Page 1: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 1

Dubna modules assembly status (March 31 2014)

Status of:

• CH2 M2 X-Y

• CH4 M1 U-V

• CH4 M1 X-Y

Shipment to CERN:

CH2 M2 X-Y + CH4 M1 U-V

Presented by S.Movchan

Page 2: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 2

CH2 M2 X-Y status

Page 3: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 3

Vacuum set up

3 support tubes per each corner

Central support tube

Page 4: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 4

CH2 M2 X-Y frame leak to vacuum (July 2013)

Leak estimation for final time interval dT=(4200-5600) min:

dP=7.8-7.5 = 0.3 mBar dT= 5600 – 4200 = 1400 min Volume V=2.2x10**6 cm3

Leak: L = dP*V/dT = 0.3 mBar/1 * 2.2x10**6 cm3/1400 min ~ 0.5 cm3/min

Page 5: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 5

CH2 M2 X-Y: final gas leak test finished (March 14 2014)

Gas leak results:

X-view

Temp.

Y-view

NO gas leak

Views pressure drop

Page 6: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 6

CH4 M1 U-V status

Page 7: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 7

CH4 M1 U-V: vacuum test(October 2013)

Leak < 0.1 cm3/min(requirement L<=0.8 cm3/min)

Page 8: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 8

CH4 M1 U-V: final gas leak test finished (March 26 2014)

Gas leak results:

Views pressure drop

U-view

V-view

Temp.

NO gas leak

Page 9: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 9

Dumping system installation: 2 options -> “blue frame” and “grey frame”

CH4 M1 U-VCH2 M2 X-Y

Page 10: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 10

Shipment to CERN: CH2 M2 X-Y ready for transportation

dP= 425 mBar of Ar

Page 11: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 11

Shipment to CERN: CH4 M1 U-V ready for transportation

dP= 402 mBar of Ar

Page 12: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 12

Shock logs installation

CH4 M1 U-VCH2 M2 X-Y

Page 13: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 13

Common view

Page 14: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 14

Mercedes Atego 1218

Page 15: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 15

Loading time and shocklog check

Page 16: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 16

go to CERN …(March 31 2014 13:10)

Page 17: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 17

CH4 M2 X-Y

Page 18: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 18

CH4 M2 X-Y: vacuum test done (January 27 2014)

Leak < 0.1 cm3/min(requirement L<=0.8 cm3/min)

Page 19: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 19

CH4 M2 X-Y installed for assembly (March 11 2014)

Page 20: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 20

Glued layers:first - March 14second - March 213-d - March 29

CH4 M2 X-Y status: X-view

Page 21: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 21

Common view

BOX for

CH4 M2 X-Y

CH4 M1 U-V

READY for shipment

CH2 M2 X-Y

READYfor shipment

Page 22: 9-Oct-14

Apr 20, 2023 S.Movchan Straw manufacturing and QC 22

CH4 M2 X-Y: schedule

Straw gluing – March-May 2014

Straw cutting + gas leak test – May 2014

Wiring + HV test – end of May 2014

Gas manifold installation – May-June 2014

Final gas leak test – June 2014

Ready for shipment – end of June 2014

Delivery to CERN - beginning of July 2014