    Transpo rte Marítim o e Po rto s I  

    Terminal Dimensioning

    Tiago A. R. Santos

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    2/30

    Transpo rte Marítim o e Po rto s I  

    Summary

    General Dimensioning Methodology

    Container Terminals

    • Terminal planning

    Dry Bulk Terminals• Terminal planning

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    3/30

    Transpo rte Marítim o e Po rto s I  

    Terminal planning

    •Planning is generally performed in two steps:

    Preliminary planning

    Simulation

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    4/30

    Transpo rte Marítim o e Po rto s I  

    Terminal planning

    • Planning is necessary at three

    levels:

    • Infrastructure,

    • Superstructure,

    • Operational.

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    5/30

    Transpo rte Marítim o e Po rto s I  

    Port Infrastructure

    Wharf: structure of timber, masonry, cement, or other material built along

    or at an angle to the navigable waterway, with sufficient depth of water to

    accommodate vessels and receive and discharge cargo or passengers.

    Quay: when applied to great solid structures in large ports.

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    6/30

    Transpo rte Marítim o e Po rto s I  

    Port Infrastructure

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    7/30Transpo rte Marítim o e Po rto s I  

    Port Superstructure

    Shed: building located on or near a pier (piershed) or wharf (wharf shed)

    used for short-term storage of cargo in transit. 

    Warehouse: building for storage of cargo.

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    8/30Transpo rte Marítim o e Po rto s I  

    Terminal planning

    Seasonality

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    9/30Transpo rte Marítim o e Po rto s I  

    Container Terminal Planning

    Saanen (2012)

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    10/30Transpo rte Marítim o e Po rto s I  

    Container Terminal Planning

    Saanen (2012)

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    11/30Transpo rte Marítim o e Po rto s I  

    Numerical method - 1

    Thoresen (2003), Port designer handbooks’s: recommendations and guidelines. 

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    12/30Transpo rte Marítim o e Po rto s I  

    Numerical method - 2

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    13/30Transpo rte Marítim o e Po rto s I  

    Numerical method - 3

    Thoresen (2003)

    UNCTAD (1985)

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    14/30Transpo rte Marítim o e Po rto s I  

    Numerical method - 4

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    15/30Transpo rte Marítim o e Po rto s I  

    Numerical method - 5

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    16/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 6

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    17/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 7

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    18/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 8

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    19/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 9

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    20/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 10

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    21/30

    Transpo rte Marítim o e Po rto s I  

    Numerical method - 11

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    22/30

    Transpo rte Marítim o e Po rto s I  

    Graphical Method - 1

    U NCTAD Handboo k o f Port Planning

    ~12 Ha

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    23/30

    Transpo rte Marítim o e Po rto s I  

    Graphical Method - 2

    UNCT AD Handbook o f Port Planning

    ~375 days

    ships arriving each year

    Need for two quays!

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    24/30

    Transpo rte Marítim o e Po rto s I  

    Graphical Method - 3

    UNCTAD Handbo ok of Port Planning

    ~3.8 million USD

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    25/30

    Transpo rte Marítim o e Po rto s I  

    Graphical Method - 4UNC TAD Handbook of Port Planning

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    26/30

    Transpo rte Marítim o e Po rto s I  

    Dry bulk terminal planningUNCTAD Handbo ok of Port Planning

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    27/30

    Transpo rte Marítim o e Po rto s I  

    Dry bulk terminal planningUNCTAD Handbo ok of Port Planning

    1 million dollar

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    28/30

    Transpo rte Marítim o e Po rto s I  

    Dry bulk terminal planning

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    29/30

    Transpo rte Marítim o e Po rto s I  

    Dry bulk terminal planningUNCTAD Handbo ok of Port Planning

    ~140000 ton

    ~70000 ton

  • 8/16/2019 6e - TMPI - Terminal Dimensioning

    30/30

    Dry bulk terminal planningUNCTAD Handbo ok of Port Planning

    ~140000 ton