Flight Program Status Heliophysics Subcommittee Meeting 8 August 2016 Joe Smith

Upload: others

Post on 11-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Flight Program StatusHeliophysics Subcommittee Meeting8 August 2016Joe Smith

Page 2: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Heliophysics Mission Timeline 1995-2025

Page 3: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Magnetospheric Multiscale (MMS)Mission

Description:MMSisaSolarTerrestrialProbesmissionwithfouridenticallyinstrumentedspacecraftthatuseEarth’smagnetosphereasalaboratorytostudythemicrophysicsofmagneticreconnection.

RecentAccomplishments:• ResultspapersonlineatGeophysicalResearchLetters:http://onlinelibrary.wiley.com/10.1002/(ISSN)1944-8007/specialsection/NASA_MMS1• StarTrackerissueresolved.

PlanningItems:• MMSScienceWorkshop#1,UCLA,7-9September

‒ Over100paperssubmitted• Phase1Bscienceopswillbegin12September

‒ Tetrahedronmeanspacing7km• AGU12-16December

‒ Twoteam-convenedspecialsessions:- daysidemagnetopauseprocesses- innermagnetotail processes

WatchItems/Concerns:• None.

Earth

SolarWind

Earth MagneticField Lines

Earth

4

Page 4: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

LWS Space Environment Testbeds (SET)-1LaunchInformation:• Spacecraft:AFRLDeployableStructures

Experiment(DSX)• LaunchVehicle:SpaceX FalconHeavy• Date: March2017• Site:CapeCanaveral• Orbit:6000x12,000km,45degree

inclinationMEO

Description:SpaceEnvironmentTestbeds (SET)improvestheengineeringapproachtoaccommodateand/ormitigatetheeffectsofsolarvariabilityonspacecraftdesignandoperationsby:1)collectingdatainspacetodevelopaphysics-basedunderstandingofresponseofspacecraftmaterials,components,&sensors/detectorstospaceenvironments;2)collectingdatainspacetovalidatenew&existinggroundtestprotocolsfortheeffectsofsolarvariabilityonemergingtechnologies;and3)developing&validatingengineeringenvironmentmodels,tools,&databasesforspacecraftdesign&operations.

Accomplishments:• DSXSpacecraftsuccessfullycompletedFactoryCompatibilityTest(FTC,end-to-endtest)

UpcomingMilestones:• SolarArrayAcousticTest– September2016• TVACtestsplannedforOctober-November2016.

WatchItems/Concerns:• None

5

Page 5: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Ionospheric ConnectionExplorer(ICON)

RecentAccomplishments:• IntegratedPayloadcompletedEnvironmentalTestProgram• Pre-ShipReview4August.Successful.• Spacecraftinbake-outpriortoObservatoryIntegration

UpcomingMilestones/Events:• SystemIntegrationReview– 10-11August2016

• KeyDecisionPoint-D– 26August2016• Pre-EnvironmentalReview– 20-21September2016• LRD– October2017

Issues/Concerns:• OrbitalDebriswaiverinsignatureroutingatGoddard.

MIGHTI TV

Description:ICONwillexploretheboundarybetweenEarthandspacetounderstandthephysicalconnectionbetweenourworldandourspaceenvironment.ICONwilllaunchonaPegasusXLlaunchingfromKwajaleinAtollinOctober2017.ThespacecraftwillbeplacedinaLEOOrbitat575kmwitha27° inclination.Thepayloadconsistsoffourinstruments,MIGHTI(NRL)– neutralwindmeasurements;IVM(UTDallas)– insituionvelocities;andFUV&EUVimagingUVspectrographs (UCBerkeley) – iondensity. EUV Baffles

6

Integrated Payload

Integrated Bus

Page 6: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

GOLD- GlobalObservationsoftheLimbAndDisk-

Description: GOLDisanExplorerProgramMissionofOpportunitythatwillprovidethefirstsimultaneousmeasurementsoftemperaturesandcompositioninEarth'sthermosphereandionosphereonaglobalscale.GOLDwillflyaUVimagingspectrographasahostedpayloadonacommercialcommunicationsspacecraftingeostationaryorbit.

RecentAccomplishments:• Completed:

ü Instrument-levelvibrationtestü ComprehensivePerformanceTestandalignmentcheck.

ü ThermalBalanceTest• CurrentlyinThermalVacuumTesting

UpcomingMilestones/Events:• Pre-ShipReview– 26October2016

• LRD– April2018

Issues/Concerns:• None

7

Channel 1 and 2 Pre-Test

Page 7: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

SolarProbePlus(SPP)DescriptionSpacecraftinahighlyeccentricellipticalorbitwithaminimumperihelionof9.9SolarRadii(~4.3millionmiles).Employsacombinationofin-situmeasurementsandimagingtoachievethemission’sprimaryscientificgoal: tounderstandhowtheSun’scoronaisheatedandhowthesolarwindisaccelerated.

RecentAccomplishments• KDP-DAPMC– 7July.Successful.• IntegrationandtestinginitiatedatAPL• SpacecraftHarnessHi-PotTestingongoing

UpcomingMilestones• Pre-EnvironmentalReview– 6October2017• Pre-ShipReview– 8March2018• LRD– 31July2018

Issues/Concerns

• None

8

StartedFlightPropulsionThermalVerificationTestingatAPL

SolarArrayCoolingSystemRadiator#1

Page 8: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

SolarOrbiterCollaboration(SOC)Description:Willuseauniquecombinationofmeasurements:Insitumeasurementswillbeusedalongsideremotesensing,closetothesun(~.3AU),torelatethesemeasurementsbacktotheirsourceregionsandstructuresonthesun'ssurface. Operatesbothinandoutoftheeclipticplane.Measuressolarwindplasma,fields,wavesandenergeticparticlescloseenoughtotheSuntoensurethattheyarestillrelativelypristine.

RecentAccomplishments:• ESAMissionCDR9June.Successful.MaintainingOctober2018launch• ESAincreasingNASAinvolvementinschedulingactivitiesandSystemsEngineeringefforts• ESA/Airbusadjustinginstrumentdeliveries(later)• HeavyIonSensorinstrumentHigh-VoltagePowerSupplyTestingOngoing• SoloHI InstrumentPre-EnvironmentalReview28July

UpcomingMilestones:• HISPre-EnvironmentalReview Aug2016• SoloHI Pre-ShipReview Oct2016• HISPre-ShipReview Dec2016• LRD Oct2018

WatchItems/Concerns:• Schedulerisk(spacecraft)toLRD

9

SoloHI Instrument Modulewith door integrated

HIS configured for Phase 2 beam testing (with parallel

beam monitor installed)

Page 9: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Heliophysics MissionsinFormulation&DevelopmentDirector’sAssessment

9

Project Overall previous months

This Month Comments

-4 -3 -2 -1 O T C S PDevelopment

EX-GOLD Apr 2018 G G G G G G G G G

EX- ICON Oct 2017 G G G G G G G G Y ODARinsignaturecycleatGoddard.

LWS-SPP Jul 2018 G G G G G G G G G

LWS-SOC Oct 2018 G G Y G/Y

G/Y

G/Y G

G/Y Y

HISHVPSprogressingwell.InstrumentschedulesbeingnegotiatedwithESA.Oct2018LRDschedulewatch.

LWS – SET Mar 2016 G G G G G G G G G

8/4/16

Page 10: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

StatusofHPDOperatingMissions

10

7/14/16

OctMission Launch Phase Extension to (*) M-3 M-2 M-1 Cur. M. RemarksGeotail 7/24/1992 Extended 12/31/2016STEREO 10/25/2006 Extended 9/30/2018THEMIS+Artemis 2/17/2007 Extended 9/30/2018AIM 4/25/2007 Extended 9/30/2018Hinode 9/23/2006 Extended 9/30/2018ACE 8/27/1997 Extended 9/30/2018RHESSI 2/5/2002 Extended 9/30/2018SOHO 12/2/1995 Extended 9/30/2018TIMED 12/7/2001 Extended 9/30/2018Voyager 1 + 2 8/20/1977 Extended 9/30/2018TWINS A + B 6/2006 & 3/2008 Extended 9/30/2018IBEX 10/19/2008 Extended 9/30/2018Wind 11/1/1994 Extended 9/30/2018SDO 2/11/2010 Extended 9/30/2018Van Allen 8/30/2012 Extended 9/30/2018IRIS 6/27/2013 Extended 9/30/2018MMS 3/12/2015 Prime 9/1/2017

Still no response from B. Project plan forward accepted by HQ 6/13.on 6/15 D lost of data: 7/2 A lost 31h of data. Both antenna issues.

Star tracker issue resolved.

Star Tracker issues should be closed soon.Star tracker issue resolved.

(*) Extended mission end dates subject to upcoming Senior Reviews. (+) Terminates at date.

Mission proceeding to Area of concern - possible meet science reduction in capabilityrequirements

Page 11: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Sounding Rocket Science HighlightsJune 2016

11

Successful Wallops Flight Facility Launch: RockON/RockSAT-C (KOEHLER) – 24 June 2016

Credits: NASA / Patrick Black

NASA successfully launched a Terrier-Improved Orion suborbital sounding rocket carrying student experiments withthe RockOn/RockSat-C programs on June 24.

More than 200 middle school, high school, community college and university students and instructors participating inRocket Week at Wallops were on hand to witness the launch.

Through RockOn and RockSat-C students are learning and applying skills required to develop experiments forsuborbital rocket flight. In addition, high school educators through the Wallops Rocket Academy for Teachers(WRATS) are learning about applying rocketry basics in their curriculum.

The next launch from NASA’s Wallops Flight Facility is a Terrier-Improved Malemute suborbital sounding rocket currently scheduled for August 16. The rocket will be carrying the RockSat-X education payload.

For more information on NASA’s Wallops Flight Facility, visit: http://www.nasa.gov/wallops

Page 12: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

SoundingRocketsLaunchScheduleJune2016– March2017

12

Updated 8/4/16

10/15/16

May 2017

7/27/16

Page 13: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Backup

Page 14: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Acronym List• ABC – Agency Baseline Commitment• ACE – Advanced Composition Explorer• AFRL – Air Force Research Laboratory• AIM – Aeronomy of Ice in the Mesosphere• AO – Announcement of Opportunity• BARREL – Balloon Array for Radiation Relativistic Electron Losses• CINDI – Coupled Ion Neutral Dynamic Investigation• CDR – Critical Design Review• EM – Engineering Model• EMC – Electromagnetic Compatibility• EMI – Electromagnetic Interference• EUV – Extreme Ultraviolet• FM – Flight Model• FPGA – Field Programmable Gate Array• FRB – Failure Review Board• FUV – Far Ultraviolet• GOLD – Global-scale Observations of the Limb and Disk• GRIPS -- Gamma-Ray Imager/Polarimeter for Solar flares• HIS – Heavy Ion Sensor• HVPS – High Voltage Power Supply • IBEX – Interstellar Boundary Explorer• ICON – Ionospheric Connection Explorer• ICP -- Instrument Control Package• IMAU -- ICON Master Avionic Unit• IRAP – Industrial Research Assistance Program• IRIS – Interface Region Imaging Spectrograph• IVM -- Ion Velocity Meter• KDP – Key Decision Point• LCC – Life Cycle Cost• LRD – Launch Readiness Date

• LVPS – Low Voltage Power SupplyLWS – Living With a StarMCP – Micro-Channel PlateMEO – Medium Earth OrbitMIDEX – Medium-Class ExplorerMIGHTI -- Michelson Interferometer for Global High resolution Thermospheric ImagingMMS – Magnetospheric Multi-ScaleMoO – Mission of OpportunityMOR – Mission Operations ReviewNRA – NASA Research AnnouncementPER – Pre-Environmental ReviewPDR – Preliminary Design ReviewPI – Principal InvestigatorPIP – Payload Interface PlatePSR – Pre-Ship ReviewRHESSI – Ramaty High-Energy Solar Spectroscopic ImagerROSES – Research Opportunities in Space and Earth SciencesSDL – Space Dynamics LaboratorySDO – Solar Dynamics ObservatorySET – Space Environment TestbedSIR – System Integration ReviewSMEX – Small ExplorerSOC – Solar Orbiter CollaborationSoloHI -- Solar Orbiter Heliospheric Imager SPP – Solar Probe PlusSTEREO – Solar-Terrestrial Relations ObservatorySTP – Solar Terrestrial ProbesTHEMIS – Time History of Events and Macroscale Interactions during Substorms

•••••

••••••••••••••••••••••

16

Page 15: 8 August 2016 - smd-prod.s3.amazonaws.com · • Phase 1B science ops will begin 12 September ‒ Tetrahedron mean spacing 7 km • AGU 12-16 December ... collecting data in space

Acronym List (Cont’d)• TIMED – Thermosphere-Ionosphere-Mesosphere Energetics and

Dynamics• TVAC – Thermal Vacuum• TWINS – Two Wide-Angle Imaging Neutral-Atom Spectrometers• UCB/SSL – UC Berkeley/Space Sciences Laboratory• UFE – Unallocated Future Expenses

17