~~7~~~~~;?,~! - dexter township, michigan · park headquarters fire station (opened 2013), wayne...

41
Sidock Architects Experience and Qualifications New Fire Substation Facility ® www.sid oc karchit ec ts.c om Prepared For Dexter Township December 4, 2013

Upload: others

Post on 10-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Sidock Architects Experience and Qualifications New Fire Substation Facility

® ~~7~~~~~;?,~! www.sidockarchitects.com

Prepared For

Dexter Township December 4, 2013

Page 2: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Sidock Architects ARCHITECTS • ENGINEERS • CONSULTANTS

December 4, 2013

Mr. Pat A. Kelly Township Supervisor Dexter Town ship 6880 Dexter-Pinckney Road Dexter, Michigan 48130

Mr. Kelly,

'A Sidock Group Company'

Thank you for allowing Sidock Architects the opportunity to submit our qualifications and proposal for your New Fire Substation project.

A 130 person, full service, Architecture and Engineering Firm, we have completed, literally, hundreds of public safety and fire facilities. Our recent experience includes the new Highland Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase) , and the City of Novi New Headquarters Fire Station Needs Assessment and Feasibility Study (in progress).

Our Team, including a Dexter Resident, is highly experienced in all aspects of Fire Station planning, design, and engineering, and our experience covers the entire gamut of urban stations, suburban stations, and rural stations, from small pre-engineered structures to large, multi-story facilities .

We trust that the following information will clearly illustrate that Sidock Architects is a strong choice as a Project Partner for the Township, and we stand ready to begin working with the Project Team immediately to accomplish the goal of a new Fire Substation to serve the residents of Dexter Township.

Again, thank you for considering our Firm, and please do not hesitate to contact me with any questions.

Sincerely,

Robert L. Jordan, AlA, NCARB Principal - Director of Architecture (248) 444-5521 [email protected]

Novi • Muskegon • Wyandotte • Lansing • Gaylord • Chicago 45650 Grand River Avenue, Novi, Michigan 48374

Phone (248) 349-4500 • Fax (248) 349-1429 www.sidockarchitects.com

Page 3: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Firm Overview Firm Overview Consultants References

Table of Contents

Architecture and Engineering Services Project Types Representative Clients

Project Team - Personnel Qualifications and Roles Consultants Resumes

Scope of Services Statement of Understanding Detailed Work Plan Project Schedule

Relevant Experience Project Experience Selected Project Profiles Representative Project List

Project Fees Total Lump Sum Fee Hourly Rates Fee By Project Phase

® ~~~~~!~:~~;~ www.sidockarchitects.com

Page 4: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Firm Overview Sidock Architects is a 130 person full service Architecture and Engineering Firm with 5 Michigan Offices (Novi. Wyandotte, Lansing, Muskegon, and Gaylord) and an office in Chicago, Illinois. Founded in 197 4, we have completed hundreds of Governmental, Municipal, Public Safety and Fire Station projects. Our current workload is strong, however, we have ample capacity to properly provide the level of service that Dexter Township deserves for its very important project.

Consultants While we are a full service A/E Firm, we do not perform survey or geo-technical services. As such, we will employ outside Consultants for these services. Both Consultants, listed in the "Project Team­Personnel" section, have worked with Sidock many times over the years and both meet the high quality and service standards to which Sidock holds them, and itself.

Environmental Engineers - Survey Testing Engineers & Consultants (TEC)- Geo-Tech

Wayne/Westland Fire Department

Highland Park Fire Department

References David Malloy Public Safety Director City of Novi dmolloy@cityofnovi .org (248)348-71 00

Jeffery R. Johnson Director of EMS & Fire Operations City of Novi [email protected] (248)347-0504

Larry Waligora Fire Chief Milford Township [email protected] (248)684-2335

Derek Hillman Fire Chief City of Highland Park [email protected] (313)459-1055

Firm Overview

Page 5: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Sidock Architects is a Iorge full service architecture and engineering firm with over 100 Professionals in 5 offices. A part of the Sidock Group, Sidock Architects has vast experience in virtua lly a ll project types and

offers a broad array of project services. We are able to complete projects of any size or complexity and in any location, with completed

projects in 20 states and 8 countries.

• Industrial - Heavy and Light • Commercial- Office. Retail.

Financial. Recreaton. and • Hospitality • Governmental - Local.

Township, County. Federal. and Military

• Medical and Senior Care • Spiritual - All Faiths • Educational - K-12 and Higher

Education • Residential - Sing le and Multi­

Family

• New Construction • Addition/Renovation • Design-Build • Development Consulting • Re-Development/Re-Use • Preservation

• Project Management • Construction Management • Construction Administration • Project Planning and Scheduling • Cost Estimating

• Master Planning • Site Selection Assistance • Due Diligence • Zoning Review • Feasibility Studies • Schematic Site Layout • Planning Department Meetings

• Landscape Design • Civil Engineering

• LEED "Green Design • Programming • Space Planning • Schematic Design • Presentation Renderings • 3D Computer Modeling • Physical Models

• Design Development • Construction Documents • Bidding Assistance

• Structural Engineering • Electrica l Engineering • Mechanical Engineering • Plumbing Engineering • Utilities Engineering

• Signoge • Furniture. Fixtures. and

Equipment • Move Management • Code & ADA Compliance • Maintenance Engineering • Energy Use Audits • Inspection Programs

• Tonk Inspections • Forensic Engineering • Inspection Programs • Life Safety Engineering

~ Sidock Architects .t.AOl!TCCTS • ENGINEERS • COP&ILTAHTS

'A Sldod: C:mup Comp.any'

www.sldoc karchitects.com

Fire Stations

~ Sidock Architects AROUTECTS • ENGIN[ERS • CONSUlTANTS

'A Stdodc Gmup Comp•ny'

Page 6: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

® Sidock Architects ARCHITl!:CTS • f NOJN!ERS • CONSUL!ANTS

'A SIJoo:k Groop Coml"nf

Sidock Architects has a brood foundation in the design of f~re stations. Our professional staff has been involved in the desi~n of more than 60 fire stations Including urban, suburban, and rural locations for career, paid-an-call, and volunteer Departments. We have designed free-standing training towers and complete public safety training centers. We understand the high demand for training space, for protection of turn-aut gear, non-slip durable floor finishes in the Apparatus Room and are familiar with multiple ways to

dry hoses. We have designed an array of living and sleeping quarters, fitness training areas, and maximized the critical locations of Watch Rooms and De-contamination cleaning areas. We even understand the need for storage. This understanding and expertise has been gained over the multiple fire station assignments awarded to us and in response to changes the fire service. Sidock Architects can provide your Department with creative and proven solutions to the individual problems facing your operations.

Page 7: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Architectural

• LEED "Green Design" and Certification • Programming • Site Selection Assistance • Due Diligence • Zoning and Ordinance Reviews • Planning Department Meetings • Feasibility Studies • Master Planning • Schematic Site Layout & Planning • Schematic Design Drawings • Presentation Renderings • 3D Computer Models • Space Planning • Interior Design • Signage • Lighting Design

Engineering

• Civil Engineering • Structural Engineering • Electrical Engineering • Mechanical Engineering • Gas Utility Engineering • Plumbing Engineering • Process Engineering • Chemical Process Engineering • Environmental Engineering • Instrumentation & Controls • Control Integration & Logic • Automation Engineering • Demolition Engineering • Utilities Engineering • Material Handling Engineering • Equipment Design, Modification, &

Repair

Architectural and Engineering Services

• Furniture Coordination • Landscape Design • Cost Estimating • Construction Documents • Project Scheduling • Construction Administration • Code Compliance Studies • ADA Studies • Lease Area Calculations • Prototypical Layouts • Tenant Build-Outs • TenantRenovaftons • Inspection Programs • Maintenance Engineering • Energy Use Audits • Safety Planning

• Custom Machine Design • Crane Engineering • Fall Protection Engineering • Rigging Engineering • Facility Inspection Programs • API Certified Tank Inspections • Safety Planning • Energy Use Audits • Failure Analysis • Forensic Engineering • Pipe Stress Analysis • Process Simulation Modeling • Coatings and Materials Specifications • Project Scheduling • Cost Estimating • Construction Management

® ~~:~~~~~~~!~ www.sidockarchitects.com

Page 8: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Types

Industrial Medical • Light • Hospital

• Manufacturing • Urgent Care • Research and Development • Medical Offices • Warehouse, Storage, and Distribution • Laboratory

• Heavy • Rehabilitation • Steel Mill • Senior Care and Assisted Living Facilities • Power Plant • Surgical Facilities • Refinery and Chemical

• Alternative Energy Governmental • Bio-Digester • Public Safety • Waste Gas Capture • Law Enforcement • Waste to Energy • Fire and EMS

• Detention Facilities Commercial • Training Facilities

• Mixed Use Developments • Civic & Cultural • Office • City Hall • High End and General Retail • Judicial • Financial Institution • Library • Auto Dealership • Museum • Repair Facilities • Senior Center • Laboratory and R&D • Airport • Restaurant and Food Service • Transit Facilities • Resort and Hospitality • DPW and DPS • Private Clubs • Water and Sewer

• Recreation Educational • Recreation Center

• Child Care I Pre-School • Water Park • K-12 • Athletic Facilities • Higher Education • Park • Athletic Facilities • Golf Course and Clubhouse Facilities • Maintenance Facilities • Maintenance Facilities

• State and Federal Spiritual • Anti-Terrorism and Force Protection

• Churches • Military • Worship Facilities • Border Patrol • Education • Airport • Gathering Facilities • Correctional Facilities

• District Court Residential • State Parks

• Senior, Assisted, and Independent Living • National Forest • Multi-Family Residential • Single Family Residential

( g ~!H~~S~~~G~~~~~S:L?~~ ~ 'A Sidock Group Compmy'

www.sidockarchitects.com

Page 9: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Representative Clients

Industrial Residential 0 Light o Rivergate Terrace Senior Living

o First Industrial Realty Trust o North Forest Condominium Association o Ashley Capital o Freighter View Assisted Living Facility o Faurecia Automotive o Harborage Pointe Condominiums o General Motors o Confidential Clients- Private Residences

o Heavy o SeverStal North America Medical o DTE Energy o Wayne State University o Marathon Petroleum o Mercy Health Partners o BASF o Henry Ford Health System

o Alternative Energy o North Macomb Medical Associates I MClaren o Reynolds Inc. I Layne Christensen o Dearborn Orthopedic o Den Dulk Dairy o Riverside Hospital

o Dr. Santoro, D.D.S Commercial

o Corvus International Governmental o Oliver Hatcher Construction o Public Safety o Laurencelle Properties o City of Wayne o Best Western o Brownstown Township o Bay Mills Resort o Otsego County o UA W Black Lakle Golf Club o City of Birmingham o Port City Development o Milford Township o Metro Shores Credit Union o City of Grayling o Garno Ford o Civic & Cultural

o 44th District Court Educational o City of Newaygo

o Wayne County Community College o City of Wyandotte o Oakland Community College o City of Muskegon o University of Michigan o City of Southfield o Birmingham Public Schools o Recreation o Muskegon Public Schools o Huron Clinton Metro Parks o Taylor Public Schools o Washtenaw County Parks and Rec o Kiddie Kampus o Oakland County Parks

o Wayne County Parks Spiritual o State and Federal

o Archdiocese of Detroit o Department of Homeland Security o St. George Greek Orthodox Church o Department of Transportation o First Reformed Church o Michigan Air National Guard o Trinity Lutheran Church o Michigan DTMB o St. Stephens Episcopal Church o Federal Bureau of Prisons o Allen Park Presbyterian Church o United States Forest Service o Metro South Church o Department of Military and Veterans Affairs o Mt. Carmel Cemetery o United States Property and Fiscal Office

Sidock Architects ARCHITECTS • ENGINEERS • CONSUlTANTS

'A Sidock Group Company'

www.sidockarchitects.com

Page 10: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Qualifications and Roles

For this project, we intend to utilize five (5) key Sidock Team Members, as well as two (2) outside Consultants:

Robert Jordan. AlA NCARB- Principal. Director of Architecture - Mr. Jordan will act as the Principal-in­charge, performing document quality checking and providing oversight on budget and schedule. Additionally, Mr. Jordan will assist with the site planning and programming. Mr. Jordan has fulfilled these roles on the recently opened Highland Park Headquarters Fire Station and on the, in design, Wayne Westland Fire Station No. 1.

Stacy Peterson. RA- Senior Project Manager -Mr. Peterson will be in charge of day to day project operations, will be the main point of contact for the Township, and will be responsible for initial quality checking, and adherence to schedule and budget. Additionally, he will be responsible for project design. Mr. Peterson has completed dozens of Public Safety and Fire Station projects in his 40+ year career. His experience encompasses all types and sizes of Fire Station projects, and he is well suited to guide you through all phases of your project.

Van Buren Township Fire Station

Project Team- Personnel

Qualifications and Roles- Continued

Casey Leach -Senior Project Engineer- Civil -Mr. Leach will be the Project Civil Engineer and will be responsible for all site related tasks. His most recent projects include the recently opened Highland Park Headquarters Fire Station and on the, in design, Wayne Westland Fire Station No. 1.

Paul Larsen - Senior Project Leader- Structural -Mr. Larsen is a Dexter Resident and will be the Project Structural Engineer and will be responsible for all structural system related tasks. His most recent projects include the recently opened Highland Park Headquarters Fire Station and on the, in design, Wayne Westland Fire Station No. 1.

Joe Oranchak- Senior Project Leader- Electrical -Mr. Oranchak will be the Project Electrical Engineer and will be responsible for all electrical system related tasks. His most recent projects include the recently opened Highland Park Headquarters Fire Station and on the, in design, Wayne Westland Fire Station No. 1.

Cyril Miranda - Senior Project Leader- Mechanical -Mr. Miranda will be the Project Mechanical Engineer and will be responsible for all HV AC, plumbing, and fire protection system related tasks. His most recent projects include the recently opened Highland Park Headquarters Fire Station and on the, in design, Wayne Westland Fire Station No. 1.

Page 11: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Team - Personnel

Township Fire Station

Consultants

Environmental Engineers Environmental Engineers will be responsible for all survey related services.

Testing Engineers and Consultants T.E.C. will be responsible for all soil boring and geo-technical related services.

Resumes Please refer to the following resumes for education, credentials, and licensing information for the Key Team Members and Consultants.

Page 12: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience

Mr. Jordan has nearly 20 years of experience with both large and small firms, as well as many years with design/ build Contractors. With a great deal of experience in the automotive and industrial sectors, Robert has also completed many commercial. municipal. and healthcare projects, with Private Clients, Developers, and Property Managers. With this vast and varied experience. Robert brings both a great deal of technical knowledge and a "worldly" eye to every project. As a Principal. Mr. Jordan is responsible for day to day business operations and business development, in addition to project design, project management, and quality control.

Representative Projects

Ashley Capital Tenant Projects Various Locations

General Motors Volt Battery Plant Brownstown, Michigan

McClaren Macomb/North Macomb Medical Associates Medical Office Building Macomb, Michigan

Faurecia Automotive Manufacturing Facility Fraser. Michigan

St. Colette Catholic Church Gathering Space Livonia, Michigan

Brownstown Township- Civic Center Master Plan. Brownstown Township, Michigan

Consumers Energy Service Center- LEED Silver Certified Howell, Michigan

Cleary University Multi Use Classroom Building Plymouth, Michigan

Edison Energy Services- Shenango Coke Battery Office Building Major Renovation Pittsburgh, Pennsylvania

H.R.C.C. Health and Recreation Center Bad Axe, Michigan

Robert L. Jordan, AlA, NCARB Principal - Director of Architecture

Credentials

Licensed Architect - States of Michigan, Ohio, Pennsylvania, Kentucky, Texas

LEED 3.0 GA Candidate

Board Member- H & H Enterprises

Board Member- J.R. Recreation

Team Leader- City of Wixom Community Emergency Response Team

Past Positions

Robert Jordan Consulting President

Wolf Wineman Associate Principal Director of Project Management

Campbeii/Manix Associates Senior Project Architect/Manager

Albert Kahn Associates Staff Architect Research & Development Technology Focus Group

Education

Bachelor of Architecture Lawrence Technological University

Bachelor of Science in Architecture Lawrence Technological University

Mechanical/Robotic Engineering Study University of Michigan

® ~:~~~:.~~~ www.sidockarchitects.com

Page 13: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience Mr. Peterson has 40 years of experience in design and construction. As a Principal of a mid-sized architectural firm, CDPA Architects, for more than 30 years, he has been personally involved in the planning, design, and construction of countless governmental and educational projects, including Police Station, Public Safety, Jail, Fire Station, DPW, Court. City Hall, K-12, and Higher Education. Having also been a Principal of a construction management firm for nearly l 0 years, he brings an organized and detailed approach to the planning and execution of any building project. Representative Projects

Birmingham City Hall/Police Station/Library Renovation Birmingham, Michigan

86th District Court Building Traverse City, Michigan

44th District Court Royal Oak, Michigan

City of Dearborn Heights Combined Police Station and 20th District Court Dearborn Heights, Michigan

City of Dearborn Combined Police Station and 19th District Court Dearborn, Michigan

Milford Township Fire Station No. l Milford Township, Michigan

Van Buren Township Fire Stations No. l and No.2 Van Buren Township, Michigan

City of Battle Creek DPW Facility Battle Creek, Michigan

City of Saline DPW Facility Saline, Michigan

Detroit Catholic Central High School Novi. Michigan

L'Anse Cruse Public Schools -New Middle School East Chesterfield, Michigan

Utica Community Schools - Beck Elementary School Macomb, Michigan

Stacy E. Peterson, RA Senior Project Consultant

Credentials

Licensed Architect -State of Michigan

Member- Michigan Association of Chiefs of Police (MACP)

Member- Southeast Michigan Association of Fire Chiefs (SMAFC)

Captain United States Army (ret.)

Past Positions

CDP A Architects, Inc. President

ArCon Services President

Education

Bachelor of Science - Architecture Lawrence Technological University

Bachelor of Science Western Michigan University

® ~~;:::~~:::~~ www.sidockarchitecls.com

Page 14: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience

With nearly a decade of experience, Mr. Leach has a wide scope of talents in the field of Civil Engineering. Casey's roots of site design and land surveying in the residential and retail sectors, have greatly enchanced the work that he does for the heavy industrial Clientelle that he also serves today. In addition to his civil engineering duties, Mr. Leach also acts as a Project Structural Engineer for projects that require a large amount of field work, such as field safety inspections and facility structural inspection programs.

Representative Projects

Washtenaw County Parks and Recreation Rolling Hills Water Park Yspilanti. Michigan

City of Highland Park New Main Fire Station Highland Park. Michigan

AGS Automotive LTD Stamping and Molding Plant Addition Sterling Heights, Michigan

Western Wayne Physicians Allen Park Medical Building Allen Park, Michigan

Metro Machine Works. Inc. Manufacturing Addition Romulus, Michigan

Marathon Pipe Line, LLC Woodhaven Cavern Facility Traffic Control, Containment. & Stormwater Management Woodhaven, Michigan

Gerdau Steel Monroe Mill New Truck Scale Complex and Entrance Road Monroe. Michigan

Severstal North America Facility Wide Structural Assessment Program Coil Truck Haul Road Dearborn, Michigan

Casey Leach, P.E., LEED AP Senior Project Engineer- Civil

Credentials

Licensed Engineer- State of Michigan

STI AST Certified(Steel Tank Institute, Aboveground Steel Tank)

LEED®AP

OSHA 1 0 Training

Manlift, Confined Space, & Respirator Training

MOWTEC (Michigan On-site Wastewater Training and Education Center) at Michigan State University Tollgate Center

Past Positions

Giffels/IBI Group Civil Engineer

Kieft Engineering Engineer

Education

Bachelor of Science Civil Engineering Michigan Technological University

( s;J ~!~~~~~G~~~~s:~~ ~- ;~ S;dock Croup Comr.uor·

www.sidockarchitects.com

Page 15: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience

Mr. Larsen has nearly 20 years of structural engineering experience including as the President of his own consulting firm in Colorado. His experience includes designing buildings, managing projects, serving existing clients and developing new clients. His project experience includes commercial, municipaL educational, health care, industriaL mining, power, and residential.

Representative Projects

City of Newaygo Newaygo Area District Library Newaygo, Michigan

North Macomb Medical Associates Medical Office Building Macomb, Michigan

Washtenaw County Parks and Recreation Rolling Hills Water Park Ypsilanti, Michigan

City of Highland Park New Main Fire Station Highland Park, Michigan

AGS Automotive LTD Stamping and Molding Plant Addition Sterling Heights, Michigan

Western Wayne Physicians Allen Park Medical Building Allen Park, Michigan

Metro Machine Works, Inc. Manufacturing Addition Romulus, Michigan

Grosse lie Schools Meridian Elementary School Grosse lie, Michigan

General Motors Corporation Sterling Heights Paint Shop Stacks Sterling Heights, Michigan

Paul Larsen, P.E. Senior Project Leader- Structural

Credentials

Licensed Engineer- States of Michigan and Colorado

Graduated Magna cum Laude Michigan Technological University

American Institute of Steel Construction (AISC)

American Society of Civil Engineers (ASCE)

Structural Engineers Association of Michigan (SEAMi)

Assistant Scoutmaster for Dexter Boy Scout Troop 456

Past Positions

Giffels/IBI Group Structural Engineer

Keystone Engineering, Sheridan, Colorado President

Education

Bachelor of Science - Civil Engineering Michigan Technological University

Bachelor of Science- Business Administration Valparaiso University

® ~~b~~~=~~~ www.sidockarchitects.com

Page 16: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience

Mr. Oranchak has over 30 years of experience in power distribution, lighting, controls, and instrumentation in the power generation, industrial, commercial, institutional and governmental sectors. Joe has successfully handled project design, marketing, and management roles and electrical department/group leadership responsibilities.

Representative Projects

City of Los Angeles-Regional Crime Laboratory Los Angeles, California

Domino Farms-Phase 6 Ann Arbor, Michigan

William Beaumont Hospital-Central Tower Renovation Royal Oak, Michigan

Carhartt, lnc.,-Corporate Headquarters Dearborn, Michigan

Ford Motor Company-Visitor's Center Dearborn, Michigan

Andrews University-Performing Arts Center Berrien Springs, Michigan

Merillat Industries-Plant Electrical Studies Michigan, Virginia, and Ohio

DTE Energy-Miscellaneous Projects Multiple Plants

DTE/EES-Miscellaneous Projects at the Zug Island (Michigan) and Shenango (Pittsburgh) Coke Works

Severstal North America Conveyor Upgrades to Support the "C" Blast Furnace Rebuild and Coke Handling Dearborn, Michigan

City of Eaton Rapids Municipal Utility Overhead Power Line Distribution Modifications Eaton Rapids, Michigan

Joseph Oranchak Senior Project Leader- Electrical

Credentials

Licensed Engineer-States of Michigan, Minnesota, Illinois, Indiana, New Jersey, and Pennsylvania

Illuminating Engineering Society of North America-Michigan Chapter Treasurer and past President

Education

Master of Science in Electrical Engineering­Northwestern University

Bachelor of Science in Electrical Engineering­Newark College of Engineering

® ~~;:~~~::~~ www.sidockarchitects.com

Page 17: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Experience

Mr. Miranda has over 30 years of experience in mechanical engineering. with some of the largest engineering firms in the country. He has a broad range of experience. from nuclear power plants to small commercial projects. in piping. HV AC. controls, fire protection, and process systems. Many of his projects have included LEED design and engineering, and he is versed in emerging technologies.

Representative Projects

Bechtel Power Corporation Midland Nuclear Power Plant Midland, Michigan

Detroit Metropolitan Airport-New North Terminal Romulus, Michigan

United States VA New Orleans Medical Center New Orleans, Louisiana

Wayne State University Damon Keith Law School Addition Detroit, Michigan

New Prospect Baptist Church Detroit, Michigan

Ford Motor Company Norfolk Assembly Plant Norfolk. Virginia

City of Told eo Fire Station No. 25 City of Toledo, Ohio

Toledo Public Schools Multiple Projects Toledo, Ohio

Washtenaw County Parks and Recreation Rolling Hills Water Park Ypsilanti. Michigan

Consumers Energy Parnall Office BUilding Jackson, Michigan

Cyril Miranda, P.E. Senior Project Leader- Mechanical

Credentials

Licensed Engineer- State of Michigan

Past Positions

Scales & Associates Senior Mechanical Engineer

Albert Kahn Associates Senior Mechanical Engineer

DiClemente Siegel Engineering Senior Mechanical Engineer

Bechtel Power Corporation Lead Systems Engineer

Sargent & Lundy Engineers Chicago, Illinois HV AC Project Engineer

Education

Master of Mechanical Engineering Indian Institute of Technology (liT Kanpur). India

Bachelor of Mechanical Engineering University of Mysore, India

Bachelor of Science - Chemistry University of Mysore. India

® ~~~~~.~=~?~ www.sidockarchilects.com

Page 18: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

nvironmental ngineers, Inc.

18620 West Ten Mile Road, Southfield, Michigan 48075 Phone: (248) 424-9510 Fax: (248) 424-2954

OUR FIRM

Environmental Engineers, Inc. is a well established civil engineering design and consulting firm incorporated in 1971 in Royal Oak, Michigan. Since that time we have provided a full spectrum of civil engineering and surveying services to both private and governmental clients. Our of-fice is now located in Southfield, Michigan in facilities which can accommodate our expanding workload and client base.

Our firm's president and chief operating officer, Paul J. Lewsley, P.E., is a graduate of Lawrence Technological University with a Bachelor of Science in Construction Engineering Degree and is a licensed Professional Engineer in ten states including Michigan. Mr. Lewsley also earned a Bachelor of Accountancy Degree from Walsh College and has been with tbe firm since its incorporation. Hjs diverse education and experience have helped the firm focus on providing value oriented design for its clients. Our design/survey team includes Oleh Cieply, P.E., a licensed Professional Engineer with over 30 years experience specializing in drainage design, Brian Korzetz, our Senior CAD Systems Specialist with over 1 0 years experience in civil engineering computer app,lications and Bryan Lewsley, our survey crew chief with over 12 years of field experience.

PAST CLIENTS

Environmental Engineers, Inc. has served a wide range of clients during its 40 year existence. Our client list includes the following sampling of architects, design/build firms, developers and governmental agencies:

ARCHJTECTS Campbeii/Manix Associates, Inc. CDPA Architects, Inc. Forum Studio, Inc. Integrated Design Solutions, L.L.C. Neumann/Smith & Associates

DEVELOPERS Button Katzman Development Company Etkin Equities, Inc. Ford Motor Land Development Corporation Mode Development, Inc. The Morningside Group

DESIGN/BUILD FIRMS Bloom General Contracting, Inc. Clayco Construction Company J.M. Olson Corporation Kirco Manix Construction, LLC L.S. Brinker Company

GOVERNMENTAL AGENCIES Livingston County Dept. of Public Works Livingston County Drain Commissioner City of Auburn Hills City of Romulus Van Buren Charter Township

PAST PRO.JECTS

Environmental Engineers, Inc. has been responsible for the civil engineering design on more than a thousand diverse projects over 40 years. Examples of past Michigan projects include the following:

Kalamazoo College Athletic Fields Complex - Kalamazoo, Michigan 20,000 S.F. Fieldhouse and 22 Acre Athletic Fields Facility

Walsh College - Novi, Michigan 34,000 S.F. Satellite Campus Facility on 9 Acres

City of Auburn Hills Community Center- Auburn Hills, Michigan 25,000 S.F. Recreation Facility on 43.7 Acre Civic Center Site

City of Romulus DPW Facility- Romulus, Michigan 61,000 S.F. Maintenance Facility on 22 Acres

Page 19: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Van Buren Township Fire Stations- Van Buren Twp., Michigan 2 Fire Stations with Living and Training Facilities

Suburban Collection Showplace- Novi, Michigan 300,000 S.F. Exposition, Convention & Conference Center

Fairlane Business Park - Allen Park, Michigan 15 Office/Research Buildings varying up to 60,000 S.F.

Fairlane Plal:a - Dearborn, Michigan Ritz-Carlton Hotel and Twin 11 Story Office Towers

500 & 550 Town Center Drive - Dearborn, Michigan 4 Story Office Buildings at Fairlane Town Center

Mercury Plaza- Dearborn, Michigan Circuit City, Petsmart & Einstein's Bagels Retail Complex

Visteon Technical Center- Dearborn, Michigan 3 Building Office/Research Development Totaling 195,000 S.F. on 29 Acres

Crown Enterprises Facility- Detroit, Michigan 360,000 S.F. Warehouse/Distribution Facility on 24 Acres

Town Air Freight Tetminal- Romulus, Michigan 48,000 S.F. Crossdock Terminal on 6 Acres

Sysco Food Services Facility- Canton, Michigan 103,000 S.F. Freezer Warehouse FacWty Expansion on 34 Acres

LOC Performance Products Facility- Plymouth, Michigan 215,000 S.F. Light Manufacturing Facility on 26 Acres

Halsted Point- Farmington Hills, Michigan 60,000 S.F. Office Building on 6 Acres

LDM World Headquarters - Auburn Hills, Michigan 100,000 S.F. Office/Research Facility on 15 Acres

Cooper Automation Facility - Auburn Hills, Michigan 83,000 S.F. Light Manufacturing Facility on 7 Acres

Bob Sellers Buick GMC Dealership - Farmington Hills, Michigan Automotive Showroom Addition on 12 Acre Site

Art Moran Buick GMC Dealership- Southfield, Michigan Automotive Showroom Addition on 7 Acre Site

Skylofts of Royal Oak- Royal Oak , Michigan 8 Story Retail/Residential Condominium Complex

The Fifth Royal Oak- Royal Oak, Michigan 18 Story Retail/Residential Condominium Complex

Northpointe Industrial Park - Lake Orion, Michigan 18 Lot Industrial Subdivision on 50 Acres

Schoolcraft Corporate Park- Plymouth, Michigan 30 Acre Research/Development Park

Summit Corporate Park - Auburn Hills, Michigan 32 Acre Research/Development Park

Mac Ray Harbor - Mt. Clemens, Michigan 76 Acre 680 Slip Marina Facility on Lake St. Clair with 5 Boathouse Buildings and Two Story Restaurant

OUR MISSION

Environmental Engineers, Inc. was founded on a commitment to provide quality, cost effective, client focused services and remains dedicated to that mission as we continue evolving today. ·

Page 20: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

TITLE: .

Senior Project Engineer Geotechnical Services

EDUCATION:

BS, Construction Engineering

GARY E. PUTT, PE.

Lawrence Technological University, 1972

PROFESSIONAL DEVELOPMENT:

Fundamentals of Shallow Foundation Design, University of Missouri Rolla, 1981 Welding Inspection Technology, American Welding Society, 1986 Concrete Technology, Michigan State University, 1992 Stmm Water Management, DEQ, 1996

LICENSES/REGISTRATION:

Licensed Professional Engineer, State of Michigan, 1992 Licensed Professional Engineer, State ofMissomi, 1989 Stmm Water Management Operator, State of Michigan, 2002

EXPERIENCE:

Over 3 7 years experience in geotechnical analysis, construction materials testing and inspection, construction management, sh·uctmal design, and coordination of contractor activities. Performs all

· types of routine and advanced soil tests in lab and field. Perfonns all types of routine concrete and asphalt tests and inspections. Evaluates bearing capacity and settlement potential from geotechnical data. Determines scope of work and ananges geotechnical investigations. Supervises drilling crews on geotechnical and enviromnental projects. Managed field and laboratory technicians in consh"Uction · services department and evaluated and resolved construction issues. Experienced with magnetometers and ground penetrating radar to determine the location of bmied objects (utilities, drums and underground storage tanks), and to differentiate between fill material and natmal soils.

Page 21: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Understanding Dexter Township has recognized the need for a new Fire Substation to serve the northern portion of Dexter Township. Through advanced study the Township has identified a project budget and site for the develop­ment of a new substation. By issuance of a Request for Proposal, the Township is now seeking the profes­sional services of an Architect experienced in the programming and design of fire stations.

Detailed Work Plan Sidock Architects, in general, must accomplish the following services:

• Conduct a Kick-Off meeting to review and confirm project goals and schedule, establish communication procedures, gather project background information/documents and set appointments for programming interviews and site inspections.

• Conduct site inspection of the ML WSA site to evaluate and document the existing facility to include field measurements, and prepare an as-built drawing based on the inspection.

• Conduct programming interviews with Township/ Fire Department staff identified in the Kick-Off meeting to determine facility needs and requirements.

Littlefield Township Fire Department

Scope of Services

Farmington Hills Fire Department

Detailed Work Plan - Continued • Prepare a preliminary Program of Area

Requirements to accommodate the function of a new facility.

• Conduct a site visit with the Township Substation Committee to the ML WSA site and to one or more comparative fire stations designed by Sidock Architects staff to portray the approximate needs identified by the interviews and Program.

• Prepare a Preliminary Estimate of Construction Cost using a square foot cost modeling for this building type based on the Program. Conduct a review meeting with the Township Substation Committee to review the progress of the preliminary program, site visits and cost estimate.

• Arrange for a topographic survey of the MLWSA site for use in the preliminary design and later preparation of construction documents. Prepare preliminary designs for three (3) building scenarios as outlined in the RFP, update the preliminary cost estimates for each scenario and prepare presentation drawings reflecting the designs for each scenario. Conduct a formal presentation to the Dexter Township Board of each scenario for their review and approval of a preferred scheme. Sidock Architects will be prepared to discuss each alternative and recommendation with the Township Board.

Page 22: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Detailed Work Plan - Continued • Based on the approved scenario, Sidock

Architects will arrange for a geotechnical investigation for use in the refinement of the selected design and construction documents.

• Prepare all trades (civiL structuraL architectural, mechanicaL electrical) construction documents necessary for the receipt of competitive construction contract bids.

• Conduct a formal review meeting with the Township Substation Committee at 50% completion of the construction documents to update progress, schedule and cost.

• Prepare the application for, submit and respond to the process for site plan approval to include Highland Park Fire Department

Scope of Services

necessary zoning, staff review, commission and Detailed Work Plan - Continued board meetings required to achieve final site plan • Upon approvals by the Township and various approval. governmental agencies, assist the Township Clerk

• Submit and follow-up with the necessary in the advertisement, solicitation and distribution applications required by Washtenaw County and of bidding documents for the receipt of other governmental agencies for roadwork, competitive construction contract bids. utilities, environmental and building permit • During the bidding process, answer bidder's approvals. questions. Conduct a formal review meeting with the • Conduct a formal bid opening, tabulation and Township Substation Committee at 90% evaluation of the construction bids received. completion of the construction documents to Conduct reference checks of the apparent low update progress, schedule and cost. bidder(s), and prepare a written

recommendation for the award of a construction contract.

• Attend the Dexter Township Board meeting to West Bloomfield Fire Department review the bid process, present the bid results and

recommendation and answer any questions from the Township Board prior to their award of a construction contract for the project.

Page 23: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

DEXTER TOWNSHIP FIRE SUBSTATION DEXTER TOWNSHIP, MICHIGAN

ID

1

I Duration : Start

FIELD MEASURE SITE

BACKGROUND DRAWING

INTERVIEWS

SITE VISITS (2+)

0 days

2 days?

7 days?

5 days?

3 days?

3 days?

Mon 12/23/13

Tue 12/31/13

Mon 1/6/14

Wed 1/8/14 PROGRAM 5 days? Thu 1/9/14 PRELIM COST ESTIMATE 3 days? Tue 1/14/14

REVIEW MEETING 3 days? Fri 1/17/14 TOPO SURVEY 20 days? Mon 1/20/14

PRELIMINARY DESIGN 15 days? Tue 1/21114

1. STAND ALONE 9 days? Tue 1/21/14

2. RENOV/ADDN 6 days? Wed 1/29/14 3. DEMO/NEW -4 da-ys? Wed 2/5714

UPDATE COST EST - - 6 days? Mon 2/1 Oi14 -- PRESENT'N- TO 1--vVP-BOARiS ---Odays -Tue-2718/1.4

GEOTECH INVEST - 23 dayS? Wed 2/19114

CONSTRUCTION DOCUMENl 48 days? Wed 2/19/14 DRAWINGS 48 days? Wed 2/19/14 SPECIFICATIONS 20 days? Mon 3/31/14

50% REVIEW MEETING 2 days? Man 3/31/14.

COST ESTIMATES 5 days? Mon 4/14/141 APPROVAL TO BID 0 days Tue 4/22/14

BIDDING 22 days? Mon 4/28/14

ADVERTISEMENT 10 days? Mon 4/28/14

DOCUMENT DIST. 8 days? Mon 4/28/14 QUESTI ONS - 15-days? Mon 5/5f14

BIDS DUE 0 days Tue 5/27/14 - --ANALYSIS - - --7 -days? - T ue-5/27 /14

RECOMMENDATION

Project: DEXTER TWP FIRE SUBST.A Date: Thu 11/21/13

Task

Split

Progress

SIDOCK ARCHITE:.G 1::, 45650 Grand River Avenue

Novi, Michigan 48374

~ar '14 I AJr '14 I ~ay '14 d:Jn '14 i 16 i 23 2 _j 9 116 I 2U~~ 6 113 I 26T 2t .L1-_J_1LL1.!L_£s iiTTI§_

0 D

c==:J - c::J

CJ

-~2/18 ---==-

0 D ~2 r-----

c:=:=J c=::::J

,----

~ 5/27

C=:J o-­

~ ·------------------------------------------------------------------------

Milestone ~ External Tasks

Summary i4iJl iiiJD External MileTask ~

Project Summary Split {7

Page 1

Page 24: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Oakland Township Fire Station

Project Experience

Project Experience

Following are a representative project list and a number of representative projects profiles, selected to illustrate our broad design range for all types of Stations. The profiles include project name, location, and description. We provided a full service scope for all projects, and all have been completed within the last ten ( l 0) years, with the majority having been completed within the last five (5) years.

Sidock generally works on a fixed lump sum fee basis or a percentage of construction cost basis. In either case, the "original design fee" and "final design fee" would remain unchanged, unless the Client revised the project scope.

Final construction cost is listed on each profile sheet. Original construction cost information is not available. As our References will attest, Sidock has a long history of minimal change orders, and of bringing projects in on budget.

In recent years, Municipalities have experienced a great deal of layoffs and turnover. As a result, many Client contacts are no longer available. We have provided a number of project references in the "Firm Overview" section.

Page 25: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Federal • Federal Bureau of Prisons • Saginaw Chippewa Indian Tribe • United States Department of Commerce

Economic Development Administration • United States Department of Homeland Security

Customs and Border Protection Division • United States General Services Administration • United States Social Security Administration • National Guard Bureau • United States Property and Fiscal Office • United States Department of Military and

Veterans Affairs • Veterans Administration • United States Forest Service

State • Michigan Department of Transportation

Aeronautics and Freight Services Bureau • Michigan Department of Human Services • Michigan Air National Guard • Michigan Army National Guard • State of Michigan - Bureau of Prisons • State of Michigan - General Services • State of Michigan- Michigan Works • Ohio Army National Guard • Michigan State Historic Preservation Office

Governmental Clients

County • Alcona County • Grand Traverse County • Hillsdale County Road Commission • Huron Clinton Metropark Authority • Huron County Road Commission • Livingston County • Manistee County Road Commission • Muskegon County • Oakland County Parks • Oakland County Road Commission • Otsego County • Ottawa County Road Commission • Van Buren County Road Commission • Washtenaw County • Washtenaw County Parks and Recreation • Wayne County Airport Authority • Wayne County Department of Human Services • Wayne County Parks and Recreation

® ~~~:~~:~~~~~~!~ www.sidockarchitects.com

Page 26: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Governmental Clients

Township City • Albert Township • City of Adrian • Armada Township • City of Allen Park • Berlin Township • City of Alpena • Bloomfield Township • City of Battle Creek • Brandon Township • City of Berkley • Brownstown Township • City of Beverly Hills • Canton Township • City of Birmingham • Chester Township • City of Center Line • Clinton Township • City of Dearborn • Delta Township • City of Dearborn Heights • Flint Township • City of East Jordan • Grayling Township • City of Ecorse • Green Oak Township • City of Farmington Hills • Grosse lie Township • City of Fenton • Hudson Township • City of Ferndale • Huron Township • City of Flat Rock • Littlefield Township • City of Garden City • Lyon Township • City of Gibraltar • Macomb T ownshio • City of Gaylord • Marquette Township • City of Grayling • Meridian Charter Township • City of Grosse lie • Milford Township • City of Hamtramck • Northfield Township • City of Harper Woods • Oakland Township • City of Highland Park • Orion Township • City of Howell • Oxford Township • City of Kalamazoo • Plymouth Township • City of Kemeny • Rapid River Township • City of Lansing • Redford Township • City of Lincoln Park • Royal Oak Township • City of Livonia • Superior Charter Township • City of Madison Heights • Van Buren Township • City of Maumee • Waterford Township • City of Midland • West Bloomfield Township • City of Muskegon

• City of Muskegon Heights • City of Newaygo • City of Novi • City of Redford • City of River Rouge • City of Riverview • City of Rockwood

Page 27: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Governmental Clients

City • City of Romulus • City of Roseville • City of Royal Oak • City of Saline • City of Sault Ste. Marie • City of Southfield • City of Southgate • City of St. Clair Shores • City of Taylor • City of Trenton • City of Troy • City of Van Buren • City of Warren • City of Wayne • City of Woodhaven • City of Wyandotte

Page 28: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Fire Station

City of Highland Park New Headquarters Fire Station Highland Park, Michigan

Milford Township New Fire Station No. 1 Milford, Michigan

Bloomfield Township Headquarters Additions and Renovations Bloomfield Hills, Michigan

Bloomfield Township Fire Station No. 2 Addition and Renovations Bloomfield Hills, Michigan

Marquette Township New Headquarters Fire Station and Township Hall Marquette, Michigan

City of Kalamazoo Park Street Station Public Safety Building Kalamazoo, Michigan

Van Buren Township New Fire Station No. 1 Van Buren Twp, Michigan

Van Buren Downtown Development Authority New Fire Station No. 2 Van Buren Twp, Michigan

Wayne County Airport Authority New Aircraft Rescue and Fire Fighting Station Romulus, Michigan

City of Farmington Hills New Fire Station No. 3 Farmington Hills, Michigan

Governmental - Public Safety

Green Oak Township New Public Safety Building Green Oak Twp, Michigan

Macomb Township New Fire Station No. 3 Macomb Twp, Michigan

Macomb Township New Fire Station No. 4 Macomb Twp, Michigan

Canton Township New Satellite fire Station Canton, Michigan

Superior Charter Township New Headquarters Fire Station Superior Twp, Michigan

Brandon Township New Satellite Fire Station No. 3 Brandon, Michigan

City of Madison Heights New Headquarters Fire Station Madison Heights, Michigan

West Bloomfield Township New Main Fire Station West Bloomfield, Michigan

Royal Oak Fire Department New Fire Station No. 4 Royal Oak, Michigan

Royal Oak Fire Department New Fire Station No. 3 Royal Oak, Michigan

Page 29: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Fire Station

Clinton Township Study for New Fire Station No. 1 Clinton Twp, Michigan

Royal Oak Fire Department HQ Fire Station Addition and Renovations Royal Oak, Michigan

Clinton Township Study for New Fire Station No. 5 Clinton Twp, Michigan

Delta Township New Headquarters Fire Station Delta Twp, Michigan

Oxford Township New HQ Fire Station No. 1 Oxford, Michigan

Oxford Township New Fire Station No. 2 Oxford, Michigan

City of Wayne Interim Fire Station/New DPW Building Wayne, Michigan

Northfield Township New Public Safety Building Whitmore Lake, Michigan

City of Howell Fire Department Study for Renovation of HQ Fire Station Howell, Michigan

Oakland Township New Fire Station No. 2 Oakland Twp, Michigan

Governmental - Public Safety

Oakland Community College Combined Regional Emergency Services Training Auburn Hills, Michigan

Lyon Township New HQ Fire Station No. 1 Lyon Twp, Michigan

Lyon Township New Fire Station No. 2 Lyon Twp, Michigan

City of Dearborn Heights Headquarters Fire Station Dearborn Heights, Michigan

City of Livonia Building Authority New Fire Station No. 3 Livonia, Michigan

Redford Township New South Fire Station Redford, Michigan

City of Fenton Study for HQ Fire Station Renovations Fenton, Michigan

City of Maumee Study for New Public Safety Training Facility Maumee, Ohio

Canton Township New HQ Fire Station Canton, Michigan

Redford Township Study for New Fire Station Redford, Michigan

Page 30: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Fire Station

City of Roseville HQ Fire Station Renovations Roseville, Michigan

Saginaw Chippewa Indian Tribe New Fire, Police & Court Building Mt. Pleasant, Michigan

Warren Fire Department New Fire Station No. 2 Warren, Michigan

Warren Fire Department New Fire Station No. 4 Warren, Michigan

Plymouth Township New Fire Station No. 3 Plymouth, Michigan

Charter Township of Meridian New Fire Station No. 2 Okemos, Michigan

City of Berkley New Public Safety Building Berkley, Michigan

Village of Beverly Hills New Public Safety Building Beverly Hills, Michigan

Warren Fire Department New Fire Station No. 3 Warren, Michigan

Orion Township New Fire Station No. 1 Lake Orion, Michigan

Governmental - Public Safety

City of Gibraltar New Fire/Police/City Hall Gibraltar, Michigan

City of Rockwood New Fire/Police/City Hall Rockwood, Mic higan

Brownstown Township Fire Station No. 1 Renovation Brownstown Township, Michigan

Brownstown Township Fire Station No. 2 Renovation Brownstown Township, Michigan

Brownstown Township Fire Station No. 3 Renovation Brownstown Township, Michigan

Brownstown Township Fire Station No. 4 Renovation Brownstown Township, Michigan

City of Taylor Fire Safety House Taylor, Michigan

City of Ecorse Fire Station Evaluation Ecorse, Michigan

City of Taylor Main Fire Station Study Taylor, Michigan

Wayne County Community College Emergency Operations Safety Training Facility Taylor, Michigan

Page 31: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Fire Station

Redford Township Study for North Fire Station Renovations Redford, Michigan

City of Wayne New Headquarters Fire Station Wayne, Michigan

City of Taylor New Fire Station No. 3 Taylor, Michigan

City of Taylor New Fire Station No. 2 Taylor, Michigan

City of Southfield New Headquarters Fire Station Southfield, Michigan

Governmental - Public Safety

Page 32: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Fire Station

Client Oakland Township

Project Category Governmental - Public Safety

Project Size 17,500 sq.ft.

Project Cost $2.700,000

Oakland Township Headquarters Fire Station Oakland Township, Michigan

Project Description New Satellite Fire Station designed to meet the future demands of an upscale community. The Station has four drive-thru apparatus bays with necessary support spaces. On one side of the central apparatus bay is the "active" area watch room, Captain's office, and large training room, which is also used for Community activities, with controlled access for after hours use. On the "passive" side are the living quarters including kitchen, day room, locker rooms, and sleeping quarters. Due to its remote location, the Station was designed with a well water system and storage tank capable of handling the fire protection systems in the Station. Future plans include a multi story training tower with draft tank for Department training.

www.sidockarchilects.com

Page 33: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Headquarters Fire Station

Client City of Highland Park, Michigan

Project Category Governmental - Public Safety

Project Size 12,120 sq. ft.

Project Cost $2,600,000

Project Description

Headquarters Fire Station Highland Park, Michigan

New one-story headquarters fire station located on the former urban civic center site. The 12,120 sq ft facility includes administrative offices for the Chief, Fire Marshal. Arson Investigator and support/ storage space. The living quarters includes separate locker/shower rooms and sleeping quarters for male and female firefighters. Kitchen, dining area and Day Room space is provided adjacent to an outdoor patio area . The Apparatus Bay contains five, single­depth bays with an e2poxy flooring system, under vehicle drainage system and support spaces for SCBA laundry, storage, workroom and a mezzanine for an exercise area . The project, funded by FEMA under an American Recovery and Reinvestment Act grant, included extensive site reconstruction of utilities and drainage structures. This engineering effort included evaluation and re-use of water service and storm drainage systems on a confined site in an urban setting along with reinforced concrete pavement to handle the emergency response vehicles.

Sidock Architects ARCHITECTS • ENGINEERS • CONSULTANTS

'A Sidock Group CompJny'

www.sidockarchitects.com

Page 34: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Littlefield Township Fire Station

Client Littlefield Township

Project Category Governmental - Public Safety

Project Size 9,600 SF

Project Cost $1,300,000

LiHiefield Township Fire Station Alanson, Michigan

Project Description Architectural Design services for a new 9,600 square foot fire station which includes administrative offices, living quarters, training room and an apparatus bay accommodating up to six vehicles for the township's fire department.

The Work included a single-story, slab on grade building constructed of a pre­engineered metal building with concrete masonry and metal sided exterior walls.

Sitework included earthwork, hot mix asphalt paving, sanitary sewer and water services, and concrete sidewalks.

® ~!~~·t:~:;~~ www.sidockarchitecls.com

Page 35: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Otsego County EMS Building

Client Otsego County

Project Category Governmental- Civic & Cultural

Project Size 15,000 SF (interior work)

Project Cost $660,000

Otsego County EMS Building

Gaylord, Michigan

Project Description Architectural Design and Construction Administration services for the new Emergency Medical Services Headquarters Facility for Otsego County EMS.

This 15,000 square foot facility was designed to replace an outdated and undersized building, and to accommodate a growing county.

This pre-engineered structure provides administrative offices, living quarters, vehicle bays and training classrooms. The drive-through vehicle bay accommodates up to ten emergency vehicles in a temperature controlled space.

www.sidockarchitecls.com

Page 36: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Headquarters Fire Station No. 2

Client Van Buren Towhsnip

Project Category Governmental - Public Safety

Project Size 17,300 sq.ft.

Project Cost $3.900,000

Headquarters Fire Station Van Buren Township, Michigan

Project Description New Headquarters Fire Station with training tower, living quarters, administrative offices, fitness training area, and unique center aisle support spine in apparatus room, with SCBA, laundry, maintenance, and de-con areas. The station provides area for emergency operations center (EOC) for the Township.

www.sidockarchilecls.com

Page 37: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Fire Station No. 3 and Community Center

Client City of Farmington Hills

Project Category Governmental - Public Safety

Project Size 23,200 sq.ft.

Project Cost $4,800,000

Fire Station No. 3 and Community Center Farmington Hills, Michigan

Project Description A new three bay drive-thru fire station for six full time and three special assignment staff. Full living quarters, fitness training space, and training room are provided. The station also provides a multi-purpose room for community use and youth activities on the lower level. A replacement station, this project was planned, designed, and constructed to maintain full operations of the existing station until the new sta tion came into operation. This project was constructed in eight months.

® ~~::~~~~:.~,:~ www.sidockarchitects.com

Page 38: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Fire Station No. 1

Client Milford Township

Project Category Governmental - Public Safety

Project Size 19,000 sq.ft.

Project Cost $3,700,000

Fire Station No. 1 Milford, Michigan

Project Description Expansion and renovation of the existing fire station, which was constructed in 1954. The station includes four double bay drive-thru apparatus room with living quarters, day room, fitness center, and storage above. The existing station was upgraded to include a training room, administrative offices, and watch room. Our design utilized bi-fold apparatus bay doors in order to compliment the period architecture reflective of the community's history.

www.sidockarchitects.com

Page 39: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Headquarters Fire Station

Client City of Madison Heights

Project Category Governmental - Public Safety Project Size 19.500 sq.ft.

Project Cost $4.800,000

Project Description

Headquarters Fire Station Madison Heights. Michigan

New five bay headquarters fire station strategically located on a corner of the civic center complex allowing separate egress onto two major roadways. The station provides a training room that can act as the City's emergency operations center ( EOC) . The site is configured with a free-standing multi-story training tower for Department use. The project also included demolition of the existing station and remodeling of a satellite station.

® ~~7~~~::~~~ www .sidockarchitects.com

Page 40: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Title Park Street Station Public Safety Building

Client City of Kalamazoo

Project Category Governmental - Public Safety

Project Size 17,500 sq.ft.

Project Cost $3,100,000

Multi-Use Fire Station Kalamazoo, Michigan

Project Description New Fire Station serving true Public Safety Department with building features to serve both fire and police activities. Sleeping quarters, kitchen, locker room, day room, on passive side of building with offices, two training rooms, armory, reception area for public access on the administrative side of the building. Separating the two sides is a three bay drive-thru apparatus room. The project included upgrade of a six bay metal building on site, for tactical vehicle parking.

®~?~;~:~?~ www.sidockarchilects.com

Page 41: ~~7~~~~~;?,~! - Dexter Township, Michigan · Park Headquarters Fire Station (opened 2013), Wayne Westland Fire Authority New Fire Station No 1. (currently in design phase), and the

Project Fees

I ·,

I j - ·

Total Lump Sum Fee Please refer to our fee sheet in separate sealed envelope.

Hourly Rates Please refer to our fee sheet in separate sealed envelope.

Fee By Project Phase Please refer to our fee sheet in separate sealed envelope.