Program OverviewProgram Overview
737 Airborne Early Warning & Control (AEW&C)
737 Airborne Early Warning & Control (AEW&C)
737 AEW&C Program OverviewIEL 03-358122 October 2003
737 AEW&C Program OverviewIEL 03-358122 October 2003
Boeing AEW History
737 AEW&C Program Overview-2IEL 03-358122 October 2003
2002 – TurkeyC/A
2008 – TurkeyDelivery
1972 2008
1979 – NATOC/A 1985 – Final NATO
Delivery (18)
1972 – Brassboard 1977 – 1st USAFProduction Delivery
1984 – Final USAFProduction Delivery (34)
1981 – SaudiC/A 1987 – Final Saudi
Delivery (5)
1987 – UKC/A 1992 – Final U.K.
Delivery (7)
1993 – JapanC/A
767 AWACS
1999 – Final ROJDelivery (4)
1987 – ROFC/A 1992 – Final ROF
Delivery (4)
2000 – AustraliaC/A 2007 – Australia
Delivery
United Kingdom E-3D
Japan E767 AWACS
Australia 737 AEW&C
NATO E-3A
Saudi Arabia E-3A
France E-3F
Turkey 737 AEW&C
U.S. E-3B/C
... Boeing (Prime Contractor) and Northrop Grumman (Formerly Westinghouse)... Boeing (Prime Contractor) and Northrop Grumman (Formerly Westinghouse)
Multi-National AWACS – 707/767/737
737 AEW&C Program Overview-3IEL 03-358122 October 2003
Boeing AEW&C Heritage
Beyond1972
Improved Communications
Integrated ElectronicSupport Measures
1993-1999 (4)1972-1992 (68) 2000 Initial Contract (4)
Electronically Scanned Radar
MechanicallyScanned Radar
We build and support for the futureWe build and support for the future
737 AEW&C Program Overview-4IEL 03-358122 October 2003
Network Centric Operations
737 AEW&C Program Overview-5IEL 03-358122 October 2003
AEW&C – Not Just an Airborne Radar!AEW&C – Not Just an Airborne Radar!
Communications Cabinet
Communications Cabinet(Cryptos and ICS)
Communications Cabinet
Mission Navigation Control Module
Communications Cabinet
ISE CabinetCPSM/MSE CabinetMercury Processor
Radar Aperture
ESM Cabinet
MissionConsoles (10)
Air Refueling Receptacle
Mission Data Processing and SPS Cabinet
RSE Cabinet
Galley
Crew Rest Area (8)
Radar T/R Modules
Lavatory
Airborne MissionSegment
Mission Planning and Analysis System SupportFlight Crew
TrainingMission Crew
Training
737 AEW&C System Configuration
737 AEW&C Program Overview-6IEL 03-358122 October 2003
Software Support
Mission Crew Training Maintenance Support Training
Flight Crew Training Engineering/Technical Support
Support Facility
737 AEW&C – A Total System
Mission Planningand Analysis
737 AEW&C Program Overview-7IEL 03-358122 October 2003
Program Status
! Signed acquisition contract with the Commonwealth of Australia (4+2+1) on 20 December 2000. Contract start date June 2001.
! Signed acquisition contract with the Republic of Turkey (4) on 04 June 2002. Contract start date 23 July 2003.
! Korean proposal submitted on 28 February 2001.! Request for Information received from Italy and U.S. Customs
Service.! Systems critical design reviews completed.! First two green aircraft to support the Australian Program were
delivered in October 2002 and May 2003, respectively.! First green aircraft to support Peace Eagle is scheduled for
delivery in December 2004.! Australian aircraft modifications started in March 2003.! First MESA Radar antenna installed October 2003.
737 AEW&C Program Overview-8IEL 03-358122 October 2003
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2025
Turkey
Wedgetail
Initial SupportIOC
Post DeliverySupport
Initial Support
Post DeliverySupport
Design
SignedContract
20 Dec
Contract Effective Date18 Jun
AMS EW Delta CDRJun 03
AMSCDR13 Dec
AMSPDR28 Jun
Software DPRs
Jan#7
Sep#6
Mar#5
Sep#4
Jul#8
Mar#3
21 Jun1T
MOA Signed20 Apr
Contract Start Date
23 JulSRR12 Dec
PDR14 May
CDR10 Dec
21 May4T
08 Jan3T
08 Jul2TSoftware DPRs
Design
Airborne System DeliveriesA1 A3A2 A4 A5 A6
OptionsJul07
Feb08
Oct07
Jun08
Nov08
Apr09
Development Mod I&CO
DT&EFCO AT&EDelivery
FAA STC
DevelopmentDT&E TAT&E
Delivery
Mod/I&CO/F&CO
Airworthiness TestingRadar Antenna #1 Delivery22 Sep
M-Demo
FAA STC
Airborne System DeliveriesA7A1/A2 A4A3 A5 A6
Nov06
Mar07
Aug07
Dec07
Jul08
Mar08
Options
Program Schedule
737 AEW&C Program Overview-9IEL 03-358122 October 2003
Aircraft Subsystem –Built and in Modification
• First green aircraft rolled out of the factory on 31 October 2002
• Auxiliary fuel tanks have been installed
• Structural modifications began in March 2003
• Second green aircraft rolled out of the factory on 28 May 2003 Boeing 737-700 Increased Gross Weight (IGW)
737 AEW&C Program Overview-10IEL 03-358122 October 2003
737 AEW&C Flight Deck
737 AEW&C Program Overview-11IEL 03-358122 October 2003
Auxiliary Fuel Tank Installation
737 AEW&C Program Overview-12IEL 03-358122 October 2003
Forward Electronics Bay
737 AEW&C Program Overview-13IEL 03-358122 October 2003
Section 46 Upper Lobe Removed
737 AEW&C Program Overview-14IEL 03-358122 October 2003
Final Assembly
Complete
Section 46 Upper Lobe Reinforced
737 AEW&C Program Overview-15IEL 03-358122 October 2003
Section 46 Upper Lobe Installed
737 AEW&C Program Overview-16IEL 03-358122 October 2003
Airplane #1 Antennas and MESA Attach Fittings
737 AEW&C Program Overview-17IEL 03-358122 October 2003
First MESA Radar Antenna Inspection
737 AEW&C Program Overview-18IEL 03-358122 October 2003
Section 46 and Radar Antenna
737 AEW&C Program Overview-19IEL 03-358122 October 2003
First MESA Radar Antenna Installed
737 AEW&C Program Overview-20IEL 03-358122 October 2003
Air Refueling ReceptaclePressure Box Installation
737 AEW&C Program Overview-21IEL 03-358122 October 2003
Air Refueling ReceptacleExterior View
737 AEW&C Program Overview-22IEL 03-358122 October 2003
CFM56-7 Engine with 180Kva IDG
737 AEW&C Program Overview-23IEL 03-358122 October 2003
SATCOM and VHF/UHF Antennas
737 AEW&C Program Overview-24IEL 03-358122 October 2003
Ventral Fin Installation
737 AEW&C Program Overview-25IEL 03-358122 October 2003
Vertical Stabilizer Re-Installation
737 AEW&C Program Overview-26IEL 03-358122 October 2003
Aircraft #2 – Section 46 Upper Lobe Removed
737 AEW&C Program Overview-27IEL 03-358122 October 2003
Summary
! High performance at an affordable price
! Program is in production for Australia and Turkey
! Designed for the integrated battlefield of the future
737 AEW&C Program Overview-28IEL 03-358122 October 2003