  • 1

    Transient Well Flow Simulations

    OLGA the Dynamic Multiphase Simulator

    Dynamic Well Simulation, application areas and benefits using OLGA for Wells

    John Sundt

    Senior Vice President, SPT Group

  • 2

    Engineering

    Operation

    Engineering

    Operation

    Flow Assurance

    Integration

    Training OTS

    Online Monitoring & Optimization

    Integrated Solutions

    Steady State Workflow

    Well Control

    Wells

    OLGA application areas and

    Versatility

    OLGA

  • 3

    Well Control

    20 years of Well control simulation with OLGA

    Well control specific interface for OLGA, (OLGA ABC)

    Well Control

  • 4

    Essential part of emergency response planning

    Blowout rate estimation

    Relief well design

    Bull heading

    Dynamic kill parameters

    Kill Rate

    Pump Pressures and capacity

    Well Control

    Well Control

  • 5

    Wells OLGA for Wells

    Well interface to OLGA

    Workflow and functionality for Dynamic simulation of well scenarios

    Near Wellbore simulator ROCX

  • 6

    Subsea and offshore Wells

    High cost

    Costly to work-over

    High reliability required

    Subsea wells have lower recovery rates

    Design, start-up & production optimization

  • 7

    Phenomena requiring dynamic modeling

  • 8 8

    A well can be a single flow path

    Vertical Slanted

    Undulating Horizontal

    8

  • 9 9

    but can also be a complicated network

    Multi-string Multi-zone

    Multi-lateral Smart

    9

  • 10 10

    Accurate performance modeling of the flow control equipment/devices

    Flow Control Choke

    Check valve

    ESP and PDP

    Gravitational separator

    ESD

    SCSSV

    Gas-lift valves

    ICV and ICD

    DIACS

    Sliding sleeves

    Slotted liner

    Sand screen

    Controllers

    10

  • 11 11

    Inflow performance relationship

    Linear and non-linear mass-based IPR

    Constant Productivity Index

    Vogel equation Saturated oil reservoir

    Normalized Backpressure Saturated reservoir (oil/gas)

    Saturated oil wells

    Backpressure equation Gas wells

    Forcheimer model Low pressure gas wells

    Single Forcheimer model High pressure gas wells

    User tabulated IPRs

    Quasi-dynamic inflow performance PR, TR, PI, k-h, S, D, n-C, GOR, WC etc are

    available as time series for input

    ROCX, Near Wellbore simulator

    Bo

    tto

    mh

    ole

    flo

    win

    g p

    ress

    ure

    Q

    PI

    S

    PR

    Res

    erv

    oir

    var

    iab

    les

    Time

    11

    X

    Z(D

    ep

    th)

    0 0.5 1 1.5 2

    0

    20

    40

    60

    80

    100

    0.2 0.3 0.4 0.5 0.6 0.7 0.8Water Saturation

  • 12

    Some examples

  • 13

    Unloading Gas Lifted Well

  • 14

    Well Clean-up / Start-up

    14

  • 15

    Clean-up to Host

    15

    Well head

    Host

  • 16

    197.5

    198.0

    198.5

    199.0

    199.5

    200.0

    Wellb

    ore

    flo

    win

    g p

    ressu

    re (

    bara

    )

    Completion design 1: cemented and perforated casing

    Completion design 2: cemented and perforated casing + passive stinger

    196.0

    196.5

    197.0

    197.5

    198.0

    198.5

    199.0

    199.5

    200.0

    0 250 500 750 1000 1250 1500 1750 2000 2250 2500

    Distance from heel (m)

    Wellb

    ore

    flo

    win

    g p

    ressu

    re (

    bara

    )

    Completion design 1: cemented and perforated casing

    Completion design 2: cemented and perforated casing + passive stinger

    Completion design 3: cemented and perforated casing + active stinger

    196.0

    196.5

    197.0

    197.5

    198.0

    198.5

    199.0

    199.5

    200.0

    0 250 500 750 1000 1250 1500 1750 2000 2250 2500

    Distance from heel (m)

    Wellb

    ore

    flo

    win

    g p

    ressu

    re (

    bara

    )

    Completion design 1: cemented and perforated casing

    Completion design 2: cemented and perforated casing + passive stinger

    Completion design 3: cemented and perforated casing + active stinger

    Completion Stinger Design

  • 17

    Production optimization/ Procedures

    17

    Annulus: ID=0.216 m

    Riser: ID:8, depth: 120 m Pipe: ID=8, length 4.6km

    Depth: 2840 m

    Tubing: ID=0.1143 m

    Gas Lift

    Rate Gas Lift

  • 18

    Modeling wells in OLGA has become easy. example; Dry-tree well geometry

    in minutes!

  • 19

    Gas lift valves and ESPs in OLGA

    in seconds!

  • 20

    In seconds!

    Gas lift valves and ESPs in OLGA

  • 21

    Drilling Hydraulics

    Cleanup

    Well Testing

    Artificial Lift

    Gas Well Deliquification

    Horizontal & Multilaterals

    Well-Pipeline Interaction

    Well-Reservoir Interaction

    Injection

    CO2 Storage

    SAGD

    Completion Design

    Hydrate

    Heavy Oil

    Wax

    Annulus Pressure Management

    Erosion

    Corrosion

    Equipment Integrity

    Temperature

    Well Control

    Leakage

    DTS

    Online/Offline Soft Sensing

    Water Monitoring

    PLT

    Well Flow Dynamics Well Integrity

    Well Flow Assurance

    Well Surveillance

    Application areas of transient well flow simulations

  • 22

    Publications: more than 70 papers published

    22

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    1990

    1991

    1992

    1993

    1994

    1995

    1996

    1997

    1998

    1999

    2000

    2001

    2002

    2003

    2004

    2005

    2006

    2007

    2008

    2009

    2010

    Nu

    mb

    er o

    f p

    ap

    ers

    Year

    OLGA-for-Wells papers - yearly statistics (1990~)

    General

    Control and Optimisation

    Validation

    Near-Wellbore

    Liquid Loading

    Flow Assurance

    Transient Operation

    Sluging

    Artificial Lift

    Well Testing

    Cleanup

    Smart Wells

    Well Control

    Drilling

  • 23

    Summary of Values

    Dynamic simulation has proven value throughout the wells life cycle

    Planning & Design

    Start-up

    Production optimization / trouble shooting

    For Operators

    Reduced risk, increased production and reduced down time

    For Service Companies

    New service offers and value added solutions

    For Engineering companies

    Extending Flow assurance to include the well and near wellbore

    Offering further value to your client base using familiar tools

  • 24

    Thank you for your attention and

    24

    be dynamic