SAP SCM 7.01

 August 2011

English

SAP SCM DemandPlanning Configuration(Y94)

SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany

Building Block Configuration Guide

Page 2: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 2/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 2 of 130

Copyright

© Copyright 2009 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without theexchoose permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components ofother software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, Systemz10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390,OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6,POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS,HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner,WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

 Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks orregistered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide WebConsortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology inventedand implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP productsand services mentioned herein as well as their respective logos are trademarks or registered trademarks ofSAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web

Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as theirrespective logos are trademarks or registered trademarks of Business Objects S.A. in the United States and inother countries. Business Objects is an SAP company.

 All other product and service names mentioned are the trademarks of their respective companies. Datacontained in this document serves informational purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and itsaffiliated companies ("SAP Group") for informational purposes only, without representation or warranty of anykind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The onlywarranties for SAP Group products and services are those that are set forth in the exchoose warrantystatements accompanying such products and services, if any. Nothing herein should be construed asconstituting an additional warranty.

Page 3: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 3/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 3 of 130

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include fieldnames, screen titles, pushbuttons as well as menu names, paths andoptions.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names,

program names, transaction codes, table names, and individual keywords of a programming language, when surrounded by body text, forexample, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths,messages, source code, names of variables and parameters as well asnames of installation, upgrade and database tools.

EXAMPLE TEXT  Keys on the keyboard, for example, function keys (such as F2) or the

ENTER key.

Example text Exact user entry. These are words or characters that you enter in thesystem exactly as they appear in the documentation.

 <Example text> Variable user entry. Pointed brackets indicate that you replace these

words and characters with appropriate entries.

Page 4: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 4/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 4 of 130

Content1  Purpose .............................................................................................................................. 6 

2  Preparation ......................................................................................................................... 6 

2.1  Prerequisites ............................................................................................................ 6 

3  Configuration ...................................................................................................................... 6 

3.1  Setting up Demand Planning ................................................................................... 6 

3.1.1  Creating the Storage Bucket Profile .................................................................... 6 

3.1.2  Creating the Time Bucket Profile ......................................................................... 7 

3.1.3  Creating the Planning Object Structure ............................................................... 8 

3.1.4  Creating the Planning Area .................................................................................. 8 

3.1.5  Creating the Forecast Profile ............................................................................. 11 

3.1.6  Creating the Diagnosis Group ........................................................................... 13 

3.1.7  Maintaining Characteristic Values ..................................................................... 13 

3.1.8  Initializing the Planning Area ............................................................................. 14 

3.2  Creating the Planning Book and Data View ........................................................... 15 

3.2.1  Planning Book – Mass Processing .................................................................... 15 

3.2.2  Planning Book – Central Planner ....................................................................... 20 

3.2.3  Planning Book – Local Planner .......................................................................... 24 

3.2.4  Defining Planning Book – Set Rows to Output Only .......................................... 26 

3.2.5  Creating Selection Profiles for the Planning Book ............................................. 27 

3.3  Setting up Macros .................................................................................................. 28 

3.3.1  Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_DATAPRE ........................................................................................................ 28 

3.3.2  Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_FCST ................................................................................................................ 30 

3.3.3  Set up Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_MACRO ............................................................................................................ 34 

3.3.4  Setup Macros for Planning Book YDP_PB_MASS_JOB and Data ViewYDP_DV_RELEASE ........................................................................................................ 38 

3.3.5  Setup Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data ViewYDP_DV_HS_ADJ ........................................................................................................... 39 

3.3.6  Set up Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data ViewYDP_DV_FC_REV ........................................................................................................... 44 

3.3.7  Set up Macros for Planning Book YDP_PB_LOCAL_PLAN and Data ViewYDP_DV_LOC_ADJ ......................................................................................................... 62 

3.4  Setting up the Process Chain ................................................................................ 71 

3.4.1  Process Chain – Data Preparation .................................................................... 71 

3.4.2  Process Chain – Data Load and Preparation from ECC ................................... 79 

3.4.3  Process Chain – Data Load and Preparation from Flat File .............................. 81 

3.4.4  Process Chain – Forecast ................................................................................. 82 

3.4.5  Process Chain – Consolidate ............................................................................ 86 

3.4.6  Process Chain – Release Demand Plan to SAP ECC ...................................... 88 

3.4.7  Process Chain – Release Demand Plan to APO-SNP ...................................... 92 

3.4.8  Process Chain – Backup Historical Data Correction ......................................... 95 

3.4.9  Process Chain – Backup Forecasting.............................................................. 100 

3.4.10  Process Chain – Daily Backup Manual Changes ............................................ 106 

3.4.11  Grouping Process Chain .................................................................................. 111 3.5  Setting up Alert Profile (Optional) ........................................................................ 112 

Page 5: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 5/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 5 of 130

3.5.1  Set Up Application-Specific Alert Profiles - APO Forecast Alert Profiles ........ 112 

3.5.2  Set Up Application-Specific Alert Profiles - APO Supply & Demand Planning Alert Profiles ................................................................................................................... 114 

3.5.3  Set Up Overall Alert Profiles ............................................................................ 115 

3.5.4   Assign Planners to Alert Profiles (Optional) .................................................... 116 

3.6  Setting up Roles and Authorizations .................................................................... 116 

3.6.1  Role Overview .................................................................................................. 117  

3.6.2  BI Authorization in Demand Planning .............................................................. 118 

3.6.3   Authorization Role and Profile Generation ...................................................... 120 

3.6.4  Creating SAP SCM Users and Assign Proper Roles ....................................... 126 

3.6.5   Assigning User to Planning Book .................................................................... 127 

3.7  Setting up Chart Engine (Optional) ...................................................................... 128 

3.7.1  Maintaining User Setting .................................................................................. 128 

3.7.2  Maintaining Chart Setting ................................................................................ 128 

3.7.3  Central Maintaining and Copying Chart Customizing ...................................... 129 

Page 6: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 6/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 6 of 130

SAP SCM Demand Planning Configuration

1 PurposeThe purpose of this document is to describe the general configuration steps required tomanually set up the configuration within the system landscape that has already been installedusing the corresponding installation or configuration guides for installation.

This document supplements the existing Customizing documentation in the ImplementationGuide (IMG) and provides additional information where required.

2 Preparation

2.1 PrerequisitesBefore you start working on this scenario, you must have implemented the prerequisite

building blocks. For more information, see the Building Block Prerequisites Matrix for SAPDemand Planning Analytics rapid-deployment solution. You will find this document in thecontent library, attached to the roadmap.

3 ConfigurationThe following section describes the complete settings for this building block. These settingscan be divided into three main groups:

  Prerequisite settings that have to be checked and which were delivered by SAP (aspart of the standard delivery)

The term Check  refers to these prerequisite settings.

  Settings defined by the customer (in the customer namespace and customer-

specific):

The system uses automation to request individual customer settings during thepersonalization process. These settings can be initial or reused from existingSAP ERP layers and are indicated in the text by <your value>.

  Additional settings that need to be made, covered either by automation or manualconfiguration (in the customer namespace)

The term Create refers to these additional settings in the text.

3.1 Setting up Demand Planning

3.1.1 Creating the Storage Bucket Profile

Use A storage buckets profile defines the time buckets in which data based on a given planningarea is saved in Demand Planning or Supply Network Planning. You need a storage bucketprofile before you can create a planning area. You need to define a storage bucket profilebefore you can create a planning area.

Procedure1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/TR32SAP SCM Menu Demand Planning   Environment   Current settings  

Page 7: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 7/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 7 of 130

Periodicities for Planning Area

2. The screen Maintain Periodicity  is displayed. Enter the following values:

Field name User action and values Comment

Stor. buck. prof YDP_SBP_MO

Month  

Year  

Start date 01.01.2010 Example, maintain according tocustomer requirements

End date 31.12.2013 Example, maintain according tocustomer requirements

You select periodicities in which you want to save data and specify a defaulthorizon for which you want to create a time series. For example, besidesmonthly, you can choose weekly time bucket here according to your ownplanning requirement. You set the actual horizon when you create the timeseries of the planning area for the version.

3. Choose Save. The storage bucket profile is created.

3.1.2 Creating the Time Bucket Profile

UseTime bucket profiles define the historical or future time horizon for Demand Planning orSupply Network Planning, specifically which time buckets are used for planning, how manyperiods of each time bucket are used and the sequence in which the time buckets appear inthe planning table.

Procedure1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/TR30

SAP SCM Menu Demand Planning   Environment   Current settings  Maintain TimeBuckets profile for Demand Planning and Supply Network Planning

2. Define the following profiles:

Field name User action and values Comment

Time buckets prfl ID YDP_MON24 The horizon spans 24 months.

Description 24 Months

3. In the Time Buckets Prof. Details Section, enter the following value and choose Enter :

Number Basic periodicity Periv2 Display periodicity

24 M

M

4. Choose Save. The time bucket profile is created.

Page 8: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 8/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 8 of 130

3.1.3 Creating the Planning Object Structure

UseThe planning object structure is the structure to be used for the planning area which forms thebasis on which a demand planning cycle can be executed according to the characteristicswhich have been created earlier.

Procedure1. Access the activity, use one of the following navigation options:

Transaction Code  /SAPAPO/MSDP_ADMIN  

SAP SCM Menu  Advanced Planning and Optimization  DemandPlanning   Environment    /SAPAPO/MSDP_ADMIN - Administration of Demand Planning and Supply NetworkPlanning

2. Choose Planning Area and select Planning Object Structures.

3. Right-click the Plng Object Structures folder  and choose Create Planning ObjectStructures. Enter the ID of your master planning object structure: for example, YDP_POS.then choose Enter .

4. On the S&DP Administration - Configure Planning Object Structure screen, enter thedescription in the text  field. SNP-possible, SNP scheduling , Char.-based forecasting  andDP BOMs relevant  are not used.

5. Transfer the following Characteristic from the right part (Copy Fr.) to the left part(Planning Obj. Struct.) of the screen:

By selecting the info objects the navigation attribute is chose automatically

6. Choose Activate, then choose Save. The master planning object structure is created.

If you get the error message Error during SID assignment for characteristic

0REQUID (current value 2), follow the instruction in the SAP Notes 615389.

3.1.4 Creating the Planning Area

Use A planning area is the central data structure of Demand Planning. It groups together theparameters that define the scope of planning activities. It also determines where and how the

planning results are saved in liveCache.

Characteristic Description

ZY93_BC01 Product

ZY93_BC02 Product Line

ZY93_BC03 Location

ZY93_BC04  Customer

ZY93_BC05  Region

ZY93_BC06 Sales Organization

Page 9: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 9/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 9 of 130

Procedure Access the activity, use one of the following navigation options:

Transaction Code  /SAPAPO/MSDP_ADMIN  

SAP SCM Menu  Advanced Planning and Optimization  DemandPlanning   Environment    /SAPAPO/MSDP_ADMIN - Administration of Demand Planning and Supply NetworkPlanning

1. Right-click the Planning areas folder  and choose Create planning area. In the dialog boxCreate Planning Area, enter the following data:

Field name User action and values Comment

Planning area YDP_PA Your planning area

Master plg object structure YDP_POSYour master planningobject structure

Stor. bckts prfl YDP_SBP_MO Your storage bucket profile

Unit of measure EA Your unit of measure

Statistics currency EUR Optional

Exch.rate type M Optional

If you want to change settings of an existing planning area, you need todeinitialize the active planning area.

3. Choose Enter. 

4. In the Change Planning Area window, choose the Key figs tab page and transfer the

required Key figs from the right part (Copy Fr.) to the left part (Planning Area) of thescreen.

Key figure Description

ZY93_BK01 Sales Quantity 1

ZY93_BK04 Hist. Sales Corr.

ZY93_BK05 Hist. Sales Override

ZY93_BK06 Corrected Sales Hist

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK09 Additional demand

ZY93_BK10 Local Fcst. Adj.

ZY93_BK11 Central Fcst. Adj

ZY93_BK12 Demand Plan

ZY93_BK91 Hist Sales w/o add.

ZY93_BK92 Additional KF 2

ZY93_BK93 Additional KF 3

ZY93_BK94 Additional KF 4

ZY93_BK95 Additional KF 5

Page 10: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 10/130

Page 11: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 11/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 11 of 130

Do not lock read only key-figures √ 

8. Choose Save and return to the planning areas overview list.

3.1.5 Creating the Forecast Profile

UseTo run a forecast, a profile needs to be set up. This contains a reference to the key figurecorrected historical on which a forecast can be generated and a target key figure where theforecast results can written to. In this configuration guide an automatic forecasting model willbe chosen based upon the historical data.

Procedure1. To Access the activity, use one of the following navigation option:

Transaction code /SAPAPO/MC96B

SAP SCM Menu  Advanced Planning Optimization  Demand Planning  

 Environment  Maintain Forecast Profiles

2. On the Maintain Forecast Profile screen, choose the Master prfl. tab page and make thefollowing entries:

Field name User action and values Comment

Basic Settings

Planning area YDP_PA Your planning area

Master prflYDP_MFP

Your master forecast profile

name

Description Master profile Your profile description

Forecast key figureZY93_BK07

The key figure used to keepstatistic forecast result

 Additional Settings

Period indicator M Months

Forecast Horizon

Periods24

Define a time period for yourforecast horizon

History Horizon

Periods24

Define a time period for yourhistory horizon

Model Selection

Univariate forecast√ 

select checkbox for univariateforecast

Univariate forecast profile

YDP_UFP

3. Choose Enter . If the information window with the information the profile does not exist  isdisplayed, ignore by choosing Enter.

4. Choose the Univariate prfl  tab page and enter the following values:

Page 12: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 12/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 12 of 130

Field name User action and values Comment

Basic Settings

Text UNIVARIATE, WITH AUTOSELECTION

Read historical data

Key figure ZY93_BK06 Corrected SalesHistory as base datafor forecast

Version 001

Model parameters

Forecast strategy 56 Forecast withautomatic modelselection 2

 Alpha 0.35Beta 0.35

Gamma 0.35

Sigma 1.25

Periods 12 Then choose Enter  

Error Measure MAD

 Alpha Start Value 0.15

 Alpha End Value 0.35

 Alpha Increment 0.1

Beta Start Value 0.15

Beta End Value 0.35

Beta Increment 0.1

Gamma Start Value 0.15

Gamma End Value 0.35

Gamma Increment 0.1

Control parameters

Outlier Correction None

Forecast Errors

MAD  

MSE

RMSE

MAPE  

MPE

Error total

Page 13: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 13/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 13 of 130

Regarding the parameters mentioned in the table above, (that is, Alpha,Beta), here we use dot as decimal point. If you are using comma as decimalpoint, please replace the dot with comma in the table above, to make surethe input can be accepted by the system.

5. Choose Save single profile, and then choose Adopt . The Univariate profile has beenassigned to the master profile.

6. Choose the Mater Prfl. tab page, choose Save. The master forecast profile has beencreated.

3.1.6 Creating the Diagnosis Group

UseThe diagnosis group contains the threshold values, which trigger an alert when they areexceeded.

Procedure1. To Access the activity, use one of the following navigation option:

Transaction code /SAPAPO/MC96B

SAP SCM Menu Demand Planning   Environment  Maintain ForecastProfiles

2. Input YDP_PA in Planning Area the field, on the Master Prfl. Tab page.

3. Choose the Univariate Profil. tab page, select your Univariate Profile by input help.

4. Then choose Maintain diagnos. Group in the Model Parameters section. 

5. In the dialog box Maintain Diagnosis group, maintain the value as follows:

Field name User action and values Comment

Group name

Group name YDP_DG1 Your diagnosis group name

Group Parameters

MAD upper limit 10 Your parameter

MAPE upper limit 30 Your parameter

You can choose the parameters according to your business requirements.

6. Choose Save Group to save the diagnosis group.

7. On the same screen, choose  Adopt values. The defined Diagnosis Group  has beenassigned to the Univariate Profile.

8. On the Univariate Forecast Profile screen, choose Save Single Profile. 

3.1.7 Maintaining Characteristic Values

UseThe purpose of this activity is to determine the master data on which you want to create thedemand pans, a necessary prerequisite of demand planning.

Procedure1. Access the activity, use one of the following navigation options:

Page 14: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 14/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 14 of 130

Transaction Code /SAPAPO/MC62 

SAP SCM Menu  Advanced Planning and Optimization  Master Data  

 Application Specific Master data  Demand Planning   Maintain Characteristic  Values 

2. On the Maintain Planning-Relevant characteristic combinations view, enter the followingdata:

Field Name User Action and Values Note

Master Planning ObjectStructure

YDP_POS

3. In the Maintain Characteristic Combinations section, choose Create CharacteristicCombination.

4. On the Create Characteristic Combinations screen, create the following entries:

Field Name Entry Value

Create Characteristic CombinationsGenerate Immedtly X 

Data Source

Load Data From: InfoProvider

InfoProvider ZY93_IC01

Data from For example, Current date – two years

To For example, Current date

 Action Selection

Results Log X

5. Choose Execute.

ResultYou have generated the master data for demand planning. You can check the characteristicscombination you have just generated by using the Display characteristics combinations optionin the Maintain Planning-Relevant characteristic combinations view.

3.1.8 Initializing the Planning Area

Use

The purpose of this activity is to initialize the planning area and to create time series objects.

Procedure1. Access the activity using the following navigation options:

Transaction Code /SAPAPO/MSDP_ADMIN

SAP SCM Menu  Advanced Planning and Optimization  Demand Planning   

Environment   Administration of Demand Planning andSupply Network Planning  

2. Right-click the planning area you created (for example, YDP_PA).

3. Choose Create Time Series Objects. 

4. Enter the following data :

Page 15: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 15/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 15 of 130

Field Name User Action and Values Notes

Plng Version 001

Start Date For example, current date – two year

End Date For example, current date + two years5. Choose Execute. 

6. If an Information dialog box appears, choose Continue (Enter). 

7. Go back.

ResultThe planning area YDP_PA has been successfully initialized.

3.2 Creating the Planning Book and Data View

Use A planning book defines the content and layout of the interactive planning screen. You useplanning books in Demand Planning and Supply Network Planning. They allow you to designthe screen to suit individual planning tasks. A planning book is based on a planning area.

You create one or more data views for the planning book. You need at least one view in orderto use the planning book.

In Configuration, you can assign planning books and data views to users; you can also definewhether or not a user is able To access other planning books and data views. Typically, aview is used by one demand planner or by a group of demand planners with a common

business goal. In the data view you specify the planning horizon, which means that planninghorizons can be user-specific. You can create several user-specific data views in a planningbook based on the same data.

Here we will create three Planning Books each with one or multiple data views for differentplanning activities.

3.2.1 Planning Book  – Mass Processing

UseThis planning book is used for system background job, which can be scheduled to run during

non-working period, for example during night. It includes 4 data views. To create planningbook execute the following steps:

Procedure1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDP8B

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning   Environment  Current settings  DesignPlanning Books

2. On the SDP: Interactive Planning  –  Initial Screen  screen, check the radio button for

Planning Book , then enter the following data:

Field name User action and values Comment

Page 16: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 16/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 16 of 130

Planning Book YDP_PB_MASS_JOB Your planning book name

Then choose Create. 

3. In the Planning Book Wizard  dialog box, make the following entries:

Field name User action and values Comment

Planning Book text Planning book for mass job Your planning book description

Planning area YDP_PA Your planning area name

4. Choose Enter . And continue to enter the following data:

Field name User action andvalues

Comment

Include standard functions

Manual ProportionMaintenance

X

Navigate to views

Univariate forecast X

5. Choose Continue to go to the Key Figures tab page. 

6. On the Key Figures tab page, assign the following key figures from Planning Area at theright side to Planning Book  at the left side via drag and drop or choose  Add all new KeyFigures to add all key figures:

Key figure Description

ZY93_BK01 Sales Quantity 1

ZY93_BK04 Hist. Sales Corr.

ZY93_BK05 Hist. Sales Override

ZY93_BK06 Corrected Sales Hist

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK09 Additional demand

ZY93_BK10 Local Fcst. Adj.

ZY93_BK11 Central Fcst. Adj

ZY93_BK12 Demand Plan

ZY93_BK91 Hist Sales w/o add.

The Proportional factor  APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure will be automatically there for your selection.

7. Choose Continue to go to the Characteristics tab page. 

8. On the Characteristics  tab page, assign the following characteristics from the Planning Area at the right side to the Planning Book  at the left side via drag and drop:

Characteristic Description

ZY93_BC01 Product

ZY93_BC02 Product Line

Page 17: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 17/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 17 of 130

The

characteris

tic9AVE RSIO

N(APO Planning Version) is automatically created in the planning book.

9. Choose Continue to go to the Data View tab page to create data views for this planningbook.

3.2.1.1 Data View - YDP_DV_DATAPREUseThis data view is used to calculate the key figure Historical Sales without additional demand  by subtracting Additional demand  from Sales Quantity 1, the key figure Historical saleswithout additional demand  will then be used as the base for statistical forecast run.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_DATAPRE

Data view Descr. DATA PREPARATION

Status 3 Changeable

Period Information

TB Profile ID(Future)

YDP_MON24 24 months in future, your timebucket profile.

TB Profile ID(History)

YDP_MON24 24 months in history, your timebucket profile.

Visible   / from 01.05.2009 (first period) choose enter if the field is noteditable

Input   / from 01.05.2009 (first period) choose enter if the field is noteditable

Title

Table 1 DP_DV_DATAPRE

Unit Column

Unit column   Unit of measure visible

2. Choose Continue to go to the Key figures tab page and assign the following key figuresfrom the Planning Book  area at right side to the Data View area at the left side via dragand drop:

Key Figures Description

ZY93_BC03 Location

ZY93_BC04 Customer

ZY93_BC05 Region

ZY93_BC06 Sales Organization

ZY93_BC08 Customer classification

ZY93_BC09 Area

Page 18: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 18/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 18 of 130

ZY93_BK01 Sales quantity

ZY93_BK09  Additional demand

ZY93_BK91 Sales quantity without additional demand

You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.

3. Click complete.

3.2.1.2 Data View - YDP_DV_FORECASTING

UseThis data view is used to determine the statistical forecast based upon the historical sales

without additional demand key figure.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_FORECAST

Data view Descr. FORECASTING

Status 3 Changeable

Period Information

TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.

TB Profile ID(History)

YDP_MON24 24 months in history, your timebucket profile.

Visible   / from 01.05.2009 (first period) choose enter if the field is noteditable

Input   / from 01.05.2009 (first period) choose enter if the field is noteditable

Title

Title 1st GridI DPA_DV_FORECASTING

Unit Column

Unit column   Unit of measure visible

2. Choose Continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via dragand drop:

Key Figures Description

ZY93_BK91 Historical Sales without additional demand

ZY93_BK04 Historical Sales Correction

ZY93_BK05 Historical Sales Override

Page 19: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 19/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 19 of 130

ZY93_BK06 Corrected Sales History

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.

3. Choose complete.

3.2.1.3 Data View - YDP_DV_MACRO

UseThis data view is used to consolidate all input to get the final demand plan which can be

released to ECC or SNP for further planning.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_MACRO

Data view Descr. MACRO

Status 3 Changeable

Period Information

TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.

TB Profile ID(History)

YDP_MON24 24 months in history, your timebucket profile.

Visible   / from 01.05.2009 (first period) choose enter if the field is noteditable

Input   / from 01.05.2009 (first period) choose enter if the field is noteditable

Title

Title 1st GridI DPA_DV_MACRO

Unit Column

Unit column   Unit of measure visible

2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via Dragand drop:

Key Figures Description

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK10 Local Planners Forecast Adjustment

Page 20: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 20/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 20 of 130

ZY93_BK09  Additional demand

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK12 Demand Plan

You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.

3. Choose complete.

3.2.1.4 Data View - YDP_DV_RELEASE

UseThis data view is used to transfer the final demand plan key figure for the release to SCM or

ECC.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_RELEASE

Data View Descr. RELEASE DEMAND PLAN

Status 3 Changeable

Period Information

TB Profile ID(Future) YDP_MON24 24 months in future, your timebucket profile.

Title

Title 1st GridI DPA_DV_RELEASE

Unit Column

Unit column   Unit of measure visible

4. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via dragand drop:

Key Figures Description

ZY93_BK12 Demand Plan

5. Choose complete.

3.2.2 Planning Book  – Central Planner

Use A separate planning book for the central planner is defined with 2 data views. One forreviewing and correcting historical sales data and another for adjusting forecast datacentrally.

Procedure

Page 21: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 21/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 21 of 130

1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDP8B

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning   Environment  Current settings  Design

Planning Books

2. In the SDP: Interactive Planning  –  Initial Screen  window, check the radio button forPlanning Book , then enter the following data:

Field name User action and values Comment

Planning Book YDP_PB_CENTRAL_PLAN Your planning book name

Then choose Create. 

3. The dialog box Planning Book Wizard  is displayed. Enter the following data:

Field name User action and values Comment

Planning Book text Planning book for central

planner

Your planning book description

Planning area YDP_PA Your planning area name

4. Choose enter .

5. In the Planning Book Wizard , enter the following data:

Field name User action andvalues

Comment

Include standard functions

Manual ProportionMaintenance

X

Navigate to views

Univariate forecast X

6. Choose Continue to go to Key figures tab page.

7. On the Key figures  tab page, assign the following key figures from  planning area  to planning book  via drag and drop:

Key figure Description

ZY93_BK01 Sales Quantity 1

ZY93_BK04 Historical Sales Correction

ZY93_BK05 Historical Sales OverrideZY93_BK06 Corrected Sales History

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK09 Additional demand

ZY93_BK10 Local Planners Forecast Adjustment

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK12 Demand Plan

ZY93_BK91 Historical Sales without additional demand

Page 22: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 22/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 22 of 130

The Proportional factor  APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure will be automatically there for your selection.

10. Choose Continue to go to Characteristics tab page. 

11. On the Characteristics  tab page, assign the following characteristics from the planningarea to the planning book via drag and drop:

The characteristic 9AVERSION (APO Planning Version) is automatically createdin the planning book.

3.2.2.1 Data View - YDP_DV_HS_ADJ

UseThis data view in the planning book Central Planner is used to review and to maintain thehistorical sales data key figures.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_HS_ADJ

Data view Descr. HISTORICAL DATA ADJUSTMENT

Status 3 Changeable

Period Information

TB Profile ID(Future)

YDP_MON24 24 months in future, yourtime bucket profile.

TB Profile ID(History)

YDP_MON24 24 months in history, yourtime bucket profile.

Visible   / from 01.05.2009 (first period) choose enter if the field isnot editable

Input   / from 01.05.2009 (first period) choose enter if the field isnot editable

Title

Characteristic Description

ZY93_BC01 Product

ZY93_BC02 Product Line

ZY93_BC03 Location

ZY93_BC04 Customer

ZY93_BC05 Region

ZY93_BC06 Sales Organization

ZY93_BC08 Customer classification

ZY93_BC09 Area

Page 23: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 23/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 23 of 130

Table 1 DPA_DV_HS_ADJ

Unit Column

Unit column   Unit of measure visible

2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via dragand drop:

Key Figures Description

ZY93_BK01 Sales Quantity 1

ZY93_BK91 Historical Sales without additional demand

ZY93_BK04 Historical Sales Correction

ZY93_BK05 Historical Sales Override

ZY93_BK06 Corrected Sales History

You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.

3. Choose complete.

3.2.2.2 Data View - YDP_DV_FC_REV

UseThis data view is used to review the statistical forecast key figure and maintain the manualforecast key figures.

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_FC_REV

Data view Descr. FORECAST REVIEW

Status 3 Changeable

Period Information

TB Profile ID(Future)

YDP_MON24 24 months in future, yourtime bucket profile.

TB Profile ID(History)

YDP_MON24 24 months in history, yourtime bucket profile.

Visible   / from 01.05.2009 (first period)

Input   / from 01.05.2009 (first period)

Title

Title 1st GridI DPA_DV_FC_REV

Unit Column

Unit column   Unit of measure visible

Page 24: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 24/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 24 of 130

2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via dragand drop:

Key Figures Description

ZY93_BK01 Sales Quantity 1

ZY93_BK91 Historical Sales without additional demand

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK10 Local Planners Forecast Adjustment

ZY93_BK09  Additional demand

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK12 Demand Plan

3. Choose Complete.

3.2.3 Planning Book  – Local Planner

Use A separate planning book for the local planner is defined with 1 data view for reviewing andadjusting local forecast data.

Procedure1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDP8B

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning   Environment  Current settings  DesignPlanning Books

2. In the SDP: Interactive Planning  –  Initial Screen  window, check the radio button forPlanning Book , then enter the following data:

Field name User action and values Comment

Planning Book YDP_PB_LOCAL_PLAN Your planning book name

3. Choose Create. 

4. In the Planning Book Wizard  dialog box, make the following entries:

Field name User action and values Comment

Planning Book text Planning book for localplanner

Your planning book description

Planning area YDP_PA Your planning area name

5. Choose Enter .

6. In the Planning Book Wizard , continue to enter the following data:

Field name User action andvalues

Comment

Page 25: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 25/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 25 of 130

Include standard functions

Manual ProportionMaintenance

X

Navigate to views

Univariate forecast X

7. Choose Continue to go to Key figures tab page.

8. On the Key figures  tab page, assign the following key figures from  planning area  to planning book  via drag and drop:

Key figure Description

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK09 Additional demand

ZY93_BK10 Local Planners Forecast Adjustment

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK12 Demand Plan

The Proportional factor  APODPDANT key figure is automatically added to your planningarea when you create the planning area. You do not have to add this key figure yourselfand assign it to the planning book in this step. When you create the respective view, thiskey figure is automatically there for your selection.

9. Choose Continue to go to Characteristics tab page.

10. On the Characteristics  tab page, assign the following characteristics from the planning

area to the planning book via drag and drop:

The characteristic 9AVERSION (APO Planning Version) is automatically createdin the planning book.

3.2.3.1 Data View - YDP_DV_LOC_ADJ

UseThis data view is used to review and to maintain the local forecast adjustment  and additionaldemand  key figures.

Characteristic Description

ZY93_BC01 Product

ZY93_BC02 Product Line

ZY93_BC03 Location

ZY93_BC04 Customer

ZY93_BC05 Region

ZY93_BC06 Sales Organization

ZY93_BC08 Customer classification

ZY93_BC09 Area

Page 26: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 26/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 26 of 130

Procedure1. Go to the Data View  tab page and enter the following values:

Field name User action and values Comment

Data View YDP_DV_LOC_ADJ

Data view Descr. FORECAST LOCAL ADJUSTMENT

Status 3 Changeable

Period Information

TB Profile ID(Future)

YDP_MON24 24 months in future, yourtime bucket profile.

Title

Table 1 DPA_DV_LOC_ADJ

Unit Column

Unit column   Unit of measure visible

2. Choose continue to go to the Key figures tab page and assign the following key figuresfrom the planning book  area at right side to the data view area at the left side via dragand drop:

Key Figures Description

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK10 Local Planners Forecast Adjustment

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK09  Additional demand

ZY93_BK12 Demand Plan

You can use the up and down pushbuttons to move key figure up and down tochange the key figure display sequence in the data view.

3. Choose Complete 

3.2.4 Defining Planning Book  – Set Rows to Output Only1. Access the activity, use one of the following navigation options:

Transaction Code /SAPAPO/SDP8B

SAP SCM Menu  Advanced Planning and Optimization  Demand Planning   

Environment  Current Settings  Define Planning Book

2. On the SDP: Interactive Planning – Initial Screen screen, choose the planning bookYDP_CENTRAL_PLAN  and data view YDP_DV_HS_ADJ , choose combo Data View, andthen choose Change. 

3. Select the row Sales Quantity 1, then right-click, and choose Select rows  Output only .

Page 27: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 27/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 27 of 130

4. Repeat the same change to other rows as following table:

Planning Book Data View Output Only Rows

YDP_PB_CENTRAL_PLAN

YDP_DV_HS_ADJSales Quantity 1

Historical Sales without additional demand

YDP_DV_FC_REV

Sales Quantity 1

Historical Sales without additional demand

Statistical Forecast

 Additional Demand

Local Planner Forecast Adjustment

YDP_PB_LOCAL_PLAN YDP_DV_LOC_ADJ

Statistical Forecast

Manual Forecast

Central Planner Forecast Adjustment

5. When you have finished all the rows in each data view, choose Save.6. On the Confirmation prompt screen, choose Save and go back.

3.2.5 Creating Selection Profiles for the Planning Book

UseFor your planning process, you need to make a selection that restricts the range of productsand locations. To do this, you create one or more selection profiles. The demand planneruses the selection profile to quickly access frequently used selections.

Here we will create one selection profile for mass process job, 3 profiles for InteractivePlanning by each local planner, another 1 profile for Interactive Planning by central planner.

PrerequisitesYou need to have initialized the planning version 001 for your planning area.

Procedure

1. To access the planning book choose one of the following navigation options:

Transaction code /SAPAPO/SDP94

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  

Planning   Interactive Demand  Planning  

2. On the Planning Book  screen, choose one Planning Book  and Data View , in the thirdwindow from above on the left side. If the No valid version exists for planning area'9ADP0 Do you want to initialize a planning version? d ialog box is displayed, choose No in the Initialize planning version?

3. Choose Data View .

4. Choose Selection window  in the left screen area. The Object Selection dialog box isdisplayed.

5. From the possible entries list in the Show  field, select Product .

6. The planning version 001 is automatically assigned in the field to the right of the APO

Planning Version field.

7. In the second row, restrict the range of products by specifying only those products thatyou actually need for your planning task. To do this, select Product  and choose Multiple

Selection for Object . On the Select Single Values tab page, enter the following productswith extensions, for example:

Page 28: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 28/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 28 of 130

  L*

  S*

  …… 

8. In the third row, restrict the range of products by specifying only those areas that you

actually need for your planning task. To do this, select Area and choose MultipleSelection for Object . On the Select Single Values tab page, enter the following productswith extensions, for example:

  AME

  APJ

  EU

9. In the Objects Selection dialog box, choose Save selection.

10. Enter YDP_MP_ALL_PROD_LOC as the selection description, and choose Save.

11. Choose Adopt. 

12. To store the saved selection in your selection profile, choose Maintain selection profile inthe second window from above in left screen area. In the Maintain Selection Profiles for

Users dialog box, use drag and drop to transfer the saved selection from the right area toyour selection profile on the left.

13. Choose Save and Copy .

14. To display objects that belong to a selection profile, choose the selection. The systemdisplays the objects in the upper left screen area.

15. Repeat the steps 2 - 14 to create the other selection profiles, according to the followingtable:

Selection Description Area (for step 8)

YDP_IP_CENTRAL_ALL  AME, APJ, EU

YDP_IP_LOC_AME AME

YDP_IP_LOC_APJ APJ

YDP_IP_LOC_EU EU

Result All selection profiles have been created.

3.3 Setting up Macros

3.3.1 Setup Macros for Planning Book YDP_PB_MASS_JOB

and Data View YDP_DV_DATAPREProcedure1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

2. Choose the row of the planning book: YDP_PB_MASS_JOB and data view YPD_DV_DATAPRE 

Page 29: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 29/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 29 of 130

3.3.1.1 Macro: Calc. Hist . Sales w ithou t add. demand  

UseCalculate the key figure Historical Sales without additional demand  by subtracting Additionaldemand  from Sales Quantity 1 

Procedure

When you create the macros, follow the instructions below. Be very careful if youcopy something directly from this document into the Macro Workbench, some ofthe symbol formats are changed when saved in Microsoft Word. For example, -

becomes- in some cases. Check carefully in the Macro Workbench.

1. Right-click the node Macros in Macro Book  below the planning table and choose Create

New Macro   Add macro . In the APO Macro Builder dialog box, enter a descriptive textfor the macro, Calc. Hist. Sales without add. demand. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, then choose Past in Processing Area, and chooseContinue.

3. Right-click the macro step and choose Add Element (Result Level) Add resul ts row .In the APO Macro Builder dialog box, choose Historical Sales without additional demandin the Row  field. Choose Adopt. 

4. Right-click the operator/function you have just created and chooseAd d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Sales Quantity 1 in the Row  field, and chooseContinue. 

5. Right-click the result row you have just created and choose

Add Element (Argument Level)   Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ -“ , and choose Continue. 

6. Right-click the operator/function you have just created and chooseAd d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Additional demand in the Row  field,and choose Continue. 

7. Select the macro and choose Check to check it. Generate the macro by choosingGenerate.

8. Move the macro by using drag and drop to the Events section and to the Start  folder in

the upper right screen area.

9. If you want to continue with the configuration, proceed with the next activity to create newmacros.

If you want to discontinue the configuration at this point, we recommend that you saveyour settings.

Result

Title Level 1 Level 2 Level 3

Calc. Hist. Sales without add. demand

New step : ( 24 Iterations : M 06.2009; M 05.2011 )

Row: Historical Sales without additional demand ( Frm M 06.2009 ) =

Row: Sales Quantity 1 ( Frm M 06.2009 )

-

Row: Additional Demand ( Frm M 06.2009 )  

Page 30: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 30/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 30 of 130

The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_DATAPRE should be like this:

Event Macro

Default

Level Change

Start Calc. Hist. Sales without add. demand

Exit

3.3.2 Setup Macros for Planning Book YDP_PB_MASS_JOBand Data View YDP_DV_FCST

Procedure1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

2. Choosethe row of planning book: YDP_PB_MASS_JOB and data view YPD_DV_FCST 

3.3.2.1 Macro: Ini t ial val: calc to co rr his t sales  

UseCalculate key figure Corrected Sales History, It equals to Historical Sales Override if this keyfigure is not initial, otherwise, it equals Historical Sales without additional demand minusHistorical Sales Correction.

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Initial val: calc to corr hist sales. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Past  in Processing Area, and chooseContinue.

3. Right-click the macro step and choose Add Element (Resul t Level) Add contro l

statement .In the APO Macro Builder dialog box, choose IF . Choose Continue. 

4. Right-click the result row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Sales override = Initial , andchoose Continue. 

5. Right-click the operator/function you have just created and chooseAdd Element (Argument Level) Add Operator /Funct ion . In the APO Macro Builder

dialog box, choose “IS_INITIAL(“ . Choose Continue.

6. Right-click the operator/function you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

Page 31: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 31/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 31 of 130

row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row  field, and Row Attributes in Data field in the part of Data Source: Value or Row/Column Attributes. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.8. Right-click the condition you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Corrected Sales History in the Row  field. Choose Adopt. 

9. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Historical Sales without additional demand inthe Row  field. Choose Continue.

10. Right-click the operator/function you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.

11. Right-click the operator/function you have just created and choose

Add Element (Argument Element) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales Correction in the Row  field. Choose Continue.

12. Right-click the result row you have created in step 8 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

13. Right-click the control statement you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Corrected Sales History in the Row  field. Choose Adopt. 

14. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row  field. Choose Continue.

15. Right-click the result row you have created in step 13 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

16. Select the macro and choose Check to check it. Generate the macro by choosingGenerate.

17. If you want to continue with the configuration, proceed with the next activity to create thenext macro.If you want to discontinue the configuration at this point, we recommend that you save

your settings.

Result

Page 32: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 32/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 32 of 130

Title Level 1 Level 2 Level 3

Initial val: calc to corr hist sales

First Step : ( 24 Iterations : M 06.2009; M 05.2011 )

IF

Sales override = InitialIS_INITIAL(

Row: Historical Sales Override ( Frm M 06.2009 )

) = 1

Row: Corrected Sales History ( Frm M 06.2009 ) =

Row: Historical Sales without additional demand ( Frm M 06.2009 )

+

Row: Historical Sales Correction ( Frm M 06.2009 )

ELSE

Row: Corrected Sales History ( Frm M 06.2009 ) =

Row: Historical Sales Override ( Frm M 06.2009 )

ENDIF

 

3.3.2.2 Macro: Copy stat . fcst to man. fcst  

UseCopy Key Figure Statistical Forecast  to Manual Forecast . Key figure Statistical Forecast  will

not be changed any more in the future processing steps.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Copy stat. Fcst to man. fcst. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .

In the APO Macro Builder dialog box, choose“ IF” and choose Continue. 

4. Right-click the control statement you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, inputs Description Manual F/C fixed , and chooseContinue. 

5. Right-click the condition you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “IS_FIXED(“. Choose Continue.

6. Right-click the Operator/Function you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row  field andRow Attribute in Data field. Choose Continue. 

Page 33: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 33/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 33 of 130

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.

8. Right-click the condition you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the

 APO Macro Builder dialog box choose Manual Forecast in the Row  field. Choose Adopt. 9. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. ChooseContinue.

10. Right-click the result row you have created in step 8 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

11. Right-click the control statement you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row  field. Choose Adopt. 

12. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Statistical Forecast in the Row  field. Choose Continue. 

13. Right-click the result row you have created in step 11 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

14. Select the macro and choose Check to check it. Choose Generate to generate the macro.

15. Choose Save.

Result

Title Level 1 Level 2 Level 3

Copy stat. Fcst to man. fcst

 First Step : ( 24 Iterations : M 06.2011; M 05.2013 )

IF

Manual F/C fixed

IS_FIXED(

Row: Manual Forecast ( Frm M 06.2011 )

) = 1

Row: Manual Forecast ( Frm M 06.2011 ) =

Row: Manual Forecast ( Frm M 06.2011 )

ELSE

Row: Manual Forecast ( Frm M 06.2011 ) =

Row: Statistical Forecast ( Frm M 06.2011 )

ENDIF

 

The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_FCST should be like this:

Event Macro

Default

Level Change

Page 34: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 34/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 34 of 130

Start

Exit

3.3.3 Set up Macros for Planning Book YDP_PB_MASS_JOBand Data View YDP_DV_MACRO

Procedure1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

2. Choose the row of the planning book: YDP_PB_MASS_JOB and data view 

YPD_DV_MACRO. 

3.3.3.1 Macro: Clear data for demo - start ing po int  

UseClear all the data in the key figures of the planning area.

This macro is only used in testing scenario. Never use it in the production system!

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Clear data for demo - starting point. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Total  in Processing Area, and chooseContinue.

3. Right-click the step you have just created and choose

Add Element (Resul t Level) Add resul t row . In the APO Macro Builder dialog box 

choose Local Planners Forecast Adjustment in the Row  field, and choose Initialization inChange mode field. Choose Adopt. 

4. Right-click the result row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Statistical forecast in the Row  field, and chooseInitialization in Change mode field. Choose Adopt. 

5. Right-click the result row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field, and choose Initialization in Change mode field. Choose Adopt. 

6. Right-click the result row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the

 APO Macro Builder dialog box choose Additional demand in the Row  field, and chooseInitialization in Change mode field. Choose Adopt. 

Page 35: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 35/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 35 of 130

7. Right-click the result row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row  field, and chooseInitialization in Change mode field. Choose Adopt. 

8. Right-click the result row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row  field, and chooseInitialization in Change mode field. Choose Adopt. 

9. Select the macro and choose Check to check it. Choose Generate to generate the macro.

10. Choose Save.

Result

Title Level 1 Level 2 Level 3

Clear data for demo - starting point

Step1: clear KF values except Hist.Sales : ( 48 Iterations : M 06.2009; M 05.2013 )Row: Statistical Forecast ( Frm M 06.2009 ) = Initial

Row: Additional Demand ( Frm M 06.2009 ) = Initial

Row: Local Planners Forecast Adjustment ( Frm M 06.2009 ) = Initial

Row: Central Planners Forecast Adjustment ( Frm M 06.2009 ) = Initial

Row: Demand Plan ( Frm M 06.2009 ) = Initial

Row: Statistical Forecast ( Frm M 06.2009 ) = Initial

Row: Manual Forecast ( Frm M 06.2011 ) =

 

3.3.3.2 Macro: Copy stat . fcst to man. fcst  

UseCopy Key Figure Statistical Forecast  to Manual Forecast . Key figure Statistical Forecast  willnot be changed any more in the future processing steps.

ProcedureThe macro is exactly the same with macro in Planning Book YDP_PB_MASS_JOB, ViewYDP_DV_FCST, you don‟t need to create the macro step by step again, but import from theview YDP_DV_FCST, just like copying.

1. Choose Menu Edit  and then choose Import Macro(s)

2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FCST), and choose Macro

Copy stat. fcst to man. fcst. And choose Continue.

3. When a warning message appears, choose Continue or choose Enter.

4. Select the macro and choose Check to check it. Choose Generate to generate the macro.

5. Choose Save.

Result

Page 36: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 36/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 36 of 130

Title Level 1 Level 2 Level 3

Copy stat. Fcst to man. fcst

 First Step : ( 24 Iterations : M 06.2011; M 05.2013 )

IF

Manual F/C fixedIS_FIXED(

Row: Manual Forecast ( Frm M 06.2011 )

) = 1

Row: Manual Forecast ( Frm M 06.2011 ) =

Row: Manual Forecast ( Frm M 06.2011 )

ELSE

Row: Manual Forecast ( Frm M 06.2011 ) =

Row: Statistical Forecast ( Frm M 06.2011 )

ENDIF

 

3.3.3.3 Macro: Determin e KF FORECAST ADJ.CENTRAL  

UseCopy the key figure Local Planners Forecast Adjustment  to Central Planner Forecast Adjustment , if Planners Forecast Adjustment  is not initial and Central Planner Forecast Adjustment is initial.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Determine KF FORECAST ADJ.CENTRAL. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement you have just created and chooseAd d Element (Result Level)   App end Condi t ion .

In the APO Macro Builder dialog box, input Description Central Adj. is Initial & Local Adj.is not initial , and choose Continue. 

5. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ IS_INITIAL(”. Choose Continue.

6. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row  field, and Row Attributes in the Data field. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1 AND IS_INITIAL(”.Choose

Continue.

Page 37: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 37/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 37 of 130

8. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row  field, and Row Attributes in the Data field. Choose Continue.

9. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”. Choose Continue.

10. Right-click the condition you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field. Choose Adopt. 

11. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Local Planners Forecast Adjustment in theRow  field. Choose Continue.

12. Right-click the result row you have created in step 10 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

13. Select the macro and choose Check to check it. Choose Generate to generate the macro.

14. Choose Save.

Result

Title Level 1 Level 2 Level 3

Determine KF FORECAST ADJ.CENTRAL

New step : ( 24 Iterations : M 06.2011; M 05.2013 )

IF

Central Adj. is Initial & Local Adj. is not initial 

IS_INITIAL(

Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )

) = 1 AND IS_INITIAL(

Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )

) = 0

Row: Central Planners Forecast Adjustment ( Frm M 06.2011 ) =

Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )

ENDIF

 

3.3.3.4 Macro: Calc. Demand Plan  

UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,

Calc. Demand Plan. Choose Continue.2. Right-click the macro and choose Add macro Element Step . 

Page 38: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 38/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 38 of 130

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.

3. Right-click the step you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the

 APO Macro Builder dialog box choose Demand Plan in the Row  field. Choose Adopt. 4. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. ChooseContinue.

5. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ +”.Choose Continue.

6. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row  field. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”. Choose Continue.

8. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Additional demand in the Row  field. 

9. Select the macro and choose Check to check it. Choose Generate to generate the macro.

10. Choose Save.

Result

Title Level 1 Level 2 Level 3

Calc. Demand Plan

New step : ( 24 Iterations : M 06.2011; M 05.2013 )

Row: Demand Plan ( Frm M 06.2011 ) =

Row: Manual Forecast ( Frm M 06.2011 )

+

Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )

+

Row: Additional Demand ( Frm M 06.2011 )

 

The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_MACRO should be like this:

Event Macro

Default

Level Change

Start

Exit

3.3.4 Setup Macros for Planning Book YDP_PB_MASS_JOB

Page 39: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 39/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 39 of 130

and Data View YDP_DV_RELEASE

No Macro is necessary in this data view.

3.3.5 Setup Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data View YDP_DV_HS_ADJ

1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

2. Choose the row of the planning book: YDP_PB_CENTRAL_PLAN and data view YPD_DV_HS_AD 

3.3.5.1 Macro: His Sale overrid e > 30% -BG Colo r =RED  

UseThis macro gives warning if the key figure Historical Sales Override deviates from HistoricalSales without additional demand  more than 30% by changing the background color of the cellto RED.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,His Sale override > 30% -BG Color =RED. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if percentage > 30%, choose Past  in Processing Area, and choose Continue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the result row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .

In the APO Macro Builder dialog box, input Description Is Sales override Initial , andchoose Continue. 

5. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ IS_INITIAL(”.Choose Continue.

6. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales override in the Row  field and Row Attributes in Data field in the part of Data Source: Value or Row/Column Attributes. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 1”. Choose Continue.

Page 40: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 40/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 40 of 130

8. Right-click the condition row you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row  field and Attribute change in Change mode field. Choose Adopt. 

9. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.

10. Right-click the result row you have created in step 8 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSEIF” and choose Continue. 

11. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   Append Cond i t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue. 

12. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “  ABS( (”. Choose Continue.

13. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales Override in the Row  field. Choose Continue.

14. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”. Choose Continue.

15. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales without additionaldemand in the Row  field. Choose Continue.

16. Right-click the argument row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) – 1 ) * 100 > 30”. Choose

Continue.

17. Right-click the condition you have created in step 11 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

18. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.

19. Right-click the result row you have created in step 17 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

20. Right-click the control statement row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Override in the Row  field and Attribute Change in Change mode field. Choose Continue.

21. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.

22. Right-click the result row you have created in step 20 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

23. Select the macro and choose Check to check it. Choose Generate to generate the macro.

Page 41: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 41/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 41 of 130

24. Use drag and drop and move the macro to the Events section and to the Default  folder inthe upper right screen area.

25. Choose Save.

ResultTitle Level 1 Level 2 Level 3

His Sale override > 30% -BG Color =RED

Change color if percentage > 30% : ( 24 Iterations : M 06.2009; M 05.2011 )

IF

Is Sales Override initial 

IS_INITIAL(

Row: Historical Sales Override ( Frm M 06.2009 )

) = 1

Row: Historical Sales Override ( Attributes ) =

CELL_BG( 2 )

ELSEIF

Percentage > 30%

ABS( (

Row: Historical Sales Override ( Frm M 06.2009 )

/

Row: Historical Sales without additional demand ( Frm M 06.2009 )

) - 1 ) * 100

> 30

Row: Historical Sales Override ( Attributes ) =

CELL_BG( 26 )ELSE

Row: Historical Sales Override ( Attributes ) =

CELL_BG( 2 )

ENDIF

 

3.3.5.2 Macro: Cor . Sale / HIS Sale >30% BG COL=RED  

UseThis macro gives warning if the key figure Historical Sales Correction is greater than 30% of  Historical Sales without additional demand  by changing the background color of the cell toRED.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Cor. Sale / HIS Sale >30% BG COL=RED. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if percentage > 30%, choose Past  in Processing Area, and choose Continue.

Page 42: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 42/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 42 of 130

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .

In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue. 

5. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “  ABS( (”.Choose Continue.

6. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales Correction in the Row  field. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ /”.Choose Continue.

8. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Historical Sales without additionaldemand in the Row  field. Choose Continue.

9. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 ) > 30”. Choose Continue.

10. Right-click the condition you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Correction in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

11. Right-click the result row you have just created and chooseAdd Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.

12. Right-click the result row you have created in step 10 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

13. Right-click the control statement row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Historical Sales Correction in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

14. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ CELL_BG( 2 )”. Choose Continue.15. Right-click the result row you have created in step 13 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

16. Select the macro and choose Check to check it. Choose Generate to generate the macro.

17. Use drag and drop and move the macro to the Events section and to the Default  folder inthe upper right screen area.

18. Choose Save.

Result

Page 43: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 43/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 43 of 130

Title Level 1 Level 2 Level 3

Cor. Sale / HIS Sale >30% BG COL=RED

Change color if percentage > 30% : ( 24 Iterations : M 06.2009; M 05.2011 )

IF

Percentage > 30%ABS( (

Row: Historical Sales Correction ( Frm M 06.2009 )

/

Row: Historical Sales without additional demand ( Frm M 06.2009 )

) * 100 ) > 30

Row: Historical Sales Correction ( Attributes ) =

CELL_BG( 26 )

ELSE

Row: Historical Sales Correction ( Attributes ) =

CELL_BG( 2 )

ENDIF

 

3.3.5.3 Macro: Ini t ial val: calc to co rr his t sales  

UseCalculate the key figure Corrected Sales History, It equals to Historical Sales Override if thiskey figure is not initial, otherwise, it equals Historical Sales without additional demand minusHistorical Sales Correction.

Procedure

The macro is exactly the same with macro in Planning Book YDP_PB_MASS_JOB, ViewYDP_DV_FCST. You don‟t need to create the macro step by step again, but import from theview YDP_DV_FCST, just like copying.

1. Choose Menu Edit  and then choose Import Macro(s)

2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FCST), and choose MacroInitial val: calc to corr hist sales. And choose Continue.

3. When a warning message appears, choose Continue or choose Enter.

4. Select the macro and choose Check to check it. Choose Generate to generate the macro.

5. Use drag and drop and move the macro to the Events section and to the Default  folder in

the upper right screen area.

6. Choose Save.

Result

Page 44: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 44/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 44 of 130

Title Level 1 Level 2 Level 3

Initial val: calc to corr hist sales

First Step : ( 24 Iterations : M 06.2009; M 05.2011 )

IF

Sales override = InitialIS_INITIAL(

Row: Historical Sales Override ( Frm M 06.2009 )

) = 1

Row: Corrected Sales History ( Frm M 06.2009 ) =

Row: Historical Sales without additional demand ( Frm M 06.2009 )

+

Row: Historical Sales Correction ( Frm M 06.2009 )

ELSE

Row: Corrected Sales History ( Frm M 06.2009 ) =

Row: Historical Sales Override ( Frm M 06.2009 )

ENDIF

 

The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_HS_ADJ should be like this:

Event Macro

Default Cor. Sale / HIS Sale >30% BG COL=RED

His Sale override > 30% -BG Color =RED

Initial val: calc to corr hist sales

Level Change

Start

Exit

3.3.6 Set up Macros for Planning Book YDP_PB_CENTRAL_PLAN and Data View YDP_DV_FC_REV

1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

2. Choose the row of the planning book: YDP_PB_CENTRAL_PLAN and data view YPD_DV_FC_REV  

3.3.6.1 Macro: Read Plannin g Status  

UseWe use a field in the table to control the planning status. There are 3 macros that are created

to modify the value of the field to indicate the current planning status: No Planning, LocalPlanner, and Central Planner.

Page 45: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 45/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 45 of 130

This macro is used to read the value in the table, and modify the attribute of some key figurerows according to the planning status.

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Read Planning Status. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

3. In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_GET, choose User-Defined  in Processing Area, choose 1 inIterations, and choose Continue.

4. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_GET. Choose Continue.

5. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the  APO Macro Builder dialog box, choose “ LAYOUTVARIABLE_SET( ’LV_CYCLE’ ;TS_GET(”.Choose Continue.

6. Right-click the operator/function row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ 'DEMAND_PLANNING' ;'PLANNING_CYCLE' ; '*' ; '*' ; 1”. Choose Continue.

7. Right-click the operator/function row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ; 1 ) )”. Choose Continue.

8. Right-click the step row you have created in step 2 and choose

Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

9. Right-click the control statement row you have just created and chooseAd d Element (Step Level)   Append Cond i t ion for steps .In the APO Macro Builder dialog box, input Description LOCAL, and choose Continue. 

10. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ LAYOUTVAR_VALUE( ‘LV_CYCLE’ ) =1”. Choose Continue.

11. Right-click the condition row you have created in step 9 and choose Add Elem ent (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Local, choose User-Defined  inProcessing Area, choose 1 in Iterations, and choose Continue.

12. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

13. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.

14. Right-click the result row you have created in step 12 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

15. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.

Page 46: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 46/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 46 of 130

16. Right-click the step row you have created in step 11 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Central, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

17. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

18. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

19. Right-click the result row you have created in step 17 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

20. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

21. Right-click the step row you have created in step 16 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

22. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.

23. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'Local_Planner' )”. Choose Continue.

24. Right-click the step row you have created in step 21 and choose

Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ ELSEIF” and choose Continue. 

25. Right-click the control statement row you have just created and chooseAd d Element (Step Level)   Append Cond i t ion for steps .In the APO Macro Builder dialog box, input Description CENTRAL, and choose Continue. 

26. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ LAYOUTVAR_VALUE( ‘LV_CYCLE’ ) =2”. Choose Continue.

27. Right-click the control statement row you have created in step 24 and choose Add

Element (Step level) Ap pend macro step . In the APO Macro Builder dialog box, inthe descriptive text section, enter a name for the macro step, for example, LOCAL, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

28. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

29. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

30. Right-click the result row you have created in step 28 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the

 APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

Page 47: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 47/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 47 of 130

31. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

32. Right-click the step row you have created in step 27 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptive

text section, enter a name for the macro step, for example, Central, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

33. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

34. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.

35. Right-click the result row you have created in step 33 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  

field and Attribute Change in Change mode field. Choose Adopt. 

36. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.

37. Right-click the step row you have created in step 35 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

38. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.

39. Right-click the action box row you have just created and chooseAdd Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'Central_Planner' )”. Choose Continue.

40. Right-click the step row you have created in step 37 and choose

Add Element (Step Level) Append Contro l Statement for steps .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

41. Right-click the control statement row you have just created and choose Add Element

(Step level) Ap pend macro step . In the APO Macro Builder dialog box, in thedescriptive text section, enter a name for the macro step, for example, LOCAL, chooseUser-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

42. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

43. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

44. Right-click the result row you have created in step 42 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Local Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

45. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

Page 48: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 48/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 48 of 130

46. Right-click the step row you have created in step 44 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Central, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

47. Right-click the step row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

48. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

49. Right-click the result row you have created in step 47 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment in the Row  field and Attribute Change in Change mode field. Choose Adopt. 

50. Right-click the result row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

51. Right-click the step row you have created in step 46 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Output Pop-up, choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

52. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description Output Pop-up. Choose Continue.

53. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ OUTPUT_POPUP( 'CYCLE' ;'STATUS' ; 'No_Planning' )”. Choose Continue.

54. Right-click the step row you have created in step 51 and choose Ad d Element (Step

level) Append macro step . In the APO Macro Builder dialog box, in the descriptivetext section, enter a name for the macro step, for example, Process Message, chooseUser-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

55. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add process message .In the APO Macro Builder dialog box, in the descriptive text section, enter WARNING:Status neither Local nor Central, choose Information in Message Type field, and chooseContinue. 

56. Right-click the step row you have created in step 54 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ 

ENDIF” and choose Continue. 

57. Right-click the step with name Local, Choose Active/Inactive in the context menu. Repeatthe same operation for all the 3 steps with name Local .

58. Select the macro and choose Check to check it. Choose Generate to generate the macro.

59. Use drag and drop and move the macro to the Events section and to the Start  folder inthe upper right screen area.

60. Choose Save.

Result

Page 49: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 49/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 49 of 130

Title Level 1 Level 2 Level 3

Read Planning Status

TS_GET : ( 1 Iterations : M 07.2009; M 07.2009 )

TS_GET

LAYOUTVARIABLE_SET( 'LV_CYCLE' ; TS_GET('DEMAND_PLANNING' ; 'PLANNING_CYCLE' ; '*' ; '*' ; 1

; 1 ) )

IF

LOCAL

LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 1

* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 1 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 48 )CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Local_Planner' )

ELSEIF

CENTRAL

LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 2

* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 1 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 48 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Central_Planner' )

 

Page 50: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 50/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 50 of 130

Title Level 1 Level 2 Level 3

ELSE

* LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'No_Planning' )

Process Message : ( 1 Iterations : M 07.2009; M 07.2009 )Information [ WARNING Status neither Local nor Central ]

ENDIF  

The rows with * in the first column should be inactivated.

3.3.6.2 Macro: Set Plannin g Cycle to "No Planning "  

UseModify the value of the field in the table to 0. This means that, currently, the planning status isneither Local Planner, nor Central Planner.

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "No Planning". Choose button Choose to assign a suitable icon forthis macro (Please make sure the icon is different with the often used ones, and differentwith the icon assigned to other Macros). Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ No Planning ” , choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

3. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ No Planning ” . Choose Continue.

4. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;

‘PLANNING_CYCLE’ ;”. Choose Continue.

5. Right-click the operation/function row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 0 )”. Choose

Continue.

Page 51: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 51/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 51 of 130

6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)

Append macro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to no input, choose User-defined  in Processing Area, choose 1 in Iterations, and choose Continue.

7. Right-click the step you have just created and chooseAd d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

8. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

9. Right-click the result row you have created in step 7and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row  In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

10. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

11. Select the macro and choose Check to check it. Choose Generate to generate the macro.

12. Choose Save.

Result

Title Level 1 Level 2 Level 3

Set Planning Cycle to "No Planning"

TS_SET: “No Planning” : ( 1 Iterations : M 06.2009; M 06.2009 )

TS_SET: “No Planning”

TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;

'*' ; '*' ; 1 ; 0 )

SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

 

3.3.6.3 Macro: Set Planning Cycle to " Loc al Planner"  

UseModify the value of the field in the table to 1. This means that, currently, the planning status isLocal Planner.

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "Local Planner". Choose button Choose to assign a suitable iconfor this macro (Please make sure the icon is different with the often used ones, anddifferent with the icon assigned to other Macros). Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ Local Planner ” , choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

Page 52: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 52/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 52 of 130

3. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ Local Plannner ” . Choose Continue.

4. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;‘PLANNING_CYCLE’ ;”. Choose Continue.

5. Right-click the operation/function row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 1 )”. Choose

Continue.

6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)

Append macro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to no input, choose User-defined  in Processing Area, choose 1 in Iterations, and choose Continue.

7. Right-click the step you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

8. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 0 )”. Choose Continue.

9. Right-click the result row you have created in step 7and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row  In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

10. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 17 )”. Choose Continue.

11. Select the macro and choose Check to check it. Choose Generate to generate the macro.

12. Choose Save.

Result

Title Level 1 Level 2 Level 3

Set Planning Cycle to "Local Planner"

TS_SET: “Local Planner” : ( 1 Iterations : M 06.2009; M 06.2009 )

TS_SET: “Local Plannner”

TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;'*' ; '*' ; 1 ; 1 )

SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

 

3.3.6.4 Macro: Set Planning Cyc le to " Central Planner"  

UseModify the value of the field in the table to 2. This means that, currently, the planning status isCentral Planner.

Page 53: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 53/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 53 of 130

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Set Planning Cycle to "Central Planner". Choose button Choose to assign a suitable iconfor this macro (Please make sure the icon is different with the often used ones, and

different with the icon assigned to other Macros). Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, TS_SET: “ Central Planner ” , choose User-Defined  in Processing Area, choose 1 in Iterations, and choose Continue.

3. Right-click the step you have just created and choose

Add Element (Resul t Level) Add act ion box . In the APO Macro Builder dialog box,input Description TS_SET: “ Central Planner ” . Choose Continue.

4. Right-click the action box row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “ TS_SET( ‘DEMAND_PLANNING’ ;‘PLANNING_CYCLE

’ ;”. Choose Continue.

5. Right-click the operation/function row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ’*’ ; ‘*’ ; 1 ; 2 )”. Choose

Continue.

6. Right-click the step you have created in step 2 and choose Ad d Element (Step Level)

Append macro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Set Central Adj to input, choose User-defined  in Processing Area, choose 1 in Iterations, and choose Continue.

7. Right-click the step you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the

 APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

8. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_INPUT( 1 )”. Choose Continue.

9. Right-click the result row you have created in step 7and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row  In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute change in Change mode field. Choose Adopt. 

10. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ROW_BG( 48 )”. Choose Continue.

11. Select the macro and choose Check to check it. Choose Generate to generate the macro.

12. Choose Save.

Result

Page 54: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 54/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 54 of 130

Title Level 1 Level 2 Level 3

Set Planning Cycle to "Central Planner"

TS_SET: “Central Planner” : ( 1 Iterations : M 06.2009; M 06.2009 )

New action box

TS_SET( 'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ;'*' ; '*' ; 1 ; 2 )

SET Central Attr. : ( 1 Iterations : M 06.2009; M 06.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 1 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 48 )

 

3.3.6.5 Macro: Copy fc st Local Adj. to Central Ad j. 

UseCopy the key figure Local Planners Forecast Adjustment  to Central Planner Forecast Adjustment , if Central Planner Forecast Adjustment is not fixed.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Copy fcst Local Adj. to Central Adj. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Determine FCST Adj. Central, choose Future in Processing Area, and choose Continue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input description FCST Adj. Central is fixed  andchoose Continue.

5. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ IS_FIXED(”.Choose Continue.

6. Right-click the operation/function row you have just created and chooseAd d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row  field, and Row Attribute in Data field. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0 AND IS_INITIAL(”. Choose

Continue.

8. Right-click the operation/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row  field, and Row Attribute in Data field. Choose Continue.

9. Right-click the argument row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .

Page 55: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 55/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 55 of 130

In the APO Macro Builder dialog box, choose “ ) = 0 AND IS_PARTLY_FIXED(”. 

Choose Continue.

10. Right-click the operation/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Cental Planners Forecast Adjustment

in the Row  field, and Row Attribute in Data field. Choose Continue.11. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”. Choose Continue.

12. Right-click the condition row you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planner Forecast Adjustment  field. Choose Adopt .

13. Right-click the result row you have just created and choose

Add Element (Argument Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row  field. Choose Continue.

14. Right-click the result row you have created in step 12 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

15. Select the macro and choose Check to check it. Choose Generate to generate the macro.

16. Use drag and drop and move the macro to the Events section and to the Start  folder inthe upper right screen area.

17. Choose Save.

Result

Title Level 1 Level 2 Level 3Copy fcst Local Adj. to Central Adj.

Determine FCST Adj. Central : ( 24 Iterations : M 07.2011; M 06.2013 )

IF

FCST Adj. Central is fixed

IS_FIXED(

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

) = 0 and is_initial(

Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )

) = 0 and is_partly_fixed(

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )) = 0

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 ) =

Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )

ENDIF

 

3.3.6.6 Macro: Calc. Demand Plan  

UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .

Procedure

Page 56: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 56/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 56 of 130

The macro is exactly the same as the macro in the Planning Book YDP_PB_MASS_JOB,View YDP_DV_MACRO. You do not need to create the macro step by step again, but youneed to import it from the view YDP_DV_MACRO, just like copying.

1. Choose Menu Edit  and then choose Import Macro(s)

2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_MACRO), and choose MacroCalc. Demand Plan. And choose Continue.

3. If a warning message appears, choose Continue or Enter.

4. Select the macro and choose Check to check it. Choose Generate to generate the macro.

5. Use drag and drop and move the macro to the Events section and to the Default  folder inthe upper right screen area.

6. Choose Save.

Result

Title Level 1 Level 2 Level 3

Calc. Demand Plan

New step : ( 24 Iterations : M 06.2011; M 05.2013 )

Row: Demand Plan ( Frm M 06.2011 ) =

Row: Manual Forecast ( Frm M 06.2011 )

+

Row: Central Planners Forecast Adjustment ( Frm M 06.2011 )

+

Row: Additional Demand ( Frm M 06.2011 )

 

3.3.6.7 Macro: Au tomatic Fix "Central Planner Ad j."  

UseFix the key figure cell Central Planners Forecast Adjustment, if it does not equal to LocalPlanners Forecast Adjustment. This macro is used for making sure the changed value ofCentral Planners Forecast Adjustment will not be overwritten by macro Copy fcst Local Adj. toCentral Adj.

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro, Automatic Fix "Central Planner Adj.". Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Automatic Fix "Central Planner Adj.", choose Future inProcessing Area, and choose Continue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .

In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Central adj. <> Local adj., and

choose Continue. 

Page 57: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 57/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 57 of 130

5. Right-click the condition row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow  field. Choose Continue.

6. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “  <> ”.Choose Continue.

7. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planner Forecast Adjustment inthe Row  field. Choose Continue.

8. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “  AND IS_FIXED(”.Choose Continue.

9. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planner Forecast Adjustment

in the Row  field, and Row Attribute in Data field. Choose Continue.

10. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “  AND IS_INITIAL(”.Choose Continue.

11. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planner Forecast Adjustmentin the Row  field, and Row Attribute in Data field. Choose Continue.

12. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ )= 0”.Choose Continue.

13. Right-click the condition row you have created in step 4 and chooseAd d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Value Change with Following Fixing in Change mode field. Choose Adopt .

14. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow  field. Choose Continue.

15. Right-click the result row you have created in step 13 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

16. Select the macro and choose Check to check it. Choose Generate to generate the macro.

17. Use drag and drop and move the macro to the Events section and to the Exit  folder in theupper right screen area.

18. Choose Save.

Result

Page 58: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 58/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 58 of 130

Title Level 1 Level 2 Level 3

Automatic Fix "Central Planner Adj.

Automatic Fix "Central Planner Adj. : ( 24 Iterations : M 07.2011; M 06.2013 )

IF

Central adj. <> Local adj Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

<>

Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )

and is_fixed(

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

) = 0 and is_initial(

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

) = 0

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 ) =

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

ENDIF

 

3.3.6.8 Macro: Autom at ic Fix "Manual Fcst"  

UseFix the key figure cell Manual Forecast if it does not equal to Statistical Forecast. This macrois used for making sure the changed value of Manual Forecast will not be overwritten. 

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro, Automatic Fix "Manual Fcst". Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Automatic Fix "Manual Fcst", choose Future in Processing Area,and choose Continue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Manual Fcst <> Stat. Fcst , andchoose Continue. 

5. Right-click the condition row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. ChooseContinue.

6. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “  <> ”.Choose Continue.

7. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Statistical Forecast in the Row  field. Choose Continue.

Page 59: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 59/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 59 of 130

8. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “  AND IS_FIXED(”.Choose Continue.

9. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row  field, andRow Attribute in Data field. Choose Continue.

10. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) = 0”.Choose Continue.

11. Right-click the condition row you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Manual Forecast in the Row  field, and ValueChange with Following Fixing in Change mode field. Choose Adopt .

12. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. Choose

Continue.

13. Right-click the result row you have created in step 11 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

14. Select the macro and choose Check to check it. Choose Generate to generate the macro.

15. Use drag and drop and move the macro to the Events section and to the Exit  folder in theupper right screen area.

16. Choose Save.

Result

Title Level 1 Level 2 Level 3Automatic Fix "Manual Fcst

Automatic Fix "Central Planner Adj. : ( 24 Iterations : M 07.2011; M 06.2013 )

IF

Central adj. <> Local adj 

Row: Manual Forecast ( Frm M 07.2011 )

<>

Row: Statistical Forecast ( Frm M 07.2011 )

and is_fixed(

Row: Manual Forecast ( Frm M 07.2011 )

) = 0

Row: Manual Forecast ( Frm M 07.2011 ) =

Row: Manual Forecast ( Frm M 07.2011 )

ENDIF

 

3.3.6.9 Macro: Central adj/man . fcs t > 30% BG COL = RED  

UseThis macro gives warning if the key figure Central Planners Forecast Adjustment is greaterthan 30% of  Manual Forecast  by changing the background color of the cell to RED. At thesame time, an alert is also generated.

Procedure

Page 60: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 60/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 60 of 130

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Central adj/man. fcst > 30% BG COL = RED. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc central adj / man. fcst, choose Future in Processing Area,and choose Continue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Calc central adj / man. fcst in the Description field. Choose Continue.

4. Right-click the auxiliary row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .

In the APO Macro Builder dialog box, choose “  ABS(”.Choose Continue.

5. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row  field. Choose Continue.

6. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ /”.Choose Continue.

7. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row  field. Choose Continue.

8. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100”. Choose Continue.

9. Right-click the step row you have created in step 2 and choose Add Element (Steplevel)   Append m acro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.

10. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

11. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue. 

12. Right-click the condition row you have just created and choose

Add Element (Argument Level) Auxi l iary Table Element   Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Calc central adj / man. fcst in the Row  field. Choose Continue.

13. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ > 30”. Choose Continue.

14. Right-click the condition row you have created in step 11 and choose

Ad d Element (Result Level) Ap pend alert/status . In the APO Macro Builder dialogbox choose Update in context in Action field, and input Central adj / man. fcst = & % inthe Alert Txt  field. Choose Continue.

15. Right-click the alert row you have just created and chooseAdd Element (Argument Level) Add auxi l iary row . In the APO Macro Builder dialogbox, choose Historical Calc central adj / man. fcst in the Row  field. Choose Continue.

Page 61: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 61/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 61 of 130

16. Right-click the alert row you have created in step 14 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute Change in Change mode field. Choose Adopt .

17. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.

18. Right-click the result row you have created in step 14 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute Change in Change mode field. Choose Adopt .

19. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_RICON( 2 )”. Choose Continue.

20. Right-click the result row you have created in step 18 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

21. Right-click the control statement row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Central Planners Forecast Adjustment in the Row  field, and Attribute Change in Change mode field. Choose Adopt .

22. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.

23. Right-click the result row you have created in step 21 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

24. Select the macro and choose Check to check it. Choose Generate to generate the macro.

25. Use drag and drop and move the macro to the Events section and to the Default  folder inthe upper right screen area.

26. Choose Save.

Result

Page 62: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 62/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 62 of 130

Title Level 1 Level 2 Level 3

Central adj/man. fcst > 30% BG COL = RED

Calc central adj / man. fcst : ( 48 Iterations : M 06.2009; M 05.2013 )

Row: Calc central adj / man. fcst ( Frm M 06.2009 ) =

ABS(Row: Central Planners Forecast Adjustment ( Frm M 06.2009 )

/

Row: Manual Forecast ( Frm M 06.2009 )

) * 100

Change color if perc > 30% : ( 48 Iterations : M 06.2009; M 05.2013 )

IF

Percentage > 30%

Row: Calc central adj / man. fcst ( Frm M 06.2009 )

> 30

Update in context : Standard status alert [ New alert : & ] with

Row: Calc central adj / man. fcst ( Frm M 06.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

CELL_BG( 26 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

CEll_RICON( 2 )

ELSE

Row: Central Planners Forecast Adjustment ( Attributes ) =

CELL_BG( 0 )

ENDIF

 

The Final Events list (on the top left of Macro Workbench) for the data viewYDP_DV_FC_REV should be like this:

Event Macro

Default Central adj/man. fcst > 30% BG COL = RED

Calc. Demand Plan

Level Change

Start Read Planning Status

Copy fcst Local Adj. to Central Adj.

Exit Automatic Fix "Central Planner Adj.

Automatic Fix "Manual Fcst

3.3.7 Set up Macros for Planning Book YDP_PB_LOCAL_PLAN and Data View YDP_DV_LOC_ADJ

1. Access the activity, use one of the following navigation options:

SAP SCM menu  Advanced Planning and Optimization  Demand Planning  Environment  Current settings  Macro Workbench

Transaction code  /SAPAPO/ADVM

Page 63: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 63/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 63 of 130

2. Choose the row of the planning book: YDP_PB_LOCAL_PLAN and data view YPD_DV_LOC_ADJ.  

3.3.7.1 Macro: Calc. Demand Plan  

UseCalculate the key figure Demand Plan by adding the following key figures together: ManualForecast, Central Planner Forecast Adjustment , and Additional Demand .

Procedure1. Right-click the macro node below the planning table and choose Create New Macro  

Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Calc. Demand Plan. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, First Step, choose Future in Processing Area, and chooseContinue.

3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

4. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Is Central Planner Fcst initial , andchoose Continue. 

5. Right-click the condition row you have just created and choose

Add Element (Argument Element) Add operator /funct ion . In the APO Macro

Builder dialog box, choose “ IS_INITIAL(”.Choose Continue.6. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Central Planners Forecast Adjustment in theRow  field, and Row Attribute in Data field. Choose Continue.

7. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append operator /funct ion . In the APO MacroBuilder dialog box, choose “ ) = 1”.Choose Continue.

8. Right-click the condition you have created in step 4 and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row  field. Choose Adopt. 

9. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. ChooseContinue.

10. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.

11. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row  field. Choose Continue.

12. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ +”. Choose Continue.

Page 64: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 64/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 64 of 130

13. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Additional demand in the Row  field. 

14. Right-click the result row you have created in step 8 and choose

Add Element (Resul t Level) Add Contro l Statement .

In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 15. Right-click the condition you have just created and choose

Ad d Element (Result Level) Planning Table Element   Add resul t row . In the APO Macro Builder dialog box choose Demand Plan in the Row  field. Choose Adopt. 

16. Right-click the result row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Add argument row . Inthe APO Macro Builder dialog box, choose Manual Forecast in the Row  field. ChooseContinue.

17. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ +”.Choose Continue.

18. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Central Planners Forecast Adjustmentin the Row  field. Choose Continue.

19. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ +”. Choose Continue.

20. Right-click the Operator/Function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Additional demand in the Row  field. 

21. Right-click the result row you have created in step 15 and choose

Add Element (Resul t Level) Add Contro l Statement .

In the APO Macro Builder dialog box, choose“ ENDIF” and choose Continue. 

22. Select the macro and choose Check to check it. Choose Generate to generate the macro.

23. Choose Save.

Result

Page 65: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 65/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 65 of 130

Title Level 1 Level 2 Level 3

Calc. Demand Plan

New step : ( 24 Iterations : M 07.2011; M 06.2013 )

IF

Is Central planner Fcst initial IS_INITIAL(

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

) = 1

Row: Demand Plan ( Frm M 07.2011 ) =

Row: Manual Forecast ( Frm M 07.2011 )

+

Row: Local Planners Forecast Adjustment ( Frm M 07.2011 )

+

Row: Additional Demand ( Frm M 07.2011 )

ELSE

Row: Demand Plan ( Frm M 07.2011 ) =

Row: Manual Forecast ( Frm M 07.2011 )

+

Row: Central Planners Forecast Adjustment ( Frm M 07.2011 )

+

Row: Additional Demand ( Frm M 07.2011 )

ENDIF

 

3.3.7.2 Macro: Read Plannin g Status  UseWe use a field in the table to control the planning status. There are 3 macros that are createdto modify the value of the field to indicate the current planning status: No Planning, LocalPlanner, and Central Planner.

This macro is used to read the value in the table, and modify the attribute of some key figurerows according to the planning status.

ProcedureThe macro is exactly the same as the macro in the Planning BookYDP_PB_CENTRAL_PLAN, View YDP_DV_FC_REV. You do not need to create the macro

step by step again, but you need to import it from the view YDP_DV_FC_REV, just likecopying.

1. Choose Menu Edit  and then choose Import Macro(s)

2. Choose Macro Book YDP_PB_MASS_JOB View (YDP_DV_FC_REV), and chooseMacro Read Planning Status. And choose Continue.

3. When a warning message appears, choose Continue or choose Enter.

4. Right-click the step with name LOCAL, Choose Active/Inactive in the context menu.Repeat the same operation for all the 3 steps with name LOCAL. Make sure these stepsare active.

5. Right-click the step with name CENTRAL, Choose Active/Inactive in the context menu.Repeat the same operation for all the 3 steps with name CENTRAL. Make sure thesesteps are inactive.

Page 66: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 66/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 66 of 130

6. Select the macro and choose Check to check it. Choose Generate to generate the macro.

7. Use drag and drop and move the macro to the Events section and to the Start  folder inthe upper right screen area.

8. Choose Save.

Result

Title Level 1 Level 2 Level 3

Read Planning Status

TS_GET : ( 1 Iterations : M 07.2009; M 07.2009 )

TS_GET

LAYOUTVARIABLE_SET( 'LV_CYCLE' ; TS_GET(

'DEMAND_PLANNING' ; 'PLANNING_CYCLE' ; '*' ; '*' ; 1

; 1 ) )

IF

LOCAL

LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 1

LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 1 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 48 )

* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Local_Planner' )

ELSEIF

CENTRAL

LAYOUTVAR_VALUE( 'LV_CYCLE' ) = 2

LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 1 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 48 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'Central_Planner' )

 

Page 67: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 67/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 67 of 130

Title Level 1 Level 2 Level 3

ELSE

LOCAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )Row: Local Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

* CENTRAL : ( 1 Iterations : M 07.2009; M 07.2009 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_INPUT( 0 )

Row: Central Planners Forecast Adjustment ( Attributes ) =

ROW_BG( 17 )

Output Pop-up : ( 1 Iterations : M 07.2009; M 07.2009 )

Output Pop-up

OUTPUT_POPUP( 'CYCLE' ; 'STATUS' ; 'No_Planning' )

Process Message : ( 1 Iterations : M 07.2009; M 07.2009 )Information [ WARNING Status neither Local nor Central ]

ENDIF  

The rows with * in the first column should be inactivated.

3.3.7.3 Macro: Local adj/man. fcst >30% BG COL= RED  

UseThis macro gives warning if the key figure Local Planners Adjustment is greater than 30% of  Manual Forecast  by changing the background color of the cell to RED.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,Local adj/man. fcst >30% BG COL= RED. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc Local Adj percentage, choose Future in Processing Area,

and choose Continue.3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Aux. row for Local Adj. Percentage in the Description field. Choose Continue.

4. Right-click the auxiliary row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “  ABS( (”. Choose Continue.

5. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Local Planners Forecast Adjustment inthe Row  field. Choose Continue.

6. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”.Choose Continue.

Page 68: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 68/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 68 of 130

7. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Manual Forecast in the Row  field. Choose Continue.

8. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 )”. Choose Continue.

9. Right-click the step row you have created in step 2 and choose Add Element (Step

level)   Append m acro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.

10. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .

In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

11. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue. 

12. Right-click the condition row you have just created and choose

Add Element (Argument Level) Auxi l iary Table Element   Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Aux. row for Local Adj. Percentage in the Row  field. Choose Continue.

13. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ > 30”. Choose Continue.

14. Right-click the condition row you have created in step 12 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Local Planners Forecast Adjustment in the Row  field, and Attribute Change in Change mode field. Choose Adopt .

15. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.

16. Right-click the result row you have created in step 14 and choose

Add Element (Resul t Level) Append Contro l Statement .

In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

17. Right-click the control statement row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Local Planners Forecast Adjustment in the Row  field, and Attribute Change in Change mode field. Choose Adopt .

18. Right-click the result row you have just created and chooseAdd Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.

19. Right-click the result row you have created in step 17 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

20. Select the macro and choose Check to check it. Choose Generate to generate the macro.

21. Use drag and drop and move the macro to the Events section and to the Default  folder inthe upper right screen area.

22. Choose Save.

Result

Page 69: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 69/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 69 of 130

Title Level 1 Level 2 Level 3

Local adj/man. fcst >30% BG COL= RED

Calc Local Adj percentage : ( 24 Iterations : M 06.2011; M 05.2013 )

Row: Aux. row for Local Adj. Percentage ( Frm M 06.2011 ) =

ABS( (Row: Local Planners Forecast Adjustment ( Frm M 06.2011 )

/

Row: Manual Forecast ( Frm M 06.2011 )

) * 100 )

Change color if percentage > 30% : ( 24 Iterations : M 06.2011; M 05.2013 )

IF

Percentage > 30%

Row: Aux. row for Local Adj. Percentage ( Frm M 06.2011 )

> 30

Row: Local Planners Forecast Adjustment ( Attributes ) =

CELL_BG( 26 )

ELSE

Row: Local Planners Forecast Adjustment ( Attributes ) =

CELL_BG( 0 )

ENDIF

 

3.3.7.4 Macro: PROM >30% frm DP BG = RED  

UseThis macro gives warning, if the key figure Additional Demand is greater than 30% of DemandPlan by changing the background color of the cell to RED.

Procedure

1. Right-click the macro node below the planning table and choose Create New Macro  Add m acro . In the APO Macro Builder dialog box, enter a descriptive text for the macro,PROM >30% frm DP BG = RED. Choose Continue.

2. Right-click the macro and choose Add macro Element Step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Calc Additional Demand percentage, choose Future in

Processing Area, and choose Continue.3. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add auxi l iary row . In the APO Macro Builder dialog box input Aux. row for Additional Demand Percentage in the Description field. ChooseContinue.

4. Right-click the auxiliary row you have just created and choose

Add Element (Argument Element) Add Operator /Funct ion .In the APO Macro Builder dialog box, choose “  ABS( (”.Choose Continue.

5. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Additional Demand in the Row  field. Choose Continue.

Page 70: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 70/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 70 of 130

6. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ /”.Choose Continue.

7. Right-click the operator/function row you have just created and choose

Ad d Element (Argum ent Level) Planning Table Element   Append argument

row . In the APO Macro Builder dialog box, choose Demand Plan in the Row  field. Choose Continue.

8. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ ) * 100 )”. Choose Continue.

9. Right-click the step row you have created in step 2 and choose Add Element (Step

level)   Append m acro step . 

In the APO Macro Builder dialog box, in the descriptive text section, enter a name for themacro step, for example, Change color if perc > 30%, choose Future in Processing Area,and choose Continue.

10. Right-click the step row you have just created and choose

Add Element (Resul t Level) Add Contro l Statement .In the APO Macro Builder dialog box, choose “ IF” and choose Continue. 

11. Right-click the control statement row you have just created and chooseAd d Element (Result Level)   App end Condi t ion .In the APO Macro Builder dialog box, input Description Percentage > 30%, and chooseContinue. 

12. Right-click the condition row you have just created and choose

Add Element (Argument Level) Auxi l iary Table Element   Add auxi l iary row . Inthe APO Macro Builder dialog box, choose Aux. row for Additional Demand Percentage inthe Row  field. Choose Continue.

13. Right-click the argument row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose“ > 30

”.

 Choose Continue.14. Right-click the condition row you have created in step 11 and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Additional Demand in the Row  field, and AttributeChange in Change mode field. Choose Adopt .

15. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .

In the APO Macro Builder dialog box, choose “ CELL_BG( 26 )”. Choose Continue.

16. Right-click the result row you have created in step 14 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ELSE” and choose Continue. 

17. Right-click the control statement row you have just created and choose

Ad d Element (Result Level) Planning Table Element   Append resul t row . In the APO Macro Builder dialog box choose Additional Demand in the Row  field, and AttributeChange in Change mode field. Choose Adopt .

18. Right-click the result row you have just created and choose

Add Element (Argument Element) Append Operator /Funct ion .In the APO Macro Builder dialog box, choose “ CELL_BG( 0 )”. Choose Continue.

19. Right-click the result row you have created in step 17 and choose

Add Element (Resul t Level) Append Contro l Statement .In the APO Macro Builder dialog box, choose “ ENDIF” and choose Continue. 

20. Select the macro and choose Check to check it. Choose Generate to generate the macro.

21. Use drag and drop and move the macro to the Events section and to the Default  folder in

the upper right screen area.

22. Choose Save.

Page 71: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 71/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 71 of 130

Result

Title Level 1 Level 2 Level 3

PROM >30% frm DP BG = RED

Calc Additional Demand percentage : ( 24 Iterations : M 06.2011; M 05.2013 )

Row: Aux. row for Addtional Demand Percentage ( Frm M 06.2011 ) =

ABS( (

Row: Additional demand ( Frm M 06.2011 )

/

Row: Demand Plan ( Frm M 06.2011 )

) * 100 )

Change color if percentage > 30% : ( 24 Iterations : M 06.2011; M 05.2013 )

IF

Percentage > 30%

Row: Aux. row for Addtional Demand Percentage ( Frm M 06.2011 )

> 30Row: Additional demand ( Attributes ) =

CELL_BG( 26 )

ELSE

Row: Additional demand ( Attributes ) =

CELL_BG( 0 )

ENDIF

 

The Final Events list (on the top left of Macro Workbench) for the data view

YDP_DV_LOC_ADJ should be like this:Event Macro

Default Macro: PROM >30% frm DP BG = RED

Local adj/man. fcst >30% BG COL= RED

Calc. Demand Plan

Level Change

Start Read Planning Status

Exit

3.4 Setting up the Process Chain

3.4.1 Process Chain  – Data Preparation

3.4.1.1 Create Process Variant  – Generate Characteristic ValueCombination

UseThe master data of Demand Planning determines the levels on which demand plans arecreated, changed, aggregated and disaggregated at your company. For example, your masterdata might consist of all of the products, product lines, regions, customers, those your

company intends to plan in Demand Planning, as well as all relevant combinations of these.From a technical point of view, you are specifying which characteristic values are plannable

Page 72: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 72/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 72 of 130

for the characteristics in your planning area. This plannable characteristic values combinationis called characteristic value combination.

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC62 

SAP SCM Menu  Advanced Planning and Optimization  Master Data  

 Application-Specific Master Data  Demand Planning

 Maintain Characteristic Values

2. On the Maintain Planning-Relevant Characteristic Combination screen, enter your masterplanning object structure, for example, YDP_POS. then choose Create CharacteristicCombination.

3. In the Create Characteristic Combinations window, make the following entries:

Field name User action and values Comment

Create CharacteristicCombinations

Generate Immedtly X

Data Source

Load Data From: InfoProvider Choose from drop list

InfoProvider For example, InfoCube:ZY93_IC01

Sales history InfoCube

Version 001

 Action Selection

Results Log X4. Choose Save.

5. On the Variant Attributes screen, make the following entry:

Field name User action and values Comment

Variant Name YDP_CVC Your variant name

Description GENERATE CVC‟S Your variant description

6. In the Object for selection screen section, choose the row which Field name is S_DAT .

7. For the selected row, use F4 input help at the column Selection variable. In the pop upVariant Attributes window, choose Type of Variable is D. Then choose Choose.

8. For the same row, use F4 input help at the column Name of variable (Input only using F4).On the prompt Variant Attributes window, choose (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.

9. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0  for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.

If you want the system to roll over periodically without scheduling the same job repeatedly, you should use selection variables to enter relative dates. Thesystem then calculates the start and end dates each time the report isexecuted. For instance, you specify that the initialization period should befrom 12 months in the past to 12 months in the future.

10. Choose Save.

Page 73: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 73/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 73 of 130

11. Go back twice. The variant for characteristic value combination generation has beencreated, and can be used for background job run.

3.4.1.2 Create Process Variant  – Initialize Planning Area

UseHere we create a process variant for initialize planning area. Then you can initialize theplanning area in a mass process job.

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/TSINIT 

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning  Environment  Current Settings  Time

Series Administration  Initialize Planning Area

2. On the Initialize Planning Area screen, make the following entry:

Field name User action and values Comment

Planning Area YDP_PA Your planning area

Planning Version 001

3. Choose Save.

4. In the Variant Attributes window, enter the following values:

Field name User action and values Comment

Variant Name YDP_PAREA_I Your variant name

Description Initialize Planning Area Your variant description

5. In the Object for selection screen area, select the row which Field name is Start/End Date.

6. For the selected row, use F4 input help for the column Selection variable. In the popupVariant Attributes window, select Type of Variable is D. Then choose Choose.

7. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.

8. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 24 for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.

9. Choose Save.

10. Go back. The variant for planning area initialize has been created, and can be used forbackground job run.

3.4.1.3 Create Process Variant  – Load Data from InfoCube

Use After data is uploaded from an external file or ECC to BW InfoCube, data then needs to betransferred into the APO planning area (live cache). Here we create a process variant that isused to run this job as a step in process chain.

Procedure1. To access the activity, use one of the following navigation options:

Page 74: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 74/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 74 of 130

Transaction code /SAPAPO/TSCUBE 

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning  Environment  Data Administration  Load Data from InfoCube

2. On the Load Planning Area Version screen, make the following entries:

Field name User action and values Comment

Source

InfoCube ZY93_IC01 Your data load infocube

Planning Version 001

Target

Planning Area YDP_PA Your planning area

Planning Version 001

Period

From For example, 01.04.2009 Define as necessary.

To For example, 31.03.2011 Define as necessary

Key Figure Assignment:InfoCube <-> Planning Area

Propose key figures X checked

Key Figure Assignment

ChooseCheck the proposed key figureassignment, change ifnecessary.

Results Log X Choose the checkbox3. Choose Save.

4. In the Variant Attributes window, enter the value as table:

Field name User action and values Comment

Variant Name YDP_LOAD Your variant name

Description Load Hist Data fromInfoCube

Your variant description

5. In the Object for selection screen area, select the row which Field name is From.

6. For the selected row, use F4 input help at the column Selection variable. In the popupVariant Attributes window, select Type of Variable is D. Then choose Enter .

7. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Enter .

8. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0  for avalue for yyy . Then choose Enter . You can change this value based on your requirement.

9. Choose Save.

10. Go back. The variant for load data from InfoCube has been created, and can be used forbackground job run.

3.4.1.4 Create Process Variant  – Calculate Proportional Factor

Use

Page 75: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 75/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 75 of 130

Proportional factors are one of the ways you can disaggregate data from an aggregate levelto a detailed one. Here you create a process variant to calculate proportional factor which canthen be used in the process chain as a process job.

Procedure

1. To Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8V 

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning  Environment  Calculate ProportionalFactors

2. On the Calculate proportional factors screen, make the following entries:

Field name User action and values Comment

Planning area

Planning Area YDP_PA Your planning area

Basis for proportion calc.

Choose InfoCube X Choose the radio button

Name ZY93_IC01 Your sales historical InfoCube

3. Choose Execute.

4. On the /SAPAPO/RMDP_SHARE_MANAGER  screen, choose the Basic Settings tabpage, make the following entries:

Field name User action and values Comment

Basis for proportion calc.

Planning version 001

Key figureZY93_BK91

Base key figure used tocalculate the proportion factor.

Period from 01.04.2009

To 31.03.2011

Calc. proportions for

Planning version 001

Transfer proportions to horizon

From 01.04.2011

To 31.03.2013

Proportion calc. type

Fixed Proportions X Check the radio button

5. Choose Save.

6. On the Variant Attributes screen, enter the value as table:

Field name User action and values Comment

Variant Name YDP_PROP Your variant name

Description Calculate Proportional Factor Your variant description

7. In the Object for selection screen area, select the row whose Field name is Period from.

8. For the selected row, use F4 input help at the column Selection variable. In the dialog boxVariant Attributes window, select D (Dynamic data calculation). Then choose Choose.

Page 76: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 76/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 76 of 130

9. For the same row, use F4 input help at the column Name of variable (Input only using F4).In the popup Variant Attributes window, select (Beginning of mth-xx months, end ofmth+yy months). Then choose Choose.

10. In the Date Calculation Parameters window, enter 24 for a value for xxx , enter 0  for avalue for yyy . Then choose Choose. You can change this value based on your

requirement.11. Repeat step 7- 9 for the row whose Field name is From.

12. In the Date Calculation Parameters window, enter 0  for a value for xxx , enter 24 for avalue for yyy . Then choose Choose. You can change this value based on yourrequirement.

13. Choose Save.

14. Go back twice. The variant for proportional factor calculation has been created, and can

be used for background job run.

3.4.1.5 Create Activities  – Data Preparation

UseHere you create an activity which includes a macro to calculate the key figure sales quantitywithout additional demand , this key figure is then used as the base of statistical forecast run.

PrerequisitesThe macro listed below has been maintained.

  Calculate historical sales without additional demand

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8T 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Define Activities for Mass Processing

2. In the Activity screen, maintain the data according to the following table:

Field name User action and values Comment

 Activity YDP_PRE Your activity name

Description Data preparation Your activity description

3. Then choose Create.

4. On the next Activity screen, maintain the data according to the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_DATAPRE

5. Choose the Macro tab page at the bottom of the screen.

6. Select the macro „CALC. HIST.SALES WITHOUT ADD. DEMAND‟ from the drop list nextto the macro radio button.

7. Choose Adopt Current Action. The macro is displayed at the List of Actions area.

8. Choose Save. 

Page 77: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 77/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 77 of 130

3.4.1.6 Create Planning Job  – Data Preparation

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8D 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Create Demand Planning in theBackground

2. Enter values according to the following table:

Field name User action and values Comment

Job number YDP_PRE

Job name DATA PREPARATION

3. Choose Execute.

4. On the Create Planning Job screen, make the following entries:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_DATAPRE

Version 001

5. Choose Execute, 

6. On the Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Control Parameters forbackground planning

 Activity YDP_PRE The activity you have created

Planning job information

Generate Log X Select the check box

Do Not Create Spool List X

Chars

One YDP_MP_ALL_PROD_LOC

7. Choose on aggregation level  button, in the Choose chars screen, select all characteristics

except navigation attributes. Then choose Continue.8. Choose Save.

3.4.1.7 Create Process Chain  – Data Preparation

UseNow, you can create the process chain to be used to prepare the planning area and the data.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC SAP SCM Menu Demand Planning   Environment  Maintain Process

Page 78: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 78/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 78 of 130

Chains

2. On the Process Chain Display Planning View screen, choose Create. 

3. In the New Process Chain window, enter values as follows:

Field name User action and values Comment

Process chain YDP_LOAD_PRE

Long description YDP – Data Preparation

4. Choose Continue.

5. On the Insert Start Process screen, choose Create. In the prompt Start Process window,make the following entry:

Field name User action and values Comment

Process variants YDP_LOAD_PRE

Long description YDP Data Preparation

6. Choose Enter . Then choose Save 

7. In the Create Object Directory Entry , choose Local Object, choose Continue.

8. In the process chain maintenance window, the starting process is now visible.

9. Choose the Process Type pushbutton.

10. Now add the 2nd

 step of the process chain. Expand the node: SCM – Demand Planning.Choose the process type: Generate Characteristic Combination. 

11. In the Insert Generate Characteristic Combination window, choose Create to create aprocess variant. Enter the Process Variants YDP_GENERATE_CVC and variantdescription. Then choose Enter .

12. On the Process Maintenance: Generate Characteristic Combination screen, choose theprogram variant YDP_CVC  you created before with F4 input help and choose continue. 

13. Choose Save. In the Create Object Directory Entry , choose Local Object , then go back tillthe new job is displayed on the right screen area.

14. Now add the 3rd

 step to the process chain. Choose the process type: Initialize (CreateTime Series Objects) under the node: SCM – Demand Planning  

15. In the Insert Initialize (Create Time Series Objects) window, choose Create to create aprocess variant. Enter the Process Variants YDP_INIT_PA and variant description. Thenchoose Enter .

16. In the Process Maintenance: Initialize (Create Time Series Objects) screen, choose theprogram variant YDP_PAREA_I  you created before with F4 input help and choosecontinue. 

17. Choose Save. In the Create Object Directory Entry , choose Local Object , then go back  and continue. The selected job is now on the right screen area.

18. Now add the 4th

 step to the process chain. Chooseprocess type: Load Data fromInfoCube under the node: SCM – Demand Planning. 

19. In the prompt Insert Load Data from InfoCube window, choose Create to create a processvariant. Enter the Process Variants YDP_LOAD and variant description. Then chooseEnter .

20. In the Process Maintenance: Load Data from InfoCube screen, choose the programvariant YDP_LOAD you created before with F4 input help and choose continue. 

21. Choose Save. In the Create Object Directory Entry , choose Local Object, then go back  and continue. The selected job is now on the right screen area.

22. Now add the 5th

 step to the process chain. Chooseprocess type: Calculate proportionalfactors under the node: SCM – Demand Planning. 

23. In the popup Insert Calculate proportional factors window, choose Create to create a

process variant. Enter the Process Variants YDP_PROP and variant description. Thenchoose Enter .

Page 79: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 79/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 79 of 130

24. In the Process Maintenance: Load Data from InfoCube screen, choose the processvariant YDP_PROP you created before with F4 input help and choose continue. 

25. Choose Save. In the Create Object Directory Entry , choose Local Object, then go back  and continue. The selected job is now on the right screen area.

26. Now add the 6th

 step to the process chain. Chooseprocess type: DP Background

Processing under the node: SCM – Demand Planning. 

27. In the prompt Insert DP Background Processing  window, choose the planning jobYDP_PRE you created before with F4 input help and choose continue. The selected jobis now on the right screen area.

28. Now link these jobs by the same sequence they are created, by selecting the start job anddragging a line to the linked job, choose …successful  in the Action for … dialog box.

29. Choose Activate to make the process chain active.

3.4.1.8 Schedule Process Chain  – Data Preparation

UseNow you can schedule when the process chain should be run, periodically or manually trigger.Because this process chain is called as a local process chain, we schedule this process chainas immediate start.

Procedure1. Choose the Process Chain you have just created, and make sure you are in the change

mode.

2. Choose the Start Job.

3. On the Maintain Start Process screen, choose Change Selections.

4. On the Start Time screen, choose Immediate (Immediate start  checkbox is selected).Choose Save.

5. On the Maintain Start Process screen, choose Save and Go back. 

3.4.2 Process Chain  – Data Load and Preparation from ECC

UseThis process chain is used to upload the master data and transaction data from SAP ECC.Then you make preparation at APO side for further demand planning in DP. It includes 3process chains, that is, load ECC transaction data, load ECC master data, and makepreparation in APO side.

PrerequisitesThe following process chains have been maintained:

  Master Data Load from ECC, for detail, please reference Building Block Y93configuration guide.

  Transaction Data Load from ECC, for detail, please reference Building Block Y93configuration guide.

  Data Preparation

3.4.2.1 Create Process Chain  – Data Load and Preparationfrom ECC

Procedure

Page 80: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 80/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 80 of 130

1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. On the Process Chain Display Planning  View , choose Create, then make the followingentries:

Field name User action and values Comment

Process chain YDP_DATA_LOAD_PRE_ECC

Long description YDP – Data Load and Preparationfrom ECC

3. Choose Continue.

4. In the Insert Start Process window, choose Create. In the Start Process window, enter the

following values:

Field name User action and values CommentProcess variants YDP_DATA_LOAD_PRE_ECC

Long description Data Load and Preparation fromECC

5. Choose Enter , then choose Save

6. In the Create Object Directory Entry window, choose Local Object , Go back  then chooseContinue.

7. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.

8. Choose Process Type. 

9. Now add the 2

nd

 step of the process chain. Expand the node:General Services. Choosethe process type: Local Process Chain. 

10. In the prompt Insert Local Process Chain window, choose the process chainZBPR_Y93_ZDPA_PC01 using F4 input help and choose continue. The selected job isnow on the right screen area.

11. Repeat step 7- 8 to add the other two process chains: ZBPR_Y93_ZDPA_PC02, andYDP_LOAD_PRE.

12. Now link these jobs by the same sequence they are created, by selecting the start joband dragging a line to the linked job, choose …successful  in the Action for … dialog box.

Make sure the process chain for master data load is executed before

process chain for transaction data load.13. Choose Activate to make the process chain active.

3.4.2.2 Schedule Process Chain  – Data Load and Preparationfrom ECC

UseNormally you need to load data and do preparation at the beginning of each planning cycle,for example, at the beginning of each month. So you would schedule this process chain to runperiodically. You also would manually trigger this process chain when necessary.

Procedure1. Choose the Process Chain you just created, and make sure you are in the change mode.

Page 81: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 81/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 81 of 130

2. Choose Start Job.

3. On the Maintain Start Process screen, choose Change Selections.

4. On the Start Time screen, if you want to manually trigger this process chain, chooseImmediate (Immediate start  checkbox is selected).

5. Or if you want to run periodically, you choose Date/Time, and specify the date, time andPeriod values.

Here, you choose to manually trigger by default. You could run periodically ifnecessary.

6. On the Start Time screen, choose Save.

7. On the Maintain Start Process screen, choose Save and Go back. 

3.4.3 Process Chain  – Data Load and Preparation from FlatFile

UseInstead from ECC, this process chain is used to upload data from flat file. After that you canmake preparation at APO side for further demand planning in DP. It includes 2 processchains, load data from flat file, and make preparation in APO side.

PrerequisitesThe following process chains have been maintained.

  Data Load from Flat File

  Data Preparation

3.4.3.1 Create Process Chain –

 Data Load and Preparationfrom Flat File

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the Process Chain Display Planning  View , choose Create and enter values as follows:

Field name User action and values CommentProcess chain YDP_DATA_LOAD_PRE_EX

Long description DPA – Data Load and Preparationfrom Excel

3. Choose Continue.

4. In the Insert Start Process window, choose Create. In the Start Process window, enter the

following values:

Field name User action and values Comment

Process variants YDP_DATA_LOAD_PRE_EX

Long description Data load and preparation from Excel

5. Choose Enter , then choose Save

Page 82: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 82/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 82 of 130

6. In the Create Object Directory Entry , choose Local Object , Go back  then chooseContinue.

7. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.

8. Choose Process Type.

9. Now add the 2nd step of the process chain. Expand the node:General Services. Chooseprocess type: Local Process Chain. 

10. In the Insert Local Process Chain window, choose the process chainYDP_DATA_LOAD_FLAT using F4 input help and choose continue. The selected job isnow on the right screen area.

11. Repeat the steps 7 - 8 to add the other process chain YDP_LOAD_PRE.

12. Now link these jobs by the same sequence they are created by selecting the start job anddragging a line to the linked job.

13. Choose Activate to make the process chain active.

3.4.3.2 Schedule Process Chain –

 Data Load and Preparationfrom Flat FileRefer to the steps described in chapter 3.4.2.2.

3.4.4 Process Chain  – Forecast

PrerequisitesThe following macros have been maintained:

  Initialize value: calc to corrected historical sales

  Copy stat. fcst to man. fcst

3.4.4.1 Create Activities  – Forecast

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code /SAPAPO/MC8T 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Define Activities for Mass Processing

2. On the Activity  screen, make the following entries:

Field name User action and values Comment Activity YDP_FC1 Your activity name

Description Macro: Calculate Corrected SalesHistory

Your activity description

3. Then choose Create.

4. On the next Activity  screen, maintain the data according to the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_FORECAST

5. Choose the Macro tab page at the bottom of the screen.

Page 83: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 83/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 83 of 130

6. Choose macro „INITIAL VAL: CALC TO CORR HIST SALES‟  from the drop list. Thenchoose Adopt Current Action button. The macro will be shown at the List of Actions area.

7. Choose Save.

8. Now create the 2nd

 activity used for forecasting run. Second activity:

Field name User action and values Comment Activity YDP_FC

Description Forecasting

9. Then choose Create.

10. On the next Activity screen, make the following entries:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_FORECAST

11. Choose the Forecast  tab page at the bottom of the screen, maintain the data according

the following table:

Field name User actionand values

Comment

Profile Selection

Master Prfl YDP_MFP F4 input help

Control Parameters

Generate alerts X

Delete old alerts before forecast X

12. Choose Select Messages, on the Selection of Storage-Sensitive Forecast Errors screen,select all error messages.

13. Choose Adopt Current Action. The forecast profile is shown at the List of Actions area.

14. Choose Save. 

15. Now create the 3rd

 activity which include a macro to copy the statistical forecast to manualforecast key figure, In the screen Activity , maintain the data according to the table below:

Field name User action and values Comment

 Activity YDP_FC2 Your activity name

Description Macro: Copy stats fcst to manualfcst

Your activity description

16. Then choose Create.

17. On the next Activity screen, maintain the data according to the table below:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_FORECAST

18. Choose the Macro tab page at the bottom of the screen.

19. Choose Macro „ COPY STAT. FCST TO MAN. FCST ‟  from the drop list next to the Macroradio button. Choose Adopt Current Action button. The macro is shown in the List of

 Actions area.

20. Choose Save.

Page 84: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 84/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 84 of 130

3.4.4.2 Create Planning Jobs  – Forecast

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8D 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Create Demand Planning in theBackground

2. Enter values according to the following table:

Field name User action and values Comment

Job number YDP_FC1

Job name Initialize Corrected Sales

3. Choose Execute.

4. On the next Create Planning Job screen, maintain values according the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_FORECAST

Version 001

5. Choose Execute, 

6. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Control Parameters forbackground planning

 Activity YDP_FC1 The activity you have created

Planning job information

Generate Log X Select the check box

Do Not Create Spool List X

Chars

One YDP_MP_ALL_PROD_LOC

7. Choose Aggregation level , in the Choose chars dialog box, select all characteristics

except navigation attributes. Then choose Continue.8. Choose Save.

9. Now create the 2nd

  job for the forecasting. Repeat step 2  – 4 with Job Name  YDP_FCDescription Forecasting, then assign activity YDP_FC to this planning job.

10. Choose  Aggregation level , in the Choose chars  dialog box, select only  product   and location characteristics. Then choose Continue.

Here, the forecast is running at product and location level, which is thenautomatically disaggregated to the lowest level.

11. Choose Save.

12. Now, create the 3rd

  job. Repeat the steps 2  –  6 with Job Name  YDP_FC2 Description 

Copy stats fcst to manual fcst, then assign the activity YDP_FC2 to this planning job

Page 85: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 85/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 85 of 130

3.4.4.3 Create Process Chain  – Forecast

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the Process Chain Display Planning  View , choose Create and make the following

entries:

Field name User action and values Comment

Process chain YDP_FORECASTING

Long description YDP - Forecasting

3. Choose Continue.

4. In the Insert Start Process window, choose Create. In the prompt Start Process window,make the following entries:

Field name User action and values Comment

Process variants YDP_FORECASTING

Long description Forecasting

Choose Enter , then choose Save.

5. In the Create Object Directory Entry , choose Local Object , go back  then choose Continue.

6. In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.

7. Choose Process Type. 

8. Now add the 2nd step of the process chain. Expand the node: SCM – Demand Planning .Choose process type: DP Background Processing. 

9. In the Insert DP Background Processing  window, choose the job YDP_FC1 you createdbefore using F4 input help and choose continue. The selected job is now on the rightscreen area.

10. Now add the 3rd

 step of the process chain. Chooseprocess type: DP BackgroundProcessing  under the node: SCM – Demand Planning .

11. In the Insert DP Background Processing  window, choose the job YDP_FC you createdbefore and choose continue. The selected job is now on the right screen area.

12. Now add the 4th

 step of the process chain. Chooseprocess type: DP BackgroundProcessing  under the node: SCM – Demand Planning .

13. In the prompt Insert DP Background Processing  window, Select the job YDP_FC2 youcreated before and choose continue. The selected job is now on the right screen area.

14. Now link these jobs by the same sequence they are created, by selecting the start joband dragging a line to the linked job, choose …successful  in the Action for … dialog box.

15. Choose Activate to make the process chain active.

3.4.4.4 Schedule Process Chain  – Forecast

UseNormally you need to run forecast for each planning cycle, for example, each month. Youwould manually trigger this process chain when necessary. You would also schedule this

process chain to run periodically

Page 86: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 86/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 86 of 130

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.5 Process Chain  – Consolidate

UsePurpose of this process chain is to consolidate the local adjustments, additional demand keyfigure for the central planner to calculate the final demand plan.

PrerequisitesMacro listed below has been maintained.

  Copy stat. fcst to man. fcst

  Determine KF FORECAST ADJ.CENTRAL

  Calc. Demand Plan

3.4.5.1 Create Activities  – Consolidate

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8T 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Define Activities for Mass Processing

2. In the screen Activity, maintain the data according to the table below:

Field name User action and values Comment

 Activity YDP_CONS Your activity name

Description Macro: Consolidate fcst data Your activity description

Then choose Create.

3. In the next screen Activity , maintain the data according to the table below:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_MACRO

4. Select the Macro tab page at the bottom of the screen. Three actions are to be defined

within this activity.5. Choose macro „ Copy stat fcst to man. fcst ‟  from the drop list next to the Macro radio

button. Choose  Adopt Current Action button. The macro is shown at the List of Actionsarea.

6. Choose the down pushbutton to go to next action button to add the 2nd

 action. Choosemacro „DETERMINE KF FORECAST ADJ. CENTRAL‟  from the drop list. Choose AdoptCurrent Action. The 2

nd macro is shown at the List of Actions area.

7. Choose the down pushbutton to go to next action button to add the 3rd

 action. Choosemacro „ Calc. Demand Plan‟  from the drop list. Choose Adopt Current Action button. The3

rd macro is shown at the List of Actions area.

8. Choose Save. 

Page 87: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 87/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 87 of 130

3.4.5.2 Create Planning job  – Consolidate

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8D 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Create Demand Planning in theBackground

2. On the Create Planning Job screen, make the following entries :

Field name User action and values Comment

Job number YDP_CONS

Job name Macro: Consolidating

3. Choose Execute.

4. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_MACRO

Version 001

5. Choose Execute, 

6. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Control Parameters forbackground planning

 Activity YDP_CONS The activity you have created

Planning job information

Generate Log X Select the check box

Do Not Create Spool List X

Chars

One YDP_MP_ALL_PROD_LOC

9. Choose Aggregation level , in the Choose chars screen, select all characteristics except

the navigation attributes. Then choose Continue.10. Choose Save. Then go back .

3.4.5.3 Create Process Chain  – Consolidation

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. On the process chain maintenance planning  screen, choose Create, then make thefollowing entries:

Page 88: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 88/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 88 of 130

Field name User action and values Comment

Process chain YDP_CONSOLIDATING

Long description YDP - Consolidate

3. Choose Continue4. In the Insert Start Process window, choose Create. In the Start Process window, enter

values as follows:

Field name User action and values Comment

Process variants YDP_CONSOLIDATING

Long description Consolidating

5. Choose Enter , then choose Save.

6. In the Create Object Directory Entry , choose Local Object, Go back  then choose Continue.In the Process Chain Maintenance Modified Version window, the starting process is nowvisible.

7. Choose Process Type.8. Expand the node: SCM – Demand Planning . Choose process type: DP Background

Processing  

9. In the Insert DP Background Processing  window, choose the job YDP_CONS you createdbefore and choose continue. The selected job is now on the right screen area.

10. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful  in the Action for … dialog box.

11. Choose Activate to make the process chain active.

3.4.5.4 Schedule Process Chain  – Consolidation

UseNormally, you need to do this consolidation after forecasting and manual adjusting. You wouldmanually trigger this process chain when necessary. You would also schedule this processchain to run periodically.

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.6 Process Chain  – Release Demand Plan to SAP ECC

UseThis process chain supports the process to release the demand plan to SAP ECC, based ona transfer profile. You take this step if you want to release final demand plan to ECC. Ignore itif you want to release final demand plan to APO SNP for further planning.

3.4.6.1 Create Transfer Profile

UseBefore the activity can be created, you have to create a transfer profile, which is to be usedfor transferring your forecast results to SAP ECC Demand Management. In the transfer profile,you also define which key figure is to be transferred.

Procedure1. To access the activity, use one of the following navigation options:

Page 89: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 89/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 89 of 130

2. In the Transfer Profile window, maintain value as follows:Field name User action and values Comment

Transfer Prfl. YDP_RLECC Your transfer profile name

3. Then choose Create.

4. In the Transfer Profile window, maintain the values as follows:

Field name User action and values Comment

 APO

Planning Area YDP_PA Your planning area

Key Figure

ZY93_BK12

The key figure you want to

transfer back to ECC

Planning Version 001

 APO Extras

Product Char.ZY93_BC01

Optional. If you do not makean entry, system uses thecharacteristic 9AMATNR.

Location Char.ZY93_BC03

Optional. If you do not makean entry, system uses thecharacteristic 9ALOCNO.

R/3

Requirement Type

Optional

You do not need to make anentry in this field if the productmaster records in R/3 containan MRP group and if each ofthese MRP groups has beenassigned a strategy group inR/3 Customizing. The systemdetermines the requirementstype from the main planningstrategy that is contained ineach strategy group.

Version

00

ID of the SAP ECC demand

program to which you wish totransfer.

 Active X checked

5. Choose Save.

3.4.6.2 Create Activities  – Release Demand Plan to SAP ECC

UseWith this step you define which action takes place, for example, a transfer to the SAP ECCsystem, when you create and schedule the respective job.

Procedure

Transaction code /SAPAPO/MC8U 

SAP SCM Menu Demand Planning   Environment  Maintain TransferProfiles

Page 90: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 90/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 90 of 130

1. Access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8T 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Define Activities for Mass Processing

2. In the Activity screen, maintain the data according to the table below:

Field name User action and values Comment

 Activity YDP_RLECC Your activity name

Description Release DP to ECC Your activity description

3. Then choose Create.

4. In the next Activity  screen, maintain the data according to the table below:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_RELEASE

5. Select the R/3 Transfer Prfl. tab page in the lower screen area.

6. Enter the name of your transfer profile YDP_RLECC  and choose Enter . The settings ofyour transfer profile are displayed. Choose Adopt Current Action, then action “R/3

Transfer ” with action counter 1 is automatically inserted in the activity.

7. Choose Save.

3.4.6.3 Create Planning job  – Release Demand Plan to ECC

Procedure

1. To access the activity, use one of the following navigation options:Transaction code /SAPAPO/MC8D 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background  Create Demand Planning in theBackground

2. Enter values as follows:

Field name User action and values Comment

Job number YDP_RLECC

Job name Release DP to ECC

3. Choose Execute.4. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_RELEASE

Version 001

5. Choose Execute. 

6. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Control Parameters for

Page 91: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 91/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 91 of 130

background planning

 Activity YDP_RLECC The activity you have created

Planning job information

Generate Log X Select the check box

Do Not Create Spool List X

Chars

One YDP_MP_ALL_PROD_LOC

7. Choose Aggregation level , in the Choose chars screen, select only ZY93_BC01 (Product)and ZY93_BC03 (Location) characteristics. Then choose Continue.

8. Choose Save. Then choose Back .

3.4.6.4 Create Process Chain  – Release DP to ECC

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment   Maintain ProcessChains

2. In the process chain maintenance planning view, choose Create and enter values asfollows:

Field name User action and values Comment

Process chain YDP_RLECC

Long description DPA – Release DP to ECC

Choose Continue.

3. In the Insert Start Process window, choose Create. In the prompt Start Process window,enter values as follows:

Field name User action and values Comment

Process variants YDP_RLECC

Long description Release DP to ECC

Choose Enter , then choose Save

4. In the Create Object Directory Entry , choose Local Object , go back  then choose

Continue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.

5. Choose Process Types. 

6. Expand the node: SCM – Demand Planning . Choose process type: DP BackgroundProcessing  

7. In the Insert DP Background Processing  window, choose the job YDP_RLECC youcreated before and choose Continue. The selected job is now on the right screen area.

8. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful  in the Action for … dialog box.

9. Choose Activate to make the process chain active.

3.4.6.5 Schedule Process Chain –

 Release Demand Plan to

Page 92: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 92/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 92 of 130

SAP ECC

UseNormally, you need to release demand plan result to SAP ECC at the end of each planningcycle. You would manually trigger this process chain when necessary. You would alsoschedule this process chain to run periodically.

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.7 Process Chain  – Release Demand Plan to APO-SNP

UseThis process chain supports the process to release the demand plan to APO-SNP, based ona release profile. You take this step if you want to release final demand plan to SNP for

further planning.Ignore this step if you want to release final demand plan to ECC.

3.4.7.1 Create Release Profile

UseBefore the activity can be created, you have to create a release profile.

Procedure1. To access the activity, use one of the following navigation options:

2. In the Release Profile window, maintain value as follows:

Field name User action and values Comment

Release Profile YDP_RLSNP Your release profile name

3. Then choose Create.

4. In the detail Release Profile window, maintain the values as follows:

Field name User action and values Comment

Basic Settings

Planning Area YDP_PA Your planning area

Key FigureZY93_BK12

The key figure you want torelease to SNP

Planning Version 001

Extras

Daily Bkts Prfl

9ADRPDEFAULT

Optional. Enter a planningbuckets profile containing daysif you wish the demand plan to

be released in daily bucketsCategory FA

Transaction code /SAPAPO/MC8S 

SAP SCM Menu Demand Planning   Environment  Maintain ReleaseProfiles

Page 93: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 93/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 93 of 130

Product Char.ZY93_BC01

Optional. If you do not makean entry, system uses thecharacteristic 9AMATNR.

Location Char.ZY93_BC03

Optional. If you do not makean entry, system uses thecharacteristic 9ALOCNO.

Strategy 20 Planning with final assembly

Create new orders X checked

5. Choose Save.

3.4.7.2 Create Activities  – Release Demand Plan to APO-SNP

Procedure1. Now the activity can be created. To access the activity, use one of the following

navigation options:

Transaction code /SAPAPO/MC8T 

SAP SCM Menu Demand Planning   Planning  Demand Planning in

the Background   Define Activities for Mass Processing

2. On the Activity screen, maintain the data according to the table below:

Field name User action and values Comment

 Activity YDP_RLSNP Your activity name

Description Release DP to SNP Your activity description

3. Then choose Create.

4. On the next Activity  screen, maintain the data according to the table below:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_RELEASE

5. Choose the Release Prfl.  tab page at the bottom of the screen. Maintain the value asfollows:

Field name User action and values Comment

Release Profile YDP_RLSNP Your release profile

6. Choose Enter .7. Choose Adopt Current Action, then action Release with action counter 1 is automatically

inserted in the activity.

8. Choose Save.

3.4.7.3 Create Planning job  – Release Demand Plan to SNP

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/MC8D 

SAP SCM Menu Demand Planning   Planning  Demand Planning inthe Background  Create Demand Planning in the

Page 94: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 94/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 94 of 130

Background

2. Enter values as follows:

Field name User action and values Comment

Job number YDP_RLSNP

Job name Release DP to SNP

3. Choose Execute.

4. On the next Create Planning Job screen, maintain values according to the following table:

Field name User action and values Comment

Planning Book YDP_PB_MASS_JOB

Data View YDP_DV_RELEASE

Version 001

5. Choose Execute. 

6. On the next Create Planning Job screen, maintain the values according to the followingtable:

Field name User action and values Comment

Control Parameters forbackground planning

 Activity YDP_RLSNP The activity you have created

Planning job information

Generate Log X Select the check box

Do Not Create Spool List X

Chars

One YDP_MP_ALL_PROD_LOC

7. Choose Aggregation level , on the Choose chars screen, select the characteristics forProduct  and Location. Then choose Continue.

8. Choose Save.

3.4.7.4 Create Process Chain  – Release DP to SNP

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the process chain maintenance planning view, cchoose Create and enter values as

follows:

Field name User action and values Comment

Process chain YDP_RLSNP

Long description DPA – Release DP to SNP

3. Choose Continue.

Page 95: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 95/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 95 of 130

4. In the Insert Start Process window, choose Create. In the Start Process window, entervalues as follows:

Field name User action and values Comment

Process variants YDP_RLSNP

Long description Release DP to SNP

5. Choose Enter , then choose Save.

6. In the Create Object Directory Entry , choose Local Object , go back  then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.

7. Choose Process Type.

8. Expand the node: SCM – Demand Planning . Choose process type: DP BackgroundProcessing  

9. In the pop up Insert DP Background Processing  window, choose the job YDP_RLSNPyou created before and choose continue. The selected job is now on the right screenarea.

10. Link the starting process to this job, by selecting the start job and dragging a line to theprevious selected job, choose …successful  in the Action for … dialog box.

11. Choose Activate to make the process chain active. On the Create Object Directory Entryscreen, choose Local Object .

3.4.7.5 Schedule Process Chain  – Release Demand Plan toAPO-SNP

UseNormally, you need to release demand plan result to SAP SNP at the end of each planning

cycle. You would manually trigger this process chain when necessary. You would alsoschedule this process chain to run periodically.

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.8 Process Chain  – Backup Historical Data Correction

UseThis process chain is used to back up the corrected history key figure into a backup InfoCube.

You can run this process chain based on your planning cycle, for example each month. Thenthis backup InfoCube can be used for reporting and analysis purposes.

3.4.8.1 Generate Backup InfoCube for Corrected history

UseFirst, you need to generate an InfoCube, which is used to backup the corrected history data.The InfoCube is generated based on the planning area. Only extract historical related keyfigures.

Procedure

1. To access the activity, use one of the following navigation options:

Page 96: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 96/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 96 of 130

Transaction Code  /SAPAPO/MSDP_ADMIN  

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment    Administration of DemandPlanning and Supply Network Planning

2. Choose Planning Area YDP_PA.3. Choose the menu path Extras  Data Extraction Tools.

4. On the DP/SNP Data Extraction screen, choose Generate DataSource, on the Generateexport data source screen, enter DataSource name YDP_PA_DS02.

5. Choose Execute. 

6. Choose Yes if the message Multiple DataSources for a planning object structure appears.

7. On the DataSource: Cusomer version Edit  screen, hide the key figures except those fromthe following list:

InfoObject ID Short text

ZY93_BK01 Sales Quantity 1

ZY93_BK04 Historical Sales Correction

ZY93_BK05 Historical Sales Override

ZY93_BK06 Corrected Sales History

ZY93_BK91 Corrrected History without additional demand

UNIT Unit of measure

8. Choose Save. 

9. On the DP/SNP Data Extraction screen, choose Data backup and dhoose GenerateInfoCube from the planning area, input the following values:

Field name User actions and values Comments

InfoCube ZY93_IC03

Description Backup YDP_PA - Corrected history

InfoArea ZBPR_Y93_DPA_IA01

10. Choose Execute. 

11. Choose Yes on the Check  window to include the proportional factor in the InfoCube.

12. Choose Continue in the Display logs window. Then Exit .

Result

The backup InfoCube for corrected historical sales data has been generated.

3.4.8.2 Change Backup InfoCube for Corrected history

UseHere, you create new dimensions for the InfoCube, then you put each characteristic to thecorresponding dimension.

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code RSA1

SAP Menu  Advanced Planning and Optimization  Demand

Page 97: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 97/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 97 of 130

Planning   Environment   Data WarehousingWorkbench

2. In the Data Warehousing Workbench: Modeling  window, choose InfoProvider  from theModeling  section, expand InfoArea ZBPR_Y93_DPA_IA01 and choose InfoCubeZY93_IC03.

3. Change to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC031 and choose Properties. Change thedescription to Product  and confirm.

4. Right-click dimension ZY93_IC03T  and choose Properties. Change the description toTime and confirm.

5. Right-click the folder Dimensions and choose Create New Dimensions

Give a description for the dimension. The extra dimensions to be created are as follows:

  Customer

  Location

  Region

  Sales Org

  Version

  Created on

6. Choose Save.

7. Follow the table below to move the characteristics under dimension Product  to the

corresponding dimensions by drag and drop:

Dimension InfoObject ID Description

Time 0CALMONTH Calendar year/month

0CALYEAR Calendar year

Product ZY93_BC01 Product

ZY93_BC02 Product Line

Customer ZY93_BC04 Customer

Location ZY93_BC03 Location

Region ZY93_BC05 Region

Sales Org ZY93_BC06 Sales Organization

Version 9AVERSION APO Planning Version

8. Right-click dimension Created on and choose InfoObject Direct Input . Input the followingvalues:

InfoObject ID Description0CREATEDON Date on which the record was created

9. Select the folder "Key Figures" and remove all key figures that are not part of thedatasource YDP_PA_DS02.

10. Choose Activate to activate the InfoCube.

6. Choose Local Object  if the Create Object Directory Entry  dialog box appears.

3.4.8.3 Create Transformation, DTP and InfoPackage

Procedure

1. To access the activity, use one of the following navigation options:

Page 98: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 98/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 98 of 130

Transaction Code RSA1

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment   Data WarehousingWorkbench

2. In the left part of the Administrator Workbench: Modeling  screen, in the Modeling  section,choose Source System. 

3. Right-click your source system, for example, SH1CLNT185, choose ReplicateDataSources in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job istriggered. Check in the job overview that this job has finished before proceeding to thenext step.

4. On the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.

5. Choose the DataSources 9AYDP_ PA_DS02 you have just created.

6. Choose Change Mode. 

7. Choose Active DataSource. Choose Local Object  if the Create Object Directory Entry  screen appears.

8. In the left part of the Administrator Workbench: Modeling  screen, in the Modeling  section,choose InfoProvider .

9. Expand InfoArea ZBPR_Y93_DPA_IA01 and right-click InfoCube ZY93_IC03, ChooseCreate Transformation….in the context menu.

10. In the Create Transformation dialog box, enter the value as follows:

Field name User action and values Comment

Source of the Transformation

Object Type DataSource From the drop list

DataSource 9AYDP_PA_DS02

Source System for example SH1CLNT185

11. Choose Create Transformation.

12. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just have a check and skip this step):

Source Field Target Field

CALMONTH  0CALMONTH

CALYEAR 0CALYEAR

/BIC/ZY93_BC01  ZY93_BC01/BIC/ZY93_BC02 ZY93_BC02

/BIC/ZY93_BC03 ZY93_BC03

/BIC/ZY93_BC04 ZY93_BC04

/BIC/ZY93_BC05 ZY93_BC05

/BIC/ZY93_BC06 ZY93_BC06

/BI0/9AVERSION 9AVERSION

/BIC/ZY93_BK01 ZY93_BK01

/BIC/ZY93_BK04 ZY93_BK04

/BIC/ZY93_BK05 ZY93_BK05

Page 99: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 99/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 99 of 130

/BIC/ZY93_BK06 ZY93_BK06

/BIC/ZY93_BK91 ZY93_BK91

UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06

13. On the Transformation Create screen, in the right target table, choose the row0CREATEDON .

14. In the Rule Details window, choose Formula from the drop down list for the Rule Typefield and choose Change rule 

15. In the prompt window, find SYST-DATUM  Current Date from the field list and choose it.The Current Date is written at the formula area.

16. Choose Back. 

17. Choose Transfer Values 

18. Choose Activate to activate the transformation. Choose Yes if Log Display  windowprompt. Choose Local Object  if the Create Object Directory Entry  screen appears.

19. Right-click Data Transfer Processes under InfoCube ZY93_IC03 again and chooseCreate Data Transfer Processes…in the context menu, enter the value below and confirm

the dialog:

Field name User actions and values

Data Transfer Proc. 9AYDP_PA_DS02 / SH1CLNT185   ZY93_IC03/Delta

DTP Type Standard(Can be Scheduled)

Object Type DataSource

DataSource 9AYDP_PA_DS02

Source System SH1CLNT185

20. Choose Continue.

21. Choose Activate Data Transfer Process. Choose Local Object  if the Create ObjectDirectory Entry  screen appears.

22. Expand the Data Transfer Processes 9AYDP_PA_DS02 / SH1CLNT185   ZY93_IC03/Delta, right-click DataSource 9AYDP_PA_DS02, choose CreateInfoPackage…. in the context menu.

23. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS02_IP01_F, and choose Save. Choose Local Object  if theCreate Object Directory Entry  screen appears.

24. At Schduler (Maintain InfoPackage) window, select Data Selection tab page, enter 001 forfrom value of /BI0/9AVERSION.

25. Choose Save and Exit .

3.4.8.4 Create Process Chain  – Corrected History Back UP

Procedure1. To Access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the Process Chain Maintenance Planning  View , choose Create and enter values asfollows:

Field name User action and values Comment

Process chain YDP_BU_CORR_HIST

Page 100: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 100/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 100 of 130

Long description YDP – Backup Corrected HistorySales

3. Choose Continue

4. In the Insert Start Process window, choose Create.

Field name User action and values Comment

Process variants YDP_BU_CORR_HIST

Long description Backup Corrected History Sales

5. Choose Enter , then choose Save

6. In the Create Object Directory Entry , choose Local Object , go back  then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.

7. Choose Process Type.

8. Expand the node Load Process and Post-Processing . Choose Execute InfoPackage andselect the InfoCube for Corrected Historical Data Back-up in the Insert Execute

Infopackage window and choose Continue. 9. The data transfer process 9AYDP_PA_DS02 / SH1CLNT185 -> ZY93_IC03/Delta is

automatically inserted in the process chain view. The selected job is now on the rightscreen area.

10. Link the starting process to the Load Data job, by selecting the start job and dragging aline to the Load Data job, choose …successful  in the Action for … dialog box. Then linkthe Load Data job to Data Transfer Process job, choose …successful  in the Action for … dialog box.

11. Choose Save.

12. Choose Activate to make the process chain active.

3.4.8.5 Schedule Process Chain –

 Backup Historical DataCorrection

UseNormally, you need to backup historical data correction for report and analysis purpose. Youwould manually trigger this process chain when necessary.

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.9 Process Chain  – Backup Forecasting

UseThis process chain is used to save the forecast key figure into a backup InfoCube. You canrun this process chain based on your planning cycle, for example each month. Then thisbackup InfoCube can be used for reporting and analysis purpose.

3.4.9.1 Generate Backup InfoCube for Forecasting Result

Use

First, you need to generate an InfoCube which is used to backup the forecasting result. TheInfoCube is generated based on the planning area, only extract forecast related key figures.

Page 101: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 101/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 101 of 130

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code  /SAPAPO/MSDP_ADMIN  

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment    Administration of DemandPlanning and Supply Network Planning

2. Choose the planning area YDP_PA.

3. Choose the menu path Extras   Data Extraction Tools. 

4. On the DP/SNP Data Extraction screen, and choose Generate DataSource, on theGenerate export data source screen, enter DataSource name YDP_PA_DS01.

5. Choose Execute. 

6. Choose Yes if the Multiple DataSource for a planning object structure screen appears.

7. On the DataSource: Customer version Edit  screen, hide key figures except list below:

InfoObject ID Description

ZY93_BK07 Statistical Forecast

ZY93_BK08 Manual Forecast

ZY93_BK10 Local Planners Forecast Adjustment

ZY93_BK11 Central Planners Forecast Adjustment

ZY93_BK09 Additional demand

ZY93_BK12 Demand Plan

UNIT Unit of measure

8. Choose Save.

9. Choose Back .10. On the DP/SNP Data Extraction screen, choose Data backup and Choose Generate

InfoCube from planning area, input the following values:

Field name User actions and values Comments

InfoCube ZY93_IC02

Description Backup YDP_PA – Forecast result

InfoArea ZBPR_Y93_DPA_IA01

11. Choose Execute. 

12. Choose Yes on the Check  window to include the proportional factor in the Infocube.

13. Choose Continue on Display logs window. Then Exit .

ResultThe backup InfoCube for forecast result data has been generated.

3.4.9.2 Change Backup InfoCube for Forecast Result

UseHere you create new dimensions for the InfoCube, then put each characteristics tocorresponding dimension.

Procedure

Page 102: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 102/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 102 of 130

1. To access the activity, use one of the following navigation options:

Transaction Code RSA1

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment   Data Warehousing

Workbench2. In the Data Warehousing Workbench: Modeling  window, choose InfoProvider  from the

Modeling  section, expand InfoArea ZBPR_Y93_DPA_IA01 and choose InfoCubeZY93_IC02.

3. Go to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC021 and choose Properties. Change thedescription to Product  and confirm.

4. Right-click dimension ZY93_IC02T  and choose Change Description. Change thedescription to Time and confirm.

5. Right-click the folder Dimension and choose Create New Dimensions

Give a description for the dimension. The extra dimensions to be created are as follows:

  Customer  Location

  Region

  Sales Org

  Version

  Created on

6. Choose Save. 

7. Follow the table below to add the characteristics to the corresponding dimensions by dragand drop:

Dimension InfoObject ID Description

Time 0CALMONTH Calendar year/month

0CALYEAR Calendar year

Product ZY93_BC01 Product

ZY93_BC02 Product Line

Customer ZY93_BC04 Customer

Location ZY93_BC03 Location

Region ZY93_BC05 Region

Sales Org ZY93_BC06 Sales Organization

Version 9AVERSION APO Planning Version8. Right-click dimension Created on and choose InfoObject Direct Input . Insert the following

values, and choose enter.

InfoObject ID Description

0CREATEDON Date on which the record was created

9. Select the folder Key Figures and remove all key figures that are not part of thedatasource YDP_PA_DS01.

10. Choose Activate to activate the InfoCube.

11. Choose Local Object  if the Create Object Directory Entry  dialog box appears.

Page 103: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 103/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 103 of 130

3.4.9.3 Create Transformation, DTP and Infopackage

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code RSA1

SAP Menu Information Systems  Business Information Warehouse  Modeling   RSA1 - Data Warehousing Workbench:Modeling

2. In the left part of the Administrator Workbench: Modeling  window, in the Modeling section,choose Source System.

3. Right-click your Source system, for example, SH1CLNT185, choose ReplicateDataSource in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job is

triggered. Check in the job overview that this job has finished before proceeding to thenext step.

4. In the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.

5. Choose the DataSources 9AYDP_ PA_DS01 you have just created.

6. Choose Change Mode. 

7. Choose Active DataSource. Choose Local Object  if the Create Object Directory Entry  screen appears.

8. In the left part of the Administrator Workbench: Modeling  screen, in the Modeling  section,choose InfoProvider .

9. Expand InfoArea ZBPR_Y93_DPA_IA01 and right-click InfoCube ZY93_IC02, chooseCreate Transformation….in the context menu.

10. In the Create Transformation dialog box, enter the value as below:

Field name User action and values Comment

Source of the Transformation

Object Type DataSource From the drop list

DataSource 9AYDP_PA_DS01

Source System e.g. SH1CLNT185

11. Choose Start Transformation.

12. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just check and skip this step):

Source Field Target Field

CALMONTH  0CALMONTH

CALYEAR 0CALYEAR

/BIC/ZY93_BC01  ZY93_BC01

/BIC/ZY93_BC02 ZY93_BC02

/BIC/ZY93_BC03 ZY93_BC03

/BIC/ZY93_BC04 ZY93_BC04

/BIC/ZY93_BC05 ZY93_BC05

/BIC/ZY93_BC06 ZY93_BC06/BI0/9AVERSION 9AVERSION

Page 104: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 104/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 104 of 130

/BIC/ZY93_BK01 ZY93_BK01

/BIC/ZY93_BK04 ZY93_BK04

/BIC/ZY93_BK05 ZY93_BK05

/BIC/ZY93_BK06 ZY93_BK06UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06

13. On the Transformation Create screen, in right target table, choosethe row 0CREATEDON .

14. On the Rule Details window, choose Formula from drop list for Rule Type field andchoose Change rule 

15. In the prompt window, find SYST-DATUM Current Date from the field list and chooseit,Current Date is written at the formula area.

16. Choose Back. 

17. Choose Transfer Values. 

18. Choose Activate to activate the transformation. Choose Yes if the Log Display  windowappears. Choose Local Object  if Create Object Directory Entry  screen appears.

19. Right-click Data Transfer Processes under InfoCube ZY93_IC02 again and chooseCreate Data Transfer Processes…in the context menu, enter the values below andconfirm the dialog:

Field name User actions and values

Data Transfer Proc. 9AYDP_PA_DS01 / SH1CLNT185 -> ZY93_IC02/Delta

DTP Type Standard(Can be Scheduled)

Object Type DataSource

DataSource 9AYDP_PA_DS01

Source System SH1CLNT185

20. Choose Continue. 

21. Choose Activate Data Transfer Process. Choose Local Object  if the Create ObjectDirectory Entry  screen appears.

22. Expand the Data Transfer Processes 9AYDP_PA_DS01 / SH1CLNT185 ->ZY93_IC02/Delta, Right-click DataSource 9AYDP_PA_DS01, choose CreateInfoPackage…. in the context menu.

23. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS01_IP01_F, and choose Save. In the Schduler (MaintainInfoPackage) window, select the Data Selection tab page, enter 001 for from value of/BI0/9AVERSION.

24. Choose Save and Exit .

3.4.9.4 Create Process Chain - Forecast Backup

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the process chain maintenance planning view, choose Create and enter values asfollows:

Field name User action and values Comment

Page 105: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 105/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 105 of 130

Process chain YDP_BU_FORECAST

Long description DPA – Backup Forecast

3. Choose Continue.

4. In the Insert Start Process window, choose Create.

Field name User action and values Comment

Process variants YDP_BU_FORECAST

Long description Back Up Forecast

5. Choose Enter , then choose Save .

6. In the Create Object Directory Entry , choose Local Object , go back  then chooseContinue.

7. In the Process Chain Maintenance Modified Version window, the starting process is now

visible.

8. Choose Process Type.

9. Choose Delete Index  under the node Data Target Administration. In the Insert DeleteIndex  window, choose Create. Then enter Process Variant  YDP_BACKUP_ZY93_IC02_IDX and Long descriptio ZY93_IC02 Index, then chooseContinue.

10. In the Process Maintenance: Delete Index  window, choose InfoCube from the drop list.Then use F4 input help for Object Name, choose your InfoCube ZY93_IC02.

11. Choose Save. In the Create Object Directory Entry , choose Local Object, Go back  thenchoose Continue.

12. Two jobs for Delete Index  and Create Index  are show.

13. Expand the node Load Process and Post-Processing. Choose Execute InfoPackage andselect Forecast InfoCube(ZBPR_Y93_9AYDP_PA_DS01_IP01_F) in the Insert ExecuteInfopackage window and choose Continue. If Display More Chain window pop up, choose

No.14. The Data Transfer Process 9AYDP_PA_DS01 / SH1CLNT185 -> ZY93_IC02/Delta is

automatically inserted in the process chain view. The selected job is now on the rightscreen area.

15. Link the starting process to the Load Data job, by selecting the start job and dragging aline to the Load Data job, choose …successful  in the Action for … dialog box. Link theLoad Data job to Delete Indexes job, choose …successful  in the Action for … dialog box.Link the Delete Indexes job to Data Transfer Process job, choose …successful  in the Action for … dialog box. Finally link the Data Transfer Process job to Create Index job,choose …successful  in the Action for … dialog box.

16. Choose Save.

17. Choose Activate to make the process chain active.

3.4.9.5 Schedule Process Chain  – Forecast Back up

UseNormally, you need to back up forecast results at the end of each planning cycle for reportand analysis purposes. You would manually trigger this process chain when necessary.

ProcedureRefer to the steps described in chapter 3.4.2.2.

Page 106: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 106/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 106 of 130

3.4.10 Process Chain  – Daily Backup Manual Changes

UseThis process chain is used for daily backup all manual changes which done in the planningprocess, for example, sales historical data correction, manual forecast, and etc.

Compared with the backups we describe in the next 2 chapters, this daily backup is mainlyused for data restore purpose, to avoid data loss.

3.4.10.1 Generate Daily Backup InfoCube for ManualChanges

UseFirst, you need to generate an InfoCube which is used to daily backup the manual changesthe planners has done in the planning process. The InfoCube is generated based on theplanning area, only extract those key figures which would be changed manually.

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code  /SAPAPO/MSDP_ADMIN  

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment    Administration of DemandPlanning and Supply Network Planning

2. Choose Planning Area YDP_PA.

3. Choose the menu path Extras   Data Extraction Tools.

4. On the DP/SNP Data Extraction screen, choose Generate DataSource, on the Generate

export data source screen, enter DataSource name YDP_PA_DS04.5. Choose Execute. 

6. Choose Yes if the Multiple DataSources for a planning object structure screen appears.

7. On the DataSource: Cusomer version Edit  screen, hide the key figures except the

following ones:

InfoObject ID Short text

ZY93_BK04 Historical Sales Correction

ZY93_BK05 Historical Sales Override

ZY93_BK08 Manual Forecast

ZY93_BK09 Additional demand

ZY93_BK10 Local Fcst. Adj.

ZY93_BK11 Central Fcst. Adj

UNIT Unit of measure

8. Choose Save. 

9. On the DP/SNP Data Extraction screen, choose Data backup and Choose GenerateInfoCube from planning area, input the following values:

Field name User actions and values Comments

InfoCube ZY93_IC04

Description Daily Backup YDP_PA – Manual Changes

InfoArea ZBPR_Y93_DPA_IA01

Page 107: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 107/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 107 of 130

10. Choose Execute. 

11. Choose Yes in the Check  window to include the proportional factor in the Infocube.

12. Choose Continue in the Display logs window. Then Exit .

ResultThe daily backup InfoCube for manual changes has been generated.

3.4.10.2 Change Daily Backup InfoCube for Manual Changes

UseHere you create new dimensions for the InfoCube, then put each characteristics to thecorresponding dimension.

Procedure

1. To access the activity, use one of the following navigation options:

Transaction Code RSA1

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment   Data WarehousingWorkbench

2. In the Data Warehousing Workbench: Modeling  window, choose InfoProvider  from theModeling  section, expand InfoArea ZBPR_Y93_DPA_IA01 and chooseInfoCubeZY93_IC04.

3. Change to change mode and select the folder Dimensions Folder at the right side of thescreen. Right-click dimension ZY93_IC041 and choose Properties. Change thedescription to Product  and confirm.

4. Right-click dimension ZY93_IC04T  and choose Properties. Change the description toTime and confirm.

5. Right-click folder Dimensions and choose Create New Dimensions

Give a description for the dimension. The extra dimensions to be created are as follows:

  Customer

  Location

  Region

  Sales Org

  Version

  Created on

6. Choose Save.7. Follow the table below to move the characteristics under dimension Product  to the

corresponding dimensions via drag and drop:

Dimension InfoObject ID Description

Time 0CALMONTH Calendar year/month

0CALYEAR Calendar year

Product ZY93_BC01 Product

ZY93_BC02 Product Line

Customer ZY93_BC04 Customer

Location ZY93_BC03 Location

Page 108: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 108/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 108 of 130

Region ZY93_BC05 Region

Sales Org ZY93_BC06 Sales Organization

Version 9AVERSION APO Planning Version

7. Right-click dimension Created on and choose InfoObject Direct Input . Input the followingvalues:

InfoObject ID Description

0CREATEDON Date on which the record was created

8. Select the folder "Key Figures" and remove all key figures that are not part of thedatasource YDP_PA_DS04.

9. Choose Activate to activate the InfoCube.

10. Choose Local Object  if the Create Object Directory Entry  dialog box appears.

3.4.10.3 Create Transformation, DTP and InfoPackage

Procedure1. To access the activity, use one of the following navigation options:

Transaction Code RSA1

SAP Menu  Advanced Planning and Optimization  DemandPlanning   Environment   Data WarehousingWorkbench

2. In the left part of the Administrator Workbench: Modeling  screen, in the Modeling  section,choose Source System. 

3. Right-click your Source system, for example, SH1CLNT185, choose Replicate

DataSources in the context menu. Select the as DataSource(RSDS) radio button if theData Source from Source System Unknown dialog box appears. A background job istriggered. Check in the job overview that this job has finished before proceeding to thenext step.

4. In the Administrator Workbench screen, you are still in the source system view. Right-click the source system SH1CLNT185 and choose Display DataSources Tree in thecontext menu.

5. Choose the DataSources 9AYDP_ PA_DS04 you just created before

6. Choose Change Mode. 

7. Choose Active DataSource. Choose Local Object  if Create Object Directory Entry  screenappears.

8. In the left part of the Administrator Workbench: Modeling  screen, in the Modeling  section,

choose InfoProvider .

9. Expand InfoArea ZBPR_Y93_DPA_IA01 and Right-click InfoCube ZY93_IC04, ChooseCreate Transformation….in the context menu.

10. In the Create Transformation dialog box, enter the value as below:

Field name User action and values Comment

Source of the Transformation

Object Type DataSource From the drop list

DataSource 9AYDP_PA_DS04

Source System e.g. SH1CLNT185

Choose Create Transformation.

Page 109: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 109/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 109 of 130

11. On the Transformation Create screen, drag the line between two tables (if they are linkedautomatically, then just check and skip this step):

Source Field Target Field

CALMONTH  0CALMONTH

CALYEAR 0CALYEAR

/BIC/ZY93_BC01  ZY93_BC01

/BIC/ZY93_BC02 ZY93_BC02

/BIC/ZY93_BC03 ZY93_BC03

/BIC/ZY93_BC04 ZY93_BC04

/BIC/ZY93_BC05 ZY93_BC05

/BIC/ZY93_BC06 ZY93_BC06

/BI0/9AVERSION 9AVERSION

/BIC/ZY93_BK04 ZY93_BK04

/BIC/ZY93_BK05 ZY93_BK05

/BIC/ZY93_BK08 ZY93_BK08

/BIC/ZY93_BK09 ZY93_BK09

/BIC/ZY93_BK10 ZY93_BK10

/BIC/ZY93_BK11 ZY93_BK11

UNIT ZY93_BK01, ZY93_BK04, ZY93_BK05, ZY93_BK06

12. On the Transformation Create screen, in right target table, choose the row0CREATEDON .

13. On the Rule Details window, choose Formula from drop list for Rule Type field andchoose Change rule. 

14. In the window, find SYST-DATUM  Current Date from the field list and choose it. CurrentDate is written at the formula area.

15. Choose Back. 

16. Choose Transfer Values. 

17. Choose Activate to activate the transformation. Choose Yes if the Log Display  windowappears. Choose Local Object  if the Create Object Directory Entry  screen appears.

18. Right-click Data Transfer Processes under InfoCube ZY93_IC04 again and chooseCreate Data Transfer Processes…in the context menu, enter the value below and confirmthe dialog:

Field name User actions and values

Data Transfer Proc. 9AYDP_PA_DS04 / SH1CLNT185 -> ZY93_IC04/Delta

DTP Type Standard(Can be Scheduled)

Object Type DataSource

DataSource 9AYDP_PA_DS04

Source System SH1CLNT185

19. Choose Continue.

20. Choose Activate Data Transfer Process. Choose Local Object  if the Create ObjectDirectory Entry  screen appears.

Page 110: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 110/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 110 of 130

21. Expand the Data Transfer Processes 9AYDP_PA_DS04 / SH1CLNT185 ->ZY93_IC04/Delta, Right-click DataSource 9AYDP_PA_DS04, choose CreateInfoPackage…. in the context menu.

22. In the Create InfoPackage window, enter InfoPackage descriptionZBPR_Y93_9AYDP_PA_DS04_IP01_F, and choose Save. Choose Local Object  if

Create Object Directory Entry  screen appears.23. At Schduler (Maintain InfoPackage) window, select Data Selection tab page, enter 001 

for from value of /BI0/9AVERSION.

24. Choose Save and Exit .

3.4.10.4 Create Process Chain  – Daily Back UP ManualChanges

Procedure1. To access the activity, use one of the following navigation options:

Transaction code RSPC 

SAP SCM Menu Demand Planning   Environment  Maintain ProcessChains

2. In the Process Chain Maintenance Planning  View , choose Create and enter values asfollows:

Field name User action and values Comment

Process chain YDP_BU_DAILY_CHANGE

Long description YDP – Daily Backup ManualChanges

3. Choose Continue4. In the Insert Start Process window, choose Create.

Field name User action and values Comment

Process variants YDP_BU_DAILY_CHANGE

Long description Daily Backup Manual Changes

5. Choose Enter , then choose Save.

6. In the Create Object Directory Entry , choose Local Object, go back  then chooseContinue. In the Process Chain Maintenance Modified Version window, the startingprocess is now visible.

7. Choose Process Type.

8. Expand the node Load Process and Post-Processing . Choose Execute InfoPackage andselect the InfoCube for Daily Back-up Manual Changes in the Insert Execute Infopackagewindow and choose Continue. 

The data transfer process 9AYDP_PA_DS04 / SH1CLNT185  ZY93_IC04/Delta isautomatically inserted in the process chain view. The selected job is now on the rightscreen area.

9. Now add the 3rd

 step of the process chain. Choose process type: Complete Deletion ofData Target Contents under the node: Data Target Administration. 

10. In the Insert Complete Deletion of Data Target Contents window, choose Create.

11. In the Complete Deletion of Data Target Contents window, enter Process Variants YDP_DEL_CUBE, and Long Description YDP – Delete InfoCube. Choose Enter .

12. In the Process Maintenance: Complete Deletion of Data Target Contents window, in theObject Type field, choose InfoCube from the droplist. In the Object Name field, choose F4and choose ZY93_IC04, then choose Transfer Selections.

Page 111: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 111/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 111 of 130

13. In the Process Maintenance: Complete Deletion of Data Target Contents window, chooseSave.

14. In the prompted Create Object Directory Entry dialog box, choose Local Object , Go back  then choose Continue. In the Process Chain Maintenance Modified Version window, the3

rd step is now visible.

15. Now add the 4th step of the process chain. Choose process type: Data Transfer Processunder the node: Load Process and Post-Processing. 

16. In the Insert Data Transfer Process window, choose Data Transfer Proc.9AYDP_PA_DS04 / SH1CLNT185 -> ZY93_IC04/Delta with F4 input help. ChooseContinue.

17. Now add the 5th

 step of the process chain. Choose process type: Deletion of Requestsfrom PSA under the node: Other BW Processes. 

18. In the Insert Deletion of Request from PSA window, choose Create.

19. In the Deletion of Requests from PSA window, enter Process Variants YDP_DEL_PSA,and Long Description YDP – Delete PSA.

20. In the Process Maintenance: Deletion of Requests from PSA window, enter the data as

table below:

Field name User action and values Comment

DataSource 9AYDP_PA_DS04

Src. system SH1CLNT185

Older Than (No. of Days/Date) 31.12.9999

21. Choose Save.

22. In the prompted Create Object Directory Entry dialog box, choose Local Object , Go back  then choose Continue. In the Process Chain Maintenance Modified Version window, the5

th step is now visible.

23. Now link these steps by the same sequence they are created, by selecting the start job

and dragging a line to the linked job, choose …successful  in the Action for … dialog box.24. Choose Save.

25. Choose Activate to make the process chain active.

3.4.10.5 Schedule Process Chain  – Daily Backup ManualChanges

UseNormally, it is better to back up all your manual planning works every day. We recommendthat you schedule this process chain as a daily job.

ProcedureRefer to the steps described in chapter 3.4.2.2.

3.4.11 Grouping Process Chain

UseWith this activity, the user can group the process chains logically, and then can easily find andmanage the process chains. Here we just give an example. You can group the processchains as your unique requirement.

Procedure1. To access the activity, use one of the following navigation options:

Page 112: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 112/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 112 of 130

Transaction Code RSPC  

SAP Menu Demand Planning   Environment  Maintain ProcessChains

2. Choose the Process Chain Data Preparation YDP_LOAD_PRE.

3. Choose Display/Change to make sure you are in the change mode.

4. Choose Display Components. 

5. In the Assign Display Grouping  dialog box, choose F4.

6. In the Selection dialog box, choose Create.

7. In the Creation of a Grouping  dialog box, enter the following data:

Field name User action and values Comment

 Application comp. YDP_DP

Long description Steps within the black box DP

8. Choose Enter .

9. In the Assign Display Grouping  dialog box, choose Enter .

10. In the Process Chain Maintenance Modified Version screen, choose Save.

11. Choose Process Chains to refresh the change.

12. Choose the Process Chain YDP_FORECASTING, choose Display Components. 

13. In the Assign Display Grouping  dialog box, choose F4.

14. In the Selection dialog box, choose the Application Components YDP_DP you created instep 7.

15. Repeat step 12 to step 14 to assign the process chain YDP_DATA_LOAD_PRE_EX,YDP_DATA_LOAD_PRE_ECC, YDP_CONSOLIDATING, YDP_RLSNP, YDP_RLECC tothe Application Components YDP_DP.

16. Repeat step 2 to step 15 to assign the other Process Chains to the corresponding

 Application Components. Follow the table below for maintenance:

Process Chain Application Components Long Description

YDP_BU_CORR_HIST

YDP_BACKUP

YDP - Backup and DataManagement

YDP_BU_BU_FORECAST

YDP_BU_DAILY_CHANGE

YDP_DATA_LOAD_FLATYDP_TRANS_LOAD

YDP - Data Load(Transaction Data)

ZDPA_ECC_TRANS_DATA

ZBRP_Y93_ZDPA_PC01YDP_MASTER_LOAD

YDP - Data Load(Master Data)

YDP_LOAD_PREYDP_SUB

YDP – Sub ProcessChain

3.5 Setting up Alert Profile (Optional)

3.5.1 Set Up Application-Specific Alert Profiles - APO ForecastAlert Profiles

Use

Page 113: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 113/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 113 of 130

Maintain this alert profile if you want to monitor forecast alerts for Demand Planning. Theprofile allows you to maintain a user-specific selection of alerts corresponding to your area ofresponsibility.

Prerequisites

  Optional: You have specified priorities for forecast alerts in Customizing. If you donot specify priorities, the system issues all forecast alerts as warning messages, asstandard.

  In the Forecast Profile for Demand Planning, you have defined a diagnosis group.The diagnosis group contains the threshold values, which trigger an alert when theyare exceeded. For Univariate forecasts these are always maximum values.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/AMON_SETTING

SAP SCM Menu Supply Chain Monitoring   Current Settings  Set

 Alert Monitor

2. In the Alert Profile Maintenance window, choose Create Profile.

3. In the Create Alert Monitor Profile window, enter the value as follows:

Field name User action and values Comment

Category

 Application Profile X selected

Identification

Profile ID YDP_FP01

Description Forecate alert profile AMO Application APO: Forecast Planning Choose from drop list

4. Choose Create.

5. In the  Alert Profile Maintenance: Change <your alert profile name> window, choose theSelection  tab page at the right side of the window, in the Select Alert Types  section,expand the node Demand Planning  –  Forecast Alerts, maintain the value as the tablebelow:

Alert Types Selection Information Warning Error

MAD upper limit exceeded X

MAPE upper limit exceeded X

Here you should choose the alert types based on the parameters you selected inyour diagnosis group.

6. In the Object Selection section of the same screen, maintain the value as the table:

Field name User action and values Comment

Object Selection

Planning Book YDP_PB_MASS_JOB The planning book name

Select the planning book for which the system should determine alerts. You canenter a selection restriction. If you enter a selection range for a specificcharacteristic, only those alerts will be displayed that have that particular

Page 114: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 114/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 114 of 130

characteristic. If you do not enter a selection, the system determines alerts for allselections in a planning book.

7. Choose Save. Expand the node APO: Forecast Planning  at the left side of the window,then you can see the alert profile you just created. 

3.5.2 Set Up Application-Specific Alert Profiles - APO Supply& Demand Planning Alert Profiles

UseMaintain this alert profile if you want to monitor macro-dependent alerts for Demand Planning.The profile allows you to maintain a user-specific selection of alerts corresponding to yourarea of responsibility.

Here we only focus on database alerts that have a better performance compared withdynamic alerts.

PrerequisitesYou should create a macro under a planning book and data view, in the macro, an alert willbe generated if some conditions is met, for example, if the adjustment by the central plannervaries from the manual forecast more than 30%.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/AMON_SETTING

SAP SCM Menu Supply Chain Monitoring   Current Settings  Set Alert Monitor

2. In the Alert Profile Maintenance window, choose Create Profile.

3. In the Create Alert Monitor Profile window, enter the value as follows:

Field name User action and values Comment

Category

 Application Profile X selected

Identification

Profile ID YDP_SDP01

Description Macro alert profile

 AMO Application APO: Supply & Demand Planning Choose from drop list

4. Choose Create.5. In the  Alert Profile Maintenance: Change <your alert profile name> window, choose the

Selection  tab page at the right side of the window, in the Select Alert Types  section,expand the node SDP – Database Macro Alerts, maintain the value as the table below:

Alert Types Selection Comment

Requirements Planning – Macro Status Alerts X

6. In the Object Selection section of the same screen, maintain the value as the table:

Field name User action and values Comment

Object Selection

Planning Book YDP_PB_CENTRAL_PLAN Your planning bookname

Page 115: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 115/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 115 of 130

7. In the Database Alerts section of the same screen, maintain the value as follows:

Data View Selection Description Comment

YDP_DV_FC_REV YDP_MP_ALL_PROD_LOC Your selection

Here select the planning book and then data views for all the database or dynamicalerts for which you want the system to determine alerts.

If you want to choose all the database alerts for a planning book, enter a blankrow in the selection area for data views.

8. Choose Save. Expand the node  APO: Supply & Demand Planning  at the left side of thewindow, then you can see the alert profile you just created.

In this project, we make an example for the macro-dependent alert. Please refer toMacro: Central adj/man. fcst > 30% BG COL = RE(Planning book:

YDP_PB_CENTRAL_PLAN, Data View: YDP_DV_FC_REV). You would maintainthe macro-dependent alert based on your specific business requirement.

3.5.3 Set Up Overall Alert Profiles

UseMaintain this overall alert profile if you want to track alerts in APO Alert Monitor. The profileallows you to maintain a user-specific selection of alerts corresponding to your area ofresponsibility, and can be set up to track alerts by planning folder.

Procedure

1. Access the transaction using one of the following navigation options:Transaction code /SAPAPO/AMON_SETTING

SAP SCM menu  Advanced Planning and Optimization Supply Chain

Monitoring   Current Settings  Set Alert Monitor  

2. In the Alert Profile Maintenance window, choose Create Profile.

3. In the Create Alert Monitor Profile window, enter the value as follows:

Field name User action and values Comment

Category

Overall Profile X selected

Identification

Profile ID YDP_OAP

Description Overall alert profile

4. Choose Create. 

5. In the Alert Profile Maintenance: Change <your overall alert profile name> window,choose the Setting  tab page at the right side of the window, maintain the value follows:

Field Name User action and values  Comment

Planning Version 001

Period

Page 116: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 116/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 116 of 130

Relative Time Interval X Selected

Months 12

 Application-Specific AlertProfiles

 Alert Profile for APO: ForecastPlanning

YDP_FP01 Your forecast alert profile

 Alert Profile for APO: Supply &Demand Planning

YDP_SDP01 Your supply & demandplanning alert profile

6. Choose Save. Expand the node Overall Alert Profiles at the left side of the window. Youcan see the alert profile you just created.

3.5.4 Assign Planners to Alert Profiles (Optional)

UseTo link specific users to specific alert profiles, if you want to display the alert at interactiveplanning screen, you have to maintain the relationships. The planners are not able to see anyalerts in Interactive Planning unless their SAP user ID is assigned to an alert profile.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDPALPR

SAP SCM Menu Demand Planning   Environment  Current settings

 Assign Planners to Alert Profile

2. In the  Assign Planner to Alert Profile window, you can assign each planner for specific

alert profiles. Maintain value as table:

Field name User action andvalues

Comment

Plannr XXXX Planner user id

Planning Area YDP_PA

FCS profl. YDP_FC01 Forecast alert profile, ifrelevant

SDP Profl. YDP_SDP01 Supply & demand planningalert profile, if relevant

3. Choose Save.

3.6 Setting up Roles and Authorizations

PurposeThe SAP authorization concept protects transactions, programs, and services in SAP systemsfrom unauthorized access. On the basis of the authorization concept, the administratorassigns authorizations to the users that determine which actions a user can execute in theSAP system, after he or she has logged on to the system and completed the authenticationprocess.

To access business objects or execute SAP transactions, a user requires the correspondingauthorizations, since business objects or transactions are protected by authorization objects.

Page 117: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 117/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 117 of 130

The authorizations represent instances of generic authorization objects and are definedaccording to the tasks and responsibilities of the employee. The authorizations are groupedinto an authorization profile that is associated with a role. The user administrators then assignthe corresponding roles using the user master record, so that the user can use thecorresponding transactions for his or her tasks.

Use

This chapter describes the security roles and authorization set up required to support theDemand Planning scenario.

 As described in the SCM Demand Planning BPD document, there are five SAP roles definedto support the process:

  Local Demand Planner (AME Area). This role is assigned to a sales/demand plannerwho is responsible for America region.

  Local Demand Planner (APJ Area). This role is assigned to a sales/demand plannerwho is responsible for Asia-Pacific, Japan region.

  Local Demand Planner (EU Area). This role is assigned to a sales/demand plannerwho is responsible for Europe region.

  Central Demand Planner. This role is assigned to a sales/ demand planner,responsible for the central demand plan. The central demand plan covers all theareas.

  Demand Planning Administrator. This role covers the administrative functions tomonitor and maintain the demand planning system with regards to dataadministration, master data maintenance and batch processes.

The Core Interface (CIF) Administrator role will be required in the DP scenario if the demandplan is going to be released to ECC. This role is not covered in this document.

3.6.1 Role Overview

Modified versions of the SAP Standard delivered roles are used in this scenario in order torestrict to specific planning books and selection ID used in the demand planning scenario andto use the Business Intelligence (BI) authorization concept.

For more information on authorization objects relevant to Demand Planning, see theapplication help for Demand Planning:

http://help.sap.com/saphelp_scm70/helpdata/en/ed/f061c18ddd79448c49064f0e645725/frameset.htm 

The table below lists the major access restriction for the different roles:Business Role SAP SCM

RoleCopy fromstandard role

Planning Area Accessible

Planning Book Accessible

Data View Accessible

BI Authorization

Local DemandPlanner( AME area)

YDP_IP_LOC_AME

SAP_SCM_FCS _PLN_STD

(DemandPlannerStandard)

YDP_PA YDP_PB_LOCAL_PLAN

YDP_DV_LOC_ADJ

YDP_LOC_AME

Local DemandPlanner ( APJarea)

YDP_IP_LOC_APJ

SAP_SCM_FCS _PLN_STD

YDP_PA YDP_PB_LOCAL_PLAN

YDP_DV_LOC_ADJ

YDP_LOC_APJ

Page 118: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 118/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 118 of 130

3.6.2 BI Authorization in Demand PlanningBusiness Intelligence (BI) has its own authorization concept that differs in some details fromthe normal SAP authorization concept. You can use the BI authorization concept to restrictthe ability to access specific characteristics or characteristic values in Demand Planning.

Since organizations are set up differently for each implementation and assignments of localplanners are specific to the implementation, you may modify the authorization based on yourrealized organizational structure by following the steps mentioned below. This sectiondescribes how to create or modify the role based on the organization‟s requirement. 

3.6.2.1 Authorization Relevant InfoObjects

UseWe only enable navigation attribute Area (attribute of characteristic Region) in the demandplanning object structure for BI authorizations control. The authorization relevant flag need tobe set up on the InfoObjects definition in the BI Administrator Workbench.

Procedure1. Access the activity using the following navigation options:

Transaction Code RSA1 

SAP SCM Menu Information Systems  Business Information Warehouse

Modeling Data Warehousing Workbench: Modeling

2. Choose InfoObjects in the left window.3. Expand the InfoArea Tree RDS Dem and Planning in the middle window.

Local DemandPlanner

( EU area)

YDP_IP_LOC_EU

SAP_SCM_FCS _PLN_STD

YDP_PA YDP_PB_LOCAL_PLAN

YDP_DV_LOC_ADJ

YDP_LOC_EU

CentralDemandPlanner

YDP_IP_CTR_ALL

SAP_SCM_FCS _PLN_EXP(DemandPlanner Expert).

YDP_PA YDP_PB_CENTRAL_PLAN

YDP_PB_MASS _JOB

* YDP_CTR_ALL

DemandPlanning Administrator

YDP_MP_ALL_ADMIN

( YDP_IP_CTR_ALL isalsoassigned)

SAP_SCM_FCS _PLN_ADM

* * * 0BI_ALL

Page 119: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 119/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 119 of 130

4. Expand the InfoObject Catalog Char. Of RDS DP  in the middle window.

5. Choose Characteristic Region in the middle window.

6. Choose the Attribute tab page in the right window.

7. If you are currently in display mode, choose Display <-> Change above to switch tochange mode.

8. Find the row of attribute ZY93_BC09 (Area), and tick the field AuthorizRelevant. 

9. Choose Activate to acitvate the infoobject.

If you need to enable the BI authorization control on a Characteristic, but not aNavigation Attribute, you can follow the same instructions mentioned above, theonly difference are:

In step 7, choose the Business Explorer tab page.

In step 9, you do not need to find any row. Select the Authorization Relevantradio button.

If some objects are inactive due to this change, re-activate these objects.

In addition, other infoobjects are also required to be flagged as authorization relevant. In

standard delivered SAP, these objects are not flagged as authorization relevant, so you need

to change the following objects following the hits above.

  0TCAACTVT - Activity in Analysis Authorizations

  0TCAIPROV - Authorizations for InfoProvider

  0TCAVALID - Validity of an Authorization

You can find these characteristics under InfoArea Unassigned Notes and InfoObject Catalog

Unassigned  Characteristics. By using Search in the middle window, you can locate the 3

characteristics mentioned above more efficiently.

3.6.2.2 Maintain Analysis Authorization

Use

You create four authorizations here to control the access to different Areas. The authorization

is assigned to different roles later.

Procedure

1. Access the activity using the following navigation options:

Transaction Code RSECADMIN  

SAP SCM Menu  Advanced Planning and Optimization  Demand Planning

Environment Manage Analysis Authorizations

2. Choose Maintenance on the Authorizations tab page.3. Input the 1

st authorization name YDP_LOC_AME  in the field Authorization, and choose

the Create. 4. On the next screen, input name YD_ LOC_AME in the field Short Text: 5. Choose Insert Row.6. Input 0TCAACTVT in the column Charact./Dimensions, then choose Enter. 7. Repeat step 5 and step 6 to add Characteristic 0TCAIPROV  and 0TCAVALID 

8. Select the all the 3 rows you have just inserted, and choose Full Authorizations (for these3 characteristics, there is no restriction here).9. Choose Insert Row.

Page 120: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 120/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 120 of 130

10. Use Selection help (F4) in the field Charact./Dimensions to choose InfoObjectZY93_BC05__ZY93_BC09 (Area), then choose Enter. 

11. Select the row ZY93_BC05_ZY93_BC09 (Area), and choose Details. 12. On the Value Authorizations tab page, choose Insert Row. 13. Input or use the selection help to choose EQ in the field Operator and AME in the field

Technical Character.(from), then choose Enter. 14. If there the Log Display window appears, choose Enter. 15. Choose Back  twice to return to the initial screen.

Use the copy function by choosing the pushbutton on the initial screen to create the other 3authorizations YDP_LOC_APJ, YDP_LOC_EU, and YDP_CTR_ALL.Each time you have copied the new authorization, select the row ZY93_BC05__ZY93_BC09(Area), and choose Details. On the new screen, change the field according to the table below:

Authorization name Intervals assigned for ZY93_BC05__ZY93_BC09 (Area)  

YDP_LOC_APJ  APJ

YDP_LOC_EU EU

YDP_CTR_ALL *

Save the new authorization each time you have finished the steps above.

3.6.3 Authorization Role and Profile Generation

UseDifferent roles are defined for Local Planner, Central Planner, and DP Administrator in thissection.

In the role maintenance transaction (t-code: PFCG), you can review the authorizationsassociated with this role:

Procedure1. Access the activity in SAP SCM system by navigating as follows:

Transaction code PFCG

SAP SCM Menu Tools   Administration  User Maintenance Role

 Administration  Roles

2. On the Role Maintenance screen, enter the following value:

Parameter ValueRole SAP_SCM_FCS_PLN_STD

3. Choose Copy Role. 

4. In the dialog box that appears, make the following entries:

Parameter Value

from role SAP_SCM_FCS_PLN_STD

to role YDP_IP_LOC_AME

5. Choose Copy All .

6. Choose Change for the newly created role and make the following entry:Parameter Value

Page 121: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 121/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 121 of 130

Description Demand Planning Local Planner –  AME Area

7. Choose Save.

8. Choose the Authorizations tab page. 

9. Choose Expert Mode for Profile Generation.

10. Choose Delete and Recreate Profile and Authorizations.

11. Choose ENTER.

If you cannot see the technical name of the authorization objects, choose themenu Utilities (M) -> Technical Name On.

12. Choose Manually to add new authorization objects.

13. In the Manual selection of authorizations box, enter the two authorization objectsS_TCODE  and S_RS_AUTH in the Authorization Objects area, then choose Continue

(Enter). 

14. In the authorization objects tree, expand the authorization you have just insert: Manually  Cross-Application Authorization Objects (AAAB) Manually Transaction Code Check atTransaction start  (S_TCODE ) Manually Transaction Code Check at Transaction start  

(S_TCODE )  Transaction Code (TCD) 

15. Choose the white bar of the authorization field Transaction Code (TCD). 

16. In the Field values box, input SU53 in the „ From‟  field. In the second row, input /SAPAPO/MC62  in the „ From‟  field. Then choose button Transfer (Enter) 

17. Now the yellow lights have been turned to green in front of these lines.

18. In the authorization objects tree, expand the authorization you have just insert: Business

Information Warehouse (RS)   Manually BI Analysis Authorizations in Role(S_RS_AUTH)    Manually BI Analysis Authorizations in Role (S_RS_AUTH)   BI Analysis Authorizations: Name of an Authorization (BIAUTH). 

19. Choose the white bar of the authorization field BI Analysis Authorizations: Name of an Authorization (BIAUTH). 

20. In the Field values box, input YDP_LOC_AME in the „ From‟  field. Then choose Transfer(Enter). 

21. Now the yellow lights have turned to green in front of these lines.

22. Expand the tree: Standard APO Authorization Objects (APO). There are nineauthorization objects with yellow light. And unter the tree Standard Basis – CentralFunctions (BC_Z), there are other authorization objects with yellow light . We need to

expand them one by one and fill them with content as follows. Each authorization objectcan be maintained as in step 18 to step 20.

In the following table, (+) means adding the following content, and (=) meanskeeping the default value proposed by system. * means choosnig Full Authorization.

AuthorizationObject Field Name Content

C_APO_DPPR ACTVT (+)*

APO_PROD (+)*

C_APO_FUN APO_FUNC (+)C_CHARC

Page 122: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 122/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 122 of 130

APO_PAREA (+) YDP_PA

C_APO_IOBJ ACTVT (+)02,03

APO_IOBJNM

(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,

 ZY93_BK10, ZY93_BK11, ZY93_BK12

APO_PAREA (+) YDP_PA

C_APO_LOC ACTVT (+)02,03,16

APO_LOC (+)*

C_APO_PB ACTVT (+)02,03,16

APO_DVIEW (+)YDP_DV_LOC_ADJ

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

C_APO_PROD ACTVT (+)02,03,16

APO_LOC (+)*

APO_PROD (+)*

C_APO_PROM ACTVT (+)02,03

APO_PROMID (+)*

C_APO_SEL3 ACTVT (+)02,03,16

APO_PAREA (+)YDP_PA

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

APO_SELTXT (+)YDP_IP_LOC_AME

APO_VERS (+)001

C_APO_VERS ACTVT (+)02,03,16

APO_APKZ (+)AM,DP,MD,SNP

APO_KENN (+)*

APO_MOD (+)000APO_VERS (+)001

S_APPL_LOG ACTVT (+)03

ALG_OBJECT (+) APO_FCS

ALG_SUBOBJ (+)*

23. Choose Generate from the application toolbar.

24. In the Generate Profile dialog box, choose Generate.

25. In the window, keep the text proposed by system and choose Execute (Enter).

26. Choose Back twice. 

27. Repeat these steps for the following values:

From Role To Role Role Description

SAP_SCM_FCS_PLN_STD YDP_IP_LOC_APJ Demand Planning Local Planner –  APJ Area

SAP_SCM_FCS_PLN_STD YDP_IP_LOC_EU Demand Planning Local Planner – EU Area

SAP_SCM_FCS_PLN_EXP YDP_IP_CTR_ALL Demand Planning Central Planner – All Areas

SAP_SCM_FCS_PLN_ADM YDP_MP_ALL_ADMIN Demand Planning Administrator

Page 123: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 123/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 123 of 130

For the roles YDP_IP_LOC_APJ and YDP_LOC_EU , they are quite similar withYDP_IP_LOC_AME, you can copy from YDP_IP_LOC_AME , and only modifythe fields in Bold in the two tables below by choosing Change Authorization dataon the Authorizations tab page. 

  Modify or add the authorization objects for the role YDP_IP_LOC_APJ  according to

the table below:

AuthorizationObject Field Name Content

S_TCODE TCD SU53

S_RS_AUTH BIAUTH YDP_LOC_APJ

C_APO_DPPR ACTVT (+)*

APO_PROD (+)*

C_APO_FUN APO_FUNC (+)C_CHARC

APO_PAREA (+) YDP_PA

C_APO_IOBJ ACTVT (+)02,03

APO_IOBJNM

(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,

 ZY93_BK10, ZY93_BK11, ZY93_BK12

APO_PAREA (+) YDP_PA

C_APO_LOC ACTVT (+)02,03,16

APO_LOC (+)*

C_APO_PB ACTVT (+)02,03,16

APO_DVIEW (+)YDP_DV_LOC_ADJ

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

C_APO_PROD ACTVT (+)02,03,16

APO_LOC (+)*APO_PROD (+)*

C_APO_PROM ACTVT (+)02,03

APO_PROMID (+)*

C_APO_SEL3 ACTVT (+)02,03,16

APO_PAREA (+)YDP_PA

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

APO_SELTXT (+)YDP_IP_LOC_APJ  

APO_VERS (+)001

C_APO_VERS ACTVT (+)02,03,16

APO_APKZ (+)AM,DP,MD,SNP

APO_KENN (+)*

APO_MOD (+)000

APO_VERS (+)001

S_APPL_LOG ACTVT (=)

ALG_OBJECT (+) APO_FCS

ALG_SUBOBJ (+)*

  Modify or add the authorization objects for the role YDP_IP_LOC_EU  according tothe table below:

Authorization Field Name Content

Page 124: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 124/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 124 of 130

Object

S_TCODE TCD SU53

S_RS_AUTH BIAUTH  ZPDA_LOC_EU

C_APO_DPPR ACTVT (+)*

APO_PROD (+)*

C_APO_FUN APO_FUNC (+)C_CHARC

APO_PAREA (+) YDP_PA

C_APO_IOBJ ACTVT (+)02,03

APO_IOBJNM

(+) ZY93_BK07, ZY93_BK08, ZY93_BK09,

 ZY93_BK10, ZY93_BK11, ZY93_BK12

APO_PAREA (+) YDP_PA

C_APO_LOC ACTVT (+)02,03,16

APO_LOC (+)*

C_APO_PB ACTVT (+)02,03,16

APO_DVIEW (+)YDP_DV_LOC_ADJ

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

C_APO_PROD ACTVT (+)02,03,16

APO_LOC (+)*

APO_PROD (+)*

C_APO_PROM ACTVT (+)02,03

APO_PROMID (+)*

C_APO_SEL3 ACTVT (+)02,03,16

APO_PAREA (+)YDP_PA

APO_PLBK2 (+)YDP_PB_LOCAL_PLANAPO_SELTXT (+)YDP_IP_LOC_EU  

APO_VERS (+)001

C_APO_VERS ACTVT (+)02,03,16

APO_APKZ (+)AM,DP,MD,SNP

APO_KENN (+)*

APO_MOD (+)000

APO_VERS (+)001

S_APPL_LOG ACTVT (=)

ALG_OBJECT (+) APO_FCS

ALG_SUBOBJ (+)*

  Modify or add the authorization objects for the role YDP_IP_CTR_ALL according tothe table below:

AuthorizationObject Field Name Content

S_TCODE TCD SU53

S_RS_AUTH BIAUTH YDP_CTR_ALL

C_APO_ADV ACTVT (=)

APO_PLBK (+)*

APO_VIEW (+)*

Page 125: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 125/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 125 of 130

C_APO_ADVN ACTVT (+)*

APO_MAKRON (+)*

C_APO_AMON ACTVT (=)

C_APO_ATP ACTVT (=)

APO_ATP_AR (=)

C_APO_DPPR ACTVT (+)*

APO_PROD (+)*

C_APO_FUN APO_FUNC (=)

APO_PAREA (+) YDP_PA

C_APO_IOBJ ACTVT (+)*

APO_IOBJNM (+) *

APO_PAREA (+) YDP_PA

C_APO_LOC ACTVT (+)*

APO_LOC (+)*

C_APO_MAC ACTVT (+)*

APO_MACRO (+)*

APO_PLBK (+)*

APO_VIEW (+)*

C_APO_MOD ACTVT (+)*

APO_KENN (+)*

APO_MOD (+)*

C_APO_PB ACTVT (+)02,03,16

APO_DVIEW (+)*

APO_PLBK2(+)YDP_PB_CENTRAL_PLAN,YDP_PB_MASS_JOB

C_APO_PROD ACTVT (+)*

APO_LOC (+)*

APO_PROD (+)*

C_APO_PROM ACTVT (+)02,03

APO_PROMID (+)*

C_APO_RES ACTVT (+)*

APO_LOC (+)*

APO_PLNR (+)*

APO_RES (+)*

C_APO_SEL3 ACTVT (+)02,03,16

APO_PAREA (+)YDP_PA

APO_PLBK2 (+)YDP_PB_LOCAL_PLAN

APO_SELTXT (+)YDP_IP_LOC_APJ

APO_VERS (+)001

C_APO_TSID ACTVT (+)*

APO_STSID (+)*

C_APO_VERS ACTVT (+)*

APO_APKZ (+)*APO_KENN (+)*

Page 126: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 126/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 126 of 130

APO_MOD (+)*

APO_VERS (+)*

S_TRANSLAT ACTVT (=)

TLANGUAGE (+)*

TRANOBJ (+)*

S_APPL_LOG ACTVT (=)

ALG_OBJECT (+) APO_FCS

ALG_SUBOBJ (+)*

  Modify or add the authorization objects for the role YDP_MP_ALL_ADMIN, and add *to all the empty authorization fields.

Result

You have generated all the authorization profiles needed for the scenario.

3.6.4 Creating SAP SCM Users and Assign Proper Roles

Use

You create four users here for different business role users. The access authorization is

controlled by assigning different roles to each user.

Procedure

1. Access the activity using the following navigation options:

Transaction Code SU01 

SAP SCM Menu Tools  Administration User Maintenance Users

2. Input User ID LOC_PLN_AME and choose Create.3. On the Address tab page, make the following entries:

Parameter Value

Last Name that is, Local Planner

First Name that is, AME

4. On the Logon Data tab page, make the following entries:Parameter Value

Initial Password that is, testing01

Repeat Password that is, testing01 (as same as cell above)

5. On the Roles tab page, make the following entries:

Parameter Value

Role YDP_IP_LOC_AME

Valid from that is, date of today

Valid to that is, 31.12.2099 

6. Choose Save, then you have created the user and assigned it with the role of the localdemand planner - AME area.

Page 127: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 127/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 127 of 130

7. Repeat the steps above to create the following users with a different role assignmentaccording to the table below:

User ID Role Assignment

LOC_PLN_APJ YDP_IP_LOC_APJ

LOC_PLN_EU   YDP_IP_LOC_EU  

CTR_PLN_ALL  YDP_IP_CTR_ALL 

DP_ADMIN YDP_MP_ALL_ADMIN

ResultYou have created the necessary users and assigned the respective role for them.

3.6.5 Assigning User to Planning Book

UseYou need to assign the default planning book to each DP user. When a planner opens thedemand planning desktop, he or she sees the planning book assigned to them. Note that youcan assign only one planning book to a user.

You can restrict the users‟ authorization so that they can only navigate to a specified planningbook or a specific data view.

Procedure1 To access the activity, use one of the following navigation options:

Transaction code  /SAPAPO/SDPPLBK

SAP Menu  Advanced Planning and Optimization

 Demand Planning

 Environment  Current Settings  Assign User to PlanningBook

2 Choose New Entries. 

3 Change the following two lines, the first without the transaction code as shown in thetable:

Name Trans.Code

Plng book Data view Specificbook

SpecificView

CTR_PLN_ALL  YDP_PB_CENTRAL_PLAN YDP_DV_FC_REV  

If you set an indicator in the Specific book  column, the user whose name you have

entered in the left column can only navigate to the specified planning book in interactivedemand planning (the user can access all the data views for this planning book).

If you set an indicator in the Specific View  column, the user you have entered in the leftcolumn can use this planning book and the planning view only and cannot navigate toother planning books and views in the interactive demand planning.

4. To restrict a person‟s authorization (for example, for a local planner), so that they canonly use planning book YDP_PB_LOCAL_PLAN and data view YDP_DV_LOC_ADJ, youhave to maintain the table as follows:

Name Trans.Code

Plng book Data view Specificbook

SpecificView

LOC_PLN  _APJ  

YDP_PB_LOCAL_PLAN YDP_DV_LOC _ADJ

X X

Page 128: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 128/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 128 of 130

5. Choose Save. If a system message appears, choose or create a customizing request andgo back.

6. Repeat the same procedure for all other users.

3.7 Setting up Chart Engine (Optional)

PrerequisitesMake sure the business function SCM_APO_DP_SNP_CTM is activated.

3.7.1 Maintaining User Setting

UseHere you can specify which of the technologies, SAP Business Graphics or Chart Engine, you

want to use by setting the relevant user parameter. Here you choose Chart Engine as default.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code SU01

SAP SCM Menu Tools   Administration  User Maintenance  Users

2. In the User Maintenance: Initial Screen window, enter user name, then choose Change.

3. Choose the Parameters tab page, and make the following changes:

Field Name User action and values Comment

Parameter ID /SAPAPO/SDP_CHART_V

Parameter value Do not maintain a value, oruse any other value thanCHART.

Parameter ID /SAPAPO/SDP_CHART_TB

Parameter value

X

To enable chart enginecustomizing tool bardisplayed in interactiveplanning screen.

4. Choose Save. 

3.7.2 Maintaining Chart Setting

UseThe chart is user-specific, planning book-specific, and data view-specific. Here the userconfigures the chart as he or she wants, including in which planning book or data view toshow chart, display which key figures, in which chart type, and so on.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDP94

SAP SCM Menu  Advanced Planning and Optimization  Demand

Page 129: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 129/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

© SAP AG Page 129 of 130

Planning  Planning  Interactive Demand Planning

2. In the Interactive Planning  window, choose Planning Book   YDP_PB_CENTRAL_PLAN,and chooseData View  YDP_DV_HS_ADJ.

This is just an example. So you can maintain the chart setting for other planningbooks and data views as desired.

3. In the Selection Profile section, chooseYDP_IP_CENTRAL_ALL.

4. In the Selected Objects section, choose Select all. 

5. In the Header  section in the work area, choose Load data.

6. In the Header   section in the work area, choose Switch to table/graphic mode, thenchoose Switch to live/design mode 

7. In the Planning Book: [Design]  window, choose Switch Graphic Settings, a setting dialogbox appears.

8. Choose the Overview  tab page, expand the node Series, and make the following settings

for each key figure:

Key Figures Setting User action and values

Corrected Sales History Visibility X

Chart type Lines

Historical Sales Correction Visibility X

Chart type Columns

Historical Sales Override Visibility Not checked

Historical Sales without additionaldemand

VisibilityNot checked

Sales Quantity 1 Visibility X

Chart type Lines

9. Choose Set Horizon, from the context menu. You can choose set or choose the start andend period of the chart. For example, you can choose 24 periods here.

10. Choose Set Value Scale, in the Set Minimum and Maximum dialog box, choose Automatic Minimum and Automatic Maximum. Then choose Continue.

11. Choose Save Graphic Settings.

12. Choose Define Layout . On the Layout Definition  screen, choose Table, Graphic   in theContainer One  section. Choose Vertically   in  Arrangement of grid and graphic   section.Then the table and the graphic are both displayed on the interactive planning screen.Choose Continue.

13. On the Planning Book: [Design] PLANNING BOOK FOR CENTRAL PLANNER /HISTORICAL screen, choose Save. In the Confirmation Prompt dialog box, choose  AllFunctional Areas, then choose Save.

14. Choose Switch to live/design mode to go back to live mode.

15. Repeat the steps for other planning books/data views.

3.7.3 Central Maintaining and Copying Chart Customizing

Use

Since the chart customizing is user-specific, planning book-specific, and data view-specific,the user can delete the selected chart customizing by choosing specific planning book and

Page 130: 96163055 SCM7 DP Config Guide

7/21/2019 96163055 SCM7 DP Config Guide

http://slidepdf.com/reader/full/96163055-scm7-dp-config-guide 130/130

SAP Best Practices   SAP SCM Demand Planning Configuration (Y94): Configuration Guide

data view with this activity. The chart customizing can also be copied to other users by thisactivity.

Procedure1. To access the activity, use one of the following navigation options:

Transaction code /SAPAPO/SDP_CHART

SAP SCM Menu  Advanced Planning and Optimization  Demand

Planning  Environment  Current Settings  Maintain Chart Customizing

2. In the Maintain Chart Customizing  window, choose the Planning Book  YDP_PB_CENTRAL_PLAN, Data View  YDP_DV_HS_ADJ.

3. Choose Interactive Planning  in the Application section.

4. If you want to delete the chart customizing, then choose Delete Chart Customizing  inChoose an Activity  section.

5. Choose Execute. The customizing for this planning book and data view is deleted.

6. If you want to copy chart customizing to other users, choose Copy Chart Customizing  inthe Choose an Activity  section.

7. Enter or choose the User  in the Source User  section.

8. Enter or choose the User  in the Target Users section. The target user can be more thanone user.