70-646: windows server 2008 administration...

22
70-646: Windows Server 2008 Administration Course 01 - Preparing for Windows 2008 Installation

Upload: dangnga

Post on 13-Mar-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

70-646: Windows Server 2008 Administration

Course 01 - Preparing for Windows 2008

Installation

Slide 1

Course Overview

• Overview of Windows Server 2008 Deployment

• Making a Deployment Plan for Windows 2008 Server

• Planning Migration

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 2

Topic A: Overview of Windows Server 2008

Deployment

• Learn what the Business Needs are first

• Consider the Advantages of 64-Bit Systems

• Don’t forget some other deployment options such

as:

▫ Server Consolidation in Windows Server 2008

▫ High Availability in Windows Server 2008

▫ Virtualization in Windows Server 2008

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 3

Business Needs

Business Requirements

Server Management •Flexible•Secure•Scalable

User Experience •Consistent•Mobility•Functionality

Operations •Cost•SLAs

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 4

Consolidation Benefits with Server 2008

Consolidation

Hardware •Costs•64-bit support

Servers •Consolidation•Virtualization•Hosting

Business Continuity •Virtual Machines•Server Core•SoftGrid

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 5

High Availability

HA with Server 2008

Hardware •RAID adapters•NIC teaming•Hot Swap

Software •Fault tolerant applications•Clustering

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 6

64-bit Systems Options

Benefits

Hardware •Increased addressable memory•Supports greater workload

Software •Application support•Licensing

Challenges •Cost•Upgrading

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 7

Virtualization Options

• Virtualization Options

• WSV (Windows Server Virtualization)

• Must use 64-bit Windows Server

• Understanding Licensing

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 8

Any Issues with Compatibility?

• Create an Application Migration Plan

• Create a Hardware Upgrade Plan

• What Issues could Prevent the Deployment of

Windows Server 2008

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 9

Topic B: Making a Deployment Plan for Windows

2008 Server.

• Document and study the Current Network

Environment

• Designing Server Deployments

• Maintenance and Deployment Schedules

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 10

Document and Study the Current Network

Environment

What to Analyze

Hardware capacity •Identify spare capacity

•Identify over utilized hardware

Software audit •SCOM

•Audit tools

Consolidation •Virtualization

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 11

Designing Server Deployments

• Image Files

• Windows Image Format (WIM)

• WDS

• PXE

• TFTP

• Volume Activation

• Key Management Services (KMS)

• Multiple Activation Key (MAK)

• Business Desktop Deployment (BDD)

• Automated Installation Kit (WAIK)

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 12

Maintenance and Deployment Schedules

• Things to Consider• Bandwidth

• Virtualization

• Remote Locations

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 13

Topic C: Planning Migration

• Creating a Migration Plan

• Using the Upgrade Plan

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 14

Creating a Migration Plan

• Consider the following for Application Support

with Windows 2008 Server.

• Migration path planning

• Upgrading existing applications

• Support for 32-bit applications

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 15

Using the Upgrade Plan

• When making hardware recommendations for

Windows 2008 Server, ask the following

Questions:▫ What plans exist at present for hardware replacement?

▫ Are there any existing hardware SLAs?

▫ Could there be a solution using Virtualization?

▫ What 64-bit hardware support do your hardware vendors

provide?

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Slide 16

What Can Delay Your Windows 2008 Server

Installation?

Issues

Cost •Deploying Platform•Staff Training

Support •In-House•External

Hardware •Compatibility

Applications •Server Applications•In-House Apps

Licensing •Costs•Implications

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Review Questions:

1. Which of the following is not a business requirement goal with server management? A. Flexibility B. Scalability C. Self configuration D. Security

2. Which of the following is not a benefit of the 64-bit system?

A. Higher workloads than 32-bit systems B. Full backward compatibility C. Higher amounts of addressable memory D. Windows Server virtualization

3. Which of the following solutions can best help in making your 64-bit Windows 2008 Server

able to support legacy applications? A. Installing only the 32-bit version of the O/S B. There are no solutions; the best that can be offered is to support legacy network

architecture protocols such as NetBIOS C. All legacy applications are fully compatible D. Using Windows Server virtualization to allow the older legacy O/S to run on the new

Windows 2008 Server platform as a virtual machine

4. Which of the following is not a solution for high availability with Windows 2008 Server? A. Having an offline copy of the server ready for replacing a server that fails B. Using a RAID solution C. NIC teaming D. Hot swappable hardware

5. Windows Server virtualization is a ____________________ implementation of

virtualization. A. purely software-based B. hyperthread-based C. multicore-based D. 64-bit hypervisor-based

6. What type of planning should be conducted to help in the transition from the existing

Windows solution to the Windows 2008 Server? A. Transition B. Migration C. Translation D. Replacement

7. Moving different server operations into a single Windows 2008 Server will eventually save money and resources for your company. This process of combining services, either to the Windows 2008 Server or with server virtualization is called what? A. Server consolidation B. Server overloading C. Customization D. Not a good administrative practice

8. Which of the following tools would not aid in the deployment of Windows servers?

A. Image files B. WDS C. CD/DVD drives D. WAIK

9. Which of the following would not be a consideration for scheduling server deployments?

A. Bandwidth B. User knowledge C. Virtualization D. Remote locations

10. True or False: A network assessment/audit should be conducted before the deployment of

Windows Server 2008. A. True B. False

Answer Key:

1. C Self configuration is not a goal of most business models in that allowing much of the server management to follow defaults or self configuration can lead to serious security flaws.

2. B The new 64-bit systems may not be fully compatible with applications designed on the 32-bit O/S.

3. D The use of virtualization can easily help support a legacy application by using the original operating system on the new 2008 server. This process can also be thought of in the discussion of server consolidation.

4. A An offline copy of a server does not meet the needs of high availability. This is instead a design for disaster recovery. High availability is a way of never having the server go offline.

5. D Windows Server 2008 implements 64-bit hypervisor-based "hardware-assisted" virtualization. It provides better resource sharing and faster access to hardware from virtual machines.

6. B Migration planning involves a process to allow a smooth transition to Windows 2008 with as little interruption in service as possible. This may be a necessity based on your exiting SLAs.

7. A This is the basic concept of server virtualization. With the availability of high performance hardware, multiple core processors, as well as large addressable amounts of memory, consolidation seems like a great concept to conserve hardware costs and management of multiple servers.

8. C Although installations can be performed with CD/DVD drives, this is the most difficult and slowest way to manage a deployment. All of the other tools can vastly decrease the deployment time and increase the scale of the deployment for multiple desktop and server installations.

9. B User knowledge may be a factor in the use of Windows 2008 and could delay a deployment if the staff is not ready, but it is not needed for the actual deployment of the product.

10. A Through the audit of the network, you can learn how to address issues such as legacy application support, server hardware capabilities, virtualization needs, and points of consolidation.