888 first street, n.e. washington, d.c. 20426 re: el paso ...€¦ · nd pig launc launcher/r vel...

14
July 17, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 20 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 20 for the period of July 7, 2019 through July 13, 2019.

Upload: others

Post on 19-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • July 17, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 20 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 20 for the period of July 7, 2019 through July 13, 2019.

  • Federal Energy Regulatory Commission -2- July 17, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

    Respectfully submitted,

    EL PASO NATURAL GAS COMPANY, L.L.C.

    By___________/s/______________ Francisco Tarin Director, Regulatory

    Enclosures

  •   

     

    EPNG WeDocket NProject N

    County/S

    ReportinEnvironm 1. Summ 

    Line wereNo. 5No. 4tie‐inwell begaFinall43+0

     Mainbegawas eslab Keyst

     Line Nhydrosite workscope

     2. Relev

    Durintrainitraini

     All eq All  oentra

     3. Envir

    No en

    eekly EnviroNo. CP19‐28‐Name: 

    State: 

    ng Period: mental Inspe

    mary of Con

    No.  31111  L completed 544+00 and 480+00 and n activities thas  road  born on  the boly,  rough  cle0 and Statio

    nline Valve an on  the pigexposed, grawas  pouredtone Compre

    No. 1105 Hyostatic testinwith  pipe space.   EPNe revisions t

    vant Environng  this  repoing.    A  totaing on the N

    quipment wa

    open  ditch apped.  No a

    ronmental Pnvironmenta

    onmental Ins‐000 

    NorWinCouJuly

    ector:  Dav

    nstruction Ac

    Loop  Line:   on the newStation No. Station No. hat were conre work.    Thore pits  for  teanup  activon No. 106+0

    nd Pig Launcg  launcher/ravel was  red.    In  additessor Station

    ydrostatic Teng of the Linbegin  expo

    NG notes thahat were req

    nmental Actorting  periol  of  five‐hunorthern Del

    as checked f

    was  walkednimals were

    Problems/Issal problems 

    spector Rep

    rthern Delawnkler,  Ector,unties, Texasy 7, 2019 to Jvid McCullou

    ctivity for In

    During  this w  loop  line. 574+00 and608+00.  Onducted betwhe  road  borthe bore unvities  began 00. 

    cher/Receivereceiver momoved  fromtion,  work n with a hyd

    esting:  Prepne No. 1105osed  and  toat this workquested in it

    ivities: od,  one‐hunndred  sevenaware Basin

    for noxious w

    d  on  a  daile noted in th

    sues and Coor issues we

    port No. 20

    ware Basin E,  Crane  ands July 13, 2019ugh 

    nspection Pe

    reporting p Lowering‐ind backfill actther activitiween Statiore  at  Texas nder Texas Hduring  this 

    er Modificatdifications a

    m  the end ofon  pig  laun

    drovac truck 

    paration wor5.   Dirt workopsoiling  anconducted ts July 3, 201

    dred  sevennty‐five  (575n Expansion 

    weeds and fo

    y  basis  to he ditch duri

    rrective Actere identifie

    Expansion Prd  Upton  D

    eriod: 

    eriod,  lowen work was tivities werees during thon No. 580+0Highway  30Highway 18/  reporting  p

    tions:  Durinat  the Line Nf  the  launchncher/receivexposing lin

    rk began durk continued nd  leveling at these  loc19 alternativ

      (107)  peo5)  people  hProject.   

    ound to be c

    ensure  thang this repo

    ions Taken:d during this

    roject Date: 7/17/2

    ring‐in  and conducted 

    e conducted his reporting00 and Statio02 was  com/Texas New period  betw

    g this reportNo. 1105 Mher/receiververs  was  cones for the b

    ring this repat the Line of  the  10‐cations wereve measures

    ple  receivedave  receive

    clean.   

    at  no  animaorting period

    s reporting p

    2019 

    backfill  actibetween Stbetween Stg period inclon No. 745+pleted  and Mexico Rai

    ween  Station

    ting period, MLV 12 site. r,  and a cononducted  atbypass. 

    porting perioNo. 1105 M‐acre  tempe not part os request.   

    d  environmd  environm

    als  had  becd.   

    period.   

     

    vities tation tation luded 00 as work lway.  n  No. 

    work  Pipe crete t  the 

    od for MLV 5 orary of the 

    mental mental 

    come 

  •   

     

    4. EnvirNo en

     5. Issue

    No la 6. Work

    Durinthe nconti1105

      

    ronmental Cnvironmenta

    es and Concendowner iss

    k Planned fong the next new  loop  linnue during t.   

    Compliance Ial complianc

    erns Identifisues or conc

    or the Followreporting pene.   Work wthe next rep

     

    Issues/Resoce issues we

    ed by Landocerns were id

    wing Reportieriod, tie‐in,ill  continueporting perio

    lutions: re identified

    owners: dentified du

    ing Period:,  road boreon pigging od in prepar

    d during this

    ring this rep

    and clean‐ufacility modration for hy

    s reporting p

    porting perio

    up activities difications aydrostatic te

    period.   

    od. 

    will continund site woresting of Line

     

    ue on k will e No. 

  •   

     

     Report NPhotos Location31111 ROStation NDirectionNorth DescriptiBackfillinditchlinedozer.   

    Location31111 ROStation NDirectionNorth DescriptiLoweringloop line ditch undline.   

     

    No. 20 

    : Line No. OW at No. 598+00 n of Photo: 

    ion: ng the with a 

    : Line No. OW at No. 591+00 n of Photo: 

    ion:  g the new into the der a foreignn 

     

     

     

  •   

     

     Photos Location31111 ROStation NDirectionNorth Descriptithe tie‐innew loop

    Location31111 ROStation NDirectionSouthweDescriptiPreparingbore at THighway 

     

    : Line No. OW at No. 591+00 n of Photo: 

    ion: Making n weld on thp line. 

    : Line No. OW at No. 552+00 n of Photo: est ion: g for the Texas 302.   

     

     

     

     

  •   

     

    Photos Location31111 ROStation NDirectionWest Descriptithe pipe pulled unHighway 

    Location31111 ROStation NDirectionNortheasDescriptiditch witloopline 

     

    : Line No. OW at No. 550+00 n of Photo: 

    ion:  Coatingthat will be nder Texas 302.   

    : Line No. OW at No. 546+00 n of Photo: st ion: Open h new lowered in. 

      

     

     

     

  •   

     

    Photos Location31111 ROStation NDirectionSouthweDescriptiLoweringthe ditch

    Location31111 ROStation NDirectionSouthweDescriptithe tie‐innew loop

     

    : Line No. OW at No. 481+00 n of Photo: est ion:  g pipe into h.   

    : Line No. OW at No. 481+00 n of Photo: est ion: Making n weld on thp line.   

     

     

  •   

     

    Photos Location31111 ROStation NDirectionNortheasDescriptiBackfillinpit on theside of TeHighway 

    Location31111 ROStation NDirectionNortheasDescriptithe pipe.

     

    : Line No. OW at No. 400+00 n of Photo: st ion:  ng the bore e coming‐in exas 874. 

    : Line No. OW at No. 389+00 n of Photo: st ion: Padding. 

     

     

  •   

     

    Photos Location31111 ROStation NDirectionSouth Descriptitopsoil bROW witwith a m

    Location31111 ROStation NDirectionSouth Descriptitopsoil bthe ROWand track

     

    : Line No. OW at No. 56+00 n of Photo: 

    ion: Pulling ack into theth a trackhoeop pipe.   

    : Line No. OW at No. 43+00 n of Photo: 

    ion: Bringingack across 

    W with dozerskhoes.   

     

     

  •   

     

    Photos Location31111 ROStation NDirectionWest DescriptiExcavatinpit on theof the Te18/TexasRailway b

    Location31111 ROStation NDirectionWest Descriptithe kickobeing ba

     

    : Line No. OW at No. 26+00 n of Photo: 

    ion:  ng the bore e west side exas Highways New Mexicbore site.   

    : Line No. OW at No. 0+00 n of Photo: 

    ion: Piers at off site after ckfilled.   

    y co 

     

     

     

  •   

     

    Photos Location1105 MLDirectionSouth DescriptiRemovinleveling tthe tempworkspacMLV 5 sit

    Location1105 MLDirectionSoutheasDescriptipipe at thin preparhydrosta

     

    : Line No. V 5 Site n of Photo: 

    ion: g topsoil anthe grade in porary ce at the te.   

    : Line No. V 5 Site n of Photo: st ion: Exposedhe MLV 5 sitration for tic testing. 

    d te 

     

     

     

  •   

     

    Photos LocationCompresDirectionSouthweDescriptiPotholingpig launcof Line Na hydrovinside KeCompres

    Location1105 MLDirectionSoutheasDescriptiRemovinthe end olauncherthe MLV 

     

    : Keystone ssor Station n of Photo: est ion: g near the cher/receiveo. 1105 withac truck eystone ssor Station. 

    : Line No. V 12 Site n of Photo: st ion: g gravel at of the pig r/receiver at 12 site.   

    r h 

      

     

  • Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 17th day of July 2019.

    /s/ Francisco Tarin