7.5m long ryogen free magnet for fundamental neutron decay ...€¦ · 7.5m long ryogen-free magnet...

1
7.5m long Cryogen 7.5m long Cryogen 7.5m long Cryogen-Free Magnet for Fundamental Neutron Decay Measurements Free Magnet for Fundamental Neutron Decay Measurements Free Magnet for Fundamental Neutron Decay Measurements R. Mitchell, J. Good , M. Owczarkowski, S. Poli : Cryogenic Ltd, London Cryogenic Ltd has manufactured one of the largest, if not the largest cryogen-free system in the world. The system was built for the Fundamental Neutron Physics Beamline (FNPBL) at the Spallaon Neutron Source (SNS), Oak Ridge, Tennessee. The magnet system houses a custom spectrometer and be used to measure a, the electron-neutrino correlaon parameter, and b, the Fierz interference term in neutron beta decay. The cryostat is cylindrical, nominally 7.5m along its axis and 1.43 m in diameter. It houses a complex set of niobium-tanium superconducng windings which provide a varying magnec field profile along a 320mm diameter gold-plated UHV bore. The bore tube extends along the full length of the cryostat and has orthogonal ports connected to the neutron beamline. A vacuum of <3.10 -10 mbar is achieved in the UHV bore once the system is cold. The stray field generated by the magnet windings is compensated by a series of negavely wound co-axial windings which have approximately twice the diameter of the internal posive windings. On the beamline, the cryostat is housed in a passive steel shield to further reduce the magnec stray field. The magnet windings operate nominally at 4K and are cooled by four Gifford McMahon two-stage cryocoolers, each delivering 1.5W cooling power at their second stage. The cryostat design allows the magnet system to be operated in both horizontal and vercal orientaons. ABSTRACT The cold neutrons enter the bore via the cruciform and decay into a proton, an electron and an anneutrino. The magnec field is designed to opmally guide the protons and electrons to silicon detectors at the upper and lower ends of the spectrometer. THE MAGNETIC PROFILE The field profile was pre-defined and had to be matched to an accuracy of <1%. The ‘pinch winding’ used to generate the highly localized field peak was highly stressed. The 7.5m UHV bore is gold plated internally. An expensive and difficult operaon! The bore constricts at the ‘pinch coil’ trapping it within the magnet assembly. Maintaining the magnet at <5K using just four cryocoolers required careful analysis. The force paern between windings is complex and can change dramacally during a quench. The internal structure contracts nearly 30mm whilst clearances near the cruciform are <8mm. The cryostat operates vercally on the beamline but must to be rotatable to the horizontal in order to load the spectrometer. DESIGN CHALLENGES STRESS ANALYSIS FOR ROTATION COOLDOWN (< 5 DAYS) FLUX PATTERN ON ENERGISATION UNDER CONSTRUCTION FIRST ROTATION READY FOR SHIPMENT THE LIFT FIRST TEST AT ORNL ON THE BEAMLINE

Upload: others

Post on 22-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 7.5m long ryogen Free Magnet for Fundamental Neutron Decay ...€¦ · 7.5m long ryogen-Free Magnet for Fundamental Neutron Decay Measurements R. Mitchell, J. Good , M. Owczarkowski,

7.5m long Cryogen7.5m long Cryogen7.5m long Cryogen---Free Magnet for Fundamental Neutron Decay MeasurementsFree Magnet for Fundamental Neutron Decay MeasurementsFree Magnet for Fundamental Neutron Decay Measurements

R. Mitchell, J. Good , M. Owczarkowski, S. Poli : Cryogenic Ltd, London

Cryogenic Ltd has manufactured one of the largest, if not the largest cryogen-free system in the world. The

system was built for the Fundamental Neutron Physics Beamline (FNPBL) at the Spallation Neutron Source (SNS),

Oak Ridge, Tennessee.

The magnet system houses a custom spectrometer and be used to measure a, the electron-neutrino correlation

parameter, and b, the Fierz interference term in neutron beta decay.

The cryostat is cylindrical, nominally 7.5m along its axis and 1.43 m in diameter. It houses a complex set of

niobium-titanium superconducting windings which provide a varying magnetic field profile along a 320mm

diameter gold-plated UHV bore. The bore tube extends along the full length of the cryostat and has orthogonal

ports connected to the neutron beamline. A vacuum of <3.10-10 mbar is achieved in the UHV bore once the system

is cold.

The stray field generated by the magnet windings is compensated by a series of negatively wound co-axial

windings which have approximately twice the diameter of the internal positive windings. On the beamline, the

cryostat is housed in a passive steel shield to further reduce the magnetic stray field.

The magnet windings operate nominally at 4K and are cooled by four Gifford McMahon two-stage cryocoolers,

each delivering 1.5W cooling power at their second stage. The cryostat design allows the magnet system to be

operated in both horizontal and vertical orientations.

ABSTRACT

The cold neutrons enter the bore via the cruciform and decay into a proton, an electron and an

antineutrino. The magnetic field is designed to optimally guide the protons and electrons to silicon

detectors at the upper and lower ends of the spectrometer.

THE MAGNETIC PROFILE

The field profile was pre-defined and had to be matched to an accuracy of <1%.

The ‘pinch winding’ used to generate the highly localized field peak was highly stressed.

The 7.5m UHV bore is gold plated internally. An expensive and difficult operation!

The bore constricts at the ‘pinch coil’ trapping it within the magnet assembly.

Maintaining the magnet at <5K using just four cryocoolers required careful analysis.

The force pattern between windings is complex and can change dramatically during a quench.

The internal structure contracts nearly 30mm whilst clearances near the cruciform are <8mm.

The cryostat operates vertically on the beamline but must to be rotatable to the horizontal in

order to load the spectrometer.

DESIGN CHALLENGES

STRESS ANALYSIS FOR ROTATION

COOLDOWN (< 5 DAYS)

FLUX PATTERN ON ENERGISATION

UNDER CONSTRUCTION

FIRST ROTATION

READY FOR SHIPMENT

THE LIFT

FIRST TEST AT ORNL

ON THE BEAMLINE