 0.264 l=8.25-2*0.3=7.6

    Along Grid c-c & d-d 2.00 4.950 0.230 0.075 0.171

    Sub-Total 6.028

    8 8 Local flat brick soling work with sand filling. sqm

    Upto to Previous Bill 142.157

    Canteen Block

    i. F1 9.0 1.200 1.200 12.960

    F2 1.0 1.550 1.550 2.403

    ii. Tie Beam

    Along Grid 1-1 & 2-2 2.00 10.350 0.230 4.761

    Along Grid 3-3 1.00 3.950 0.230 0.909

    Along Grid a-a & b-b 2.00 7.650 0.230 3.519

    Along Grid c-c & d-d 2.00 4.950 0.230 2.277

    iii. On Floor 1.00 4.020 5.020 20.180

    2.0 3.270 5.020 32.831

    1.0 4.020 2.770 11.135

    iii. East Poarch 1.00 4.840 5.070 24.539

    iv. East Apron 1.00 28.120 1.330 37.400

    v. West Apron 1.00 8.212 1.240 10.183

    1.00 5.234 1.300 6.804

    Sub-Total 312.057

    9 9 Cum

    Upto to Previous Bill 101.947

    Canteen Block

    i. F1 Rectangular Portion 9.0 1.150 1.150 0.180 2.142

    F1 Rectangular Portion 9.0 1.150 0.500 0.120 0.621

    F1 Triangular Portion 18.0 Area= 0.020 1.150 0.414 b=0.325,h=0.12

    F2 Rectangular Portion 1.0 1.500 1.500 0.180 0.405

    F2 Rectangular Portion 1.0 1.500 1.500 0.120 0.270

    F2 Triangular Portion 2.0 Area= 0.030 1.500 0.090 b=0.5,h=0.12

    ii. Foundation Beam

    Along Grid 1-1 & 2-2 2.00 11.550 0.230 0.300 1.594

    Along Grid 3-3 1.00 4.550 0.230 0.300 0.314

    Along Grid a-a & b-b 2.00 6.950 0.230 0.300 0.959

    Along Grid c-c & d-d 2.00 4.950 0.230 0.300 0.683

    iii. Plinth Level Tie Beam

    Along Grid 1-1 & 2-2 2.00 11.550 0.230 0.300 1.594

    Along Grid 3-3 1.00 4.550 0.230 0.300 0.314

    Along Grid a-a & b-b 2.00 6.950 0.230 0.300 0.959

    Along Grid c-c & d-d 2.00 4.950 0.230 0.300 0.683

    iv. Column Upto Lower portion of tie Beam 10.0 1.000 0.30 0.300 0.900

    v. Toilet Block

    Cornice Above Parapet Wall 1.0 27.480 0.35 0.075 0.721

    vi South Side Toilet Cornic

    Measurement aretaken upto PM offi

    toilet

    Plain cement Concrete (PCC) for RCC

    works(1:1.5:3) for slab/lintels with approvedquantity of cement and sand and crushed stoneaggregate including mixing, laying, curing etc allcomplete in approval of site engineer

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    12/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    Cornice Above Parapet Wall 1.0 7.450 0.35 0.075 0.196

    Sub-Total 115.080

    10 10 sqm

    Upto to Previous Bill 242.271

    i. Canteen Block

    F1 9.0 4.600 0.180 7.452 l=1.15*4=4.6m

    F2 1.0 6.000 0.180 1.080

    Sub-Total 250.803

    11 11 sqm

    Upto to Previous Bill 206.102

    i. Canteen Block

    Column Upto Lower portion of tie Beam 10.0 1.000 1.200 12.000

    Sub-Total 218.102

    12 12 sqm

    Upto to Previous Bill 354.840

    Canteen Block

    i. Foundation Beam

    Along Grid 1-1 & 2-2 2.00 11.250 0.600 13.500

    Along Grid 3-3 1.00 4.250 0.600 2.550

    Along Grid a-a & b-b 2.00 7.950 0.600 9.540

    Along Grid c-c & d-d 2.00 4.950 0.600 5.940

    ii. Plinth Level Tie Beam

    Along Grid 1-1 & 2-2 2.00 11.250 0.600 13.500

    Along Grid 3-3 1.00 4.250 0.600 2.550

    Along Grid a-a & b-b 2.00 7.950 0.600 9.540

    Along Grid c-c & d-d 2.00 4.950 0.600 5.940

    iii. Toilet Block

    Cornic Above Parapet Wall 1.0 27.480 0.13 3.435

    iv. South Side Toilet Cornic

    Cornic Above Parapet Wall 1.0 10.430 0.13 1.304

    v. North-East Toilet Block

    Cornic Above Parapet Wall 1.0 7.450 0.13 0.931

    Sub-Total 423.570

    13 13 MT

    Upto to Previous Bill 17.014

    This bill 2.590

    Sub-Total 19.604

    Formwork, shuttering, centering with 19mmthick waterproof ply for slab with steel pipe proopping, scaffolding, staging, supporting

    inclusive of wedging and cutting holes forutilization till support if fully unyielding nett.

    Formwork, shuttering, centering with 19mmthick waterproof ply for column, necessary propping, scaffolding, staging, supportinginclusive of wedging and cutting holes forutilization till the support if fully unyielding nett.

    Formwork, shuttering, centering with 19mmthick waterproof ply for beam with steel pipe proopping, scaffolding, staging, supportinginclusive of wedging and cutting holes forutilization till support if fully unyielding nett.

    For steel reinforcement bar of fe 415/500 gradeincluding straightening, cleasing, cutting,binding &fixing in position with annealed tying binding wire as per drawing, design &instruction all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    13/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    14 14 sqm

    Upto to Previous Bill 58.667

    15 15 Cum

    Upto to Previous Bill 40.515

    i. Canteen Block

    ii. Upto Plinth Level Tie Beam

    Along Grid 1-1 & 2-2 2.00 10.350 0.230 1.000 4.761

    Along Grid 3-3 1.00 3.950 0.230 1.000 0.909

    Along Grid a-a & b-b 2.00 7.650 0.230 1.000 3.519

    Along Grid c-c & d-d 2.00 4.950 0.230 1.000 2.277

    iii. East Poarch 1.00 12.510 0.230 0.100 0.288

    iv. East Apron 1.00 28.120 0.230 0.100 0.647

    v. West Apron 1.00 8.212 0.230 0.100 0.189

    1.00 5.234 0.230 0.100 0.120

    Sub-Total 53.224

    16 16 Cum

    Upto to Previous Bill 115.448

    i. East Poarch 1.00 5.300 5.300 0.075 2.107

    ii. East Apron 1.00 28.120 1.330 0.075 2.805

    iii. West Apron 1.00 8.212 1.300 0.075 0.801

    1.00 5.234 1.240 0.075 0.487

    Sub-Total 121.647

    17 17 cum

    Upto to Previous Bill 73.415

    18 18 cum

    Upto to Previous Bill 8.559

    i. East Poarch 1.00 5.300 5.300 0.150 4.214

    ii. East Apron 1.00 28.120 1.330 0.150 5.610

    iii. West Apron 1.00 8.212 1.300 0.150 1.601

    1.00 5.234 1.240 0.150 0.974

    iv. Canteen Block 1.00 4.020 5.020 0.150 3.027

    2.0 3.270 5.020 0.150 4.925

    1.0 4.020 2.770 0.150 1.670

    Sub-Total 30.579

    19 19 sqm

    i. W1 10.0 2.360 2.180 51.448

    ii. W2 8.0 1.790 2.030 29.070

    iii. W3 5.0 1.150 1.800 10.350

    Sub-Total 90 868

    0.5mm colour GI plain sheet for ridge cover onroofing including fixing in proper shape & sizewith all necessary rails, screws, bolts & nutswashers, J & L hooks etc as per drawing &instruction all complete.

    Good quality local chimney made Brickwork in1:6 C/S mortar up to ground floor in perfect linelevel finishe including wetting the bricks,racking the joints and curing the work for at least7 da s all com lete.

    Measurement aretaken upto PM offi

    toilet

    Plain cement Comcrete (PCC) in 1:2:4 ratio forfoundation,flooring and walls with approvedquallity of cement and sand and crushed stoneaggregate including mixing, laying, curing etc allcomplete inapproval of site engineer.

    Measurement aretaken upto PM offi

    toilet

    Earth filling in 150 mm thick layer, watering,ramming including supply of filling materialswithin compound all complete

    Sand filling including supply of filling materials,watering, ramming etc all complete.

    Aluminium sliding windows of section withnaturally anodized color section (888x38x1.1)with 5mm thick approved tinted colored glass allcomplete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    14/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    20 20 sqm

    Upto to Previous Bill 15.318

    i. Main Hall

    DW 8.0 0.550 2.160 9.504

    Dw 4.0 1.490 3.250 19.370

    D 3.0 1.200 2.390 8.604

    D1 4.0 0.980 2.390 9.369

    D2 1.0 1.470 2.500 3.675

    2.0 0.700 2.500 3.500

    1.0 0.980 2.500 2.450

    3.0 1.470 2.500 11.025

    1.0 1.000 2.390 2.390

    1.0 1.000 2.400 2.400

    Sub-Total 87.605

    21 21 kg

    Upto to Previous Bill 8428.180

    22 22 kg

    Upto to Previous Bill 17935.382

    23 23 sqm

    Upto to Previous Bill 102.571

    Rest Room Pm Office sill sill W3 5.0 1.400 0.340 2.380

    W2 2.0 1.780 0.340 1.210

    Sub-Total 106.161

    24 25 sqm

    Upto to Previous Bill 1593.878

    25 26 sqm

    i. Waiting Room 1.0 7.700 3.770 29.029

    ii. P.A Room 1.0 7.700 3.600 27.720

    iii. Main Waiting Room 1.0 7.700 3.870 29.799

    iv. Meeting Room 1.0 4.760 6.580 31.321

    v. P.M office Room 1.0 4.620 4.520 20.882

    vi. Sec. office Room 1.0 6.260 4.760 29.798

    vii. Meeting Room Hall 1.0 7.980 4.760 37.985

    viii. Cabinet hall 1.0 9.690 6.270 60.756

    ix. Main Hall 1.0 19.800 14.550 288.090

    x. Rest room 1.0 4.680 4.740 22.183

    Sub-Total 577.563

    Aluminium casement door of section withnaturally anodized color section(101x45x1.1)with 5mm thick approved tinted colored glass allcomplete.

    M.S. blackpipe roof truss with I.S or B.S.sectionincluding jointting, fixing,erection and primerpainting with all necessary M.S bed plates, shoeangles, anchor bolts leas sheeting as per drawingand instruction all complete.

    M.S. blackpipe purlin with I.S or B.S.sectionincluding jointting, fixing,erection and primerpainting with all necessary M.S bed plates, shoeangles, anchor bolts leas sheeting as per drawingand instruction all complete.

    Supplying and laying of good quallity Marble incement Sand Mortar (1:2) ratio with approvedcolour on floors, skirting and walls all complete.

    12.5mm thick cement sand plaster in (1:4) ratioon wall of good finish including racking the joint, wetting of surfaces & curing the work allcomplete.

    20 mm thick cement sand plaster in (1:4) ratioon floor of good finish including racking the joint, wetting of surfaces & curing the work allcomplete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    15/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    26 27 sqm

    Upto to Previous Bill 38.827

    Meeting Room Ceiling 1.0 4.760 3.730 17.755

    Sub-Total 56.582

    27 29 sqm

    i. On Ceiling

    a) Waiting Room 1.0 7.700 3.770 29.029

    b) P.A Room 1.0 7.700 3.600 27.720

    c) Main Waiting Room 1.0 7.700 3.870 29.799

    d) meeting Room 1.0 4.760 6.580 31.321

    e) P.M office Room 1.0 4.620 4.520 20.882

    f) Sec. office Room 1.0 6.260 4.760 29.798

    g) Meeting Room Hall 1.0 7.980 4.760 37.985

    h) Sec. Office Room Passage 1.0 5.050 1.500 7.575

    i) Cabinet hall 1.0 9.690 6.270 60.756

    Vertical 1 1.0 24.720 0.150 3.708

    Vertical 2 1.0 23.520 0.150 3.528

    Vertical 3 1.0 22.320 0.150 3.348

    j)PM Office Room Passage 1.0 7.850 1.950 15.308

    K) Toilet 1.0 1.970 1.970 3.881

    l) Staircase Passage 1.0 4.720 4.000 18.880

    m) Lower hall Passage 1.0 11.980 2.710 32.466

    n) Main Hall 1.0 19.800 14.550 288.090

    Vertical 1 1.0 65.100 0.125 8.138

    Vertical 2 1.0 57.900 0.125 7.238

    Vertical 3 1.0 54.300 0.125 6.788

    Vertical 4 1.0 55.500 0.125 6.938

    Slanting portion 1.0 60.500 0.896 54.208

    o) East Ramp 1.0 4.700 5.150 24.205

    p) West Ramp 2.0 4.650 2.760 25.668

    q)Rest room 1.0 4.680 4.740 22.183

    Deductions

    Slanting portion (1.0) 60.500 0.775 (46.888)

    Toilet Block 2.0 3.840 4.770 36.634

    ii. On Wall

    a) Waiting Room 1.0 7.700 3.770 52.303 52.303 H=2.28 m

    b) P.A Room 1.0 7.700 3.600 51.528 51.528 H=2.28 m

    c) Main Waiting Room 1.0 7.700 3.870 52.759 52.759 H=2.28 m

    d) meeting Room 1.0 4.760 6.580 51.710 51.710 H=2.28 m

    e) P.M office Room 1.0 4.620 4.520 41.678 41.678 H=2.28 m

    f) Sec. office Room 1.0 6.260 4.760 50.251 50.251 H=2.28 m

    g) Meeting Room Hall 1.0 7.980 4.760 58.094 58.094 H=2.28 m

    h) Sec. Office Room Passage 1.0 5.050 5.050 10.100 10.100 H=2.04

    i) Cabinet hall 1.0 9.690 6.270 65.117 65.117 H=2.28 m

    j)PM Office Room Passage 1.0 7.850 15.700 15.700 H=2.28 m

    K) Toilet 1.0 1.970 1.970 3.940 3.940 H=2.28 m

    l) Staircase Passage 1.0 4.720 4.000 13.440 13.440 H=2.28 m

    n) Main Hall 1.0 19.800 14.550 156.636 156.636 H=2.28 m

    q)Rest room 1.0 4.680 4.740 42.955 42.955 H=2.28 m

    Toilet Block

    Sub-Total 1455.396

    28 31 sqm

    12.5mm thick cement sand plaster in (1:4) ratioon ceiling of good finish including racking the joint, wetting of surfaces & curing the work allcomplete.

    Supplyin and applying white cement putty onceiling and wall with line and level all complete.

    3 mm thick cement sand punning (1:1) on floor,

    skirting, dado etc, including mixing laying andrubbing with steel trowel to a hard smooth andshining surface and curing all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    16/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    iii. Main Waiting Room 1.0 7.700 3.870 29.799

    iv. Meeting Room 1.0 4.760 6.580 31.321

    v. P.M office Room 1.0 4.620 4.520 20.882

    vi. Sec. office Room 1.0 6.260 4.760 29.798

    vii. Meeting Room Hall 1.0 7.980 4.760 37.985

    viii. Cabinet hall 1.0 9.690 6.270 60.756

    ix. Main Hall 1.0 19.800 14.550 288.090

    x. Rest room 1.0 4.680 4.740 22.183

    Sub-Total 577.563

    29 32 rm

    i. Waiting Room 1.0 7.900 3.870 23.540

    ii. P.A Room 1.0 7.750 3.750 23.000

    iii. Main Waiting Room 1.0 7.800 0.387 16.374

    iv. Meeting Room 1.0 4.700 6.680 22.760

    v. P.M office Room 1.0 4.720 4.520 18.480

    vi. Sec. office Room 1.0 6.260 4.760 22.040

    vii. Meeting Room Hall 1.0 7.980 4.760 25.480

    viii. Sec. Office Room Passage 1.0 5.050 1.500 11.600

    ix. Cabinet hall 1.0 9.690 6.270 31.920

    Vertical 1 1.0 24.720 24.720

    Vertical 2 1.0 23.520 23.520

    Vertical 3 1.0 22.320 22.320

    x. PM Office Room Passage 1.0 7.850 1.950 19.600

    Toilet 1.0 1.970 1.970 7.880

    xi. Staircase Passage 1.0 4.720 4.000 13.440

    xii. Lower hall Passage 1.0 11.980 2.710 29.380

    xiii. Main Hall 1.0 19.800 14.550 68.700

    Vertical 1 1.0 65.100 65.100

    Vertical 2 1.0 57.900 57.900

    Vertical 3 1.0 54.300 54.300

    Vertical 4 1.0 55.500 55.500

    xiv. East Ramp 1.0 4.700 5.150 19.700

    xv. West Ramp 2.0 4.650 2.760 29.640

    xvi. Rest room 1.0 4.680 4.740 18.840

    Sub-Total 705.734

    30 34 rm

    i- Toilet Block 1.0 33.200 33.200

    vi. South Side Toilet

    1.0 11.630 11.630

    vii. North-East Toilet Block

    1.0 8.650 8.650

    Sub-Total 53.480

    31 35 sqm

    i. Waiting Room 1.0 7.700 3.770 29.029

    ii. P.A Room 1.0 7.700 3.600 27.720

    iii. Main Waiting Room 1.0 7.700 3.870 29.799

    iv. Meeting Room 1.0 4.760 6.580 31.321

    v. P.M office Room 1.0 4.620 4.520 20.882

    vi. Sec. office Room 1.0 6.260 4.760 29.798

    vii. Meeting Room Hall 1.0 7.980 4.760 37.985

    viii. Cabinet hall 1.0 9.690 6.270 60.756

    ix Main Hall 1 0 19 800 14 550 288 090

    Plaster of Parish (POP) cornice and moldingmaking die, casting of cornice as per design anddrawing including fixing in position using steelscrews on resin glue finishing all complete 6" to8" wide.

    12.5mmthick cement sand rainwater protection plaster line in (1:4) ratio including wettingofsurfaces &curing the work all complete.

    Supplying and laying Teak wood Parqueting onfloor polishingallcomplete(150mm*30mm*8mm)

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    17/43

    Description of work Unit NoLength Breadth Height

    Quantity Remarksm m m

    WorkNo.

    ItemNo.

    32 36 Cum

    Upto to Previous Bill 96.439

    i. South Side Toilet

    Parapet Wall 1.0 10.430 0.23 0.900 2.159

    ii. North-East Toilet Block

    Parapet Wall 1.0 7.450 0.23 0.600 1.028

    Sub-Total 99.626

    33 45 cum

    Upto to Previous Bill 133.916

    34 47 sqm

    Upto to Previous Bill 733.073

    35 48 sqm

    Upto to Previous Bill 1104.383

    36 49 Clay tile ridge roofing work with all complete

    Upto to Previous Bill 75.700

    37 51 kg

    Upto to Previous Bill 14500.980

    38 52 Rubble masonary filling work in foundation. cum

    Upto to Previous Bill 1.290

    39 53 sqm

    Upto to Previous Bill 57.061

    40

    56

    sqm

    Upto to Previous Bill 4.873

    Pm office room

    Ventilation 2.0 0.990 0.860 1.703

    Hall Toilet

    Ventilation 3.0 0.970 0.700 2.037

    Sub-Total 8.613

    41 57 cum

    Upto to Previous Bill 9.673

    Machine made Brickwork in 1:4 C/S mortar insuperstructure in perfect line level finishincludingwettingthe bricks, racking the jointsand curing the workfor at least 7 days allcomplete.

    Good Quality local chimney made Brickwirk in1:4 C/S mortar up to ground floor in perfect linelevel finishe including wetting the bricks,racking the joints and curing the work for atleast 7 days all complete.

    Fitting & fixing of water resistance gypsum board design false ceiling with all necessaryhanger, angles, hooks nut bolt all complete.

    Machine made clay tiles on roofing includingfixing in proper shape and size as per drawingand instruction all complete.

    Fabrication and Fixing of I.S or B.S Standard

    iron section with one coat primer painting allcomplete

    Supplying and laying of one laying of 500 gaugepolythene sheet on prepared surface.

    Aluminium casement windows of section withnaturally anodized color section(54x38x1.1)with 5mm thick approved tinted colored glass all

    complete.

    Machine made Brickwork in 1:4 c/s mortar up toground floor in perfect line level finish includingwetting the bricks ,racking the joints and curingthe work for at least 7 days all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    18/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    19/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    20/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    21/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    22/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    23/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    24/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    25/43

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    26/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ gsfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    A. Civil Works

    1 1 sqm 2,670.026 20.00 53,400.52 2,670.026 53,400.52 -

    2 2 cum 12.283 1,000.00 12,283.00 12.283 12,283.00 -

    3 3 job 1.000 20,000.00 20,000.00 1.000 20,000.00 -

    4 4 cum 115.502 150.00 17,325.30 73.415 11,012.25 42.087

    5 5 cum 139.717 100.00 13,971.72 101.663 10,166.30 38.054

    6 6 sqm 1,101.948 800.00 881,558.40 1,101.948 881,558.40 -

    7 7 cum 6.028 6,000.00 36,170.10 4.107 24,642.00 1.921

    8 8 sqm 312.057 500.00 156,028.54 142.157 71,078.50 169.900

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    Site preparation work with cleaningand disposal of debrises, uprootingroots, solid wastes etc. all complete

    Dismantling of RCC work includingdisposal of the debris out of site asper instruction

    Cutting and stacking all existingrusted iron rods except LAP allcomplete works as per instruction

    Earthwork in excavation in ordinarysoils

    Earth filling in 150 mm thicklayer,watering,ramming includingsupply of filling material fromoutsides all complete

    0.5 mm CGI sheet roofing withproper shape & size, all necessarynails, screws, bolts , nuts washers,J of L hooks etc as per drawing &instruction all complete.

    Plain cement Concrete (PCC) in1:3:6 ratio for foundations, flooringand walls with approved quantity ofcement and sand and crushedstone aggregate inccluding mixing,laying, curing etc all complete inapproval of site engineer.

    Local flat brick soling work withsand filling.

    d=n]=k=kmf=g+= !^&

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    27/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ gsfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    9 9 Cum 115.080 10,000.00 1,150,802.50 101.947 1,019,470.00 13.133

    10 10 sqm 250.803 500.00 125,401.50 242.271 121,135.50 8.532

    11 11 sqm 218.102 500.00 109,051.00 206.102 103,051.00 12.000

    12 12 sqm 423.570 500.00 211,785.00 354.840 177,420.00 68.730

    13 13 MT 19.604 ### 1,960,430.68 17.014 1,701,400.00 2.590

    Plain cement Concrete (PCC) forRCC works(1:1.5:3) for slab/lintelswith approved quantity of cementand sand and crushed stoneaggregate including mixing, laying,curing etc all complete in approvalof site engineer

    Formwork, shuttering, centeringwith 19mm thick waterproof ply forslab with steel pipe proopping,scaffolding, staging, supportinginclusive of wedging and cuttingholes for utilization till support iffully unyielding nett.

    Formwork, shuttering, centeringwith 19mm thick waterproof ply forcolumn, necessary propping,scaffolding, staging, supportinginclusive of wedging and cuttingholes for utilization till the support iffully unyielding nett.

    Formwork, shuttering, centeringwith 19mm thick waterproof ply forbeam with steel pipe proopping,scaffolding, staging, supportinginclusive of wedging and cuttingholes for utilization till support iffully unyielding nett.

    For steel reinforcement bar of fe415/500 grade including

    straightening, cleasing, cutting,binding &fixing in position withannealed tying binding wire as perdrawing, design & instruction allcomplete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    28/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ g+sfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    14 14 sqm 58.667 1,500.00 88,000.50 58.667 88,000.50 -

    15 15 cum 53.224 8,000.00 425,793.98 40.515 324,120.00 12.709

    16 16 cum 121.647 8,000.00 973,177.22 115.448 923,584.00 6.199

    17 17 cum 73.415 120.00 8,809.80 73.415 8,809.80 -

    18 18 cum 30.579 1,400.00 42,811.01 8.559 11,982.60 22.020

    19 19 sqm 90.868 4,500.00 90.868

    0.5mm colour GI plain sheet forridge cover on roofing includingfixing in proper shape & size withall necessary rails, screws, bolts &nuts washers, J & L hooks etc asper drawing & instruction allcomplete.

    Good quality local chimney madeBrickwork in 1:6 C/S mortar up toground floor in perfect line levelfinishe including wetting the bricks,racking the joints and curing thework for at least 7 days allcomplete.

    Plain cement Comcrete (PCC) in1:2:4 ratio for foundation,flooringand walls with approved quallity ofcement and sand and crushedstone aggregate including mixing,laying, curing etc all completeinapproval of site engineer.

    Earth filling in 150 mm thick layer,watering, ramming including supplyof filling materials within compoundall complete

    Sand filling including supply offilling materials, watering, rammingetc all complete.

    Aluminium sliding windows of

    section with naturally anodizedcolor section (888x38x1.1) with5mm thick approved tinted coloredglass all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    29/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ gsfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    20 20 sqm 87.605 5,500.00 481,826.40 - 87.605

    21 21 kg 8,428.180 120.00 1,011,381.60 8,428.180 1,011,381.60 -

    22 22 kg 17,935.382 100.00 1,793,538.20 ### 1,793,538.20 -

    23 23 sqm 106.161 2,500.00 265,403.50 102.571 256,427.50 3.590

    24 25 sqm 1,593.878 200.00 318,775.60 1,593.878 318,775.60 -

    25 26 sqm 577.563 300.00 577.563

    Aluminium casement door ofsection with naturally anodizedcolor section(101x45x1.1) with5mm thick approved tinted coloredglass all complete.

    M.S. blackpipe roof truss with I.Sor B.S.section including jointting,fixing,erection and primer paintingwith all necessary M.S bed plates,shoe angles, anchor bolts leassheeting as per drawing andinstruction all complete.

    M.S. blackpipe purlin with I.S orB.S.section including jointting,fixing,erection and primer painting

    with all necessary M.S bed plates,shoe angles, anchor bolts leassheeting as per drawing andinstruction all complete.

    Supplying and laying of goodquallity Marble in cement SandMortar (1:2) ratio with approvedcolour on floors, skirting and wallsall complete.

    12.5mm thick cement sand plasterin (1:4) ratio on wall of good finishincluding racking the joint, wettingof surfaces & curing the work allcomplete.

    20 mm thick cement sand plaster in(1:4) ratio on floor of good finishincluding racking the joint, wettingof surfaces & curing the work allcomplete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    30/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ g+sfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    26 27 sqm 56.582 250.00 14,145.45 38.827 9,706.75 17.755

    27 29 sqm 1,455.396 100.00 1,455.396

    28 31 sqm 577.563 150.00 577.563

    29 32 rm 705.734 600.00 705.734

    30 34 rm 53.480 150.00 53.480

    31 35 sqm 577.563 3,000.00 577.563

    32 36 cum 99.626 12,000.00 1,195,513.32 96.439 1,157,268.00 3.187

    12.5mm thick cement sand plasterin (1:4) ratio on ceiling of goodfinish including racking the joint,wetting of surfaces & curing thework all complete.

    Supplyin and applying whitecement putty on ceiling and wallwith line and level all complete.

    3 mm thick cement sand punning(1:1) on floor, skirting, dado etc,including mixing laying and rubbingwith steel trowel to a hard smoothand shining surface and curing allcomplete.

    Plaster of Parish (POP) cornice andmolding making die, casting ofcornice as per design and drawingincluding fixing in position usingsteel screws on resin glue finishingall complete 6" to 8" wide.

    12.5mmthick cement sandrainwater protection plaster line in(1:4) ratio including wettingofsurfaces &curing the work allcomplete.

    Supplying and laying Teak woodParqueting on floor polishingallcomplete(150mm*30mm*8mm)

    Machine made Brickwork in 1:4 C/Smortar in superstructure in perfect

    line level finish includingwettingthebricks, racking the joints and curingthe workfor at least 7 days allcomplete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    31/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ gsfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    33 45 cum 133.916 8,000.00 1,071,328.00 133.916 1,071,328.00 -

    34 47 sqm 733.073 2,500.00 1,832,682.50 733.073 1,832,682.50 -

    35 48 sqm 1,104.383 1,000.00 1,104,383.00 1,104.383 1,104,383.00 -

    36 49 r m 75.700 300.00 22,710.00 75.700 22,710.00 -

    37 51 kg 14,500.980 120.00 1,740,117.60 ### 1,740,117.60 -

    38 52 cum 1.290 5,000.00 6,450.00 1.290 6,450.00 -

    39 53 sqm 57.061 100.00 5,706.10 57.061 5,706.10 -

    40 56 sqm 8.613 5,000.00 43,064.00 4.873 24,365.00 3.740

    Good Quality local chimney madeBrickwirk in 1:4 C/S mortar up toground floor in perfect line levelfinishe including wetting the bricks,racking the joints and curing thework for at least 7 days allcomplete.

    Fitting & fixing of water resistancegypsum board design false ceilingwith all necessary hanger, angles,hooks nut bolt all complete.

    Machine made clay tiles on roofingincluding fixing in proper shape andsize as per drawing and instructionall complete.

    Clay tile ridge roofing work with allcomplete

    Fabrication and Fixing of I.S or B.SStandard iron section with one coatprimer painting all complete

    Rubble masonary filling work infoundation.

    Supplying and laying of one layingof 500 gauge polythene sheet onprepared surface.

    Aluminium casement windows ofsection with naturally anodizedcolor section(54x38x1.1) with 5mmthick approved tinted colored glass

    all complete.

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    32/43

    g]kfn ;/sf/

    ef}lts of]hgf tyf lgdf{0f dGqfno 7]Ssfkfsf] ;+Vojnsf] qmd ;+Fifth running bill zx/L ljsf; tyf ejg lgdf{0f ljefu cl3Nnf] e'QmfgL

    7]s]bf/sf] gf ejg lgdf{0f ;Def/ l8lehg sfof{no sfo{ ;DkGg ug 20

    cl3Nnf] e'QmfgL ljnsf] qmd ;+ 7]Ssf ;DalGw lan e'QmfgL ef}r/ gsfof{/De cfb] 9/12/2066 e'QmfgL ldlt Msfo{ ;DkGg ePsf] ldlt M gfkL lstfj g++ M

    m=;+ sfdsf] ljj/0f PsfO{cBfjlws sfd ePsf] cl3Nnf] ljndf r9]sf] xfnsf]

    kl/df0f b/ hDdf d"No kl/df0f hDdf d"No kl/df0f

    Koshi And Neupane/BandanBhagwati

    of]hgfsf] gfd M Contruction of Meeting Hall

    d=n]=k=kmf=g+= !^&

    41 57 cum 9.673 12,000.00 116,076.00 9.673 116,076.00 -

    -

    (37,256.16)

    (65,749.56)

    Grand Total 17,206,896.31 16,034,030.22

    VAT 13% 2,236,896.52 - 2,084,423.92

    Grand Total 19,443,792.83 - 18,118,454.14

    pko'{Qm adf]lhd 7Ls 5 egL k|dfl0ft ug]{of] ljn adf]lhd hDdf ?= 7]s]bf/sf] ;xL / 5cl3Nnf] ljnaf6 e'QmfgL ePsf] ?=

    sf ug'{ kg]{ ?= ===================== afFls lbg' kg]{ ?=s_ k]ZsL ========================= -v_ dfn;fdfgsf] df]n ===================== -u_ d]lzg cf}hf/sf] axfn =====

    3_ 7]Ssf s/ ======================== -_ w/f}6L M -r_ clu|d cfos/ jfktMv'b lbg' kg]{ M k]z ug]{ l;=l8=O{= sf] ;xL :jLs[t ug]{sf] ;xL

    k]z ug]{ cf]=;L=sf] ;xL hfFr ug]{ O{lGhlgo/s] ;xL bhf{ Mbhf{ M bhf{ MhDdf ?= ===================== cIf/]kL =============================================== sf] r]s g

    Machine made Brickwork in 1:4 c/smortar up to ground floor in perfectline level finish including wetting thebricks ,racking the joints and curingthe work for at least 7 days allcomplete.

    additional amountdeduction from second bill

    deduct 5% of 2nd running billtruss amount

    deduct 5% of 2nd. running billPurlin amount

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    33/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    34/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    35/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    36/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    37/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    38/43

    M

    sf] k[i7 ;

    s}lkmot

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    39/43

    M

    sf] k[i7 ;

    s}lkmot

    =====

    =====

    ====

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    40/43

    Angle Fabrication and Reinforcement detailS.NO DESCRIPTION Nos L Qty Wt/unit Weight(Kg)

    A Angle Fabrication ISA 40x40x5

    1 West block

    South horizontal 22 13.27 291.94 3.000 875.820

    SouthVertical 10 5.92 59.20 3.000 177.600

    North Horizontal 4 11.00 44.00 3.000 132.000

    17 12.85 218.45 3.000 655.350

    L=(11.1+13.6)/2 11 12.35 135.85 3.000 407.550

    North Vertical 9 8.70 78.30 3.000 234.900

    1 0.84 0.84 3.000 2.520

    1 1.87 1.87 3.000 5.610

    1 4.40 4.40 3.000 13.200

    2 Main Block - -

    East Roof (Nose) - -

    Vertical 8 3.90 31.20 3.000 93.600

    2 1.41 2.82 3.000 8.460

    2 2.61 5.22 3.000 15.660

    Horizontal L=(8.93+4.43)/2 30 6.68 200.40 3.000 601.200East Face - -

    Vertical 19 9.75 185.25 3.000 555.750

    1 6.83 6.83 3.000 20.490

    1 5.36 5.36 3.000 16.080

    1 5.57 5.57 3.000 16.710

    1 8.17 8.17 3.000 24.510

    4 9.75 39.00 3.000 117.000

    Horizontal 15 39.10 586.50 3.000 1,759.500

    L=(30.4+27.5)/2 20 28.95 579.00 3.000 1,737.000

    1 27.50 27.50 3.000 82.500

    L=(5.69+8.24)/2 17 6.97 118.41 3.000 355.215

    2 6.00 12.00 3.000 36.0001 5.62 5.62 3.000 16.860

    1 5.63 5.63 3.000 16.890

    Main Roof West Face - -

    North Projection - -

    Horizontal 1 18.20 18.20 3.000 54.600

    1 17.40 17.40 3.000 52.200

    1 16.95 16.95 3.000 50.850

    1 16.30 16.30 3.000 48.900

    1 16.10 16.10 3.000 48.300

    1 15.00 15.00 3.000 45.000

    Vertical 2 1.20 2.40 3.000 7.200

    Vertical 8 1.53 12.24 3.000 36.720

    South Projection - -

    Horizontal 1 16.60 16.60 3.000 49.800

    1 15.80 15.80 3.000 47.400

    1 15.35 15.35 3.000 46.050

    1 14.70 14.70 3.000 44.100

    1 14.50 14.50 3.000 43.500

    1 13.40 13.40 3.000 40.200

    Vertical 1 1.20 1.20 3.000 3.600

    8 1.53 12.24 3.000 36.720

    West Projection - -

    Horizontal L=(11.2+9.5)/2 6 10.35 62.10 3.000 186.300

    Vertical 2 1.20 2.40 3.000 7.200

    Vertical 6 1.53 9.18 3.000 27.540

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    41/43

    S.NO DESCRIPTION Nos L Qty Wt/unit Weight(Kg)

    North Nose - -

    Vertical 4 4.00 16.00 3.000 48.000

    2 2.60 5.20 3.000 15.600

    1 1.60 1.60 3.000 4.800

    1 1.50 1.50 3.000 4.500

    Horizontal L=(2.1+7)/2 30 4.55 136.50 3.000 409.500

    1 2.10 2.10 3.000 6.300South Nose - -

    Horizontal L=(2.1+7)/2 30 4.55 136.50 3.000 409.500

    Vertical 2 1.50 3.00 3.000 9.000

    1 2.65 2.65 3.000 7.950

    1 2.60 2.60 3.000 7.800

    1 0.90 0.90 3.000 2.700

    4 4.00 16.00 3.000 48.000

    North Part -

    Vertical 4 9.80 39.20 3.000 117.600

    1 7.30 7.30 3.000 21.900

    1 5.15 5.15 3.000 15.450

    Horizontal 1 5.80 5.80 3.000 17.400

    L=(5.8+8.4)/2 19 7.10 134.90 3.000 404.700

    In between North and South nose - -

    Vertical 7 9.80 68.60 3.000 205.800

    1 7.85 7.85 3.000 23.550

    1 5.70 5.70 3.000 17.100

    1 7.20 7.20 3.000 21.600

    1 4.70 4.70 3.000 14.100

    Horizontal L=(8.55+14.65/2) 19 15.88 301.63 3.000 904.875

    1 8.55 8.55 3.000 25.650

    South Part - -

    Vertical 6 9.80 58.80 3.000 176.4001 7.10 7.10 3.000 21.300

    1 8.00 8.00 3.000 24.000

    1 7.30 7.30 3.000 21.900

    Horizontal L=(8.93+4.43)/2 9 10.45 94.05 3.000 282.150

    L=(15.3+13.7)/2 10 14.50 145.00 3.000 435.000

    1 7.30 7.30 3.000 21.900

    1 8.00 8.00 3.000 24.000

    Through North/ South 16 39.10 625.60 3.000 1,876.800

    Total Kg 14,500.980

    B Reinforcement work

    upto 3rd running bill (MT) 16.979

    Rest room lintel 10 mm dia 4 4.85 19.40 0.617 11.975Rest room sill 10 mm dia 4 3.85 15.40 0.617 9.506

    Toilet lintel 4 2.06 8.24 0.617 5.086

    Stirrups

    Rest room lintel 8 mm dia 25 0.40 10.00 0.395 3.951

    Rest room sill 8 mm dia 20 0.40 8.00 0.395 3.160

    Toilet lintel 8 mm dia 11 0.40 4.40 0.395 1.738

    Total Kg 35.417

    Total of this running bill(MT) 0.035

    upto 4th running bill (MT) 17.014

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    42/43

    REINFORCEMENT BAR SCHEDULE

    Project: Construction of Incomplete MEETING HALL,TOILET & CANTEEN Building

    Site: Rt.HPMQuarter,Baluwatar.Ktm.

    Contract No:-7/066/067

    Date:

    Work ItemDescription and Shape of Bending

    Dia. Cut Length

    Nos.

    Total Length Weight Weight

    RemarkNo. No. (mm) (m) (m) per m in kg

    A. 13 Canteen Block1 Footing

    F1 12 1.21 144 174.24 0.89 155.074 8*2*9

    F2 12 1.55 20 31.00 0.89 27.590 10*2

    2 Foundation Beam

    Along grid 1-1 & 2-2 12 12.91 12 154.92 0.89 137.879

    12 0.72 12 8.64 0.89 7.690

    Along Grid 3-3 12 5.69 6 34.14 0.89 30.385

    Along Grid A-A,B-B 12 9.69 12 116.28 0.89 103.489

    Along Grid C-c & D-D 12 6.69 12 80.28 0.89 71.449

    3 Shear reinforcement

    Along grid 1-1 & 2-2 8 0.96 186 178.56 0.40 71.424

    Along Grid 3-3 8 0.96 35 33.60 0.40 13.440

    Along Grid A-A,B-B 8 0.96 140 134.40 0.40 53.760

    Along Grid C-c & D-D 8 0.96 92 88.32 0.40 35.328

    2 Tie Beam Plinth Level

    Along grid 1-1 & 2-2 16 12.69 12 152.28 1.59 242.125

    16 0.96 12 11.52 1.59 18.317

    Along Grid 3-3 16 6.17 6 37.02 1.59 58.862

    Along Grid A-A,B-B 16 10.17 12 122.04 1.59 194.044

    16 0.96 12 11.52 1.59 18.317

    Along Grid C-c & D-D 16 7.17 12 86.04 1.59 136.804

    3 Shear reinforcement

    Along grid 1-1 & 2-2 8 0.96 186 178.56 0.40 71.424

    Along Grid 3-3 8 0.96 35 33.60 0.40 13.440

    Along Grid A-A,B-B 8 0.96 140 134.40 0.40 53.760

    Along Grid C-c & D-D 8 0.96 92 88.32 0.40 35.328

    2 Column

    a 12 6.59 80 527.20 0.89 469.208

    b Shear reinforcement

    Upto Tie Beam 8 1.10 110 121.00 0.40 48.400 11*10

    8 0.93 110

    Above Tie Beam 8 1.10 430 473.00 0.40 189.200 43*10

    8 0.96 430 412.80 0.40 165.120

    c East Apron 8 4.50 18 81.00 0.40 32.400

    8 5.30 18 95.40 0.40 38.160

  • 8/6/2019 5th Running Civil Works ,Baluwatar

    43/43

    REINFORCEMENT BAR SCHEDULE

    Project: Construction of Incomplete MEETING HALL,TOILET & CANTEEN Building

    Site: Rt.HPMQuarter,Baluwatar.Ktm.

    Contract No:-7/066/067

    Date:

    Work ItemDescription and Shape of Bending

    Dia. Cut Length

    Nos.

    Total Length Weight Weight

    RemarksNo. No. (mm) (m) (m) per m in kg

    Apron East 8 28.12 5 140.60 0.40 56.2408 0.48 20 9.60 0.40 3.840 lap

    West Apron 8 8.21 5 41.06 0.40 16.424

    West Apron 8 5.23 5 26.17 0.40 10.468

    8 1.30 21 27.30 0.40 10.920

    Sub-Total 2,590.307

    2.59 MT