888 first street, n.e. washington, d.c. 20426 re: el paso ... · pipe was b ine replacem ission in...

12
October 23, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 34 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 34 for the period of October 13, 2019 through October 19, 2019.

Upload: others

Post on 20-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

October 23, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 34 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 34 for the period of October 13, 2019 through October 19, 2019.

Page 2: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

Federal Energy Regulatory Commission -2- October 23, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

Respectfully submitted,

EL PASO NATURAL GAS COMPANY, L.L.C.

By__________/s/_______________ Francisco Tarin Director, Regulatory

Enclosures

Page 3: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

EPNG We

Docket N

Project N

County/S

Reportin

Environm

 1. Summ 

Line NDurinCompwas  tWink

 MainconcrMLV wereKeystchain

 Line sectiooccuralongMP  3watesurfareplaNew pipelComm

 2. Relev

Durintwo Expan

 All eq All opNo an

eekly Enviro

No. CP19‐28‐

Name: 

State: 

ng Period: 

mental Inspe

mary of Con

No. 31111 Long  this  repopressor Statthen paddedk Compresso

nline Valve arete pad at 5, and the fo poured wittone and Linnlink fence a

No.  1105  Hon betweenrred along  tg the second34+4170.    Hr  was  deterce.    Landowcement  wopipe was  bine replacemmission in 20

vant Environng this repor(702)  peoplnsion Projec

quipment wa

pen ditch wnimals were

onmental Ins

‐000 

Nor

WinCou

Oct

ector:  Dav

nstruction Ac

oop Line:   orting  perioion was madd  and backfor Station wa

and Pig Launthe end of orms for conth concrete.ne No. 1103 t Line No. 20

Hydrostatic  T MLV 4 andthis  segmentd section beHydrostatic  trmined  to  bwners  at  therk  was  thenrought  in, wments will b020.   

nmental Actrting period,e  have  recect.   

as checked f

as walked o noted in the

spector Rep

rthern Delaw

nkler,  Ector,unties, Texas

tober 13, 201

vid McCullou

ctivity for In

d,  the  tie‐inde, the weldfilled.    In  adas replaced. 

ncher/Receivthe pig  launncrete suppo   In additionwas sandbl000 MLV 1 w

Testing:    On Hogg Metet at  at  appretween the test  water  sbe  clear.    Te  sites  of  en  initiated  awelded up,  ae reported i

ivities:  no environeived  enviro

for noxious w

on a daily bae ditch durin

port No. 34

ware Basin E

,  Crane  ands 

19 to Octobe

ugh 

nspection Pe

n  of  Line  Nds were sandddition,  the   

ver Modificancher/receivorts of the Kn, the pipe aasted, primewas installed

n  Sunday,  Oer Station beroximate MPMP 41.0 tessamples  weThe  rupturesach  ruptureand  the  ruptand weldedin EPNG’s an

mental trainonmental  tra

weeds and fo

asis to ensurng this repor

Expansion Pr

d  Upton  D

er 19, 2019

eriod: 

No.  31111  adblasted anchainlink  fe

ations:   Durinver barrel wKeystone Coat the intersed for paintd.   

October  13,egan.  A hydP 29+1268.st break sitere  taken  at s  caused  noe  were  conttured  pipe  w  into  Line Nnnual 2.55(b

ning was giveaining  on  th

ound to be c

re that no arting period.

roject 

Date: 10/23/

and  Line  Nod coated anence  along  t

ng this repowas poured ampressor Stsection of thing and pain

  2019,  testdrostatic test A  second  re and MLV 4both  ruptu

o  contaminatacted.    Emwas  excavatNo.  1105.    Tb) report to 

en. A total ohe  Northern

clean.   

nimals had .   

/2019 

o.  3162  at nd the open the north  sid

orting periodat  Line No. tation bypashe bypass  linted.  Finally

ing  on  the t related ruprupture occu4 at approxiure  sites  andation  to  theergency  pipted  and  cutThese  emergbe filed wit

of seven‐hunn  Delaware 

been entrap

 

Wink ditch de of 

d, the 1105 s line ne at y, the 

third pture urred mate d  the e  soil peline t  out.  gency h the 

ndred Basin 

pped.  

Page 4: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

 3. Envir

No en 4. Envir

No en 5. Issue

No la 6. Work

TaW

Tsase

Ex

  

 

ronmental Pnvironmenta

ronmental Cnvironmenta

es and Concendowner iss

k Planned fo

he chainlinkddition,  it  isWink Compre

he  new  pipandblasted, ections.   

xposed pipin

Problems/Issal problems/

Compliance Ial complianc

erns Identifisues or conc

or the Follow

k fence alongs anticipatedessor Station

pe  that  wascoated  and

ng for the by

 

sues and Co/issues were

Issues/Resoce issues we

ed by Landocerns were id

wing Reporti

g the east sid  that paint ns.   

s  welded  ind  backfilled 

ypass line at

rrective Acte identified d

lutions: re identified

owners: dentified du

ing Period:

ide of Wink will be  tou

nto  Line  Noand  prepar

 Keystone C

ions Taken:during this re

d during this

ring this rep

Compressorched up on

o.  1105  at rations  will 

ompressor S

eporting per

s reporting p

porting perio

r Station wil  the piping 

both  ruptubegin  to  re

Station will b

riod. 

period.   

od. 

ll be installeat Keystone

ure  sites  wie‐test  these

be painted.  

 

ed.  In e and 

ill  be e  two 

 

Page 5: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Report N

Photos 

Location31111 atCompresDirectionNorth Descriptithe crossbetweenloop line 3162.   

Location31111 atCompresDirectionNortheasDescriptiAbrasive the crossbetweenloop line 3162.  

 

No. 34 

: Line No. t Wink ssor Station n of Photo: 

ion: Tying insover  the new and Line No

: Line No. t Wink ssor Station n of Photo:  st ion:  blasting on sover welds  the new and Line No

o. 

o. 

 

 

 

Page 6: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

Location31111 atCompresDirectionNortheasDescriptiwelds oncrossovethe new Line No. 

Location31111 atCompresDirectionSouth Descriptibackfilledcrossovethe new Line No. 

 

: Line No. t Wink ssor Station n of Photo: st ion: Coatingn the r between loop line an3162. 

: Line No. t Wink ssor Station n of Photo: 

ion: Ditch d at the r between loop line an3162.   

 

 

 

 

 

Page 7: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

Location31111 atCompresDirectionNorthweDescriptiReplacingchainlinkthe northWink ComStation.  

Location31111 atCompresDirectionNortheasDescriptiReplacedfence onside of WCompres

 

: Line No. t Wink ssor Station n of Photo: est ion:  g the k fence on h side of mpressor  

: Line No. t Wink ssor Station n of Photo: st ion: d chainlink  the north 

Wink ssor Station. 

 

 

Page 8: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

Location31111 at553+00 DirectionNortheasDescriptialong theline ROW

Location31111 at340+00 DirectionNortheasDescriptialong theline ROW

 

 

: Line No. t Station No.

n of Photo: st ion:  View e new loop W. 

: Line No. t Station No.

n of Photo: st ion: View e new loop W.   

 

 

 

 

Page 9: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

Location31111 at188+00 DirectionNorth Descriptialong theline ROW

Location31111 at5+00 DirectionWest Descriptialong theline ROW

 

 

: Line No. t Station No.

n of Photo: 

ion:  View e new loop W.   

: Line No. t Station No.

n of Photo: 

ion: View e new loop W. 

 

 

 

 

Page 10: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

Location1105 at approxim29+1268DirectionSoutheasDescriptisite on thexcavatewelding ointo Line 

Location1105 at approxim34+4170DirectionNorthweDescriptisite on sesegment and new into Line 

 

 

 

: Line No. 

mately MP  n of Photo: st ion:  Rupturhird segmened and of new pipe No. 1105.   

: Line No. 

mately MP  n of Photo: est ion: Ruptureecond excavated pipe weldedNo. 1105.   

e t 

 

 

Page 11: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

  

 

Photos 

LocationCompresDirectionNorth Descriptiline afterpainted aCompres

Location1105 at MDirectionWest Descriptiinstalled pad and basin at tthe pig launcherMLV 5.   

 

: Keystone ssor Station n of Photo: 

ion:  Bypass r being at Keystone ssor Station. 

: Line No. MLV 5 n of Photo: 

ion: Newly concrete cachement the end of 

r/receiver at 

 

Page 12: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ... · pipe was b ine replacem ission in 20 ant Environ g this repor (702) peopl sion Projec uipment wa en ditch w imals

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 23rd day of October 2019.

/s/ Francisco Tarin

Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517