6 5 4 3 2 - pinellas county, florida · 2020-02-10 · 4. see specifications for gauges, thickness,...

10
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT M BD P M TS SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION 200 A RHC-1-1 AHU-1 VTU-1-1 -EXISTING FIRE DAMPER TO REMAIN -EXISTING FIRE & SMOKE DAMPER TO REMAIN -PACKAGED TERMINAL AIR CONDITIONER (PTAC) -HYDRONIC REHEAT COIL -FLAT OVAL DUCT (WITH ACCESS PANEL) (WITH ACCESS PANEL) -ELECTRIC DUCT HEATER (W/ PANEL CLEARANCE) FM -MANUAL BALANCING DAMPER -AIR FLOW MEASURING STATION -MOTOR OPERATED CONTROL DAMPER (MOD) -FIRE & SMOKE DAMPER -FIRE DAMPER -FLEXIBLE CONNECTION -ACCESS DOORS, VERTICAL OR HORIZONTAL -INLINE CENTRIFUGAL FAN -STAINLESS STEEL DUCTWORK -DOOR GRILLE -UNDERCUT DOOR SA-1 -SOUND ATTENUATOR -SPIN-IN TAKE-OFF -DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE -RECTANGLE-TO-ROUND TAKE-OFF DN UP -TRANSITION, SQUARE TO ROUND UP W/IN FLOOR DOWN -CEILING EXHAUST -CEILING RETURN 24x12 -STANDARD BRANCH TAKE-OFF -RADIUS ELBOW -TRANSITION, ECCENTRIC -FLEXIBLE DUCT -CHANGE OF ELEVATION -DUCT ELBOW, NEGATIVE PRESSURE, RETURN -DUCT ELBOW, EXHAUST DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING -DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST -NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN -TRANSITION, CONCENTRIC -SQUARE THROAT ELBOW W/TURNING VANES -RECTANGULAR/ROUND BRANCH TAKE-OFF OR ROUND/ROUND BRANCH TAKE-OFF -SQUARE THROAT TEE -RADIUS TEE -ROUND DIFFUSER -SUPPLY REGISTER OR GRILLE -RETURN/EXHAUST REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL) (VERTICAL MOUNT, SIDEWALL) -EXISTING DUCTWORK TO REMAIN -EXISTING DUCTWORK TO BE REMOVED (CEILING DIFFUSERS ARE 4-WAY THROW UNO) -CEILING DIFFUSER, ROUND NECK -CEILING DIFFUSER, RECTANGULAR OR SQUARE NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO) 1 M-1 1 -TEMPERATURE SENSOR -MOTORIZED CONTROL DAMPER -HUMIDISTAT/HUMIDITY SENSOR -THERMOSTAT/TEMPERATURE SENSOR -REVISION REFERENCE -DETAIL REFERENCE: TOP-DETAIL#, BOTTOM-DRAWING# SHOWN ON -PRESSURE SENSOR -DUCT SMOKE DETECTOR -CONNECT TO EXISTING -DEMOLISH TO POINT INDICATED FF -FINAL FILTERS DDC -DIRECT DIGITAL CONTROLS PRS -PRESSURE REDUCING STATION SP -STATIC PRESSURE -CFM (CUBIC FEET PER MINUTE) P -CHANGE IN PRESSURE CV -CONSTANT AIR VOLUME -ROOFTOP AIR HANDLING UNIT RTU RS/L -REFRIGERANT SUCTION & LIQUID LINES h -OUTSIDE AIR LOUVER OAL -VARIABLE AIR VOLUME VAV -SUPPLY AIR SA -ROOFTOP HEAT PUMP RHP -REHEAT COIL RHC -REVOLUTIONS PER MINUTE RPM -RETURN AIR RA -POLYVINYL CHLORIDE PIPE PVC -PSI GAUGE PSIG -POUNDS PER SQUARE INCH PSI -PRESSURE REDUCING VALVE PRV -OUTSIDE AIR OA -NOT TO SCALE NTS -NORMALLY OPEN NO -NORMALLY CLOSED NC -LINEAR DIFFUSER LD -LEAVING WATER TEMPERATURE LWT -LEAVING AIR TEMPERATURE LAT -GALLONS PER MINUTE GPM -FEET PER MINUTE -FIRE DAMPER -FAN COIL UNIT -ENTERING WATER TEMPERATURE -ENTERING AIR TEMPERATURE -DOWN -CONDENSING UNIT -CUBIC FEET PER MINUTE -CHANGE IN TEMPERATURE -COOLING TOWER -CEILING DIFFUSER -CENTER LINE -BRITISH THERMAL UNIT -BRAKE HORSEPOWER -BOTTOM OF PIPE -ACCESS PANEL -ABOVE FINISHED FLOOR FPM FD FCU EWT EAT DN CU CFM T CT CD BTU BOP BHP AP AFF -AIR HANDLING UNIT AHU MBH -THOUSAND BTUs PER HOUR AFD -ADJUSTABLE FREQUENCY DRIVE ESP -EXTERNAL STATIC PRESSURE KW -KILOWATT MCA -MINIMUM CIRCUIT AMPS MOCP -MAXIMUM OVER CURRENT PROTECTION UNO TSP -TOTAL STATIC PRESSURE -VOLTS/PHASE V/PH VFD -VARIABLE FREQUENCY DRIVE -UNLESS NOTED OTHERWISE FLA -FULL LOAD AMPS -CONTROL VALVE -45° PIPE RISE (R) / DROP (D) -CONDENSER WATER SUPPLY -CONDENSER WATER RETURN -CHILLED WATER SUPPLY -CHILLED WATER RETURN -CONDENSATE -HOT WATER RETURN -HOT WATER SUPPLY -REFRIGERANT LIQUID -REFRIGERANT SUCTION -VALVE ON RISER -CAP -CONNECTION, BOTTOM -CONNECTION, TOP -COUPLING -ELBOW, 90° -ELBOW, 45° -ELBOW, TURNED DOWN -ELBOW, TURNED UP -TEE, OUTLET DOWN -TEE, OUTLET UP CWS CWR CHWS CHWR RL RS -FLOW SWITCH -CHECK VALVE -PSI REG. -SOLENOID VALVE -STRAINER -GAS COCK -BUTTERFLY VALVE -CALIBRATING BALANCING VALVE -BALL VALVE -GATE VALVE -UNION PC -PUMPED CONDENSATE D D -HIGH PRESSURE STEAM SUPPLY -LOW PRESSURE STEAM SUPPLY -MEDIUM PRESSURE STEAM SUPPLY CR -CONDENSATE RETURN -SLOPE DIRECTION (DOWN) -FLEX CONNECTION -O.S.&Y. GATE VALVE -THREE-WAY CONTROL VALVE -THERMOMETER - P-TRAP -TWO-WAY CHECK VALVE EQUIP. -MANUAL VENT -PRESSURE GAUGE -RELIEF VALVE -FLOW METER -WATER METER -INLINE PUMP -INLINE PUMP CTU - CONSTANT TERMINAL UNIT VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS VTU - VARIABLE TERMINAL UNIT PTU - PARALLEL TERMINAL UNIT STU - SERIES TERMINAL UNIT -AIR HANDLING UNIT -REHEAT COIL -AIR DISTRIBUTION DEVICE -NEGATIVE RELATIVE PRESSURE -POSITIVE RELATIVE PRESSURE -NEUTRAL RELATIVE PRESSURE -HIGH PRESSURE STEAM RETURN -LOW PRESSURE STEAM RETURN -MEDIUM PRESSURE STEAM RETURN -BACKDRAFT DAMPER MOD -MOTOR OPERATED CONTROL DAMPER (MOD) -PACKAGED TERMINAL AIR CONDITIONER PTAC -PIPE ANCHORS -CONCENTRIC REDUCER -ECCENTRIC REDUCER -STEAM TRAP -FLOW DIRECTION -SHEET NOTE CALLOUT -SHEET NOTE CALLOUT -SHEET NOTE CALLOUT -EXHAUST DUCT UP THROUGH SLAB W/ -EXHAUST FAN ON ROOF W/ DUCT DOWN THROUGH ROOF -CEILING MOUNTED ACCESS DOOR -RECTANGULAR DUCT SECTION UP, EXHAUST -RECTANGULAR DUCT SECTION UP, -RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE, -ROUND DUCT SECTION UP -FLAT OVAL DUCT SECTION UP SUPPLY OR OUTSIDE AIR NEGATIVE PRESSURE, RETURN FAN ON ROOF ABOVE -ABOVE FINISHED ROOF AFR -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME WITH ELECTRIC HEAT -TERMINAL UNIT, VARIABLE/CONSTANT AIR -TERMINAL UNIT, VARIABLE/CONSTANT AIR VOLUME, FAN POWERED VOLUME, FAN POWERED, WITH ELECTRIC HEAT -TERMINAL UNIT, VARIABLE/CONSTANT AIR 12x8 HVAC GENERAL NOTES HVAC ABBREVIATIONS HVAC SYMBOL LEGEND HVAC EQUIPMENT TAGS HVAC PIPING SYMBOL LEGEND 10x8 24x12 12x8 HPS MPS LPS CD HWR HWS HPR MPR LPR 1 1 1 _ + 0 H VOLUME WITH ELECTRIC HEAT 1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED. 2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT. 3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD. 4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK. 5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS. 6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED. 7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES. 8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS. 9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. 10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS. 11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK. 12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT. 13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED. 14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT. 15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT. 16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS. 17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES. 18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL UNITS. 19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED. 20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE. 21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER. 22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS. 23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS. 24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK. 25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI. 26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN. 27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING. 28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26. 24x12 24x12 S MV FM M T UC c TAG CFM AHU NUMBER AHU NUMBER COIL NUMBER AHU NUMBER TERMINAL NUMBER TERMINAL UNIT TYPE NOT FOR CONSTRUCTION PRELIMINARY DOCUMENTS KEY PLAN 1 APPROVED BY CHECKED BY A SHEET NO. TITLE DRAWN BY DATE PROJECT NO. SCALE SEAL REVISIONS 2 3 4 5 6 B C D E F 12" = 1'-0" M-000 MECHANICAL LEGEND HAT LTE LTE 03/19/2014 Dewberry Architects Inc. 50057109 Pinellas County Jail Phase I Infrastructure Criteria Package - Drawings Pinellas County 114400 North 49th Street Clearwater, FL. 401 SW Water St. Suite 701 Peoria, IL 61602 309.282.8000 Phone 309.282.8001 Fax No. Description Date

Upload: others

Post on 04-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

M

BD

P

M

TS

SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION SYMBOL DESCRIPTION

SYMBOL DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL DESCRIPTION

SYMBOL DESCRIPTION

200A

RHC-1-1

AHU-1

VTU-1-1

-EXISTING FIRE DAMPER TO REMAIN

-EXISTING FIRE & SMOKE DAMPER TO REMAIN

-PACKAGED TERMINAL AIR CONDITIONER (PTAC)

-HYDRONIC REHEAT COIL

-FLAT OVAL DUCT

(WITH ACCESS PANEL)

(WITH ACCESS PANEL)

-ELECTRIC DUCT HEATER (W/ PANEL CLEARANCE)

FM

-MANUAL BALANCING DAMPER

-AIR FLOW MEASURING STATION

-MOTOR OPERATED CONTROL DAMPER (MOD)

-FIRE & SMOKE DAMPER

-FIRE DAMPER

-FLEXIBLE CONNECTION

-ACCESS DOORS, VERTICAL OR HORIZONTAL

-INLINE CENTRIFUGAL FAN

-STAINLESS STEEL DUCTWORK

-DOOR GRILLE

-UNDERCUT DOOR

SA-1 -SOUND ATTENUATOR

-SPIN-IN TAKE-OFF

-DUCT ELBOW UP THROUGH ROOF OR SLAB ABOVE

-RECTANGLE-TO-ROUND TAKE-OFF

DNUP

-TRANSITION, SQUARE TO ROUND

UP W/IN FLOORDOWN

-CEILING EXHAUST

-CEILING RETURN

24x12

-STANDARD BRANCH TAKE-OFF

-RADIUS ELBOW

-TRANSITION, ECCENTRIC

-FLEXIBLE DUCT

-CHANGE OF ELEVATION

-DUCT ELBOW, NEGATIVE PRESSURE, RETURN

-DUCT ELBOW, EXHAUST

DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING

-DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST

-NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN-TRANSITION, CONCENTRIC

-SQUARE THROAT ELBOW W/TURNING VANES

-RECTANGULAR/ROUND BRANCH TAKE-OFFOR ROUND/ROUND BRANCH TAKE-OFF

-SQUARE THROAT TEE

-RADIUS TEE

-ROUND DIFFUSER

-SUPPLY REGISTER OR GRILLE

-RETURN/EXHAUST REGISTER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

(VERTICAL MOUNT, SIDEWALL)

-EXISTING DUCTWORK TO REMAIN

-EXISTING DUCTWORK TO BE REMOVED

(CEILING DIFFUSERS ARE 4-WAY THROW UNO)-CEILING DIFFUSER, ROUND NECK

-CEILING DIFFUSER, RECTANGULAR ORSQUARE NECK (CEILING DIFFUSERSARE 4-WAY THROW UNO)

1

M-11

-TEMPERATURE SENSOR

-MOTORIZED CONTROL DAMPER

-HUMIDISTAT/HUMIDITY SENSOR

-THERMOSTAT/TEMPERATURE SENSOR

-REVISION REFERENCE

-DETAIL REFERENCE: TOP-DETAIL#, BOTTOM-DRAWING# SHOWN ON

-PRESSURE SENSOR

-DUCT SMOKE DETECTOR

-CONNECT TO EXISTING

-DEMOLISH TO POINT INDICATED

FF -FINAL FILTERS

DDC -DIRECT DIGITAL CONTROLS

PRS -PRESSURE REDUCING STATION

SP -STATIC PRESSURE

-CFM (CUBIC FEET PER MINUTE)

P -CHANGE IN PRESSURE

CV -CONSTANT AIR VOLUME

-ROOFTOP AIR HANDLING UNITRTU

RS/L -REFRIGERANT SUCTION & LIQUID LINES

h

-OUTSIDE AIR LOUVEROAL

-VARIABLE AIR VOLUMEVAV

-SUPPLY AIRSA

-ROOFTOP HEAT PUMPRHP

-REHEAT COILRHC

-REVOLUTIONS PER MINUTERPM

-RETURN AIRRA-POLYVINYL CHLORIDE PIPEPVC

-PSI GAUGEPSIG

-POUNDS PER SQUARE INCHPSI

-PRESSURE REDUCING VALVEPRV

-OUTSIDE AIROA-NOT TO SCALENTS

-NORMALLY OPENNO

-NORMALLY CLOSEDNC

-LINEAR DIFFUSERLD

-LEAVING WATER TEMPERATURELWT

-LEAVING AIR TEMPERATURELAT

-GALLONS PER MINUTEGPM

-FEET PER MINUTE

-FIRE DAMPER

-FAN COIL UNIT

-ENTERING WATER TEMPERATURE

-ENTERING AIR TEMPERATURE

-DOWN

-CONDENSING UNIT

-CUBIC FEET PER MINUTE

-CHANGE IN TEMPERATURE

-COOLING TOWER

-CEILING DIFFUSER

-CENTER LINE

-BRITISH THERMAL UNIT

-BRAKE HORSEPOWER

-BOTTOM OF PIPE

-ACCESS PANEL

-ABOVE FINISHED FLOOR

FPM

FD

FCU

EWT

EAT

DN

CU

CFM

T

CT

CD

BTU

BOP

BHP

AP

AFF

-AIR HANDLING UNITAHU

MBH -THOUSAND BTUs PER HOUR

AFD -ADJUSTABLE FREQUENCY DRIVE

ESP -EXTERNAL STATIC PRESSURE

KW -KILOWATT

MCA -MINIMUM CIRCUIT AMPS

MOCP -MAXIMUM OVER CURRENT PROTECTION

UNO

TSP -TOTAL STATIC PRESSURE

-VOLTS/PHASEV/PH

VFD -VARIABLE FREQUENCY DRIVE

-UNLESS NOTED OTHERWISEFLA -FULL LOAD AMPS

-CONTROL VALVE

-45° PIPE RISE (R) / DROP (D)

-CONDENSER WATER SUPPLY

-CONDENSER WATER RETURN

-CHILLED WATER SUPPLY

-CHILLED WATER RETURN

-CONDENSATE

-HOT WATER RETURN

-HOT WATER SUPPLY

-REFRIGERANT LIQUID

-REFRIGERANT SUCTION

-VALVE ON RISER

-CAP

-CONNECTION, BOTTOM

-CONNECTION, TOP

-COUPLING

-ELBOW, 90°

-ELBOW, 45°

-ELBOW, TURNED DOWN

-ELBOW, TURNED UP

-TEE, OUTLET DOWN

-TEE, OUTLET UP

CWS

CWR

CHWS

CHWR

RL

RS

-FLOW SWITCH

-CHECK VALVE

-PSI REG.

-SOLENOID VALVE

-STRAINER

-GAS COCK

-BUTTERFLY VALVE

-CALIBRATING BALANCING VALVE

-BALL VALVE

-GATE VALVE

-UNIONPC -PUMPED CONDENSATE

DD

-HIGH PRESSURE STEAM SUPPLY

-LOW PRESSURE STEAM SUPPLY

-MEDIUM PRESSURE STEAM SUPPLY

CR -CONDENSATE RETURN

-SLOPE DIRECTION (DOWN)

-FLEX CONNECTION

-O.S.&Y. GATE VALVE

-THREE-WAY CONTROL VALVE

-THERMOMETER

- P-TRAP

-TWO-WAY CHECK VALVE

EQUIP.

-MANUAL VENT

-PRESSURE GAUGE

-RELIEF VALVE

-FLOW METER

-WATER METER

-INLINE PUMP

-INLINE PUMPCTU - CONSTANT TERMINAL UNIT

VARIABLE/CONSTANT AIR VOLUME TERMINAL UNITS

VTU - VARIABLE TERMINAL UNIT

PTU - PARALLEL TERMINAL UNITSTU - SERIES TERMINAL UNIT

-AIR HANDLING UNIT

-REHEAT COIL

-AIR DISTRIBUTION DEVICE

-NEGATIVE RELATIVE PRESSURE

-POSITIVE RELATIVE PRESSURE

-NEUTRAL RELATIVE PRESSURE

-HIGH PRESSURE STEAM RETURN

-LOW PRESSURE STEAM RETURN

-MEDIUM PRESSURE STEAM RETURN

-BACKDRAFT DAMPER

MOD -MOTOR OPERATED CONTROL DAMPER (MOD)

-PACKAGED TERMINAL AIR CONDITIONERPTAC

-PIPE ANCHORS

-CONCENTRIC REDUCER

-ECCENTRIC REDUCER

-STEAM TRAP

-FLOW DIRECTION

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-SHEET NOTE CALLOUT

-EXHAUST DUCT UP THROUGH SLAB W/

-EXHAUST FAN ON ROOF W/ DUCT DOWNTHROUGH ROOF

-CEILING MOUNTED ACCESS DOOR

-RECTANGULAR DUCT SECTION UP, EXHAUST

-RECTANGULAR DUCT SECTION UP,

-RECTANGULAR DUCT SECTION UP, POSITIVE PRESSURE,

-ROUND DUCT SECTION UP

-FLAT OVAL DUCT SECTION UP

SUPPLY OR OUTSIDE AIR

NEGATIVE PRESSURE, RETURN

FAN ON ROOF ABOVE

-ABOVE FINISHED ROOFAFR

-TERMINAL UNIT, VARIABLE/CONSTANT AIRVOLUME WITH ELECTRIC HEAT

-TERMINAL UNIT, VARIABLE/CONSTANT AIR

-TERMINAL UNIT, VARIABLE/CONSTANT AIRVOLUME, FAN POWERED

VOLUME, FAN POWERED, WITH ELECTRIC HEAT

-TERMINAL UNIT, VARIABLE/CONSTANT AIR

12x8

HVAC GENERAL NOTESHVAC ABBREVIATIONSHVAC SYMBOL LEGEND

HVAC EQUIPMENT TAGSHVAC PIPING SYMBOL LEGEND

10x8

24x12

12x8

HPS

MPS

LPS

CD

HWR

HWS

HPR

MPR

LPR

1

1

1

_

+

0

H

VOLUME WITH ELECTRIC HEAT

1. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

2. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST. FOR PROJECTS INVOLVING RENOVATION, COORDINATE NEW WORK WITH EXISTING ELEMENTS SUCH AS THE BUILDING STRUCTURE AND ARCHITECTURAL FEATURES, SPRINKLER PIPING, LIGHTS, PLUMBING, AND ELECTRICAL CONDUIT.

3. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARD.

4. SEE SPECIFICATIONS FOR GAUGES, THICKNESS, BRACING, REQUIREMENTS, ETC., OF DUCTWORK.

5. PROVIDE AIR TURNING VANES IN ALL 90 DEGREE RECTANGULAR DUCT ELBOWS.

6. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.

7. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS AND EQUIPMENT OF ALL TRADES.

8. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.

9. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

10. ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

11. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE PAINTED FLAT BLACK.

12. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

13. TRAPPED CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED FOR PROPER DRAINAGE TO SUIT EQUIPMENT FURNISHED.

14. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

15. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

16. PROVIDE CONCRETE HOUSEKEEPING PAD UNDER ALL FLOOR-MOUNTED EQUIPMENT. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.

17. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND OTHER AIR DISTRIBUTION DEVICES.

18. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO EACH FAN, AIR HANDLING UNITS, AND FAN COIL UNITS.

19. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE CONNECTED.

20. INTERRUPTIONS TO EXISTING SERVICES SHALL BE SCHEDULED FOR TIMES OTHER THAN NORMAL OPERATING HOURS (SUCH AS NIGHTS AND WEEKENDS). SUCH INTERRUPTIONS TO SERVICES SHALL NOT BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER'S REPRESENTATIVE AND PROPER COORDINATION WITH OTHER TRADES. PRE-WORK SHALL BE PERFORMED TO MAKE THE SHUTDOWN PERIOD AS BRIEF AS POSSIBLE.

21. ALL EQUIPMENT, DUCTWORK, ETC., TO BE REMOVED SHALL REMAIN PROPERTY OF THE OWNER OR DISPOSED OF LEGALLY, AS DIRECTED BY OWNER.

22. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

23. LOCATE ALL OUTSIDE AIR INTAKES A MINIMUM OF 10' CLEAR FROM ALL PLUMBING VENTS AND EXHAUST AIR DISCHARGE LOCATIONS.

24. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

25. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI.

26. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN.

27. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CHILLED WATER AND HOT WATER PIPING.

28. PIPING, DUCTWORK, LEAK PROTECTION APPARATUS, OR OTHER EQUIPMENT FOREIGN TO ELECTRICAL SWITCHBOARDS, PANELBOARDS, DISTRIBUTION BOARDS, OR MOTOR CONTROL CENTERS SHALL NOT BE INSTALLED WITHIN THE REQUIRED SPACE FOR WORKING CLEARANCES OR DEDICATED SPACES OF THE ELECTRICAL EQUIPMENT, EXTENDING IN FRONT OF AND FROM FLOOR TO STRUCTURAL CEILING WITH A WIDTH AND DEPTH OF THE ELECTRICAL EQUIPMENT IN ACCORDANCE WITH NEC-110.26.

24x12

24x12

S

MV

FM

M

T

UC

c

TAG

CFM

AHU NUMBER

AHU NUMBER COIL NUMBER

AHU NUMBER

TERMINAL NUMBER

TERMINAL UNIT TYPE

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

12" = 1'-0"

M-000

MECHANICALLEGEND

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

No. Description Date

Page 2: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

(E)8" CHWS/R

(E)3" CHWS/R

(E)4" CHWS/R

(E)1" BALL VALVES

(E)6" CHWS/R

(E)4" CHWS/R

(E)6" CHWS/R

(E)4" CHWS/R(E)4" CHWS/R

(E)4" CHWS/R

GENERAL NOTES:

1. ALL EXISTING, PLASTIC CHILLED WATER PIPING SHALL BEDEMOLISHED/ABANDONED. ANY METALLIC BRANCH PIPINGTHAT IS CONNECTED TO PLASTIC MAIN PIPE SHALL BEDISCONNECTED FROM THE PLASTIC PIPE. METAL ENDS SHALLBE CAPPED AND LEFT IN SUITABLE CONDITION FORCONNECTION TO NEW, METALLIC UNDERGROUND CHILLEDWATER LINES. CONTRACTOR TO VERIFY WHERE PLASTIC PIPEENDS AND METAL PIPE BEGINS.

2. FINAL PIPE SIZE TO BE DETERMINED BY FINAL DESIGN BUILDCONTRACTOR.

(E)8" CHWS/R

(E)3" CHWS/R

(E) CHWS/RVALVE BOX

(E) CHWS/R

(N)CHWS/R DISTRIBUTION

(N) CHWS/R DISTRIBUTION

(N) 20" CHWS/R DISTRIBUTION RUN PARALLEL TO EXISTINGPIPING SERVING CENTRAL/INTAKE AND HOUSING A-G

(N)CHWS/R PIPING BRIDGED OVER TOSTATE ATTORNEY/ CJC CENTER

(N)CHWS/R DISTRIBUTION

(N)CHWS/R BRANCH TONEW BUILDING

(N)CHWS/R BRANCH TONEW BUILDING

(E) CHWS/R

JURISDICTIONAL WETLAND LINE

SIR LB021(FIR 1/2" LB1344 0.30' S., 0.50' W.)

FIR 1/2" LB1344EDGE OF WATER

EDGE OF WATER

ASPHALT WALK

OHE OHEOHE

2' VALLEY GUTTER

POND POND

POND

POND

140TH AVE N

49TH

ST

N

142ND AVE N

145TH AVE N

PINELLAS COUNTYCRIMINAL COURT

COMPLEX

MAINTENANCE

"B""A"

HEALTH CARE FACILITY

"M1"

"M2"

"C""D""E""F"

"G"

CENTRAL DIVISION

"C"

SOUTH DIVISION

JUVENILE DETENTION CENTER

SAFE HARBOR

SHERIFF ADMIN.C

RO

SS

BA

YOU

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

1" = 100'-0"

M-001

MECHANICAL SITEPLAN

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

Scale: 1" = 100'-0"1 MECHANICAL SITE PLAN

No. Description Date

Page 3: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

WORKERSTAGING

122

INMATETOILET121

SEARCH123

STORAGE

INMATETOILET119STAFF

118

JANITOR114

INMATETOILET113

WATERHEATER124

STAIRBSB1

STAFFTOILET125

AIRCOMPRESSOR

126

DRYERS127

CENTRALLAUNDRY

138

CHEMICALSTORAGE

128

INMATETOILET129BREAK

ROOM130

UNIFORMSTORAGE

131

RISERROOM132

WATER TANKSTORAGE

104MAINTENANCE

SUPPLY133

STORAGE134

CLEAN LAUNDRYSTORAGE

135

UTILITYWASH136

GARBAGE/RECYCLE DOCK

106

SALLYPORTSERVICE DRIVE

103DOCKSTORAGE

102

SECURITYELECTRONICS

101

STAIRASA1

PARKING AREA

ELECTRICAL140

CARTWASH139

OFFICE/

137

ELEVATORBEB

ELEVATORCEC

PROGRAMMEETING ROOM

116

PROGRAMMEETING ROOM

110

PROGRAMMEETING ROOM

111

BULK DRYSTORAGE

108

DOCKSTAGING

107

BULK REFIGSTORAGE

109

STORAGE112

JANITOR142

LOADINGDOCK105

ELEVATORAEA

6.9

6.9

1.1

1.1

3

3

5

5

A.1 A.1

B B

C C

D D

E.9 E.9

1

F

7

A A

F

1 7

TRASH COMPACTOR

FECFECC

2448 2448

H

C

MEDIUM PRESSURE SUPPLY DUCT ESTIMATED 80x30

CO AND NO2 SENSORS LINKED TO ALARM

USED OIL TANK NEW OIL TANK

1

2

3

4

3

4

3

T

T

TT

T

T

T

T

T

T

1

1

44

4

4

4

3

56

7

S

S

S

S

S

T3

3

3

3

3

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

1/8" = 1'-0"

M-110

FIRST FLOORMECHANICAL

PLAN

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

Scale: 1/8" = 1'-0"1 FIRST FLOOR MECHANICAL PLAN

No. Description Date

Keynotes1 AREA TO BE PROVIDED WITH DEDICATED CHILLED

WATER FAN COIL UNIT.2 AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL

RATED.3 AREA TO BE EXHAUSTED.4 VAV BOX WITH ELECTRIC HEAT. PROVIDE ACCESS

PANEL AS REQUIRED.5 PROVIDE LINT TRAP.6 DRYER EXHAUST FAN. ROUTE TO EXTERIOR WALL.7 COMBUSTION AIR MAKE UP FAN. ROUTE TO

EXTERIOR WALL.

Page 4: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

CHEMICAL STORAGE(SECURE)

216

WARE WASHAREA215

STORAGE/FUTURE LINK

217

STORAGE218CART STORAGE

AND WASHING219

TRAYMAKE-UP

220

CORRIDOR221

ELEC233

ICE/BEV.234

STAIRB

SB2

STAIRA

SA2

ELEVATORBEB

ELEVATORCEC

ELEVATORAEA

CORRIDOR222

STAFF DININGMULTI-PURPOSE

232

SERVING231

FOOD PREPSERVICE AREA

230

MULTI-PURPOSE223

CORRIDOR229

JAN228

STAFFTOILET227

STAFFTOILET226

CONNECTOR TOCENTRAL TOWER

CN

DAILY DRYSTORAGE

236

FINISH VEGPREP237

FINISH MEATPREP238

-10 FREEZER239

-20 FREEZER240

THAW/PULL241

BULKCOLDROOM

242

FINISHED BULKCOLDROOM

243

BULK MEATCOLDROOM

242

FINISH PRODUCECOLDROOM

245

BULK PRODUCECOLDROOM

248

CORRIDOR251

DAIRYCOLDROOM

247

CORRIDOR250

TRASHHOLDING246

JAN249

KITCHEN/LAUNDRYSTORAGE

201

JAN/EQUIPSUPPLIES

202

EQUIPMENTSTORAGE

203

UNIFORM205

INMATETOILET208

INMATETOILET207

STAFFTOILET206

DRY FOODSTORAGE

204 SECUREDSTORAGE

209BREAKROOM211

CORRIDOR212

OFFICE213

FOOD SERVICEMGMT OFFICE

214

HOT FOODPRODUCTION

235

CORRIDOR210

A/VCLOSET224

6.9

6.9

1.1

1.1

3

3

5

5

A.1 A.1

B B

C C

D D

E.9 E.9

1

1

7

7

F F

A A

FECFEC

REF

REFMIC

MIC

C

H

C

H

C

H

C

H

C

G

E1

D2

C1

D1

E2G

E1

D2

C1

D1

E2

FAUCET, TANGENT DRAW-OFF

ARE OPTIONAL

G

CH

G

DC

DD

C

H

H

C

H

C

GG

GG

GG

GG

G

DRR

DRR

CC

C

D

GG

GG

H

C

H

C

12"X10"

1353 C

FM.43" S.P.

12"X12"

937 C

FM.27" S.P.

12"X10"

1352 C

FM.43" S.P.

12"X12"

937 C

FM.27" S.P.

12"X12"

937 C

FM.27" S.P.

12"X9"

1216 C

FM.37" S.P.

12"X12"

937 C

FM.27" S.P.

12"X9"

1217 C

FM.37" S.P.

12"X10"

1379 C

FM.42" S.P.

12"X12"

937 C

FM.27" S.P.

11"X8"

1011 C

FM.29" S.P.

12"X10"

809 C

FM.20" S.P.

11"X8"

1012 C

FM.29" S.P.

12"X10"

809 C

FM.20" S.P.

#321.2L

#321.2R

FIRE CABINET

#321.1L

#321.1R

FIRE CABINET

12"X10"

1456 C

FM.39" S.P. 9"X8"

538 C

FM.07" S.P.

12"X11"

1648 C

FM.47" S.P.

12"X12"

1075 C

FM.27" S.P.

#321.6L

#321.6R

TRAP AN

D ST

RAIN

ERSTEAM C

ONDENSATE

RETU

RNCONDENSATE

1/2" NPT

SAFETY VA

LVE

STEAM

VALVE

CONTROL

TRAP AN

D ST

RAIN

ERSTEAM C

ONDENSATE

RETU

RNCONDENSATE

1/2" NPT

SAFETY VA

LVE

STEAM

VALVE

CONTROL

TRAP AN

D ST

RAIN

ERSTEAM C

ONDENSATE

RETU

RNCONDENSATE

1/2" NPT

SAFETY VA

LVE

STEAM

VALVE

CONTROL

TRAP AN

D ST

RAIN

ERSTEAM C

ONDENSATE

RETU

RNCONDENSATE

1/2" NPT

SAFETY VA

LVE

STEAM

VALVE

CONTROL

TRAP AN

D ST

RAIN

ERSTEAM C

ONDENSATE

RETU

RNCONDENSATE

1/2" NPT

SAFETY VA

LVE

STEAM

VALVE

CONTROL

D

D C

1

2

3

3

APPROXIMATE SUPPLY DUCT SIZE 96x24

APPROXIMATE RETURN DUCT SIZE 70x24

44

4

4

4

4

5

4

6

7

6

4

4

4

6

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

1/8" = 1'-0"

M-120

SECOND FLOORMECHANICAL

PLAN

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

Scale: 1/8" = 1'-0"1 SECOND FLOOR MECHANICAL PLAN

No. Description Date

Keynotes1 ROUTE EXHAUST DUCTWORK, APPROXIMATELY 60x20, TO

KITCHEN HOODS. COORDINATE WITH KITCHENDESIGNER.

2 ROUTE MAKE UP DUCTWORK, APPROXIMATELY 50x20, TOKITCHEN EQUIPMENT. COORDINATE WITH KITCHENDESIGNER.

3 ROUTE SUPPLY AND DUCTING TO MECHANICAL CHASE.4 AREA TO BE EXHAUSTED.5 AREA TO BE EXHAUSTED. FAN TO BE CHEMICAL RATED.6 AREA TO BE PROVIDED WITH DEDICATED CHILLED

WATER FAN COIL UNIT.7 REFRIGERATER/ FREEZER AREA. SEE KITCHEN

EQUIPMENT PLANS.

Page 5: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

OFFICE301

CONTROLROOM302

STAFFTOILET305

VESTIBULE303

ELEVATORLOBBY

I.T.ROOM306ELEVATOR

CEC

STAIRBSB3

STAIRA

SA3

GENERATORCONTROL

309310ELEVATOR

AEA

ELECTRICAL

312

GENERATORROOM311EXTERIOR

ROOFER1

EXTERIORROOFER2

CONTROLCONFERENCE RM

313

6.9

6.9

1.1

1.1

3

3

5

5

A.1 A.1

B B

C C

D D

E.9

1 7

A A

FF

E.9

1 7

REF

REF

ABSO

RPTI

ON C

HILL

ER

FUTU

RE A

BSOR

PTIO

N CH

ILLER

ELECTRIC CHILLERFUTURE ELECTRIC CHILLER

KITCHEN EQUIPMENTCONDENSING UNIT

ELECTRIC CHILLER

FUTURE GAS ENGINE

GAS ENGINE

CWP-3 CWP- 2

SYS PUMP

CHW FAN COIL

CHW FAN COIL

CHW FAN COIL

CHW FAN COILCHW/ DX FAN COILCHW FAN COIL

WATERTREATMENT ANDHYDRONICSPECIALTIES AREA

CHWP-3 CHWP-2 CWP-1 CHWP-1

CWP- FUTURE

CHWP-FUTURE

20" CHWS/R PIPING TO SOUTH CAMPUS.SEE STRUCTURAL AND ARCHITECTURAL FOR ROUTING.

CHWP-1ABS

CHW FAN COIL

LAUNDRY CHW AHU

KITCHEN CHW AHU

1

1

2

2

3

3

4

4

4

5

5

6

7

7

8

9

1010

411

5

FUTURE SYS PUMP

CWP-1ABS

CHWP-2ABS

CWP-2ABS

CHWP-FUTUREABS

CWP-FUTUREABS

12

1314

COUPON RACK ANDCHEMICALS

SHOT FEEDER &PUMPS

CHEMICALSTORAGE

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

1/8" = 1'-0"

M-130

THIRD FLOORMECHANICAL

PLAN

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

Scale: 1/8" = 1'-0"1 THIRD FLOOR PIPING PLAN

No. Description Date

Keynotes1 GENERATOR RADIATOR. PIPE TO AND FROM

GENERATOR.2 THREE- WAY CATALYST INSTALLED ON EXHAUST GAS

PIPE.3 ROUTE EXHAUST GAS PIPE SHORTEST DISTANCE TO

ABSORPTION CHILLER.4 NEW CHILLED WATER FAN COIL UNIT. ROUTE OUTSIDE

AIR THROUGH ROOF. COORDINATE ROOF PENETRATIONSWITH STRUCTURAL.

5 AREA TO BE PROVIDED WITH DEDICATED CHILLEDWATER FAN COIL UNIT.

6 AREA TO BE EXHAUSTED.7 ROOFTOP CHILLED WATER AIR HANDLER. PROVIDE

MANUFACTURER'S CLEARANCES. SUPPLY AND RETURNDUCTING PENETRATIONS TO BE COORDINATED WITHSTRUCTURE.

8 ROOFTOP MAKE UP FAN FOR KITCHEN EQUIPMENT.COORDINATE WITH KITCHEN DESIGNER. COORDINATEROOF PENETRATIONS WITH STRUCTURAL.

9 ROOFTOP EXHAUST FAN FOR KITCHEN EQUIPMENT.COORDINATE WITH KITCHEN DESIGNER. COORDINATEROOF PENETRATIONS WITH STRUCTURAL.

10 ROUTE ABSORPTION CHILLER EXHAUST THROUGH ROOFTO MUFFLER. COORDINATE ROOF PENETRATIONS WITHSTRUCTURAL.

11 PROVIDE DEDICATED DX/ CHILLED WATER UNIT FORELEVATOR MACHINE ROOM.

12 ACOUSTICAL TREATED WALL. PROVIDE ACOUSTICALWRAP FOR PIPING PENETRATIONS.

13 REFRIGERANT PURGE SYSTEM FAN.14 PROVIDE OUTSIDE AIR DROP FOR PURGE SYSTEM.

Page 6: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

STAIRA

SA4

STAIRB

SB4

6.91.1 3 5

6.91.1 3 5

A.1

B

C

D

E.9

B

C

D

E.9

A.1

1 7

A A

F F

71

FUTURE 2-CELLCOOLING TOWER

(ELECTRIC CHILLER) 2-CELL COOLING TOWER(ELECTRIC CHILLER)

2-CELL COOLING TOWER(ELECTRIC CHILLER)

(2) SINGLE-CELL COOLING TOWERS(ABSORPTION CHILLERS)

(1) FUTURE

11

1

1

1

23

2 3

FUTURE MUFFLERMUFFLER

FUTURE SUPPLY FAN FUTURE EXHAUST FAN

44

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

1/8" = 1'-0"

M-140

ROOFMECHANICAL

PLAN

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

Scale: 1/8" = 1'-0"1 ROOF PIPING PLAN

No. Description Date

Keynotes1 ROUTE CONDENSER PIPING FROM TOWER

THROUGH ROOF SLAB TO PUMP LOCATED INMECHANICAL ROOM. COORDINATE ROOFPENETRATION WITH STRUCTURAL.

2 GENERATOR ROOM INTAKE FAN. COORDINATEFAN WITH STRUCTURE. PROVIDE PENTHOUSE.PROVIDE SILENCERS AS REQUIRED.

3 GENERATOR ROOM EXHAUST FAN.COORDINATE FAN WITH STRUCTURE. PROVIDEPENTHOUSE. PROVIDE SILENCERS ASREQUIRED.

4 ABSORPTION CHILLER MUFFLER ANDSILENCER. PROVIDE HEAT RECOVERY SYSTEM.

Page 7: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

FM

M

MV

CHILLED WATER PIPING DIAGRAMNo Scale 1

PIPING SYMBOL LEGEND

FUTURE CHILLER

CHW

P-1

CHW

P-2

FUTU

RE C

HWP

AIR SEPARATOR

EXPANSION TANK

TO BLDG.

FROM BLDG

BYPA

SSFUTURE SYSTEM PUMP

SYSTEM PUMP

CH-2

CH-1

-CONTROL VALVE

-FLOW SWITCH

-CHECK VALVE

-STRAINER

-GAS COCK

-BUTTERFLY VALVE

-CALIBRATING BALANCING VALVE

-BALL VALVE

-GATE VALVE

-UNION

-FLEX CONNECTION

-O.S.&Y. GATE VALVE

-THREE-WAY CONTROL VALVE

-THERMOMETER

-TWO-WAY CHECK VALVE

-MANUAL VENT

-PRESSURE GAUGE

-RELIEF VALVE

-FLOW METER

-WATER METER

-INLINE PUMP

-INLINE PUMP

-FLOW DIRECTION

ABSO

RPTIO

N CH

WP

FUTU

RE A

BSOR

PTIO

N CH

WP

ABSORPTION CHILLER

FUTURE ABSORPTION CHILLER

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

NOT TO SCALE

M-200

MECHANICALDIAGRAMS

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

No. Description Date

Page 8: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

FM

M

MV

CONDENSER WATER PIPING DIAGRAMNo Scale 1

PIPING SYMBOL LEGEND

CWP-2 CWP- FUTURE

CT-FUTURECT-2CT-1

FUTURE ABSORPTION CHILLER

ABSORPTION CHILLER

CH-1CH-2FUTURE CHILLER

CWP-1

CWP-ABSORPTION

-CONTROL VALVE

-FLOW SWITCH

-CHECK VALVE

-STRAINER

-GAS COCK

-BUTTERFLY VALVE

-CALIBRATING BALANCING VALVE

-BALL VALVE

-GATE VALVE

-UNION

-FLEX CONNECTION

-O.S.&Y. GATE VALVE

-THREE-WAY CONTROL VALVE

-THERMOMETER

-TWO-WAY CHECK VALVE

-MANUAL VENT

-PRESSURE GAUGE

-RELIEF VALVE

-FLOW METER

-WATER METER

-INLINE PUMP

-INLINE PUMP

-FLOW DIRECTION

CT-ABSORPTION FUTURE CT-ABSORPTION

CWP-ABSORPTIONFUTURE

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

NOT TO SCALE

M-201

MECHANICALDIAGRAMS

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

No. Description Date

Page 9: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

COGENERATOR DIAGRAMNo Scale 1

COGENERATOR DIAGRAMNo Scale 2

NATURAL GAS

HOT EXHAUST GAS

ENGINE HIGH TEMP RADIATOR

SILENCER

ABSORPTION CHILLER

12" MAX.

12" MAX.

VALVESFLOW LIMITING

RADIATOR

(200 F.) OFF THE DUAL ENGINESHOT WATER PIPING

TYPICAL FLEXIBLE CONNECTIONS

AS POSSIBLE TO RADIATOR.MOUNT HEAT EXCHANGER AS CLOSE

EXPANSION TANK ON TOP OF RADIATOR

TYPICAL SHUT-OFF VALVE

FUTURE EXPANSION TANK ON TOP OF RADIATOR

SEE PLUMBING FOR CONTINUATIONPIPING TO PLUMBING SYSTEM

PLUMBING SYSTEM

HEAT EXCHANGER

3-WAY CATALYTIC

GENSET

EXHAUST BYPASS VALVE

FLEX CONNECTION (TYP)

HIGH TEMP PUMP RETURN TEMPERAURE

HEAT RECOVERY HEAT EXCHANGER, SHELL IN TUBE

HEAT RECOVERY RECIRC PUMP

FROMTO

EXPANSION TANK

REGULATING 3-WAY VALVE

NONONC

REFER TO P201, DETAIL 9 FOR FURTHER DETAIL

REFER TO P201, DETAIL 9 FOR FURTHER DETAIL

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

NOT TO SCALE

M-202

MECHANICALDIAGRAMS

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

No. Description Date

Page 10: 6 5 4 3 2 - Pinellas County, Florida · 2020-02-10 · 4. see specifications for gauges, thickness, bracing, requirements, etc., of ductwork. 5. provide air turning vanes in all 90

ASSEMBLY ACCEPTABLE)(PRE-MANUF. SINGLE

BALANCING VALVE

AIR FLOW

NOTES: 1. PROVIDE (4 x DIA.) OF STRAIGHT PIPE ON BOTH SIDES OF

2. ALL COMPONENTS FULL LINE SIZE UNLESS NOTED OTHERWISE3. LOCATE UNIONS TO ALLOW FOR COIL PULL

SUPPLY

RETURN

PLUGCOCK

MANUAL AIR VENTW/AUTOSHUT-OFF COCK

COIL

FLEX. CONNECTION (TYP.)

THERMOMETER W/SEPARABLE WELL (TYP.)

UNION (TYP.)

STRAINER W / BLOWDOWN

P/T TEST PORTS

SHUT-OFF VALVE (TYP.)

THREE WAYCONTROLVALVE

AUTOMATIC FLOWCONTROLDEVICE PRESET BY MANUF.W/ P & T TEST PORTS,STRAINER, AND DRAIN.(PRE-MANUF. SINGLEASSEMBLY ACCEPTABLE)

BALL VALVE

PRESSURE GAUGE &COCK (TYP.)

SNUBBER

SLOPE TO DRAIN

COOLING COIL

UNION

DRAIN PAN

CASING SLEEVE

THREADED CAP, HAND TIGHTENED

THREADED CAP WITH 1/4" DIA.HOLE DRILLED IN TOP, HANDTIGHTENED.

CONDENSATE DRAIN PIPING DIMENSIONS:

A = FULL SIZE OF UNIT DRAIN CONNECTIONB > 1-1/2" TIMES FAN SUCTION STATIC PRESSUREC > FAN DISCHARGE STATIC PRESSURE PLUS 1/2" INCH

COORDINATE MOUNTING/CURB HEIGHT AS REQUIRED TO PROVIDE PROPER CONDENSATE DRAINAGE.

CB

A

LIGHT

SPIN-IN FITTING W/VOLUMECONTROL DAMPER (INSUL.PER SPEC.)

EXTENDED OPERATORON BALANCE DAMPER

DRAW BAND

FLEXIBLE DUCT MAX.8'-0" IN LENGTHFULLY EXTENDED.

DRAW BAND

DIFFUSER NECK (INSUL. PER SPEC.)

DIFFUSER CONE (INSUL. PER SPEC.)

CEILING TEE

BLANK-OFF PLATESWHERE REQUIRED

FANSA RA

STEEL RODS W/THREADEDENDS (TYP. 4 PLACES)SUPPORT FROM STRUCTUREABOVE AS REQUIRED

SPRING VIB. ISOLATORS

FLEX CONN. (TYP.)

FLOAT SWITCH

ROUTE MAIN CONDENSATELINE TO FLOOR DRAIN

GALVANIZED SHEET METAL SECONDARYDRAIN PAN TO EXTEND 3" BEYOND UNITON ALL SIDES BY 1-1/2" DEEP

CEILING

PROVIDE WITH FILTEROVER OPENING

SILENCER

THREE LAYERS OF 5/8" GYPBOARD, REFERTO SPECIFICATION SECTION 15910

TOP OF DUCT TO BEAS HIGH AS POSSIBLE

EXTEND TREATMENTACROSS OPEN CEILINGSEE PLAN DRWGS.

WALL

PAD

VALVE (TYP.)P/T PORT W/BLOWDOWN

PRESSUREDIFFERENTIAL

4" AND SMALLERW/MEMORY STOPLEVER LATH HANDLE5" AND LARGERGEAR W/HAND WHEEL

SNUBBER

HOUSEKEEPINGCONCRETE

NEAREST DRAINEXTEND TO FLOOR

INLET DIAMETERDIAMETER TO MATCH PUMP

FLOOR DRAINVALVE. EXTEND TO NEARESTSTRAINER & 3/4" BLOW DOWNSUCTION DIFFUSER W/INTEGRAL

DIAMETERSYSTEM PIPINGDIAMETER TO MATCH

VALVE

PIPE SUPPORT

CONNECTOR

BALL VALVE

FLEXIBLE CONNECTER

VALVE (TYP.)BUTTERFLY PRESSURE GAUGE

PIPE SUPPORT

s" PUMP DRAIN,

FLEXIBLE

NON-SLAM CHECK

TRANSMITTER

DUCTSUPPLY

DRAW BAND

FLEXIBLE DUCT

SPIN-IN FITTING W/VOLUMECONTROL DAMPER (INSUL. PERSPEC. REQ'D.)

TAP, TYPICAL 45DEGREE BOOT

DAMPER, TYPICALMANUAL BALANCING

RADIUS ELBOWS MAYBE USED IN LIEU OFSQUARE ELBOWS

ROCK FREE BACKFILL

PITTWRAP JACKETING

FOAMGLASS INSULATION

SAND BACKFILL

PIPE

GRAVEL

6".

6" M

IN.

6" MIN.

1'-0

" MIN

.

6".

PANELMONITOR

REFRIGERANT

FLOOR

FILTER

COUPLINGCOMPRESSION

SAMPLE TUBE

SAMPLE LINES

BEACON

120 VAC

TO CHILLER

WIRINGANALOG OUTPUT

PROVIDE NEW REMOTEALARM BEACONOUTSIDE ALLCHILLER ROOMENTRY DOORS

ALARM WIRING PERASHRAE 15 TO EMS

SUPPORT TOCOLUMN ORWALL

NOTES:1. PROVIDE REFRIGERANT MONITOR CAPABLE OF

SENSING R-123 REFRIGERANT.2. NEW EXHAUST FAN.3. PROVIDE TWO REFRIGERANT SAMPLE LINES I

LOCATIONS AS SHOWN ON PLANS.12" TO 18"

CHILLER

R OOF

RELIEF PIPING SHALL BE SIZEDAND INSTALLED IN ACCORDANCEWITH ASHRAE STANDARD 15.MINIMUM RELIEF PIPING SIZEINDICATED ON FLOOR PLAN.DEVIATION FROM SIZE INDICATEDIS ACCEPTABLE ONLY AFTERRECOMMENDATION FROMCHILLER MANUFACTURER ANDAPPROVAL OF THE ENGINEER.

COORDINATE RELIEF PIPINGREQUIREMENTS WITH CHILLERMANUFACTURER.

FLEX CONNECTION

FLANGED JOINT

FULL SIZE OF VENTOPENING (MIN.) OR ASCODE REQUIRES

r" FL x r" NPT DRAINVALVE (5'-0" ABOVE FLR.)

COMPRESSORSUCTIONCONNECTION

RESETTING RELIEF ASSEMBLYBY EQUIPMENT MANUFACTURER

6" MINIMUM

CONNECT NEWRELIEF PIPING TOEXISTING RELIEFPIPING HEADER.

LUG TYPE BUTTERFLYVALVE W/GEAROPERATOR (TYP.) TEMP. SENSOR

THERMOMETER (TYP.)

EVAPORATOR

CONDENSER

DIFFERENTIAL PRESSURESENSOR/TRANSMITTER(TYP.)

VALVES ABOVE TUBEPULL (TYP.)

ACTUATOR & VALVEBY CONTROLSCONTRACTOR (TYP.)

PETE'S PLUG (TYP.)

FLANGED ELBOW W/LIFT PLATE (TYP.)

HOUSEKEEPINGPAD

VIBRATION ISOLATIONSPRINGS (TYP.)

FLOOR SLAB

CWS

RELIEF VENT

CWR

CHW

S

CHW

R

CHILLER DIFFERENTIAL PRESSURESWITCH TO CHILLER CONTROL PANEL

CONTROLPANEL

PRESSURE GAUGE W/SNUBBER & BALLVALVES (TYP.)

(TYP.)

TO CONTROLPANEL

A

FLEXIBLECONNECTOR

A

MECHANICAL JOINT (SIMILIARTO A VICTAULIC COUPLING)

NOT FOR CONSTRUCTIONPRELIMINARY DOCUMENTS

KEY PLAN

1

APPROVED BY

CHECKED BY

A

SHEET NO.

TITLE

DRAWN BY

DATE

PROJECT NO.

SCALE

SEAL

REVISIONS

23456

B

C

D

E

F

NOT TO SCALE

M-300

MECHANICALDETAILS

HAT

LTE

LTE

03/19/2014

Dewberry Architects Inc.

50057109

Pin

ella

s C

ount

y Ja

il P

hase

IIn

frast

ruct

ure

Crit

eria

Pac

kage

- D

raw

ings

Pine

llas

Cou

nty

1144

00 N

orth

49t

h St

reet

Cle

arw

ater

, FL.

401 SW Water St.Suite 701Peoria, IL 61602309.282.8000 Phone309.282.8001 Fax

No. Description Date

NOT TO SCALE 13-WAY COIL PIPING DIAGRAM (FCU-4)NOT TO SCALE 2AHU CONDENSATE DRAIN TRAP

NOT TO SCALE 3DIFFUSER MOUNTINGNOT TO SCALE 4FAN COIL UNIT

NOT TO SCALE 5NOISE CONTROL TREATMENT AT DUCT SILENCERNOT TO SCALE 6SPLIT-CASE DOUBLE SUCTION PUMP

NOT TO SCALE 7TYPICAL FLEX DUCT CONNECTIONNOT TO SCALE 8TYPICAL PRESSURE DUCTWORK

NOT TO SCALE 9UNDERGROUND PIPING INSTALLATIONNOT TO SCALE 10REFRIGERANT MONITORING

NOT TO SCALE 11RELIEF PIPINGNOT TO SCALE 12WATER COOLED CHILLER