    Asset ManagementProgram

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    2/28

    2

    Program Priorities

    Program Focus System safety and security

    Regulatory requirements State of Good Repair (SGR) - 85% of program

    System Expansion

    System Enhancements

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    3/28

    Definition

    State of Good Repair (SGR) the condition ofan asset where the asset, at a minimum, iscapable of delivering the required performancesafely and reliably for a predetermined period oftime*

    * state of good repair may include short or long termreplacement/rehabilitation based on the needs of the

    Authority. It does not necessarily constitute completereplacement/rehabilitation of an asset

    3

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    4/28

    4

    Current Planning Methodology

    Inventory assets

    Assess conditions

    Quantify deficiencies

    Prioritize actions

    Evaluate alternatives

    Program acquisition,renewal, or disposal

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    5/28

    5

    Condition AssessmentThe Condition Assessment forms the basis for MARTAs CapitalImprovement Program (CIP).

    The last formal system wide condition assessment was performed in2000.

    Asset Breakdown StructureThere were sixteen (16) asset categories assessed:

    - Buildings - Traction Power- Structures - Communications- Other Structures - Vehicle Service Equipment- Mechanical Equipment - Buses- Track - Rail Cars- Fare Collection - Other Vehicles

    - Automatic Train Control - Computers- Signage - Office Furniture

    Assets were broken down by system, component and type

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    6/28

    Asset Breakdown Structure (ABS)

    6

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    7/28

    Condition Assessment - Points Focused on age, condition and replacement/rehabilitation cost

    It included 10, 20 and 40 year projections of Remaining Useful Lifeand the Investment Required to maintain a State of Good Repair.

    Data gathering (historical data, legacy systems, active data bases,physical inspection and work sessions/partnering with asset owners -operators and maintainers)

    Used handheld inspection tools (pre-loaded) Five (5) Point Ranking System(New, Very Good, Good, Fair and Poor)

    Cost Adjustment Factors (single tracking, wayside safety, demolition,non-revenue windows etc.)

    Burdening (Design, Construction Management, Authority Staff,

    Insurance, Contingency etc.) cost of performing work Produced useful tools

    Maintainability (challenge) - change management and control

    7

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    8/28

    Condition AssessmentRemaining Useful Life (RUL) and Percent of Assets

    8

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    9/28

    Bus Projections 2000-2040

    9

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    10/2810

    Condition Assessment CIPRoad Map - Next Condition Assessment Study funded in Fiscal FY10

    Conduct a MARTA-wide inventory of assets requiring capital funding, to validatethe asset base used in resource projections (38% of all assets were inspected inthe 2000 Condition Assessment)

    Implement a MARTA-wide system for condition-based replacement, using aconsistent set of prioritization criteria applicable to all MARTA assets, systems andcomponents.

    Develop a MARTA-wide process for prioritizing projects Develop a computer interface program to provide MARTA staff with tools to

    update, sort, group, filter and create reports from the condition database Obtain preliminary cost and funding data information and integrate it into a

    database that parallels the structure of the condition database Develop the methodology and program to export the condition database and

    funding databases into a cost loaded scheduling software Review schedules and performance of what-if scenarios to develop sensitivity

    analysis to identify how the Condition Assessment components impact on the CIP

    Integrate Maintenance Management Information System (MMIS) data withCondition Assessment Program and CIP Planning. Revise data, as necessary, and refine the data files until an appropriate CIP is

    developed Aligned with Contracts & Procurement, Budget and Federal/Local funding

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    11/2811

    Capital Improvement ProgramPlanned Expenditures FY2008 FY2018

    0

    50

    100

    150

    200

    250

    300

    350

    400

    FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018

    Fiscal Year

    ($Millions)

    State of Good Repair Service Enhancements System Expansion Regulatory Requirem

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    12/2812

    Capital Improvement ProgramActual Expenditures FY2002 FY2008

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    Fiscal Year

    ($Millions)

    Planned Expenditures Actual Expenditures

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    13/2813

    Program Review

    Continued Focus on State of Good Repair Safety/Regulatory Mandates

    In 2008, MARTA completed an independent comprehensivesystem wide Safety Assessment of all safety related systems to

    be used for CIP prioritization.

    Detailed Capital Program Review Good Project Definition Dedicated Project Manager/Team

    Constructability/Phasing GEC Transition & Staffing Lags Needs Based Justification Realistic Cash flow

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    14/2814

    Capital ImprovementLooking Forward

    0.0

    50.0

    100.0

    150.0

    200.0

    250.0

    300.0

    350.0

    400.0

    450.0

    FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18

    Fiscal Year

    Dollars(millions)

    CIP January CIP April

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    15/2815

    Bus - Vehicles

    Infrastructure (average bus age 5.5 years) 532 - 40 foot low floor buses, 428 CNG, 104 Diesel 22 - 30 foot low floor buses, all CNG 55 - 35 foot low floor buses, all Diesel

    Proposed CIP

    Continuation of Baseline (major programs) Replacement (CNG ~$350,000, Diesel ~$320,000, Accessories)

    30-40 foot bus 12 years or 500,000 miles

    State of Good Repair Engine/Transmission Rebuild Mid-Life Overhaul @ 6-7 years (replace engine, transmission, charger,

    cooler, radiator, paint) New Initiatives Memorial Drive BRT Bus Procurement

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    16/2816

    Bus - Facilities Infrastructure

    Operating Garages Hamilton diesel only, S. Fulton, 31 years old, capacity: 223 Laredo diesel/CNG, DeKalb, 24 years old, rehab project ~2000, capacity: 250 Perry diesel/CNG, W. Atlanta, 11 years old, capacity: 225

    Browns Mill heavy maintenance 31 years old, S. Atlanta Street furniture (shelters and benches)

    Proposed CIP Continuation of Baseline (major programs)

    State of Good Repair Facility renovation Hamilton (Title VI issue) Facility upgrades Laredo, Perry & Browns Mill Equipment upgrades/replacements all facilities & street furniture

    Enhancements Stonecrest Park & Ride

    New Initiatives Replacement of Rotary Lifts Relocate Non-revenue Vehicle Maintenance

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    17/2817

    Mobility

    Infrastructure Lift Vans 130 in revenue service, 45 pending

    50 medium duty vans, 5 years old 12 heavy duty vans, 3 years old 33 heavy duty vans, 2 years old 5 heavy duty vans, 1 year old 30 medium duty vans, less than 1 year

    45 heavy duty vans, currently being equipped for revenue service Brady Avenue 33 years old, W. Atlanta

    Proposed CIP Continuation of Baseline (major programs)

    Replacement (Medium 4 years or 100,000 mi. Heavy 5 years or200,000 mi.)

    State of Good Repair Brady Renovation Enhancement

    Mapping Device for Vans

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    18/2818

    Rail - Vehicles Infrastructure

    Fleet 338 heavy rail cars 118 CQ310, Franco Belge (1979-1981) - Rehabilitated 2007-2009* 120 CQ311, Hitachi (1984-1988) - Rehabilitated 2004-2008* 100 CQ312, Breda (2000-2006)* 15 year life extension at average cost of $1.1 M per car

    SystemsTrain Control HVAC Doors Propulsion

    Communications Aux. Power Supply Cab & Fault Monitoring CouplerSCADA Air System/Brakes Trucks Car Body

    Proposed CIP Continuation of Baseline (major programs)

    Procurement close out CQ312 Breda contract State of Good Repair

    Mid-Life Overhaul (final car delivered FY09) Life Cycle Asset Reliability Enhancement Program (LCARE) Rotables/Rebuilds

    New Initiatives Configuration Management standardize fleet

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    19/2819

    Rail - Facilities Infrastructure

    Maintenance/Yard Facilities Avondale 28 years old South 19 years old Armour 2 years old

    Passenger Facilities 38 rail stations service dates 1979-2000

    Ancillary Facilities (Traction Power Sub Station, Gap Breaker Sub Station,Train Control Rooms, Auxiliary Power) Structures

    Bridges - 19 Pedestrian, 6 General Aerial Structures 58 structures totaling 12.6 miles Parking Decks 10 decks

    Tunnels/Cut & Cover 41 structures, 9.4 miles

    Track 48 miles double trackway in revenue service (100+ miles total) Support Facilities Headquarters, South Annex, Rail Services Control Center

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    20/2820

    Rail Facilities (continued) Proposed CIP

    Continuation of Baseline (major programs) State of Good Repair

    Elevator/Escalator rehabilitation Replace Station Mechanical Equipment Structural Rehabilitations

    Roofing & Paving Programs Track Renovations Train Control rehabilitation and upgrades Station Upgrades Station Lighting upgrades

    Enhancements

    Buckhead North Entrance New Initiatives

    Five Points Renovation Rehabilitate Station Chillers

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    21/2821

    Technology Infrastructure

    Radio Communication - AFC System (Breeze) Network Ops Center - Call Centers EDP Hardware & Software - CCTV LAN/WAN Systems - Admin Systems Ops & Maint. Info Systems - Dispatch Centers

    Proposed CIP Continuation of Baseline (major programs)

    Replacement ERP/EAM System (Financial/Maintenance/HR)

    New MMIS System on-line October 2006 Bus & System wide Radio

    Automated Fare Collection (Breeze) Equipment & Software upgrades

    New Initiatives DEO Management Systems

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    22/28

    22

    Safety & Security

    Infrastructure CCTV System Environmental Security Related Equipment

    Proposed CIP Continuation of Baseline (major programs)

    CCTV replacement Facilities Security Underground storage tank management programs Pollution Prevention Program

    New Initiatives CCTV on revenue rolling stock

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    23/28

    23

    System Support

    Infrastructure Non-Revenue Vehicles Administrative Facilities Tools & Equipment

    Proposed CIP (major programs) Replace non-revenue vehicles Facility renovations Tools & equipment (shop, printing, etc.) Furniture

    New Initiatives Training Equipment & E-lab

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    24/28

    24

    Communications Infrastructure

    Life Safety Fire Alarm Public Address (audio & visual) Telephone

    Signage Multipurpose LED Signs (by Sign Post)

    CBS Rail Network TTN Fixed route bus

    Proposed CIP Continuation of Baseline (major programs)

    State of Good Repair Station signage upgrades Fire alarm upgrades Upgrade PA system Voice communication

    New Initiatives Seamless Bus, Rail, Station and Vehicle communication system

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    25/28

    25

    Proposed CIP (major programs) System Optimization Study

    Facility Requirements Infill Stations Neighborhood Circulators Fleet Sizing and Configuration

    Expansion I-20 East Line BRT I-20 West Line BRT BeltLine Clifton Corridor

    Other

    Peachtree Street Car Woodruff Arts Center Transit Oriented Development Greening Initiative

    Planning

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    26/28

    26

    New Initiatives[$millions]

    Configuration Management 30.0

    CCTV Cameras in Buses 13.0

    CCTV Cameras in Rail Cars 8.0

    Relocation of Nonrevenue Vehicle Maintenance 2.5

    Update Condition Assessment of Fixed Assets 2.5

    Decatur Tunnel Vibration Remediation 0.5

    Seamless Bus, Rail, Station, and Vehicle Communication System (planning) 0.5

    E-Labs and Equipment 0.4Environmental "Greening" Initiative 0.3

    Multimodal Facility Requirements and Plan 0.3

    Peachtree Streetcar Project 0.3

    GIS/REIS Needs Assessment 0.2

    DEO Management Systems 0.2

    Rail Station Chiller Plant Rehabilitation Evaluation (Five Points Arts Center) *

    Replacement of Rotary Lifts *

    Five Points Station Renovation *Accelerate Systemwide Escalators Groups 4, 5, & 6 *

    Arts Center Station Modifications for Woodruff Arts Center *

    * Funded within existing projects

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    27/28

    27

    FY08 FY18 Ten Year Plan

    Program Type

    Capital Program 282.5 373.2 350.4 312.7 290.6 244.5 221.6 164.6 158.3 154.6 158.3 2,711.3

    Expansion Program 3.8 8.8 12.1 25.8 25.4 22.4 23.7 25.7 39.8 35.2 29.5 252.1

    Total Program Cost 286.3 382.0 362.5 338.5 316.0 267.0 245.3 190.3 198.1 189.8 187.8 2,963.5

    MARTA's Operating Budget is approx. $400M

    Metropolitan Atlanta Rapid Transit Authority

    FY08-FY18 Proposed Capital Program Analysis (M)

  • 8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management

    28/28

    Questions