9.mpr - may 2012
TRANSCRIPT
Third Party Quality Audit(TPQA)
National Cyclone Risk Mitigation Project(NCRMP)
Revenue (DM) DepartmentGovernment of Andhra Pradesh
National Cyclone Risk Mitigation Project(NCRMP)
Revenue (DM) DepartmentGovernment of Andhra Pradesh
in JointVenture
with
Third Party Quality Audit(TPQA)
National Cyclone Risk Mitigation Project(NCRMP)
Revenue (DM) DepartmentGovernment of Andhra Pradesh
National Cyclone Risk Mitigation Project(NCRMP)
Revenue (DM) DepartmentGovernment of Andhra Pradesh
in JointVenture
with
MONTHLY REPORT
1 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
2.0 Third Party Quality Audit Consultant 3
3.0 Major Activities and Review Meetings of the Month 3
4.0 Status of TPQA Visits 4
5.0 Progress of NCRMP works 5
TPQA Status Report for NCRMP Works To the end of(31-05-2012) 6
6.0 District wise status of tests conducted by TPQA 29
7.0 Details of QC Audit Reports Submitted during this Month 30
8.0 Details of Environmental & Social Reports Submitted during this Month 32
9.0 Details of Electrical QC Reports during this Month 34
10.0 Observations of Submitted Reports 35
11.0 Statement Showing the Inspections and Site Visits of Districts during the
Month of May-201267
Photographs of Site Visits during the Month of April - 2012
MONTHLY REPORT
2 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state, the
nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-December,
cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic events are
increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging
from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster due
to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based on
experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.
National Cyclone Risk Mitigation Project (NCRMP) – Project Implementation Unit (PIU), Andhra Pradesh, headquartered at
Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project “Construction of Multipurpose Cyclone Shelters, Roads to CycloneShelters, and Roads to habitations and Roads & Bridges under NCRMP” is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for which
agreements are concluded in each district is shown in the table below.
District
No. of works(Under Concluded Agreements) No. of works under Progress No. ofworks
notstartedRHB RCS MPCS Bridges Roads
(R&B) Total RHB RCS MPCS Bridges Roads(R&B)
Srikakulam 6 8 2 4 1 21 6 5 2 3 1 4
Vizianagaram - - - 2 1 3 - - - 2 1 0
Visakhapatnam 8 6 7 - - 21 8 6 7 - - 0
East Godavari 2 8 3 - - 13 2 7 3 - - 1
West Godavari 10 - - - - 10 10 - - - - 0
Krishna 5 3 - - - 8 5 3 - - - 0
Guntur 3 12 - 2 - 17 3 9 - 2 - 3
Prakasham 14 7 2 1 - 24 14 7 2 1 - 0
Nellore 16 8 - - - 24 16 8 - - 0
MONTHLY REPORT
3 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Roads to
Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal districts The Commissioner for
Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP has selected Egis International in JV
with Egis India Consulting Engineers (I) Pvt. Ltd. On 31st May’2011, the Contract for Consultancy Service was signed
between The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP and
the Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd.
3.0 Major Activities and Review Meetings of the Month
S.No. Place Date Activity
1 Hyderabad 09-05-2012Attended NCRMP, SPIU’s office for review ofSrikakulam, Vijayanagaram and Vishakhapatnamdistricts.
2 Nellore 23-05-2012 Convened a QA workshop for PR engineers andContractors in Nellore.
3 Vishakhapatnam 24-05-2012 Attended SPIU Review Meeting at Palm Beach Hotel.
4 Vishakhapatnam 25-05-2012 Attended to Inspection of NCRMP Works by JointSecretary and Project Director, NDMA.
5 Hyderabad 28-05-2012 Attended Commissioners office at H block for a reviewmeeting by World Bank Social expert.
MONTHLY REPORT
4 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
District Total Number of VisitsUp to Apr.'2012 In May.'2012 Up to May.'2012
Srikakulam 212 43 255Vizianagaram 50 5 55
Vishakhapatnam 213 18 231East Godavari 364 57 421West Godavari 286 37 323
Krishna 187 17 204Guntur 189 12 201
Prakasam 244 25 269Nellore 193 28 221
No. of Visits by TPQA
MONTHLY REPORT
5 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 Progress of NCRMP works:
The district wise progress of works is shown below. The works in the West Godavari are not started and the works inKrishna District has just started. At many places the first milestone is completed but works are not started. The linedepartments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per theagreement conditions should be imposed.
Third Party Quality Audit by Egis – India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 17 4
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
5 West Godavari 3 0 10 0
6 Krishna 4 0 8 0
7 Guntur 6 2 14 3
8 Prakasham 12 1 24 0
9 Nellore 16 0 24 0
Total 67 11 133 8
Total Packages for which Agreements are received 78
Total Number of works in the above packages 141
MONTHLY REPORT
6 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA Status Report for NCRMP Works To the end of(31-05-2012)
S.No. District
Packages /Works
entrustedStatus of Works
No.of
Visitsof
TPQA
TotalNo.
of QCtestsdone
NCRs
QCReportsIssued
Environmentaland Social
ReportsIssued
Issued closed PendingPR R&B Started Not
Started
1 Srikakulam 06_16 5_5 17 4 255 879 21 11 10 22 17
2 Vizianagaram - 3_3 3 0 55 366 2 - 2 9 5
3 Visakhapatnam 13_21 - 21 0 231 1407 15 11 4 25 16
4 East Godavari 07_13 - 12 1 421 812 11 11 - 26 11
5 West Godavari 03_10 - 10 0 323 277 7 3 4 24 27
6 Krishna 04_08 - 8 0 204 69 3 3 - 16 13
7 Guntur 06_15 2_2 14 3 201 373 10 10 - 18 5
8 Prakasham 12_23 1_1 24 0 269 1802 17 13 4 19 26
9 Nellore 16_24 - 24 0 221 886 11 10 1 21 24
Total 67_130 11_11 133 8 2180 6871 97 72 25 180 144
MONTHLY REPORT
7 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 31.05.2012
Category Packages allotted under Phase - 1 Names of works undereach package Agreement No. / Date DHS DFC Progress up to
31.05.2012
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&Broad to Uddandapalem
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
Road from K. UmiladaJunction to Koduru (LinkRoad)
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
Road from Borubadra,Malagam to Kollipadu viaSeepuram, Gantapeta
/2010-11, Dt.30.04.2011 30.04.11 30.04.12 complete Entire work
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B roadMobagam toDuubakavanipeta viaGajapathinagaram
/2010-11, Dt.30.04.2011 30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
Road fromTalasamudram to DolaRegulator
/2010-11, Dt.30.04.2011 30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B roadEdulavalasa - Killam toJonnam viaTalasamudram
/2011-12, Dt.30.04.2011 30.04.11 31.01.12
First Milestone i.eEarthwork & Cd
works &GSB
Bridges
NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001
Construction of bridge atKm 11/6-8 of NH-5 toPatnavanipetaConnectingSundarapalem
46/2011, Dt.17.12.2010 17.12.10 17.06.12
Second Milestone i.eCompletion up to
below the deck slab.
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
Construction of MinorBridge at Km 12/2-4 ofNH-5 to SurampetaRoad via Naruva,Mentada
45/2010-2011,Dt17.12.2010 17.12.10 17.03.12
Second Milestone i.eCompletion up to
below the deck slab.
MONTHLY REPORT
8 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
Construction of Highlevel bridge acrossBendigadda at KM 4/10of Pundi-Parlakimidi roadin Srikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.12 Completion of entirework
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)Improvements Naupada-Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.12 Completion of entirework
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
Road from NP road toURK Puram
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12 WBM GR-II &III
completeRoad from Deppuru,Bahadapalli road toOnkuluru to CycloneShelter
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12 WBM GR-II &III
complete
Road from R & B Roadto Devunthalada
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12 WBM GR-II &III
completeRoad from Pollada toKomarthalada toCyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011 06.04.11 29.09.12 WBM GR-II &III
complete
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
Road from Koyyam R &B Road toMoosavanipeta
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12 Completion of entire
work
Road from Mentada toDovupeta
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12 Completion of entire
work
Road from Kotcherelaroad to Kollibhemavaram& Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12 Completion of entire
work
Road from Kotcherlaroad toPathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011 30.04.11 07.05.12 Completion of entire
work
MONTHLY REPORT
9 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCS NCRMP/B_W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelterat Kollipadu
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of Ground floorPlinth level
Construction of Cyclone Shelterat Runku
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of stilt floor & firstfloor
Status of works in Vizianagaram District up to 31.05.2012
Category Packages allottedunder Phase - 1
Names of works under eachpackage Agreement No./ Date DHS DFC Progress up to
31.05.2012
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligadda of Konada
– Ramatheertham R&B Road toKonathalapalem via Yerukonda,
Pasupam, Kollayavalsa (Z.P.Road)
31/2010-201 Dt.1.12.2010 01.12.10 31.05.12 99.97% of work
completed
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of Minor Bridge atKm 15/2 near Chakaligadda of
Konada Ramatheertham R&B roadto Konathalapalem (via)Yerukonda, Pasupam,
Kollayavalsa (ZP Road)
34/2010-2011 Dt.8.12.2010 08.12.10 07.06.12 78.99% of work
completed
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalsa from Km 12/0 to 16/5
(Km 0/0 to 4/0 i.e. up to NH-5crossing)
33/2010-201 Dt.8.12.2010 08.12.10 07.03.12 100% of work
completed
MONTHLY REPORT
10 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.05.2012
Category Packages allotted under Phase - 1Names of works
under eachpackage
AgreementNo. / Date DHS DFC Progress up to 31.05.2012
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011 11.01.11 11.01.12 Work is completed
Road from R&B road toMullaparra up to Beach
end
/2010-11, Dt.11.01.2011 11.01.11 27.10.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011 10.03.11 09.12.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011 28.03.11 27.12.11 Work is completed
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011 28.03.22 28.12.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006 Road from R & B roadto Venkayyapalem
/2010-11, Dt.11.01.2011 11.01.11 11.10.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/007
Road from R&B road toAva- Somavaram
/2011-12, Dt.27.04.2011 27.04.11 26.01.12 Work is completed
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011 27.04.11 26.01.12 Work is completed
MONTHLY REPORT
11 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.05.2012
Category Packages allotted underPhase - 1
Names of works under eachpackage
Agreement No. /Date DHS DFC
Progress upto
31.05.2012
RCS
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001
Road from NH-5 toRamarayadupalem /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
RoadFurniture &B.T iscompleted.
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road toKrishnampalem /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works areProgress &B.T work isCompleted
Road from R & B road toKattubolu to Marripalem /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD works arein progress &WBM Grade-3 work is inprogress
Road from R & B road toRajakoduru /2010-11, Dt. 15.09.2011 15.09.11 14.09.12
CD Work iscompleted &B.T work iscompleted
NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003
Road from R & B road toPedateenarla to Chinateenarla /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
B.T & C.Croad worksareCompleted.
Road from Upamaka RajayyapetaR & B road to Janakayyapeta /2010-11, Dt. 15.09.2011 15.09.11 14.06.12
CD works areCompleted &B.T work iscompleted
MONTHLY REPORT
12 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 31.05.2012
Category Packages allotted under Phase - 1 Names of works undereach package
Agreement No./ Date
Milestone Completion Dates Progress w.r.t.milestone up to
31.05.2012First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011 02.02.12 02.06.12 02.10.12
Foundationfootings are inprogress
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011 02.02.12 02.06.12 02.10.12 1st Floor Slab is
completed.
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
FoundationRefilling & Plinthbeam works are inprogress.
Construction of cycloneshelter at Moolaparra
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Plinth Beam iscompleted. Aboveplinth beamcolumns work is inprogress.
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011 02.03.12 02.08.12 02.01.13
Stilt Slab is inCompleted. Staircase, Ramp worksand Columns laidup to 1st Floor Slablevel areCompleted.
NCRMP/B-W/AP/MPCS/PRED/03/Rambillii/004Construction of cyclone
shelter atVenkayyapalem
/2011-12, Dt.03.10.2011 02.01.12 02.04.12 02.07.12 Earth work is in
progress
NCRMP/B-W/AP/MPCS/PRED/03/Parawada/001Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011 06.01.12 06.04.12 06.07.12
E/W foundationexcavation iscompleted & Dueto site problemwork is stopped.
MONTHLY REPORT
13 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in East Godavari District up to 31.05.2012
Category Packages allotted under Phase - INames of works
under eachpackage
AgreementNo. / Date
Mile stonesRemarks
First Second Third
RHB (2 )RCS (8)MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta and
to Cyclone Shelter
/2011-12Dt:27.04.2011 30-11-2011 30-11-2011 20-01-2012 Completed.
NCRMP/B-W /RCS/PRED/04/Karapa/001Approach Road tocyclone Shelter at
Adivipudi
2011-12Dt:20.05.2011 30-11-2011 31-10-2011 31-01-2012 Completed.
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
Road fromGurjanapalli to
Bandulavaripalem
2011-12Dt:27.04.2011 30-09-2011 31-10-2011 31-01-2012 Completed.
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
2011-12Dt:07.09.2011 3 months 3 months 3 months
CC road Completed,Road furniture Work
is in Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto K.Chodipallipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
CC road Completed,Road furniture Work
is in Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
CC road Completed,Road furniture Work
is in Progress
MONTHLY REPORT
14 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
CC road Completed,Road furniture Work
is in Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months
CC road Completed,Road furniture Work
is in Progress
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Road from R&B Roadto G.Musalayyapeta
CS
2011-12Dt:07.09.2011 3 months 3 months 3 months Not yet Started
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto Chinaraghavulapeta
Cyclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011 -----------
Jungle Clarence inProgress
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction ofCyclone Shelter at
Pedaraghavulapeta ofUppalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012 3 months
16.07.2012
Sand filling work isin progress belowplinth beam
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Laxamanudupadu inThondangi
/2011-12Dt:07.09.2011
RCC Column is inprogress aboveground level
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Avulamanda
/2011-12Dt:07.09.2011
RR completed andSand filling work isin progress belowplinth beam
MONTHLY REPORT
15 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in West Godavari District up to 31.05.2012
Category Packages allotted under Phase- 1
Names of works undereach package
AgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up to
31.05.2012Remarks
First Second Third
RHB
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/0
01
Road from NH 214 A atRanga Statue center to
Harijanawada of Kalipatnam(E) (Mogalthuru Mandal
W.G.Dist.)
16 /2011-12Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
90.36%Shoulders work is in
Progress.
R&B road at PanchayatOffice to Pulaparthivarithota
via Badava(Mogalthuru Mandal
W.G.Dist.)
91.61%Shoulders work is in
Progress.
Mogalthuru Vempa R&BRoad at Uchintha Kalava
Bridge to GogulammaHarijanapeta (Mogalthuru
Mandal W.G.Dist.)
92.58%Shoulders work is in
Progress.
From Narsapur MogalthuruR&B road to Dayadaldaspetavia Venkateshwara Swamytemple (Mogalthuru Mandal
W.G.Dist.)
92%
Shoulders work is inProgress.
Road from NH 214 A road toHarijanapeta of Kothota
(Mogalthuru MandalW.G.Dist.)
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/201299.20% Shoulders work is in
Progress.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/0
02
R&B road to India Nagar (via)Pochamma temple (Narsapur
Mandal W.G.Dist.)
21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
100% Completed.
Road from R&B road toPedalanka (Narsapur Mandal
W.G.Dist.)100% Completed.
Road from LB Cheria CCroad to Chillapalemm of LBCheria (Narsapur Mandal
W.G.Dist.
100% Completed.
MONTHLY REPORT
16 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District up to 31.05.2012
Category Packages allotted under Phase - 1 Names of works under eachpackage
Agreement No. /Date DHS DFC Progress up to
31.05.2012
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B roadthrough Gantalammapalem /2011-12
Dt.27.4.2011 27.04.11 26.01.2012 CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002
Road from R & B Road to B.VThota
/2011-12Dt.27.4.2011 27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from Potlapalem Z.P roadto Chikativanipalem CD works,GSB,Gr-
II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011 27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from R&B road to CycloneShelter at Chandala CD works,GSB,Gr-
II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B Road toSatyanarayanapuram (Kalla
Mandal W.G.Dist.)25 /2011-12
Dt.26.05.2011
26/5/2011To
20/8/2011
20/8/2011to
21/11/2011
22/11/2011To
23/2/2012
100% Completed.
From A-U R&B Road toMekaladibba (Kalla Mandal
W.G.Dist.)100% Completed.
MONTHLY REPORT
17 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District’s up to 31.05.2012
Category Packages allotted under Phase - 1Names of works
under eachpackage
AgreementNo. / Date
Milestone Completion Dates Progressw.r.t.
milestoneup to
31.05.2012
RemarksFirst Second Third
RCS NCRMP/B-W/AP/RCS/PRED/06/Machipatnam/001
Road fromBhogireddipalli R&B
Road toRamakhandam
/2011-12/Dt.02.09.2011 01.12.2011 01.03.12 01.06.12 13.20%
GSB workcompletedCD work inprogress
Road from R&BRoad Chinnapuram
to Gundupalem
/2011-12/27.04.2011 01.12.2011 01.03.12 01.06.12
31.68%
GSB,Gr-II,G-III
completedcd work
inprogress
Road fromPotlapalem Z.P
road to Pothepalli.
/2011-12/Dt.02.09.2011 01.12.2011 01.03.12 01.06.12 41.38%
GSB,Gr-II,Gr-III
completed
MONTHLY REPORT
18 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 31.05.2012
Category Packages allotted underPhase - 1 Names of works under each package Agreement No./
Date DHS DFC Progress up to31.05.2012
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
R/f Ganapavaram R&BRoad to Kesavapuri ST colony 7/2011-2012
27.04.2011 27.04.11 26.01.2012 Completed.
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&B Road to Mohammad Alipalem
8/2011-201227.04.2011 27.04.11 26.4.2012
BT completed.
R/f R&B Road to Katuivaripalem.BT completed.
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of High level Bridge @Km5/2 ofBapatla-Suryalanka Road across Perali drain in
Guntur79/2010-2011
1.12.2010 01.12.10 31.5.2012 Approaches is inprogress
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of High level Bridge @Km2/4 ofBapatla-Pandurangapuram Road across Perali
drain in Guntur 78/2010-20111.12.2010 01.12.10 31.5.2012 Approaches is in
progress
MONTHLY REPORT
19 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 31.05.2012
Category Packages allotted under Phase - 1 Names of works under eachpackage
Agreement No. /Date DHS DFC Progress up to 31.05.2012
RCS
NCRMP/B-W/AP/RCS/PRED/07/PPalem/001
Road from R&B Road toMandevaripalem
/2010-11Dt.01.11.2011
01.11.11 31.07.2012 BT completed, Shoulder Workis in Progress..
Road from R&B Road Alluru toYadavapalem
/2010-11Dt.01.11.2011
01.11.11 31.07.2012 Earth work is in progress.
NCRMP/B-W/AP/RCS/PRED/07/KarlaPalem/002
Road from Ganapavaram R & Broad to Pedamarpuvaripalem
/2010-11Dt.01.11.2011
01.11.11 31.10.2012 Work yet to be started
Road from R & B Road toChinapuluguvaripalem
/2010-11Dt.01.11.2011
01.11.11 31.10.2011 Work yet to be started
Road from R & B road toYaramvaripalem
/2010-11Dt.01.11.2011 01.11.11 31.10.2011 CC Road work is Completed,
Shoulders, and GSB is inprogress.
Road from R & B road toPedagollapalem Cyclone Shelter
/2010-11Dt.01.11.2011 01.11.11 31.10.201 CC Road work is Completed,
Shoulders, and GSB is inprogress.
Pedagollapalem PR Road toBonthagorlapalem
/2010-11Dt.01.11.2011
01.11.11 31.10.201 Work yet to be started
NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road toGurunadhanagar
/2010-11 Dt.17.10.2011
17.10.11 16.07.12 Work yet to be started
Road from R&B Road to AdavalaH/O Bavajipalem
/2010-11 Dt.17.10.2011 17.10.11 16.07.12 CC Road work is Completed,
Shoulder work yetobe start.
MONTHLY REPORT
20 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B Road toAtlavaripalem
/2010-11 Dt.17.10.2011
17.10.11 16.07.12 CC Road work is Completed.
NCRMP/B-W/AP/RCS/PRED/07/Bapatla/004
Road from R&B Road toHanumanthanagar 2010-11
Dt13.10.2011 13.10.11 12.07.2012
CC Road work is Completed,Shoulder work is in progress.
Road from R & B road toAdarsanagar CC Road work is Completed,
Shoulder work is in progress.
Status of works in Prakasam District up to 31.05.2012
Category Packages allottedunder Phase - 1
Names of worksunder eachpackage
Agreement No. /Date
Milestone completion datesProgress up to
31.05.2012 RemarksFirst Second Third
BRIDGESNCRMP/B-
W/AP/Br/R&B/08/Kanaparthy/012
Construction ofHigh level Bridge at
Km 16/10 ofNaguluppalapadu –Kanaparthy road inPrakasam District
76/2010-11 Dated1/12/2010
5/31/2011Completion
up to silllevel
12/31/2011Completion upto below deck
slab
5/31/2012Completion of
entire workincluding
approaches
WMM work is inprogress
Reached Milestone-III
RHBNCRMP/B-
W/AP/RHB/PRED/08/S.Konda/001
Road from PakalaZP Road to
AulavaripalemCyclone shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011 8/24/2011
Earth work,CD work,
GSB
12/24/2011WBM, Grade II
& III
4/24/2012 BT,Shoulders &road furniture
CC RoadCompleted.Shoulders work inprogress
Reached Milestone-III
Road from R&BRoad to
Somarajupalli
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT, CC road &culverts arecompleted from KM0/0 to 2/146.
Reached Milestone-III
MONTHLY REPORT
21 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&Broad to
Narravaripalem
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT, & culverts areCompleted fromKM 0/0 to 0/900.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011 6/9/2011
Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IIwork iscompleted.WBMgr-III work to bestarted
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
Road from R&Broad to
Chalivendradibba
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated -10/02/2011
CC work iscompleted from KM0/0 to KM 0/270
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from PakalaR&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IImaterial collectionis in progress
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
Road from R&Broad to Binginapalli
HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
GSB completed
Not Reached asper Mile stone-III (Awaiting forEOT Proposal)
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&BRoad Allur to M T
Raju colony
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003Dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT, CC road &culverts arecompleted from km0/0 to km 3/8.
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
Road from KEMR&B Road to
NCRMP/B-W/AP/RHB/PRED/0
9/26/2011Earth work,
2/26/2012WBM, Grade II
7/26/2012 BT,Shoulders &
BT completed.CDwork completed.CC
Reached Milestone-III
MONTHLY REPORT
22 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8/Kothapatnam/004 Sankuvarigunta 8/Kothapatnam/004Dated 27/04/2011
CD work,GSB
& III road furniture road workcompleted from km0/0 to km 1/430
Road from KEM R& B Road to
Pullareddypalem
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004Dated 27/04/2011
BT completed.CDwork completed.CCroad workcompleted fromfrom km 0/0 to km3/900
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
Road from MCRoad to
SubbarayaduSatram
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted fromfrom km km 0/0 tokm 4/4
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
Road from R&Broad Tettu to
Ramayapatnam
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted fromfrom km 0/0 to km5/086
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09
Road from R&Broad Pellur toVasepallipadu
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09dated 16/03/2011
7/15/2011Earth work,CD work,
GSB
11/15/2011WBM, Grade II
& III
3/15/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted fromfrom km km 0/0 tokm 4/5
Reached Milestone-III
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10
Road from R&Broad to Kesupalem
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10dated 19/04/2011
7/18/2011Earth work,CD work,
GSB
10/18/2011WBM, Grade II
& II
1/18/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad workcompleted fromfrom km 0/0 to km2/103
Reached Milestone-III
RCSNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
Road from R&Broad to
Vijayanagaramcolony cyclone
shelter
NCRMP/B-W/AP/RCS/PRED/0
8/Vetapalem/001dated 2011/12
dated 30.09.2011
1/29/2012Earth work,
GSB
5/29/2012shoulders, Gr-
III
9/29/2012 BT,CC pavement
and roadfurniture
cc road completed,BT roadcompleted&shouldersprogress. Roadfrom km 0/0 to km0/525
Reached Milestone-III
MONTHLY REPORT
23 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from NH roadto
Challareddypalem
cc road completed,BT roadcompleted&shouldersprogress. Roadfrom km 0/0 to km1/735
Reached Milestone-III
Road from R&Broad to Jeevaraksh
nagar colonycyclone shelter
C.C.completed.Shoulders Progress.
Reached Milestone-III
Road from R&Broad to Ramnagar
colony cycloneshelter
C.C.completedRoad from km 0/0to km0/475.ShouldersProgress.
Reached Milestone-III
Road from R&Broad to cyclone
shelter atMankenavaripalem
GSB Materialcollection is inprogress
NCRMP/B-W/AP/RCS/PRED/0
8/Chirala/002
Road from R&BRoad to
Keertivaripalemcyclone shelter NCRMP/B-
W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
C.C.completedRoad from km 0/0to km 0/265.ShouldersProgress.
Reached Milestone-III
Road from R&BRoad to Devinutulacyclone shelter ofChirala Mandal in
Prakasham district.
C.C.completedRoad from km 0/0to km0/800.ShouldersProgress.
Reached Milestone-III
MPCSNCRMP/B-
W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cycloneshelter in
Ulavapadu MandalPrakasam district
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
24.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,
24.02.2012 Allitems up tosecond floor
slab includingfirst floor, andin 2nd floor
including staircase, columns
24.05.2012Head room,plastering,
flooring, watersupply
arrangements,sanitary fitting,
electrical
Stilt floor, G.F , &Terrace floor- roofslab completed.Brick workcompleted,Plastering workcompleted,Cattleplatform
Reached Milestone-III
MONTHLY REPORT
24 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
columns,beams,pcc
flooring etc.,
etc., items,compound
wall, ccpavement.
Earthenmounds(raised
portion), waterharvesting,septic tank,slump and
soak pit.etc.
comopletedrevitmrnt work is inprogress, flooringwork is in progress,compound wall 120meters leangthcompleted,Electrical work is inprogress.
NCRMP/B-W/APMPCS/PRED/
08/NG Padu/003
Kanaparthy cycloneshelter in
NaguluppapaduMandal Prakasam
district
NCRMP/B-W/AP/MPCS/PRED/08/NG Padu/003
23.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,columns,bea
ms,pccflooring etc.,
23.02.2012 Allitems up to
first floor slaband head
room slab in 2nd floor
including staircase, columns
etc.,
23.05.2012plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthenmounds(raised
portion), waterharvesting,septic tank,slump and
soak pit.etc.
Stilt floor, Groundfloor roof slabcompleted.Plastering in Stiltfloor & Curing is inprogress.
As per Milestone-II, NotCompleted
MONTHLY REPORT
25 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Nellore District up to 31.05.2012
(RCS)
Package Number Name of Work Milestone1 Milestone2 Milestone3 RemarksProgress up
to31.05.2012
NCRMP/B-W/AP/09MUTHUKUR/RC
S/002
Road from R&B Roadkappaladoruvu to bandla
Palem H.wada
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTCC road and
Road Furniturework completed 94% of work
completed
NCRMP/B-W/AP/09/D.V.SATRAM/R
CS/008
Road from R&B road toSullurpeta Mallam to
berjengalapalli cyclone shelter 3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII Shouldersand CC Pavement
9 Months: BT,CC Pavement
and RoadFurniture
BT IS Completed,shoulders is in
progress
94 % of workcompleted
NCRMP/B-W/AP/09T.P.GUDUR/RC
S/005
Road from7/2 M.C Road tovenkannapalem pattapupalem work completed 96 % of work
completed
NCRMP/B-W/AP/09chillakur/RCS/00
4
Road from KatuivaripalemR&B road to vellapalm
3Months: EarthWork,CD Works,
GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
BT is completed 76 % of workcompleted
NCRMP/B-W/AP/09kota/RCS /001
road from R&B road to A.SPURAM 3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
work completed 97 % of workcompleted
Road from GD Road toVavillapalem
BT IS Completed,shoulders is in
progress
96 % of workcompleted
NCRMP/B-W/AP/RCS/PRED/09/KA
VALI/007
Road from Kotha Satram R&Bto Indiranagar (via)
Thumalapenta palam,Patharavadu palam, Ramudu
palam, Karaduvari palam&Sreeramapuram in SPSR
Nellore District.
4Months: EarthWork, Pipe
Culverts, GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
BT IS Completed,shoulders is in
progress
78 % of workcompleted
MONTHLY REPORT
26 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/09/KA
VALI/006
Road Connecting R&B Roadthrough Voter Village in SPSR
Nellore District.
4 Months: EarthWork, PipeCulverts,
GSB
4 Months: WBMGrII, GrII ,
Shoulders and CCPavement
4 Months: BT,CC Pavement
and RoadFurniture
GSB 2/0 to 2/8 is inprogress, 6nos pipe
culverts is inprogress
16% of workcompleted
RHB
NCRMP/B-W/AP/RHB/PRED/09RH
B/KAVALI/004
Road from5/8 ofChennayapalem Road to
Gummadi bandla
5Months:Earthwork, CD
Works,ccpavement and GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
BT IS completed87 % ofwork is
completed
Road from PedattapupalemR&B road to Chennayapalem
H.wada
WBM Gr -III isCompleted
73 % ofwork is
completed
Road from K.T R&B Road toAlliguntapalem
BT IS Completed,shoulders is in
progress
85 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09BO
GOLU/RHB/002
Road from 1/6 of JuvvaladinneR&B Road to Tellagunta KM to
2/720
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
95 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09BO
GOLO/RHB/001
1. Road from NH5 toSambasivapuram
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
BT IS Completed,shoulders is in
progress
94 % ofwork is
completed
Road from 9/6 of JuvvaladinneR&B Road to 11/0 of
Juvvaladinne R&B Road ViaVenkateshpalem
BT IS Completed,shoulders is in
progress
94 % ofwork is
completed!
NCRMP/B-W/AP/RHB/PRED/09/VID
AVALURU/005
1)Road from kt R&B ROAD TOALLAGANIPADU to Vavilla
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
construction ofstructures iscompleted,ccPavement is
Completed.GSB ISCOMPLETED
42 % ofwork is
completed!
MONTHLY REPORT
27 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B roadKancharapalem HW to
Alaganipadu.
earth work inembankment is in
progress
18 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09V.C
HALEM/RHB/007
ROAD FROM SUVEPALLI-PUDIPARTHI ROAD TO
SRIKANTH COLONY 4Months: EarthWork, Pipe
Culverts, GSB
8 Months: WBMGrII, GrII and
Shoulders
12 Months: BTand RoadFurniture
WorkCOMPLETED,
98 % ofwork is
completed!
providing BT Surface to theroad from R&B road to Edagali
KandrigaWork COMPLETED
97 % ofwork is
completed
NCRMP/B-W/AP/RHB/PRED/09CHI
TTAMURU/003
Road from R&B Road toMuttembake Via Pittuvanipalli 5Months: Earth
Work, PipeCulverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
WBM Gr -III, IS INPROGRESS
49 % ofwork is
completed
Road from R&B Chittamur toSoma Samudram
WBM Gr -III, IS INPROGRESS
14 % ofwork is
completed
NCRMP/B-W/AP/09/MUTHUKUR/R
HB/006
Road from R&B road topatuvarikandriga
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
Work Completed99 % ofwork is
completed
NCRMP/B-W/AP/09Allur/RHB/009
Road from R&Broad alluru toGalidibbalu (via)Chukavani
dibba
5Months: EarthWork, Pipe
Culverts, GSB
10 Months: WBMGrII, GrII and
Shoulders
15 Months: BTand RoadFurniture
2 VENT SLABCULVERT IS INPROGRESS, BTKm 3.02 to 0/0 is
completed,remaining is in
progress
62 % ofwork is
completed
MONTHLY REPORT
28 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/009/T.
P.GUDUR/012
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and Mandapam Village3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
GSB ,WBM Gr - II &Gr-III is completed
71 % ofwork is
completed
Road from R & B Road C SPuram to Sivaramapuram
GSB is completedWBM Gr -III is in
progressCCPAVEMENT IS
COMPLETED
73 % ofwork is
completed
MONTHLY REPORT
29 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at various
stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards. These tests are
carried out in the site itself and in some cases samples are collected and testing done in outside laboratories. The details of
tests conducted in the field till end of September 2011 are presented.
Summary of QC Tests - Up to 31.05.2012
S.No. DistrictNo. Tests
Conductedduring the
Month
Total no. of TestsCumulativeTests Done
Total no. of Tests
Passed Failed Passed Failed
1 Srikakulam 160 156 4 879 875 4
2 Vizianagaram 0 0 0 366 366 0
3 Visakhapatnam 92 88 4 1407 1394 13
4 East Godavari 146 146 0 812 812 0
5 West Godavari 48 42 6 277 270 7
6 Krishna 20 20 0 69 69 0
7 Guntur 23 23 0 373 369 4
8 Prakasham 8 8 0 1802 1802 0
9 Nellore 51 51 0 886 886 0
Total 548 534 14 6871 6843 28
The works in West Godavari and Krishna Districts were just started
MONTHLY REPORT
30 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Quality Control Audit Reports Submitted During this Month:
Package Number Name of Work DistrictNCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/002 Road from R&B road to B.V.Thota Krishna
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003Road from R&B road to Cyclone shelter at
ChandalaKrishna
NCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/002Road from Potalapalem Z.P road to
ChikativanipalemKrishna
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003Road from Intheru ZP road to
RangaraopetaKrishna
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001Road from Chinnapuram R&B road to
GundupalemKrishna
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001Road from Potalapalem ZP road to
PotepalliKrishna
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001Road from Bhogireddipalli R&B road to
RamakhandamKrishna
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002Construction of cyclone shelter atPatimeeda in Nakkapalli Mandal
Vishakhapatnam
NCRMP/BW/AP/RCS/PRED/07/Karlapalem/002.Road from R&B Road to Pedagollapalem
Cyclone Shelter.Guntur
NCRMP/BW/AP/RCS/PRED/07/Karlapalem/002. Road from R&B Road to Yaramvaripalem. Guntur
NCRMP/BW/AP/RHB/PRED/07/Karlapalem/001.Road from R&B Road to Kesavapuri ST
colony.Guntur
NCRMP/B-W/AP/RCS/PRED/07/PV Palem/001. Road from R&B Road to Mandevaripalem Guntur
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002Construction of cyclone shelter atMullaparra in Nakkapalli Mandal
Visakhapatnam
MONTHLY REPORT
31 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B W/AP/RHB/PRED/09/Kavali/004Road from pedattapupalem R&B road to
Chennayapalem H.wadaNellore
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007
Road from Kotha Satram R&B toIndrsanagar (via) Thumalapenta palam,Patharavadu palam ,Ramudu palam,Karaduvari palam &Sreeramapuram
Nellore
NCRMP/B -W/AP/RHB/PRED/09/BOGOLU/001 Road from NH5 to Sambasivapuram NelloreNCRMP/B-
w/AP/MPCS/PRED/01/Santhabommali/005Construction of cyclone shelter at
Kollipadu in Santhabommali Mandal.Srikakulam
NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of cyclone shelter at Runkuin Santhabommali Mandal.
Srikakulam
NCRMP/B-W/AP/RHB/ PRED/05/Kalla/003From A-U R&B Road to
Satyanarayanapuram of Kalla Mandal inWest Godavari District.
West Godavari
NCRMP/B-W/AP/RHB/ PRED/05/Kalla/003From A-U R&B Road to Mekaladibba ofKalla Mandal in West Godavari District.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001
From Narsapur Mogaltur R&B road toDayadaldaspeta via Venkateshwara
Swamy Temple of Mogalthuru Mandal inWest Godavari District.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001R&B Road at Panchayat office toPulaparthivarithota via Badava of
Mogalthuru MandalWest Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001Mogaltur Vempa R&B Road at Uchintha
kalava Bridge to GogulammaHarijanapeta of Mogalthuru Mandal
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001Road from NH 214 A road to
Harjanawada of Kothota of MogalthuruMandal
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001Road from NH 214 A at Ranga statue
center to Harjanawada of Kalipatnam (E)of Mogalthuru Mandal
West Godavari
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001Construction of Cyclone shelter atChakicharla in Ulavapadu Mandal,
Prakasam districtPraksham
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002Road from Pollada to Komaralthada & to
cyclonic shelter.Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from R&B Road to Devunthalada. SrikakulamNCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from NP road to URK Puram. Srikakulam
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005Road from Kotcherla road to
PathesundrapalemSrikakulam
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005Road from Koyyam R&B Road to
MoosavanipetaSrikakulam
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004 Road from R&B Road to Danavaipeta East Godavari
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004Road from R&B Road to Gaddipeta of
Thondangi MandalEast Godavari
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004Road from R&B Road to Hukumpeta
Cyclone ShelterEast Godavari
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004 Road from R&B Road to P.Chodipallipeta East Godavari
MONTHLY REPORT
32 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004 Road from R&B Road to K.Chodipallipeta East Godavari
NCRMP/B-W/AP/RCS/PRED/09/Chillakur/004.Road from Kakuvaripalem R&B Road to
Vellapalem in Chillakur Mandal SPSRNellore
Nellore
NCRMP/B-W/AP/RCS/PRED/09/Kota/001.Road from GD road to Vavillapalem inVakadu Mandal of SPSR Nellore Dt.
Nellore
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002Road from Deppuru, Bahadapalli road to
Onkuluru & cyclone shelter.Srikakulam
NCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/001Road connecting R&B road through
GantalammapalemKrishna
8.0 Details of Environmental and Social Reports Submitted During this Month:
Package Number Name of Work DistrictNCRMP/B-
W/AP/RHB/PRED/05/MOGALTHURU/001
Road from NH 214 A at Ranga statuecenter to Harijanawada of Kalipatnam
(E) of Mogalthuru Mandal
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/0
01
R&B Road at Panchayat office toPulaparthivarithota via Badava of
Mogalthuru Mandal in West GodavariDistrict.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/0
01
Mogaltur Vempa R&B Road atUchintha kalava Bridge to
Gogulamma Harijanapeta ofMogalthuru Mandal in West Godavari
District.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/0
01
From Narsapur Mogalthuru R&B roadto Dayadalspeta via Venkateshwara
Swamy Temple of Mogalthuru Mandal
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/0
01
Road from NH 214 A road toHarijanawada of Kothota of
Mogalthuru Mandal in West GodavariDistrict.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
R&B Road to Indira Nagar viaPochamma temple Narsapur Mandal
West Godavari District
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
Road from R&B road to Pedalanka ofNarsapur Mandal in West Godavari
District.
West Godavari
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
Road from LB Cheria CC road toChillapalemm of LB Cheria of
Narsapur Mandal in West GodavariDistrict.
West Godavari
NCRMP/B-W/AP/RCS/PRED/09/kota/001
Road from R&B to A.S.Puram Nellore
MONTHLY REPORT
33 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/09/kota/001 Road from GD road to Vavillapalem
Nellore
NCRMP/B-W/AP/RCS/PRED/Chillakur/004
Road from Kakuvaripalem R&B roadto vellapalm
Nellore
NCRMP/B-W/AP/RCS/PRED/09/T.P.GUDUR/005
Road from 7/2 M.C. Road toVenkannapalem Pattapupalem
Nellore
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006
Road Connecting R&B Road throughVoturu Village in SPSR Nellore
District.
Nellore
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007Road from Kotha Satram R&B toIndrsanagar (via) Thumalapenta
palam, Patharavadu palam, Ramudupalam, Karaduvari palam
&Sreeramapuram in SPSR NelloreDistrict.
Nellore
NCRMP/B-W/AP/RCS/PRED/09/D.V.SATRAM/008
Road from R& B road to SullurpetaMallam to Berijangalapalli Cyclone
shelter
Nellore
NCRMP/B-W/AP/RHB/PRED/09/BOGOLO/001
Road from 9/6 of Juvvaladinne R & BRoad to 11/0 of Juvvaladinne R & B
Road Via Venkateshpalem
Nellore
NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/00
3
Road from R&B Road to MuttembakeVia Pittuvanipalli
Nellore
NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/00
3
Road from R&B Chittamur to SomaSamudram
Nellore
NCRMP/B-W/AP/RHB/PRED/09/KAVALI/004
Road from pedattapupalem R&B roadto Chennayapalem H.wada
Nellore
NCRMP/B-W/AP/RHB/PRED/09/Vidavalur/005
Road from kt R&B Road ToAlaganipadu to Vavilla
Nellore
NCRMP/B-W/AP/RHB/PRED/09/T.P.Gudur/012
Ring Road to TP Gudur -Salipeta R&BRoad via CS Puram and Mandapam
Village
Nellore
NCRMP/B-W/AP/RHB/PRED/09/T.P.Gudur/012
Road from R&B Road CS Puram toSivaramapuram
Nellore
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from NH road toChallareddypalem
Prakasam
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/002
Road from R&B road to Jeevarakshnagar colony cyclone shelter
Prakasam
MONTHLY REPORT
34 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B road to Ramnagarcolony cyclone shelter
Prakasam
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/002
Road from R&B road to Vijayanagarcolony cyclone shelter
Prakasam
NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B road to cycloneshelter at Mankenavaripalem
Prakasam
NCRMP/B-W/AP/RCS/PRED/08/Chirala/002
Road from R&B Road toKeertivaripalem cyclone shelter
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Road from R&B road toNarravaripalem
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
Road from NH5 to Mulaguntapadu Prakasam
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
Road from R&B road to BinginapalliHarijanawada Cyclone Shelter
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09
Road from R&B road Pellur toVasepallipadu
Prakasam
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10
Road from R&B road to Kesupalem Prakasam
9.0 Electrical Quality Control Reports Submitted During the Month
Package Number Name of Work DistrictNCRMP/B-
W/AP/MPCS/PRED/08/N.G.Padu/003Construction of Cyclone Shelter atThopulaKanaparthy in N.G.Padu
Mandal, Ongole
Prakasam Dist.
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
Construction of Cyclone Shelter atChakicharla in Ulavapadu Mandal,
Prakasam Dt.
Prakasam Dist.
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter atRatnayampeta in Payakaraopeta
VisakhapatnamDist.
Submitted Electrical drawings for A, B, C and D type MPCS works of NCRMP phase I
MONTHLY REPORT
35 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10.0 Observations in the submitted reports:
Name ofWork: Road from R&B road to B.V.Thota in Krishna District
1. 100 % value of the work is completed. Total stretch of road is 320 mts. BT and Road furniture works arecompleted for length of 320mts.
2 As per the Agreement the Mile stones fixed are as follows.Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarseaggregate and the observed values are satisfying the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
4 Aggregate for Seal Coat: The gradation of seal coat chips was verified and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2
5During execution, The rate of spraying of prime coat is verified and found within the specified limits as perClause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 340C to 390 C, which is within the specified limits as per MORD specification.
6 During execution, the rate of spreading of tack coat is verified and found within the specified limits as perClause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 35°C to 40°C, which are within the specified limits as per MORD specifications.
7 During execution, Temperature at mixing, laying and at compaction are verified and found to be within thespecified temperature range as per MORD Para 508.1.3.4
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 andKm0/320 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in BT Extraction table.
9 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km Km0/320 areverified and found fairly tallying with the required measurements. The details are given in Annexure-1.
10 The 600mm dia single row pipe culvert 1 No. is completed in Km 0/211 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are provided as per agreement.12 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B road to Cyclone shelter at Chandala
1. 100 % value of the work is completed. Total stretch of road is 625 mts. BT work for 575mts, CC Pavementfor 50mts and Road furniture work for 625mts length are completed.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3 The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km0.575 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
4 Sieve analysis, Bitumen Extraction, AIV and FIV QC tests conducted for OGPC and Seal coat in betweenKm 0.000 to Km 0.575 and Prime and tack coat QC tests were conducted for checking the rate of binderspray.
5The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 andKm0/575 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in BT Extraction table.
6 The 600mm dia single row pipe culvert (1 No's) completed in 0/4.7 The formation width shall be widened to required width of 7.50mts as per drawings.8 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelines
MONTHLY REPORT
36 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
given by SPIU, NCRMP.9 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Potlapalem ZP Road to Chikativanipalem
1. 100 % value of the work is completed. Total stretch of road is 590 mts. BT and Road furniture works arecompleted for length of 590mts.
2 As per the Agreement the Mile stones fixed are as follows.Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3 The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km0.590 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1. They are fairly tallying.
4 Sieve analysis, Bitumen Extraction, AIV and FIV QC tests conducted for OGPC and Seal coat in betweenKm 0.000 to Km 0.590 and Prime and tack coat QC tests were conducted for checking the rate of binderspray.
5The measurements like width and thickness of the GSB, WBM Gr-II & Gr-III Layers from Km 0.000 to Km0.590 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
6 The 600mm dia single row pipe culvert 1 No. is completed in Km 0/47 R/S Body wall of CD work at Km 0.130 shall be constructed.8 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Intheru ZP road to Rangaraopeta
1. 100 % value of the work is completed. Total stretch of road is 635 mts. BT and Road furniture works arecompleted for length of 635mts.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3 The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km0.635 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
4 Sieve analysis, Bitumen Extraction, AIV and FIV QC tests conducted for OGPC and Seal coat in betweenKm 0.000 to Km 0.635 and Prime and tack coat QC tests were conducted for checking the rate of binderspray.
5The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 andKm0/635 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in BT Extraction table.
6 The 600mm dia single row pipe culvert (1 No's) completed in 0/6.7 The formation width is varying from 6.00m to 6.50m in between Km 0.000 to Km 0.125 and less than
required width 7.50m in other chainages also.8 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are provided as per agreement.9 Parawise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
37 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: Road from Chinnapuram R&B road to Gundupalem
1. 43.54 % value of the work is completed. Total stretch of road is 0.485 mts. GSB layer and WBM Gr IIlayer is completed for length of 0.435mts against length of 0.485 mts. CC road for some length is to betaken up to connect cyclone shelter
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 01.12.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 01.03.2012 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 01.06.2012 - BT and Road furniture - 3 Months
3 2nd Milestone Completed but Gr-III Work and CC road were not yet taken up. Progress needs to beimproved.
4 The measurements like width and thickness of the GSB Layer and WBM Gr II layer from Km 0.000 to Km0.435 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
5 The 600mm dia single row pipe culvert (1 No.) to be taken up in 0/2. Pipes were collected.6 While laying WBM simultaneously shoulders shall be also compacted.7 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are to be provided as per aggregement.The same shall be provided as per the guidelinesgiven by SPIU, NCRMP.
8 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Potlapalem ZP road to Potepalli
1. 66.50 % value of the work is completed. Total stretch of road is 645 mts. GSB WBM Gr-II and GIII layerscompleted for a length of 595mts. For 50M length CC road is to be taken up to connect the cycloneshelter. This package consists of 3 road works.
2. Works to be done as per Milestone:Mile stone 1 to the end of Dt: 01.12.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 01.03.2012 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 01.06.2012 - BT and Road furniture - 3 Months
3. 2nd Milestone Completed. Progress needs to be improved.4. The measurements like width and thickness of the GSB, WBM Layers from Km 0.000 to Km 0.595 are
verified and found to be fairly tallying with the required measurements. The details are given in Annexure -1.
5. Volumetric analysis tests were conducted for WBM Gr-II, Gr-III layers from Km 0/0 to Km 0/595. QC testswere conducted for WBM layers (field & Lab).The Details are givenin QC test summary. They are fairlytallying with the specfication requirements of clause 405.13 of MORD.
6. The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are to be provided as per aggrement. The same shall be provided as per the guidelinesgiven by SPIU, NCRMP.
7. Requirement of width and relative compaction shall be maintained for shoulders.8. Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Bhogireddipalli R&B road to Ramakhandam
1. 13.20 % value of the work is completed. Total stretch of road is 1.470 mts. GSB is completed for length of1420mts.This package contains 3 works
2. Works to be done as per Milestone:Mile stone 1 to the end of Dt: 01.12.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 01.03.2012 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 01.06.2012 - BT and Road furniture - 3 Months
3. 2nd Milestone Completed but WBM Gr-II & Gr-III Works are not yet started. 1st Milestone works like
MONTHLY REPORT
38 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Earthwork and Pipe Culverts are also still to be done. Progress needs to be improved.4. The measurements like width and thickness of the GSB Layer from Km 0.000 to Km 1.420 are verified and
found to be fairly tallying with the required measurements. The details are given in Annexure - 1.5. The 600mm dia single row pipe culverts (3 No's) proposed in Km 0/2, 0/4 & 1/4 were not taken up. Only
pipes were collected. Local villages are asking for change in diameter of pipes.6. While laying WBM simultaneously shoulders shall be also compacted.7. The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are not provided as per aggregement.The same shall be provided as per the guidelinesgiven by SPIU, NCRMP.
8 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road connecting R&B road through Gantalammapalem
1. 100 % value of the work is completed. Total stretch of road is 3333 mts. Construction of Embankment withcarted earth, GSB, WBM Gr-II & Gr-III, BT layer completed for length of 2000 mts. and shoulders arecompleted for length of 3333 mts.
2. Works to be done as per Milestone:Mile stone 1 to the end of Dt: 26.07.2011 - Earthwork, Pipe Culverts, GSB - 3 MonthsMile stone 2 to the end of Dt: 26.10.2011 - WBM Gr-II, Gr-III and Shoulders - 3 MonthsMile stone 3 to the end of Dt: 26.01.2012 - BT and Road furniture - 3 Months
3. The measurements like width and thickness of the GSB, WBM Gr-II, Gr-III & OGPC & Seal coat Layers1/033 to Km 1/131 & Km 1.431 to Km 3/333 and shoulders from Km 0.000 to Km3.333 are verified and thedetails are given in Annexure - 1.
4. Volumetric analysis tests were conducted for WBM Gr-II & Gr-III layers from Km 1/033 to Km 1/131 & Km1.431 to Km 3/333. QC tests were conducted for WBM Gr-II & Gr-III (field & Lab) i.e., Gradation andPhysical tests are given in QC test summary.
5. Aggregate for OGPC: The gradation and other physical tests are conducted for Coarse aggregate and theobserved values are satisfying the requirements of MORD Para 508.1.2.1 after screening and removingthe undersized materials.
6. Aggregate for Seal Coat: The gradation of seal coat chips was verified and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2 after screening the chips passing 2.36 MM sieve.
7. During execution, the rate of spraying of prime coat is verified and found within the specified limits as perClause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during executionand found varying from 340C to 420 C, which is within the specified limits as per MORD specification.
8. During execution, the rate of spreading of tack coat is verified and found within the specified limits as perClause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 35°C to 40°C, which are within the specified limits as per MORD specifications.
9. During execution, Temperature at mixing, laying and at compaction are verified and found to be within thespecified temperature range as per MORD Para 508.1.3.4
10 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 1/033 to1/131 and KM 1/431 to Km3/333 are verified as per IRC:SP:20 and IRC:SP:11. The details are given inAnnexure -2.
11 The measurements like width and thickness of the OGPC & Seal coat from KM 1/033 to 1/131 and KM1/431 to Km3/333 are verified and the details are given in Annexure-1.
12 The 600mm dia single row pipe culverts 3 No. are completed. They are also verified with reference toMORD section 1100.
13 The project informatory boards with all details, Cautionary sign boards and Village name boards areprovided at necessary points.
14 During execution of WBM layers, oversized metal was got removed under the instruction of TPQA andspreading was allowed after the metal collected satisfied the graduation requirement.
15 Similarly during execution of OGPC and Seal coat works, the undersized material was got removed byTPQA, before allowing the work.
16 Issuing NCRs and ok cards is ensuring satisfactory Quality and workmanship.17 Except for the inadequate formation at some places and improper compaction of shoulders, the other
items of works are satisfactory
MONTHLY REPORT
39 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: From A-U R&B Road to Satyanarayanapuram of Kalla Mandal in West Godavari District.
1. 100 % value of the work is completed for this one work in the package which contains two no. of worksunder one agreement. Total stretch of the road is 1225 mts. BT for length of 550 mts, CC pavement forlength of 575 mts and Road furniture works are completed.
2. Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.08.2011 - 15.56 lakhs. (18.31%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.11.2012 - 30.91 lakhs. (36.35%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 25.02.2012 - 38.54 lakhs.(45.34%)
3. Volumetric analysis tests were conducted for WBM Grade III layer, They are fairly tallying with thespecification requirements of clause 405.13 of PMGSY Quality Assurance Volume II.
4. During execution the rate of spraying of prime coat is verified and found to be within the specified limits asper Table 500.1 of Mordant the spraying temperature is observed as 300C to 360 C and within thespecified limits as MORD - 502.4.3.
5. During execution the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 500.2 of Mordant the spraying temperature is observed as 400C to 440 C andwithin the specified limits as per MORD sub clause. 503.4.3.
6. During execution, Temparature at mixing, laying and at compaction are verified and found to be within thespecified temperature limits.
7. The thickness of the OGPC and Seal coat is observed and which is varying from 25 to 26 mm as againstthe requirement of 26mm. Details is enclosed in annexure - 2.
8. The concrete pavement contraction joints shall be widened to a 10 mm width and to a depth 18 to 20mmand shall be sealed. The guide lines given in section 1500 shall be followed.
9. The width and outside thickness of CC Road is verified and found to be fairly tallying. However cores willbe taken shortly to verify the concrete compressive strength and internal thickness of CC Road.
10 Formation width of the road shall be widened to required width as the formation width varying from 5.0M to5.5M only.
11 Suitable action to be taken to shift the electrical poles away from the carriageway edges. Reflectivepainting shall be done on the poles to prevent accidents.
12 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided. The same shall be provided as per the guidelines given by PIU, NCRMP.
13 Protective works like retaining walls and or revetment are necessary on both sides of the road.14 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: From A-U R&B Road to Mekaladibba of Kalla Mandal in West Godavari District.
1. 100 % value of the work is completed for this one work in the package which contains two no. of worksunder one agreement. Total stretch of the road is 1265 mts. BT and Road furniture works are completedfor length of 1265mts.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.08.2011 - 15.56 lakhs. (18.31%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.11.2012 - 30.91 lakhs. (36.35%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 25.02.2012 - 38.54 lakhs.(45.34%)
3 The measurements like width and thickness of the OGPC and Seal coat Layer from Km 0.000 to Km 1.265are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1. They are fairly tallying.
4 Sieve analysis, Bitumen Extraction, AIV and FIV QC tests were conducted for OGPC and Seal coat. ForPrime and tack coat QC tests were conducted for checking the rate of binder spray and temperature etc.
5 The measurements like width and thickness of the GSB, WBM Gr-II & Gr-III Layers from Km 0.000 to Km1.265 are verified and found to be fairly tallying with the required measurements. The details are given inAnnexure - 1.
6 Electrical poles are in obstructions on both sides of the Road in shoulder portion. Shifting of poles shall be
MONTHLY REPORT
40 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
taken up and also shall be Painted as Black & White Strips of reflective nature to required height frombottom for clear visibility to vehicular traffic.
7 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided .The same shall be provided as per the guidelines given by PIU,NCRMP.
8 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: R&B Road at Panchayat office to Pulaparthivarithota via Badava of Mogalthuru Mandal
1. 68.65 % value of the work is completed for this one work in the package which contains five no. of worksunder one agreement. Total Stretch of the road is 1490mts. WBM Gr-II & Gr-III for length of 900mts andCC Pavement for length of 590mts is completed.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs. (9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs. (42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 The thickness of the Gr-II & Gr-III is observed and which is varying from 75 to 80 mm as against therequirement of 75mm. Details is enclosed in annexure - 1.
4 Volumetric analysis tests were conducted for WBM Grade III layer, They are fairly tallying with thespecification requirements of clause 405 of MORD.
5 The 600mm dia single row pipe culvert 1 No. is completed in Km 0/4 against 2 Nos. and balance 1 No. notExecuted.
6 White wash shall be done to parapet walls of the existing culvert for the clear visibility of vehicular traffic.7 Electrical poles are in obstructions on both sides of the Road. Painting as Black & White Strips is to be
done to stones for clear visibility to vehicular traffic. Stabile action shall be taken to shift the electrical polesaway in the carriageway.
8 The contraction joints of the concrete pavement shall be widened to 10 mm width and to a depth of 18 to20mm and shall be sealed as per MORD clause 1501
9 The width and outside thickness of CC Road is verified and found to be fairly tallying. However cores willbe taken shortly to verify the concrete compressive strength and internal thickness of CC Road.
10 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided. The same shall be provided as per the guidelines given by SPIU, NCRMP.
11 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Mogaltur Vempa R&B Road at Uchintha kalava Bridge to Gogulamma Harijanapeta ofMogalthuru Mandal
1. 75.34 % value of the work is completed for this one work in the package which contains five no. of worksunder one agreement. Total Stretch of the road is 1190mts. WBM Gr-III for length of 595mts and CCPavement for length of 595mts is completed.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs. (9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs. (42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 The thickness of the Gr-III is observed and which is varying from 75 to 79 mm as against the requirementof 75mm. Details is enclosed in annexure - 1.
4 Gradation is conducted for WBM Gr-III material and results are within the specified limits as per agreementspecification.
5 Volumetric analysis tests were conducted for WBM Grade III layer, They are fairly tallying with thespecification requirements of sub- clause 405.13 of PMGSY Quality Assurance Manual volume II.
6 The 600mm dia single row pipe culvert (2 No's) completed in 0/6.7 White wash shall be done to parapet walls of the existing culverts for the clear visibility to vehicular traffic.8 The measurements like width and length of parapets and pipes of all the culverts are verified and found to
be tallying.
MONTHLY REPORT
41 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9 Electrical poles are in obstructions on both sides of the Road. Painting as Black & White Strips is to bedone to stones for clear visibility to vehicular traffic. Necessary action shall be initiated to shift the electricalpoles close to the carriageway edge to a safe location.
10 The Contraction joints of the concrete pavement shall be widened to 10 mm width and to a depth of 18 to20mm and shall be sealed as per sub clause 1501.20.
11 The width and outside thicknesses of CC Road is verified and found to be fairly tallying. However coreswill be taken shortly to verify the concrete compressive strength and internal thicknesses of CC Road.
12 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided. The same shall be provided as per the guidelines given by SPIU, NCRMP.
13 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
From Narsapur Mogaltur R&B road to Dayadaldaspeta via Venkateshwara Swamy Templeof Mogalthuru Mandal
1. 85.79 % value of the work is completed for this one work of the package which contains five no. of worksunder one agreement. Total Stretch of road is 926mts. CC Pavement completed for total length of 926mts.
2 Works to be done as per Milestone for the package:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs. (9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs. (42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 One pipe culvert which is proposed to be constructed in KM 0/6 was not taken up. The field officers havestated that it was not taken up; it was found to be not necessary as per site condition.
4 GSB & CC Pavement for 926 meters length is completed. Shoulders not compacted.5 The thickness of the CC Pavement is observed and varying from 200 to 210 mm as against the
requirement of 200mm. Details are enclosed in annexure - 1. However, cores are proposed to be takenshortly to assess internal thickness and compressive strength of concrete.
6 Contraction joints shall be widened to 10 mm width and to a depth 18 to 20mm and shall be sealed as persection 1500 of MORD.
7 The formation width is verified and at some locations the formation width is observed less than the requiredwidth. The reasons for the less width shall be furnished.
8 Electrical poles are found to be very near to the carriageway. Immediately reflection stickers shall bepasted to the poles to prevent accidents. Suitable action shall be taken to shift the electrical poles awayfrom the carriageway.
9 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided .The same shall be provided as per the guidelines given by SPIU, NCRMP.
10 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from NH 214 A road to Harjanawada of Kothota of Mogalthuru Mandal
1. 97 % value of the work is completed for this one work of the package which contains five no. of worksunder one agreement. Total Stretch is 380mts. The CC pavement completed for total length of 380mts.
2 Works to be done as per Milestone for the package:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs. (9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs. (42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 C.C Road of 380 meters length and shoulders work for length of 300 meters is completed.4 The 600mm dia single row pipe culvert (1 No's) completed in Km 0/4.5 The measurements like width and length of parapets and pipes of the culvert is verified and found to be
tallying.6 White wash shall be done to parapet walls of the existing culvert for the clear visibility of vehicular traffic.7 Electrical poles are in obstructions on both sides of the Road in shoulder portion. Shifting of poles shall be
taken up and also shall be Painted as Black & White Strips of reflective nature to required height frombottom for clear visibility to vehicular traffic. Suitable action shall be taken to shift the electrical poles away
MONTHLY REPORT
42 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
from the carriageway.8 Construction of joints of concrete pavement shall be widened to 10 mm width and to a depth of 18 to 20mm
and shall be sealed as per MORD clause 1501.9 The width and outside thickness of CC Road is verified and found to be fairly tallying. However cores will be
taken shortly to verify the concrete compressive strength and internal thickness of CC Road.10 The project informatory boards with all details, Cautionary sign boards at necessary points and Village
name boards are provided .The same shall be provided as per the guidelines given by PIU,NCRMP.11 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Road from NH 214 A at Ranga statue center to Harjanawada of Kalipatnam (E) ofMogalthuru Mandal
1. 65.91 % value of the work is completed for this one work in the package which contains five no. of worksunder one agreement. Total Stretch of the road is 890mts. WBM Gr-III for length of 600mts and CCPavement for length of 290mts is completed.
2 Works to be done as per Milestone:Mile stone 1 (i.e, Earth work, Pipe culverts, GSB) to the end of Dt: 26.09.2011 - 16.24 lakhs. (9.03%)Mile stone 2 (I.e, WBM Gr II, Gr III and Shoulders) to the end of Dt: 26.02.2012 - 76.44 lakhs. (42.51%)Mile stone 3 (i.e, BT, CC pavement and Road furniture) to the end of Dt: 26.07.2012 - 87.13 lakhs.(48.46%)
3 WBM Gr-III of 600 meters, CC Pavement of 290 meters length is completed .Shoulders need to becompacted simultaneously along with WBM layers.
4 The thickness of the Gr-III is observed and varying from 75 to 80 mm as against the requirement of 75mm& The thickness of the CC Pavement is observed and varying from 200 to 202 mm as against therequirement of 200mm. Details are enclosed in annexure - 1. However, cores will be taken to assess thecompressive strength of concrete and internal thickness of the CC Road.
5 Volumetric analysis tests were conducted for WBM Grade III layer, They are fairly tallying with thespecification requirements of sub-clause 405.13 of PMGSY Quality Assurance Volume II.
6 Electrical poles are in obstructions on both sides of the Road. Painting as Black & White Strips is to bedone to stones for clear visibility to vehicular traffic.
7 Construction of joints concrete pavement shall be widened to 10 mm width and to a depth of 18 to 20mmand shall be sealed as per clause 1501 of MORD specification for rural roads.
8 The width and outside thickness of CC Road is verified and found to be fairly tallying. However cores will betaken shortly to verify the concrete compressive strength and internal thickness of CC Road.
9 The project informatory boards with all details, Cautionary sign boards at necessary points and Villagename boards are provided .The same shall be provided as per the guidelines given by SPIU, NCRMP.
10 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B Road to Danavaipeta in East Godavari District
1. 90 % value of the work is completed. Total stretch of road is 572 mts. WBM Gr-II & III, initially and B.T iscompleted recently.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3 MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 Gradation tests are conducted for OGPC and Seal coat and chips and the results are found to be within thespecified limits as per agreement specification after screening and removing the undersized materials.
4 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits asper Table 502.1 of MORD. The spraying temperatures are also observed during execution and found to bevarying from 300C to 360 C, which is within the specified limits as per MORD.
5 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 503.1 of MORD. The spraying temperatures are also observed during executionand found to be varying from 38°C to 44°C, which are within the specified limits as per MORDspecifications.
MONTHLY REPORT
43 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6 During execution, Temparature at mixing, lying and at compaction are monitored and ensured that they arewithin the specified temperature range.
7 The measurements like width and thickness of the OGPC and Seal coat between Km 0/0 to Km 0/572 areverified. The details are given in Annexure 1
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat as per IRC: SP: 20 andIRC: SP: 11 from Km 0/0 to Km 0/572 are verified. The details are given in Annexure 2.
9 For OGPC + Seal coat from Km 0/0 to Km 0/572. QC tests conducted for Bitumen content (field & Lab.)Gradation, AIV, FIV and Water absorption. The Details are given in QC test summary.
10 Trees and electrical poles located adjacent to the BT road edge need be painted with black & white stripsto guide the traffic and public during night time .Suitable action shell be taken to shift the electrical poleswhich are near the BT road edge
11 Village name boards, cautionary and mandatory sign boards shall be erected at necessary points.12 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B Road to Gaddipeta of Thondangi Mandal
1. 90 % value of the work is completed. Total stretch of road is 457mts. WBM Gr-II & III, initially and Batescompleted recently.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3 MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 Gradation tests are conducted for OGPC and Seal coat and chips and the results are found to be within thespecified limits as per agreement specification after screening and removing the undersized materials.
4 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits asper Table 502.1 of MORD. The spraying temperatures are also observed during execution and found to bevarying from 300C to 360 C, which is within the specified limits as per MORD.
5 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 503.1 of MORD. The spraying temperatures are also observed during executionand found to be varying from 38°C to 44°C, which are within the specified limits as per MORDspecifications.
6 During execution, Temparature at mixing, lying and at compaction are monitored and ensured that they arewithin the specified temperature range.
7 The measurements like width and thickness of the OGPC and Seal coat between Km 0/0 to Km 0/457 areverified. The details are given in Annexure 1
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat as per IRC: SP: 20 andIRC: SP: 11 from Km 0/0 to Km 0/457 are verified. The details are given in Annexure 2.
9 For OGPC + Seal coat from Km 0/0 to Km 0/457. QC tests conducted for Bitumen (field & Lab.) Gradation,AIV, FIV and Water absorption. The Details are given in QC test summary.
10 Trees and electrical poles located adjacent to the BT road edge need be painted with black & white stripsto guide the traffic and public during night time .Suitable action shell be taken to shift the electrical poleswhich are near the BT road edge
11 Village name boards, cautionary and mandatory sign boards shall be erected at necessary points.12 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B Road to Hukumpeta Cyclone Shelter
1. 90 % value of the work is completed. Total stretch of road is 630 mts. WBM Gr-II & III, and Pipe Culvert1no. Completed initially and Bates completed recently.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3 MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 Gradation tests are conducted for OGPC and Seal coat and chips and the results are found to be within the
MONTHLY REPORT
44 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
specified limits as per agreement specification after screening and removing the undersized materials.4 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits as
per Table 502.1 of MORD. The spraying temperatures are also observed during execution and found to bevarying from 300 C to 360 C, which is within the specified limits as per MORD.
5 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 503.1 of MORD. The spraying temperatures are also observed during executionand found to be varying from 38°C to 44°C, which are within the specified limits as per MORDspecifications.
6 During execution, Temparature at mixing, lying and at compaction are monitored and ensured that they arewithin the specified temperature range.
7 The measurements like width and thickness of the OGPC and Seal coat between Km 0/0 to Km 0/630 areverified. The details are given in Annexure 1
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat as per IRC: SP: 20 andIRC: SP: 11 from Km 0/0 to Km 0/630 are verified. The details are given in Annexure 2.
9 For OGPC + Seal coat from Km 0/0 to Km 0/630. QC tests conducted for Bitumen (field & Lab.) Gradation,AIV, FIV and Water absorption. The Details are given in QC test summary.
10 Trees and electrical poles located adjacent to the BT road edge need be painted with black & white stripsto guide the traffic and public during night time .Suitable action shell be taken to shift the electrical poleswhich are near the BT road edge
11 Village name boards, cautionary and mandatory sign boards shall be erected at necessary points.12 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B Road to P.Chodipallipeta
1. 90 % value of the work is completed. Total stretch of road is 670 mts. WBM Gr-II & III, and Pipe Culvert1no. Completed initially and B.T is completed recently.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3 MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 Gradation tests are conducted for OGPC and Seal coat and chips and the results are found to be within thespecified limits as per agreement specification after screening and removing the undersized materials.
4 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits asper Table 502.1 of MORD. The spraying temperatures are also observed during execution and found to bevarying from 300C to 360 C, which is within the specified limits as per MORD.
5 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 503.1 of MORD. The spraying temperatures are also observed during executionand found to be varying from 38°C to 44°C, which are within the specified limits as per MORDspecifications.
6 During execution, Temparature at mixing, lying and at compaction are monitored and ensured that they arewithin the specified temperature range.
7 The measurements like width and thickness of the OGPC and Seal coat between Km 0/0 to Km 0/670 areverified. The details are given in Annexure 1
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat as per IRC: SP: 20 andIRC: SP: 11 from Km 0/0 to Km 0/670 are verified. The details are given in Annexure 2.
9 For OGPC + Seal coat from Km 0/0 to Km 0/670. QC tests conducted for Bitumen (field & Lab.) Gradation,AIV, FIV and Water absorption. The Details are given in QC test summary.
10 Trees and electrical poles located adjacent to the BT road edge need be painted with black & white stripsto guide the traffic and public during night time .Suitable action shell be taken to shift the electrical poleswhich are near the BT road edge
11 Village name boards, cautionary and mandatory sign boards shall be erected at necessary points.12 Parawise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
45 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: Road from R&B Road to K.Chodipallipeta
1. 90 % value of the work is completed. Total stretch of road is 720 mts. WBM Gr-II & III, and Pipe Culvert1no. Completed initially and Bates completed recently.
2 Works to be done as per Milestone:Mile stone 1 to the end of Dt: 06.12.11 - Earthwork, Pipe Culverts, GSB and Road Furniture - 3 MonthsMile stone 2 to the end of Dt: 06.03.11 - WBM Gr-II, Gr-III , Shoulders and CC Pavement - 3 MonthsMile stone 3 to the end of Dt: 06.06.12 - BT - 3 Months
3 Gradation tests are conducted for OGPC and Seal coat and chips and the results are found to be within thespecified limits as per agreement specification after screening and removing the undersized materials.
4 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits asper Table 502.1 of MORD. The spraying temperatures are also observed during execution and found to bevarying from 300C to 360 C, which is within the specified limits as per MORD.
5 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 503.1 of MORD. The spraying temperatures are also observed during executionand found to be varying from 38°C to 44°C, which are within the specified limits as per MORDspecifications.
6 During execution, Temparature at mixing, lying and at compaction are monitored and ensured that they arewithin the specified temperature range.
7 The measurements like width and thickness of the OGPC and Seal coat between Km 0/0 to Km 0/720 areverified. The details are given in Annexure 1
8 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat as per IRC: SP: 20 andIRC: SP: 11 from Km 0/0 to Km 0/720 are verified. The details are given in Annexure 2.
9 For OGPC + Seal coat from Km 0/0 to Km 0/720. QC tests conducted for Bitumen content (field & Lab.)Gradation, AIV, FIV and Water absorption. The Details are given in QC test summary.
10 Trees and electrical poles located adjacent to the BT road edge need be painted with black & white stripsto guide the traffic and public during night time .Suitable action shell be taken to shift the electrical poleswhich are near the BT road edge
11 Village name boards, cautionary and mandatory sign boards shall be erected at necessary points.12 Parawise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal In VishakhapatnamDistrict
1. Three works are there in this package:1) Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal,2) Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal and3) Construction of cyclone shelter at Patimeeda in Nakkapalli MandalThe individual progress of this work is nearly 34.75% value of work is completed.The combined progress of this package is 35.3%.
2 34.75 % value of the work is completed. Plinth beam PCC is completed and placing of Plinth beamreinforcement is in progress. Deviation in the construction of CRS masonry is observed. It isinstructed to get approval from the competent authority.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 02.03.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 02.08.12- First Floor Roof Slab Cast.Mile stone 3 to the end of Dt: 02.01.13- Completion of Works.
4 The marking for footing positions are given with the help of total station instrument. The linearmeasurements of the centre line of columns are verified and found to be fairly tallying with the approveddrawing of Type-A Cyclone shelter with a SBC Value of 10.0 t/m2.
5 The soil sample was collected by the contractor at a depth of 2.5m from the ground level and sent to Govt.Polytechnic college to test the SBC value of soil and the result obtained is 11.0 t/m2 as against of 10.0 t/m2as per approved drawing. The confirmatory test for SBC is conducted by TPQA. The SBC obtained is 20.0t/m2
6 The measurements like width, thickness and length of PCC, Footings and Columns up to bottom level of
MONTHLY REPORT
46 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
plinth beam.etc are verified and found tallying as per approved drawing.7 The field officers have furnished the test results for Soil SBC value, Mix Designs, Steel reports and Water
obtained from Department of Civil Engineering in Govt. Polytechnic and Andhra university atVisakhapatnam Districts.Materials.
8 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of IS 383 table 4. Finenessmodulus is varying from 2.423 -2.541 as against the allowable limits of. 2.4 to 3.2.
9 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are withinthe specified range as per IS 383 table-2
10 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of AlkaliAggregate reactivity test for Fine and Coarse aggregates and the obtained results are within thelimit as per IS 2386(Part VII) -1963.
11 Cement: TPQA collected the cement sample and tested for all the required tests on cement such asfineness, initial setting time, final setting time, consistency etc and the values observed within the specifiedrange as per IS 4031.
12 Steel: Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties andthe obtained results are within the specified limits as per IS 1786.
13 Cement coating for Steel: The protection of reinforcement against corrosion prior to placement of concreteis done by applying a Cement slurry coating on the steel. However it is advised to apply cement slurrywhenever disturbed due to bending and placing etc.(As per agreement technical specification of Subcl:1.3.27).The steel samples are randomly collected and tested for verification of Mass per Meter Run, theresults are given in Annexure-I
14 Water: Sample is collected and sent to Gitam University for testing of Physical properties and the obtainedresults are within the specified range as per IS: 456-2000 & IS: 3025-1986.
15 C.C Cubes : M-20 and M30 Cube are tested for Compressive strength and the results are satisfying therequirements as per IS 456 Table 11
16 During execution the foundation levels and measurements of steel reinforcement and dimensions offootings, are verified and fairly tallying with the approved drawing. pH value of water, slump are also testedand found within the specified limits
17 Spacing and dimension of strips are verified with reference to the drawing and they are found to be as perdrawing. Clear cover is also verified.
18 It is requested to the contractor to improve the curing arrangements for columns and beams.19 Site order book is being maintained by the field officers. The field officers are requested to take instructions
from the inspecting officers.20 It is observed that the steel is not properly stacked. Instructed to stack the steel neatly stored on blocks,
racks or platforms and above the ground in clean and dry condition and suitably marked to facilitateinspection and identification
21 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff during the inspection for verification.
22 The field officers have not furnished the approved quarry letters for metal, sand and water used for theshelter. The same shall be furnished to the TPQA staff during the inspection for verification.
23 The field officers are requested to insist the contractor to test the samples of cement and steel from everyconsignment and ensure its suitability before proceeding with the work.
24 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to theworking portion to prevent any casualties the public and the workers.
25 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,NCRMP.
26 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.27 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.28 Para wise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
47 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: Construction of cyclone shelter at Patimeeda in Nakkapalli Mandal
1. Three works are there in this package:1) Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal,2) Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal and3) Construction of cyclone shelter at Patimeeda in Nakkapalli MandalThe individual progress of this work is nearly 21% value of work is completed.The combined progress of this package is 35.3%.
2 21.00 % value of the work is completed. Foundation footing work is completed and Columns are inprogress up to bottom level of Plinth beam, Foundation Refilling work is Completed and Basement work isin progress. NCR is issued for the deviation in the construction of RR masonry instead of CRS masonry
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 02.03.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 02.08.12- First Floor Roof Slab Cast.Mile stone 3 to the end of Dt: 02.01.13- Completion of Works.
4 The marking for footing positions are given with the help of total station instrument. The linearmeasurements and the centre line of columns are verified and fairly tallying with the approved drawing ofType-C Cyclone shelter with a SBC Value of 10.0 t/m2.
5 The soil sample was collected by the contractor at a depth of 2.5m from the ground level and sent to Govt.Polytechnic college to test the SBC value of soil and the result obtained is 12.0 t/m2 as against design SBCof 10.0 t/m2 as per approved drawing. The confirmatory test for SBC is conducted by TPQA. The SBCobtained is 15.0 t/m2
6 The measurements like width, thickness and length of PCC, Footings, and Columns up to bottom level ofplinth beam etc are verified and found tallying as per approved drawing.
7 The field officers have furnished the test results for Soil SBC value, Mix Designs, Steel reports and Waterobtained from Department of Civil Engineering in Govt. Polytechnic and Andhra university atVisakhapatnam Districts.Materials.
8 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of IS 383 table 4. Finenessmodulus is varying from 2.48 -2.59 as against the allowable limits of. 2.4 to 3.2.
9 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are withinthe specified range as per IS 383 table-2
10 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine and Coarse aggregates and the obtained results are within the limit as per IS2386(Part VII) -1963.
11 Cement: TPQA collected the cement sample and tested for all the required tests on cement such asfineness, initial setting time, final setting time, consistency etc and the values observed are within thespecified range as per IS 4031.
12 Steel: Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties andthe obtained results are within the specified limits as per IS 1786.
13 Cement coating for Steel: The protection of reinforcement against corrosion prior to placement of concreteis done by applying a Cement slurry coating on the steel. However it is advised to apply cement slurrywhenever disturbed during bending, placing etc.(As per agreement technical specification of Subcl:1.3.27).The steel samples are randomly collected and tested for verification of Mass per Meter Run, theresults are given in Annexure-I
14 Water: Sample is collected and sent to Gitam University for testing of Physical properties and the obtainedresults are within the specified range as per IS: 456-2000 & IS: 3025-1986.
15 C.C Cubes : M-20 and M30 Cube are tested for Compressive strength and the results are satisfying therequirements as per IS 456 Table 11.Rebound hammer test conducted for the foundation pedestals.
16 During execution the foundation levels and measurements of steel reinforcement and footing sizes areverified and they are fairly tallying with the approved drawing.
17 Spacing and dimension of strips are verified with reference to the drawing and they are found to be as perdrawing. Clear cover is also verified.
18 It is requested to the contractor to improve the curing arrangements for columns and beams.19 Site order book is being maintained by the field officers. The field officers are requested to take instructions
from the inspecting officers.20 Quality control lab is not available at site and the field officers are requested to insist the contractor to
MONTHLY REPORT
48 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
procure the lab equipments for conducting tests on coarse and fine aggregates and concrete.21 It is observed that the steel is not properly stacked. Instructed to stack the steel neatly stored on blocks,
racks or platforms above the ground in clean and dry condition and suitably marked to facilitate inspectionand identification
22 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff during next inspection for verification.
23 The field officers have not furnished the approved quarry letters for metal, sand and water used for theshelter. The same shall be furnished to the TPQA staff during next inspection for verification.
24 The field officers are requested to insist the contractor to set the samples of cement and steel tested fromevery consignment and ensure its suitability before proceeding with the work.
25 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to theworking portion to prevent any casualties to the public and the workers.
26 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,NCRMP.
27 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.28 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.29 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Construction of cyclone shelter at Kollipadu in Santhabommali Mandal in SrikakulamDistrict
1. Two works are there in this package:1) Construction of cyclone shelter at Kollipadu in Santhabommali Mandal,2) Construction of cyclone shelter at Runku in santhabommali MandalThe individual progress of this work is nearly 26.37% value of work is completed.The combined progress of this package is 23.65%.
2 26.37% value of the work is completed. Plinth beam concrete completed. Sand filling work is in progress.3 Works to be done as per Combined Milestone:
Mile stone 1 to the end of Dt: 07.03.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 07.08.12- First Floor Roof Slab Cast.Mile stone 3 to the end of Dt: 07.01.13- Completion of Works.
4 Sand filling for stilt floor is in progress. The material is tested for gradation and silt content. The observedvalue of silt content is more than the specified value. NCR is issued for the same.
5 The center line Marking pedestals are disturbed. The same shall be erect immediately to verify the linermeasurements of the centre line of the columns. The outer to outer measurements of plinth beam wasverified and found 20 to 35 mm more than the required. It is requested to verify the same and takenecessary action for the rectification.Materials.
6 The soil sample was collected by the contractor at a depth of 2.5m from the ground level and sent to GitamUniversity to test the SBC value of soil and the result obtained is 9.0 t/m2 as against design SBC of 7.5t/m2 as per approved drawing for Type - D cyclone Shelter. The confirmatory test for SBC is conducted byTPQA. The SBC obtained is 9 t/m2
7 The field officers have furnished the test results for Soil SBC value, Mix Designs, Steel reports fromSheladia laboratory, Visakhapatnam and Water obtained from Department of RWS Srikakulam.
8 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of IS 383 table 4. Finenessmodulus is varying from 2.48 -2.59 as against the allowable limits of. 2.4 to 3.2.
9 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are withinthe specified range as per IS 383 table-2
10 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine and Coarse aggregates and the obtained results are within the limit as per IS2386(Part VII) -1963.
11 Cement: TPQA collected the cement sample and tested for all the required tests on cement such asfineness, initial setting time, final setting time, consistency etc and the values observed are within thespecified range as per IS 4031.
12 Steel: Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties andthe obtained results are within the specified limits as per IS 1786.
MONTHLY REPORT
49 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
13 Water: Sample is collected and sent to Panchayatraj internal water quality monitoring Laboratory Z.PCompound Srikakulam. Results are within the specified range as per IS: 456-2000 & IS: 3025-1986.
14 C.C Cubes : M-20 and M30 Cube are tested for Compressive strength and the results are satisfying therequirements as per IS 456 Table 11
15 Cement coating for Steel: The protection of reinforcement against corrosion prior to placement of concreteis done by applying a Cement slurry coating on the steel. However it is advised to apply cement slurrywhen ever disturbed during bending, placing etc.(As per agreement technical specification of Subcl:1.3.27).The steel samples are randomly collected and tested for verification of Mass per Meter Run, theresults are given in Annexure-I
16 In foundation stage, The linear measurements of the centre line of columns are verified and fairly tallyingwith the approved drawing of Type-D Cyclone shelter with a SBC Value of 7.50 t/m2.
17 During execution the foundation levels and measurements of steel reinforcement and footing sizes areverified and they are fairly tallying with the approved drawing.
18 The measurements like width, thickness and length of PCC, Footings, and Columns up to bottom level ofplinth beam etc are verified and found tallying as per approved drawing.
19 Spacing and dimension of stirrups are verified with reference to the drawing and they are found to be asper drawing. Clear cover is also verified.
20 Basement Filling with sand is in progress. The silt is observed more than the specified range. NCR isissued for the same during execution
21 It is requested to the contractor to improve the curing arrangements for columns and beams.22 Site order book is being maintained by the field officers. The field officers are requested to take instructions
from the inspecting officers.23 Quality control lab is not available at site and the field officers are requested to insist the contractor to
procure the lab equipments for conducting tests on coarse and fine aggregates and concrete.24 It is observed that the steel is not properly stacked. Instructed to stack the steel neatly stored on blocks,
racks or platforms above the ground in clean and dry condition and suitably marked to facilitate inspectionand identification
25 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff during next inspection for verification.
26 The field officers have not furnished the approved quarry letters for metal, sand and water used for theshelter. The same shall be furnished to the TPQA staff during next inspection for verification.
27 The field officers are requested to insist the contractor to set the samples of cement and steel tested fromevery consignment and ensure its suitability before proceeding with the work.
28 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to theworking portion to prevent any casualties to the public and the workers.
29 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,NCRMP.
30 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.31 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.32 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Construction of cyclone shelter at Runku in Santhabommali Mandal
1. Two works are there in this package:1) Construction of cyclone shelter at Kollipadu in Santhabommali Mandal,2) Construction of cyclone shelter at Runku in Santhabommali MandalThe individual progress of this work is nearly 20.80% value of work is completed.The combined progress of this package is 23.65%.
2 20.80% value of the work is completed. Sand filling work is in progress. The progress of work is slow asper mile stone.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 07.03.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 07.08.12- First Floor Roof Slab Cast.Mile stone 3 to the end of Dt: 07.01.13- Completion of Works.
4 Lying of PCC under plinth beam work is in progress. The plinth beam PCC levels are varying +40mm to -60
MONTHLY REPORT
50 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
mm as per the drawing. The same shall be rectified as per drawing before placing the plinth beamreinforcement.
5 The center line Marking pedestals are disturbed. The same shall be erect immediately to verify the linermeasurements of the centre line of the columns and plinth beam.Materials.
6 The soil sample was collected by the contractor at a depth of 2.5m from the ground level and sent to GitamUniversity to test the SBC value of soil and the result obtained is 9.0 t/m2 as against design SBC of 7.5t/m2 as per approved drawing. The confirmatory test for SBC is conducted by TPQA. The SBC obtained is9 t/m2
7 The field officers have furnished the test results for Soil SBC value, Mix Designs, Steel reports fromSheladia laboratory, Visakhapatnam and Water obtained from Department of RWS Srikakulam.
8 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of IS 383 table 4. Finenessmodulus is varying from 2.48 -2.59 as against the allowable limits of. 2.4 to 3.2.
9 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are withinthe specified range as per IS 383 table-2
10 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine and Coarse aggregates and the obtained results are within the limit as per IS2386(Part VII) -1963.
11 Cement: TPQA collected the cement sample and tested for all the required tests on cement such asfineness, initial setting time, final setting time, consistency etc and the values observed are within thespecified range as per IS 4031.
12 Steel: Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties andthe obtained results are within the specified limits as per IS 1786.
13 Water: Sample is collected and sent to Panchayatraj internal water quality monitoring Laboratory Z.PCompound Srikakulam. Results are within the specified range as per IS: 456-2000 & IS: 3025-1986.
14 C.C Cubes : M-20 and M30 Cube are tested for Compressive strength and the results are satisfying therequirements as per IS 456 Table 11
15 Cement coating for Steel: The protection of reinforcement against corrosion prior to placement of concreteis done by applying a Cement slurry coating on the steel. However it is advised to apply cement slurrywhen ever disturbed during bending, placing etc.(As per agreement technical specification of Subcl:1.3.27).The steel samples are randomly collected and tested for verification of Mass per Meter Run, theresults are given in Annexure-I
16 In foundation stage, The linear measurements of the centre line of columns are verified and fairly tallyingwith the approved drawing of Type-D Cyclone shelter with a SBC Value of 7.50 t/m2.
17 During execution the foundation levels and measurements of steel reinforcement and footing sizes areverified and they are fairly tallying with the approved drawing.
18 The measurements like width, thickness and length of PCC, Footings, and Columns up to bottom level ofplinth beam etc are verified and found tallying as per approved drawing.
19 Spacing and dimension of stirrups are verified with reference to the drawing and they are found to be asper drawing. Clear cover is also verified.
20 Filling with sand is completed. The silt is observed more than the specified range. NCR is issued for thesame during execution
21 It is requested to the contractor to improve the curing arrangements for columns and beams.22 Site order book is being maintained by the field officers. The field officers are requested to take instructions
from the inspecting officers.23 Quality control lab is not available at site and the field officers are requested to insist the contractor to
procure the lab equipments for conducting tests on coarse and fine aggregates and concrete.24 It is observed that the steel is not properly stacked. Instructed to stack the steel neatly stored on blocks,
racks or platforms above the ground in clean and dry condition and suitably marked to facilitate inspectionand identification
25 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff during next inspection for verification.
26 The field officers have not furnished the approved quarry letters for metal, sand and water used for theshelter. The same shall be furnished to the TPQA staff during next inspection for verification.
27 The field officers are requested to insist the contractor to set the samples of cement and steel tested fromevery consignment and ensure its suitability before proceeding with the work.
28 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to theworking portion to prevent any casualties to the public and the workers.
MONTHLY REPORT
51 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
29 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,NCRMP.
30 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.31 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.32 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Pollada to Komaralthada & to cyclonic shelter.
1. Four works are there in this package:1) Road from Deppuru Bahadapalli road to Onkuluru & to cyclone shelter2) Road from Pollada to Komaralthada&to cyclonic shelter.3) Road from R&B Road to Devunalthada4) Road NP road to URK puramThe individual progress of this work is 43.70% value of work is completed.The combined progress of this package is 50.00%.
2 43.70% value of the work is completed. WBM Grade-II is completed, C.C roads not yet started and WBMGrade-III material collection is in progress.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 06.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 06.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.09.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB and Mix Design obtained from Department ofCivil Engineering, Gitam University and Sheladia Associates, Visakhapatnam.
5 The formation width is verified from KM 0/00 to KM 0/780 and found to be tallying with the requiredmeasurements of the approved drawing.
6 It is observed that the shoulder material of sand and gravel is not properly mixed and at some locations raincuts are observed. It shall be scarified, suitably remixed, watered to OMC and compacted to achieve therequired relative compaction of min.98% of lab MDD as per the agreement clause.
7 Aggregate for WBM Gr-II: The gradation and other physical tests are conducted for Coarse aggregate andthe observed values are satisfying the requirements of MORD Para 400.7 & 400.8
8 The measurements like width and thickness of the WBM Grade-II layer from KM 0/000 to KM 0/780 isverified and found to be tallying with the required measurements. The details are given in Annexure -1.
9 Volumetric analysis tests were conducted from KM 0/000 to KM 0/485 for WBM Gr.-II layer. Therequirements are satisfactory as per clause 405.13 of QA PMGSY Volume-II.
10 The approved letters of quarries like earth and aggregates were not produced by field officers forverification.
11 Temporary KM Stones are erected in this working road stretch. Insisted to erect permanent stones.12 Village name boards, Guard stones, cautionary and mandatory signboards at necessary points all along the
outer edge of sharp curves and at school locations shall be erected.13 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from R&B Road to Devunthalada.
1. Four works are there in this package:1) Road from Deppuru Bahadapalli road to Onkuluru & to cyclone shelter and2) Road from Pollada to Komaralthada&to cyclonic shelter.3) Road from R&B Road to Devunalthada4) Road NP road to URK puramThe individual progress of this work is 48% value of work is completed.
The combined progress of this package is 50.00%.2 48 % value of the work is completed. WBM Grade-II is completed, C.C roads not yet started and WBM
Grade-III collection is in progress.
MONTHLY REPORT
52 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 06.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 06.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.09.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB and Mix Design obtained from Department ofCivil Engineering, Gitam University and Sheladia Associates, Visakhapatnam.
5 The formation width is verified from KM 0/00 to KM 0/380 is verified and found to be tallying with therequired measurements of the approved drawing.
6 It is observed that the shoulder material of sand and gravel is not properly mixed and at some locations raincuts are observed. It shall be scarified, suitably remixed, watered to OMC and compacted to achieve therequired relative compaction of min.98% of lab MDD as per the agreement clause.
7 Aggregate for WBM Gr-II: The gradation and other physical tests are conducted for Coarse aggregate andthe observed values are satisfying the requirements of MORD Para 400.7 & 400.8
8 The measurements like width and thickness of the WBM Grade-II layer from KM 0/000 to KM 0/380 isverified and found to be tallying with the required measurements. The details are given in Annexure -1.
9 Volumetric analysis tests were conducted from KM 0/000 to KM 0/485 for WBM Gr.-II layer. Therequirements are satisfactory as per clause 405.13 of QA PMGSY Volume-II.
10 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II per MORD Clause 1103.Fineness modulus is varying from 2.52 -2.54 as against the allowable limits of. 2.4 to 3.50. The results arefound satisfactory.
11 Coarse Aggregates: Sieve analysis for 20mm metal is conducted and observed values are within thespecified range as per MORD Clause 1103.
12 The measurements like width and length of parapet walls of the entire slab culvert are verified and found tobe tallying with the approved drawing.
13 The test reports are not shown for water utilized in the CD Works to the TPQA staff during the inspectionfor verification.
14 The approved letters of quarries like earth and aggregates were not produced by field officers forverification.
15 Temporary KM Stones are erected in this working road stretch. Inistited to erect permanent stonesimmediately
16 White wash shall be done to parapet walls of the constructed culvert for the clear visibility of vehiculartraffic.
17 Village name boards, Guard stones, cautionary and mandatory signboards shall be erected at necessarypoints all along the outer edge of sharp curves and at school locations shall be erected.
18 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from NP road to URK Puram.
1. Four works are there in this package:1) Road from Deppuru Bahadapalli road to Onkuluru & to cyclone shelter2) Road from Pollada to Komaralthada&to cyclonic shelter.3) Road from R&B Road to Devunalthada4) Road NP road to URK puramThe individual progress of this work is 25.33% value of work is completed.The combined progress of this package is 50.00%.
2 25.33% value of the work is completed. WBM Grade-III collection is in progress, C.C road not yet started.3 Works to be done as per Combined Milestone:
Mile stone 1 to the end of Dt: 06.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 06.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.09.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB and Mix Design obtained from Department ofCivil Engineering, Gitam University and Sheladia Associates, Visakhapatnam.
5 The formation width is verified from KM 0/00 to KM 2/270 and in the stretch from 0/020 to 0/120, formationwidth is very narrow and in the remaining length, the formation width is as per requirement.
6 It is observed that the shoulder material of sand and gravel is not properly mixed and some locations raincuts are observed. It shall be scarified, suitably remixed, watered to OMC and compacted to achieve the
MONTHLY REPORT
53 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
required relative compaction of min.98% of lab MDD as per the agreement clause.7 Up to WBM GR-II road work was done under NREGS programmed.8 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II per MORD Clause 1103.
Fineness modulus is varying from 2.58 -2.62 as against the allowable limits of. 2.0 to 3.50.9 Single Sized Aggregates: Sieve analysis for 20mm metal is conducted and observed values are within the
specified range as per MORD Clause 1103.10 C.C Cubes : M20 grade C.C Cubes Compressive strength results are satisfactory as per acceptance
criteria of per MORD section 800.11 Laying and Jointing of pipes and back filling for pipe culverts was done as per specifications of the MORD
section 110012 The test reports are not shown for water utilized in the CD Works to the TPQA staff during the inspection
for verification.13 The approved letters of quarries like earth and aggregates were not produced by field officers for
verification.14 The measurements like width and length of parapet walls of all the pipe culverts are verified and found
verifying with reference to the approved drawing.15 Temporary KM Stones are erected in this working road stretch. The field officers are requested to erect
permanent stones immediately16 White wash shall be done to parapet walls of the existing and constructed culverts for the clear visibility of
vehicular traffic.17 Village name boards, Guard stones, cautionary and mandatory signboards at necessary points all along the
outer edge of sharp curves and at school locations shall be erected.18 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Kotcherla road to Pathesundrapalem
1. Four works are there in this package:1) Road from Kotcherla road to Pathesundrapalem in Etcherla Mandal and2) Road from Kotcherla road to Kollibhemavaram & Cyclonic shelter in Etcherla Mandal3) Road from Koyyam R&B road to Moosavanipeta in Etcherla Mandal4) Road from Mentada to Dovupeta in Etcherla Mandal.Individual progress of work is 40%
2 40.00 % value of the work is completed. WBM GR-III completed3 Works to be done as per Combined Milestone:
Mile stone 1 to the end of Dt: 07.11.11- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 07.03.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.06.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB, WBM, Mix Design and Water obtained fromDepartment of Civil Engineering, Gitam University, and Visakhapatnam.
5 The GSB Samples collected by TPQA were sent for testing to SSGC Lab for conducting test of CBR andPI.
6 The formation width is verified from KM 0/00 to KM 0/500and at some locations the width of formation isless. The field officers are requested to furnish the reasons for the same. (Avg.road widths from Km: 0/0 toKm 0/200is 7.25m and Km: 0/200 to Km 0/500 is varying 7.3 to 7.00m)
7 It is observed that the shoulder material of sand and gravel is not properly mixed. It shall be scarified,suitably remixed, watered to OMC and compacted to achieve the required relative compaction of min.98%of lab MDD as per the agreement clause.
8 The measurements like width and thickness of the WBM Grade-II and Gr-III layer from KM 0/000 to KM0/500 is verified and found to be tallying with the required measurements. The results are tabulated inannexure-I and II
9 Volumetric analysis tests were conducted from KM 0/000 to KM 0/450 for WBM GR-II layer. The results arefairly satisfying sub clause 405.13 of PMGSY Quality manful volume-II.
10 Temporary KM Stones are erected in this working road stretch. The field officers are requested to erectpermanent stones immediately
11 Village name boards, Guard stones, cautionary and mandatory signboards at necessary points all along theouter edge of sharp curves and at school locations shall be erected.
MONTHLY REPORT
54 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
12 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Koyyam R&B Road to Moosavanipeta
1. Four works are there in this package:1) Road from Kotcherla road to Pathesundrapalem in Etcherla Mandal and2) Road from Kotcherla road to Kollibhemavaram & Cyclonicshelterin Etcherla Mandal3) Road from Koyyam R&B road to Moosavanipeta in Etcherla Mandal4) Road from Mentada to Dovupeta in Etcherla MandalThe combined progress of this package is 50.00% .
2 80.00 % value of the work is completed. B.T completed and C.C roads not yet started.3 Works to be done as per Combined Milestone:
Mile stone 1 to the end of Dt: 07.09.11- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 07.03.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.06.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB, WBM, Mix Design and Water obtained fromDepartment of Civil Engineering, Gitam University and Sheladia Associates, Visakhapatnam.
5 The formation width is verified from KM 0/00 to KM 0/600 and at some locations the width of formation isless. The field officers are requested to furnish the reasons for the same. (Avg.road widths from Km: 0/300to Km 0/600 is 6.5m and from Km: 0/790 to Km 1/340 it is varying from 6.25 to 6.5m)
6 In the agreement earth work quantity was not provided. But TPQA requested the line department to explorethe feasibility of widening the formation width to 7.50m.
7 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarseaggregate and the observed values are satisfying the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
8 Aggregate for Seal Coat: The gradation seal coat chips conducted and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2
9 The thickness and BT content for OGPC+ seal coat verified and given in annexure 2 and 310 Aggregate for WBM Gr-III: The gradation and other physical tests are conducted for Coarse aggregate and
the observed values are satisfying the requirements of MORD Para 400.7 & 400.811 The measurements like width and thickness of the WBM Grade-III layer from KM 0/000 to KM 1/340is
verified and found to be tallying with the required measurements. The details are given in Annexure -1.12 Volumetric analysis tests were conducted from KM 0/000 to KM 1/340 for WBM II Iayers. The requirements
are as per sub clause 405.13 of PMGSY QA Manual Vol.213 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II as per MORD table 800.214 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are within
the specified range as per MORD table 800.115 C.C Cubes : M20 grade C.C Cubes Compressive strength results are as per acceptance criteria as per
MORD specification16 Laying and Jointing of pipes and back filling for pipe culverts are done as per specifications of the MORD
section 110017 The test reports are shown for water utilized in the CD Works to the TPQA staff during the inspection for
verification.18 The approved letters of quarries like earth and aggregates were not produced by field officers for
verification.19 The measurements like width and length of parapet walls of all the pipe culverts are verified and found to
be tallying with the approved drawing.20 Temporary KM Stones are erected in this working road stretch. The field officers are requested to erect
permanent stones immediately21 White wash shall be done to parapet walls of the existing and constructed culverts for the clear visibility of
vehicular traffic.22 Village name boards, Guard stones, cautionary and mandatory signboards shall be erected at necessary
points all along the outer edge of sharp curves and at school locations.23 Para wise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
55 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: Road from Deppuru, Bahadapalli road to Onkuluru & cyclone shelter.
1. Four works are there in this package:1) Road from Deppuru Bahadapalli road to Onkuluru & to cyclone shelter2) Road from Pollada to Komaralthada&to cyclonic shelter.3) Road from R&B Road to Devunalthada4) Road NP road to URK puramThe individual progress of this work is 43% value of work is completed. The combined progress of thispackage is 50.00%.
2 43% value of the work is completed. WBM Grade-II is completed, C.C roads not yet started and WBMGrade-III collection is in progress.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 06.01.12- Earthwork, CD Works and GSB.Mile stone 2 to the end of Dt: 06.05.12- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 06.09.12- BT and Road furniture.
4 The field officers have furnished the test results for Soil, GSB and Mix Design obtained from Department ofCivil Engineering, Gitam University and Sheladia Associates, Visakhapatnam.
5 The formation width is verified from KM 0/00 to KM 0/485 and found to be tallying with the requiredmeasurements of the approved drawing.
6 It is observed that the shoulder material of sand and gravel is not properly mixed and at some locations raincuts are observed. It shall be scarified, suitably remixed, watered to OMC and compacted to achieve therequired relative compaction of min.98% of lab MDD as per the agreement clause.
7 Aggregate for WBM Gr-II: The gradation and other physical tests are conducted for Coarse aggregate andthe observed values are satisfying the requirements of MORD Para 400.7 & 400.8
8 The measurements like width and thickness of the WBM Grade-II layer from KM 0/000 to KM 0/485 isverified and. The details are given in Annexure -2.
9 Volumetric analysis tests were conducted from KM 0/000 to KM 0/485 for WBM Gr.-II layer. Thecompaction requirements are satisfactory as per clause 405.13 of QA PMGSY Volume-II.
10 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of As per MORD Clause 1103.Fineness modulus is varying from 2.58 -2.62 as against the allowable limits of. 2.0 to 3.50. The results arefound satisfactory.
11 Single Sized Aggregates: Sieve analysis for 20mm metals is conducted and observed values are within thespecified range as per MORD Clause 1103.
12 C.C Cubes : M20 grade C.C Cubes Compressive strength results are satisfactory as per acceptancecriteria of per MORD specification of section 800.
13 Laying and Jointing of pipes and back filling for pipe culverts was done as per specifications of the MORDsection 1100
14 The test reports are not shown for water utilized in the CD Works to the TPQA staff during the inspectionfor verification.
15 The approved letters of quarries like earth and aggregates were not produced by field officers forverification.
16 The measurements like width and length of parapet walls of all the pipe culverts are verified and foundtallying (except for some minor variations) with the approved drawing.
17 Temporary KM Stones are erected in this working road stretch. The field officers are requested to erectpermanent stones after black tapping.
18 White wash shall be done to parapet walls of the existing and new culverts for the clear visibility ofvehicular traffic.
19 Village name boards, Guard stones, cautionary and mandatory signboards at necessary points edgepainted sandstones shall be fixed all along the outer edge of sharp curves.
20 Para wise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
56 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork:
Construction of Cyclone shelter at Chakicharla in Ulavapadu Mandal, in PrakasamDistrict
1. 90 % value of the work is completed. Mile stone -III work is in progress.2 Milestone-I Upton 24.11.2011: All items up to stilt floor slab including Ramp, Staircase, Foundations,
Columns, Beams, PCC flooring etc all as per sanctioned estimate.3 Milestone2 up to 24.02.2012: All items up to second floor slab including first floor, and in second floor
including staircase columns etc all as per sanctioned estimate.4 Milestone3 24.05.2012: Head room plastering, flooring, water supply arrangements, sanitary fittings,
electrical items, compound wall, CC pavement, Earthen mound, water harvesting, septic tank, sump andsoak pit etc all as per sanctioned estimate.Materials
5 Cement: The Fineness of cement, Consistency of cement, Initial & Final setting of cement tests areconducted randomly and the results are within the permissible limits as per IS 4031.Confirmatory Design Mix
6 The field officer produced design mixfor M30 Grade of Concrete, the
duties are as follows
The TPQA got confirmatory design mix done by Bapatla EggCollege for M30 Grade of Concrete, the details are as
follows:
Material (mix-1Proportion) Units Material (mix-2 Proportion)
Cement 420 Kg/m³ Cement
CoarseAggregate
812.00 Kg/m³(20mm-66%),406.00 Kg/m³(10mm-34%)
Coarse Aggregate
Fine Aggregate 567 Kg/m³ Fine Aggregate
W/C Ratio 0.42 W/C Ratio
Target MeanStrength 38.25N/mm² Target Mean Strength
7 Steel:1.Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties and theobtained results satisfy the specified limits as per IS 1786.2.The samples of 8mm, 10mm, 12mm, 16mm, 20mm & 25mm dia bars are collected during inspection andthe coefficients are verified as per code IS: 1786. The Results obtained are as follows:
8S.No Diameter (mm)
Weight per MeterLength (As per IS:
1786-1985)
Yield Stress(N/mm²)
Ultimate TensileStrength (N/mm²)
1 8 0.395 508 6102 10 0.617 495 6253 12 0.888 553 6724 16 1.58 650 7695 20 2.47 571 688
Note- For 8mm diameter bars permissible deviation is ±7% in weight.Note- For 10mm, 12mm and 16mm diameter bars permissible deviation is ±5% in weight.Note- For 20mm diameter bars permissible deviation is ±3% in weight.Note- The percentage of elongation is minimum 12%.Note- The Bend & Rebind test is also conducted on all the above samples and there is no transverse crackis observed during the testing of samples.
9 Graded Aggregates: Sieve analysis tests are conducted at regular intervals for graded metal (20mm 66%& 12 mm 34%), and the values are within limits as per table-2 of IS 383-1970.
MONTHLY REPORT
57 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10 Sand: Sieve Analysis tests are conducted at regular intervals. Sand is confirming to Zone II and the valuesare within limits as per table-4 of IS 383-1970. Fineness modulus is varying from 2.45- 3.03 as against theallowable limits of 2.0 to 3.50.
11 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine and Coarse aggregates and the obtained results are within the limit as per IS2386(Part VII) -1963.
12 C.C Cubes: M30 grade C.C Cubes are casted and tested, from the test results the values are satisfying therequirements for various components
13 Cement Coating of Steel: The protection of reinforcement against corrosion prior to the placement ofconcrete is done by applying a Cement slurry coating on the steel.
14 Water: Sample is collected and sent to Natural Resources Development Co-Operative Society Ltd.,Ongole. Results are within the specified range as per IS: 456-2000 & IS: 3025-1986.
15 Brick: Water absorption and Crushing strength tests are conducted as per specification IS 3495, results arewithin the specification limits.FoundationEarth work
16 Earthwork in excavation for structures is done as per drawing and technical specifications.17 The Excavated depths are verified as 2.50 meters and are fairly tallying with the approved Drawing.18 The soil sample is collected by the TPQA at a depth of 2.5m from the ground level and sent to SSGC LAB
in Nellore for confirmatory test of SBC value of soil at foundation level. The SBC obtained is 14.1t/m2 asagainst the design SBC of 10 t/m2 as per approved drawing.
19 The marking for Footing positions are verified and are tallying with the approved drawing of Type-D. Thelinear measurements of the center line of columns are verified and they are fairly tallying with the approveddrawing of Type-D Cyclone shelter with a design SBC Value of 10 t/m².
20 During execution the foundation levels and measurements of steel reinforcement and concrete are verifiedand they are fairly tallying with the approved drawing.
21 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff for verification.
22 The measurements like width, thickness and length of PCC, Footings, Columns, plinth beam, Slabs andBeams etc. are verified and found to be tallying as per approved drawing.
23 During the concreting work the workability of concrete, concrete temperature are randomly checked &cubes are casted in site and tested after the curing period is complete.
24 The curing arrangements done for columns, beams & slabs are satisfactory.25 The Reinforcement steel is cement coated and neatly stacked on wooden blocks above the ground in clean
and dry condition and suitably marked to facilitate inspection and identification.26 Safety measures for workers such as Helmets, Gum Shoes etc, are provided by the contractor.27 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.28 Supplying and filling of sand including watering and tamping etc. were done as per requirement.29 Footings, Pedestals, Columns, plinth beam, Stair Case, Beams and Slabs are casted with M30 grade of
concrete.30 FOOTINGS-The plumb and measurements of footings are verified randomly before and after execution and
they tallied as per approved Drawing. The compressive strength of concrete cubes tested for footings isdone randomly which is within the permissible limits.
31 PEDASTALS-The plumb and measurements of Pedestals are verified randomly before and after executionand they tallied as per approved Drawing. the compressive strength of concrete cubes test for columns isdone randomly which is within the permissible limits are obtained
32 PLINTH BEAM-The measurements of Plinth Beam are verified randomly before and after execution andthey tallied as per approved Drawing. the compressive strength of concrete cubes test conducted forcolumns randomly which is within the permissible limits are obtained
33 STAIRCASE- The stair case and Ramp portion measurements are verified before and after execution and itis tallied as per approved drawing
34 Stilt floor to first floor ramp waist slab is completed. The waist slab measurements are verified and tallied asper approved drawing
35 Instead of providing M.S Railing brick work is constructed on ramp portion. For which deviation approval isrequired.
Foundations, First Floor, Second Floor and Terrace Floor36 M30 concrete for lintels, coleus, beams, slabs and stair case. For all the above M30 concrete members,
MONTHLY REPORT
58 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
reinforcement, grills, were verified with reference to the drawing and necessary rectifications were carriedout. After fully satisfying with the shuttering arrangements, OK cards were issued for concreting.
37 During concreting, TPQA monitored the proportioning of the ingredients, water cement ratio, slump andplacement of concrete etc. During their inspection. Casting of cubes was also carried out.
38 After curing is over and shutters are removed, concreting surfaces were checked for finishing on theinstructions were issued to carry out minor rectifications.
39 Cubes were tested for 7 day and 28 day compressive strength. Also non destructive rebound hammer testswere done on the concrete surfaces.
40 Brick Work: With CM(1 : 6) was verified for measurements, thickness of mortar joint, mortar quality, line andcuring etc.
41 Reinforced brick masonry 115mm thick with second class bricks, embedded with 2-8 mm Φ rods in everythird layer was also verified at different stages.
42 20 mm thick outside plastering and 12mm thick in side plastering was verified for thickness, curing andquality etc at various stages.
43 Painting to exterior surface of walls is in progress44 Painting to Internal surface of walls is in progress45 The Door frames are fixed in brick wall construction and Doors are to be fixed. The Door frames are made
with sale wood of sizes 75mm x 100mm. The size of door frames are found to be in the range of 73 x 76mm x 98mm to 101mm.
46 Before filly the door frames in Brick wall, it is painted with liquid bitumen on wall side with 6 Nos of holdfasts (3 on each side) are provided and found satisfactory as per agreement.
47 Flooring with polished Tangur stones slabs of 15 mm thick is in progress, the Measurements of tenderstone slabs are verified and the thickness is varying from 13 mm to 18mm.
48 FOR STEPS-Flooring with polished Tangur stones slabs of 15 mm thick is to be done.49 Providing skirting to internal walls to 15 cm height/risers of steps with 15 mm thick polished Tangur stone
length work is in progress50 The Window sizes are verified and compared with 1.50 m x 1.20 m. and found satisfactory except for minor
variation.51 The Window frame made of sale wood of sizes are compared with 100 x 75mm of and found satisfactory
Before fixed the Window frames in Brick wall and it is painted with liquid bitumen on wall side with 2 Nos ofhold fasts is provided and found satisfactory as per agreement.
52 The 16mm rods are fixed to the Window frame @ 10cm interval against the 30 Cm interval, for whichworking estimate approval is required.
53 As per approved Drawing fixing of four windows in one side brick wall is proposed but the length of wall isnot sufficient. Hence three windows in one side of brick wall and fourth window were fixed in another brickwall for both same HALL-1 and HALL-2.
54 The ventilator sizes are verified and compared with the required 0.60 m x 0.30 m. and found satisfactoryexpect for minor variations.
55 The ventilator frame made of sale wood of sizes are compared with the required 75mm x 100 mm and theyare varying slight by found satisfactory as per agreement., Before fixed the Window frames in Brick walland it is painted with liquid bitumen on wall side with 2 Nos of hold fasts is provided and found satisfactory.Lowers for clearing the ventilators may be provided.
56 The 16mm rods (2nos) are fixed to the ventilators frame and found satisfactory as per agreement.57 The application of crushed stone graded Pebble dash exterior plaster on walls is completed and found
satisfactory as per agreement.58 Painting to exterior surface of walls is in progress59 Painting to Internal surface of walls is in progress60 APPROACH ROAD- to be taken up.61 COMPOUND WALL: 120 meters length compound wall is completed. For approximately 50 meters length
compound wall is to be constructed. For which working estimate approval is required.62 The measurements of Earthwork in excavation are verified and found to be tallying.63 It is observed that construction joints are provided at 21M cc.64 The Construction of CRS masonry with hard granite stone is completed and the measurements are verified.65 COMPOUND WALL GATE- IN PROGRESS(GATE IS AVAIABLE ATSITE)66 WATER HARWESTING & SOAK PIT- Water harvesting is completed and soak pit work is in progress.67 Sump: sump is completed as per approved drawing68 Cattle Platform : Cattle platform is completed and revetment work is in progress69 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,
MONTHLY REPORT
59 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP.70 O.K CARDS are issued at every stage of work Reports are enclosed Annexure-VIII71 ELECTRICAL WORK: Is in progress72 Approved Electrical Drawings are not available at site.73 The field officers have not furnished the approved quarry letters for metal, sand and water used for the
shelter. The same shall be furnished to the TPQA staff during next inspection for verification.
Name ofWork: Road from R&B Road to Mandevaripalem in Guntur District
1. Progress: About 90% of work is completed. Shoulders are in progress.Materials:
2 Sieve analysis is conducted of WBM material and the results are fairly satisfying the requirements ofMORD Table 400.8
3 The measurements like width and thickness of the WBM Grade-III layers from 0/2+04 to0/4+133 M areverified and found fairly tallying with the required measurements. The details are given in Annexure -I
4 We conducted the volumetric analysis tests from km 0/2+04 to km 0/4+133 for WBM layers. It is fairlytallying to the specification of MORD.
5 The shoulder material work in progress and compaction is to be done.6 During execution, The rate of spraying of prime coat is verified and found to be within the specified limits
as per Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed duringexecution and found to be varying from 30°C to 37°C, which are within the specified limits as per MORDspecifications.
7 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found to be varying from 30°C to 37°C, which are within the specified limits as per MORDspecifications.
8 t is obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from Km0/0+128 to0/4+154.6 Km are verified and found to be tallying with the requirement as per IRC:SP:20 and IRC:SP:11.The details are given in Annexure - II.
9 Aggregate for OGPC and Seal Coat: The gradation and other physical tests are conducted for Coarseaggregate and the observed values are satisfying the requirements of MORD Para 508.1.2.1 and MORDtable 500.13
10 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0+128to 0/4+154.6 Kmand Km is verified and found to be fairly tallying with the required measurements. The details are given inAnnexure-III
11 Gradation is conducted for OGPC and Seal coat CA material and results are found to be within thespecified limits as per agreement specification.
12 Aggregate for Seal Coat: The gradation seal coat chips conducted and the observed values are fair lysatisfying the requirements of MORD Para 510.2.2
13 During execution, Temparature at mixing, laying and at compaction are verified and found to be within thespecified temperature range.
14 The Contractor shall take necessary precautions for safety of the workers and preserving their health whileworking in such jobs, which require special protection and precaution
15 Site order book is not being maintained by the field officers. The field officers are requested to maintaininvariably the site order book and get the instructions from the inspecting officers from time to time.
16 Material Registers are not available. The field officers are requested to maintain the material registers andsame shall be furnished to the T.P.Q.A. staff for verification.
17 KM & HM Stones are not available on the working road stretch. The field officers are requested to erectthem after compaction of widened portions.
18 The project informatory boards with all details were not provided as per agreement. The same may beprovided immediately at site as per the guidelines given by PIU, NCRMP.
19 The field officers have not furnished manufacture certificate of bitumen test results or bill to the T.P.Q.A.staff for verification.
MONTHLY REPORT
60 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork: Road from R&B Road to Yaramvaripalem.
1. Progress: CC pavement work is in Completed. GSB is in progress. Compaction to be done.Materials :
2 Blended Mix Gradation test conducted for 20mm, 12.5 mm and sand observed values are within thespecified range as per table 1500.3 of MORD Specifications for Rural Roads.
3 CC pavement measurements are verified and they are fairly tallying with the Drawing requirements. Resultsare furnished in Annexure-I.
4 The core strength results are furnished in Annexure II. The core compressive strength of 3 cores taken isfound to be varying from 25.94 to 26.93 N/mm2 as against the minimum average requirement of 25.50N/mm2.
5 Site order book is not being maintained by the field officers. The field officers are requested to maintaininvariably the site order book and get the instructions from the inspecting officers from time to time.
6 The field officers have not furnished the test results for Embankment soil .The field officers are requested tofurnish the Soil test results to the T.P.Q.A. staff for verification. The field officers shall be instructed in thisregard.
7 The earth work done in the widening portion is not yet compacted. It is to be compacted in layers and thefield dry density shall be compared with laboratory maximum Dry density for ensuring the specified relativecompaction.
8 The field officers have not furnished test reports of manufacturer for cement to the T.P.Q.A. staff forverification.
9 For the C.C road, contraction joints are not provided. The contraction joints shall be cut immediately as persub clause- 1501.8 of More.
10 Material Registers are not available. The field officers are requested to maintain the material registers andsame shall be furnished to the T.P.Q.A. staff for verification.
11 KM & HM Stones are not available on the working road stretch. The field officers are requested to erectthem after compaction of widened portions.
12 The project informatory boards with all details were not provided as per agreement. The same may beprovided immediately at site as per the guidelines given by PIU, NCRMP.
13 Cautionary signboards at necessary points and village name boards shall be erected. Guide stones shallbe fixed along the outer edge of all the sharp curves. Extra width off formation is necessary at sharpcurves.
14 DCBM, TBM Stones are not available at site. The field officers are requested to fix the DCBM & TBMStones and carry the levels and same shall be furnished the DCBM & TBM list to the T.P.Q.A. staff forverification.
15 Pre-levels of earth work are not submitted by the field officer. Hence The field officers are requested tofurnish the prelates to the T.P.Q.A. staff for verification.
16 Compliance shall be submitted parawise at an early date after attending to the above remarks.
Name ofWork: Road from R&B Road to Pedagollapalem Cyclone Shelter.
1. Progress: About 96% of the work is completed .C C Road is completed. Shoulder work is in progress andcompaction is to be done.Materials :
2 Blended Mix Gradation test conducted for 20mm, 12.5 mm and sand observed values are within thespecified range as per table 1500.3 of MORD Specifications for Rural Roads.
3 CC pavement measurements are verified and fairly tallying with the Drawing requirement. Results arefurnished in Annexure I.
4 The core strength results are furnished in Annexure II.5 Cement concrete cubes are tested and the results are satisfying the requirement as per MORD Table
800.4. Results are furnished in Annexure III.6 Cement was tested and the results are within the specified limits as per MORD Clause 802.2.7 The field officers have not furnished the test results for C pavement materials. The field officers are
requested to furnish the C pavement materials test results to the T.P.Q.A. staff for verification.
MONTHLY REPORT
61 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8 The field officers have not furnished certificate of cement test results by the manufacturers to the T.P.Q.A.staff for verification.
9 Material Registers are not available. The field officers are requested to maintain the material registers andsame shall be furnished to the T.P.Q.A. staff for verification.
10 KM & HM Stones are not available on the working road stretch. The field officers are requested to erectthem after compaction of widened portions.
11 The informatory and identification of semi - reflective sign boards with all details shall be provided as perthe agreement.
12 The quality control tests should be conducted as per IRC SP-11, maintain Q.C. record and the same shallbe produced to Q.A. wing for verification.
13 It is absorb that the C.C road and existing B.T surface joint not properly, it is to be done properly.14 Compliance shall be submitted parawise at an early date after attending to the above remarks.
Name ofWork: Road from R&B Road to Kesavapuri ST colony.
1. Progress: about 95% of work is completed .C C Road is completed. Shoulder work is in progress.Materials:
2 Blended Mix Gradation test conducted for 20mm, 12.5 mm and sand observed values are within thespecified range as per table 1500.3 of MORD Specifications for Rural Roads.
3 CC pavement measurements are verified and fairly tallying with the Drawing. Results are furnished inAnnexure I.
4 The core strength results are furnished in Annexure II.5 Cement concrete cubes are tested and the results are satisfying the requirement as per MORD Table
800.4. Results are furnished in Annexure III.6 Cement was tested and the results are within the specified limits as per MORD Clause 802.2.7 There will be a level difference in construction joints. And the finishing is not good. The field officers are
request to take necessary precautions to keep both joints at same level. Finish the rough surface bymaking a grove of 20mm and neatly finish with sealant material. Guidelines of MORD clause 1501 shall befollowed
8 For the C.C road, contraction joints are not provided, .The field officers are requested to take necessaryaction to provide the same as per MORD Sub clause 1501.22.
9 The field officers have not furnished the test results for C pavement .The field officers are requested tofurnish the C pavement test results to the T.P.Q.A. staff for verification.
10 The field officers have not furnished certificate of cement test results of manufacturers to the T.P.Q.A. stafffor verification.
11 Material Registers are not available. The field officers are requested to maintain the material registers andsame shall be furnished to the T.P.Q.A. staff for verification.
12 KM & HM Stones are not available on the working road stretch. The field officers are requested to erectthem after compaction of widened portions.
13 The informatory and identification of semi - reflective sign boards with all details shall be provided as perthe agreement.
14 The quality control tests should be conducted as per IRC SP-11, maintain Q.C. record and the same shallbe produced to Q.A. wing for verification.
15 Compliance shall be submitted parawise at an early date after attending to the above remarks.
Name ofWork:
Road from Kotha Satram R&B to Indrsanagar (via) Thumalapenta palam ,Patharavadupalam ,Ramudu palam, Karaduvari palam &Sreeramapuram in SPSR Nellore District.
1. Milestone 1 - Earthwork, Pipe Culverts, GSB - (28.12.2012)Milestone 2 - WBM Gr. II & III and shoulders and Cc pavement (28.4.2012)Milestone 3 - BT & Road furniture (28.08.2012)
2 Value of work completed is about 83% of the agreement value.3 As per agreement there are 5No of CD works .But contractor has not executed so far, The field officers
have informed that the pipe culverts are not required as per site conditions.
MONTHLY REPORT
62 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4 The measurements like width and thickness of the WBM Gr.-II Layer from Km 0.00 to Km 4.865 is verifiedand found to be fairly tallying with the required measurements. The details are given in Annexure-1.
5 Volumetric analysis tests were conducted for WBM Grade-II layer from Km 0.000 to Km 4.865. It is fairlytallying with the specfication of sub clause 405.13 of PMGSY Quality Assurance Manual Volume II.
6 The measurements like width and thickness of the WBM Gr.-III Layer from Km 0.00 to Km 4.865 is verifiedand found fairly tallying with the required measurements. The details are given in Annexure-II.
7 Volumetric analysis tests were conducted for WBM Grade-III layer from Km 0.000 to Km 4.865. It is fairlytallying with the specfication of clause 405.13 of PMGSY Quality Assurance Manual Volume II.
8 We suggested to contractor to compact the sand mixed gravel shoulders simultaneously along with theWBM layers as per MORD section 405,Para 405.3.5.
9 The shoulder material of sand and gravel is not properly mixed. It shall be scarified, suitably remixed,watered to OMC and compact acted to achieve the required relative compaction of min.98% of lab MDD asper the agreement clause.
10 Aggregate for Seal Coat: The gradation seal coat chips was conducted and the observed values are fairlysatisfying the requirements of MORD Para 510.2.2
11 During execution, The rate of spraying of prime coat is verified and found within the specified limits as perClause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during execution andfound varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.
12 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found varying from 30°C to 37°C, which are within the specified limits as per MORD specifications 501.
13 During execution, Temperature at mixing, laying and at compaction are verified and found to be within thespecified temperature range as per MORD Para 508.1.3.4
14 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km 4/865 is verifiedand found to be fairly tallying with the required measurements. The details are given in Annexure- III.
15 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/00 andKm 4/865 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. The detailsare given in Annexure - IV.
16 Cautionary, direction and place identification sign board shall be Semi reflective, for better visibility forvehicular traffic during the night. The boards provided are not of semi reflection type.
17 Cautionary, direction and place identification sign board are provided; They shall be Semi reflective forbetter visibility for vehicular traffic during the night. The boards provided are not of semi reflection type.
18 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from pedattapupalem R&B road to Chennayapalem H.wada
1. 73 % value of the work is completed. Shoulders are in progress.2 Work to be done as per Milestones:
Mile stone 1 to the end of Dt: 16.06.11- Earthwork, CD Works, ccpavement and GSB.Mile stone 2 to the end of Dt: 16.11.11- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 16.4.12- BT and Road furniture.
3 The measurements like width and thickness of the WBM Gr.-II Layer from Km0.000 to Km2.600 is verifiedand found fairly tallying with the required measurements. The details are given in Annexure-1.
4 Volumetric analysis tests were conducted for WBM Grade-II layer from Km 0.000 to Km 2.600. It is fairlytallying with the specfication of clause 405.13 of MORD.
5 The measurements like width and thickness of the WBM Gr- III Layer from Km0.000 to Km2.600 is verifiedand found fairly tallying with the required measurements. The details are given in Annexure-1.
6 Volumetric analysis tests were conducted for WBM Gr-III layer from Km 0.000 to Km 2.600. It is fairlytallying with the specfication of clause 405.13 of PMGSY Quality Assurance Volume II.
7 We suggested to contractor to compact the sand mixed gravel shoulders simultaneously along with theWBM layers as per MORD section 405,Para 405.3.5.
8 The shoulder material of sand and gravel not properly mixed. It should be scarified and remixed ,water toOMC and compacted to achieve the required density as per specification
9 Aggregate for Seal Coat: The gradation tests for seal coat chips were conducted and the observed valuesare fairly satisfying the requirements of MORD Para 510.2.2
10 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per
MONTHLY REPORT
63 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during execution andfound to be varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.
11 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during executionand found to be varying from 30°C to 37°C, which are within the specified limits as per MORDspecifications.
12 During execution, Temparature at mixing, laying and at compaction are verified during execution and foundto be within the specified temperature range.
13 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km and Km 2/600 isverified and found to be fairly tallying with the required measurements. The details are given in Annexure-II.
14 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from Km 0/0 to Kmand Km 2/600 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in Annexure - III.
15 Cautionary, direction and place identification sign board shall be Semi reflective, for better visibility forvehicular traffic during the night. The boards fixed are not of semi reflection type.
Name ofWork: Road from NH5 to Sambasivapuram
1. Two works are in this package:95 % value of this work is completed. Road furniture has to be taken up
2 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 19.06.11- Earthwork, CD Works and CC PavementMile stone 2 to the end of Dt: 18.11.11- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 18.04.11- BT and Road furniture.
3 The field officers are requested to instruct the contractor to maintain site order book and get the instructionsfrom the inspecting officers time to time.Materials.
4 Sieve analysis is conducted on Coarse Aggregates for WBM grade II and grade III layers and the resultsare fairly satisfying the requirements of MORD Table 400.8
5 The field officers are requested to provide the guard stones at outer edge of along the Canal ,and paintingto be done with white and black strips for better visibility for vehicular traffic during the night
6 The formation width is verified between KM 0/075 to KM 2/950 and at some locations the width of formationis less. The field officers are requested to furnish the reasons for the same.
7 The measurements like width and thickness of the GSB layers from KM 0/075 to KM 2/950 are verified andfound to be fairly tallying with the required measurements. The details are given in Annexure -1
8 It is observed that the shoulder material of sand and gravel is not properly mixed. It shall be scarified,suitably remixed, watered to OMC and compacted to achieve the required relative compaction of min.98%of lab MDD as per the agreement clause.
9 The measurements like width and thickness of the WBM Grade-II and WBM Grade-III layers from KM 0/000to KM 2/850 are verified and found to be fairly tallying with the required measurements. The details aregiven in Annexure -2
10 We conducted the volumetric analysis tests from KM 0/000 to KM 2/850 for WBM layers. It is fairly tallyingto the requirements given in sub clause 405.13 of PMGSY Quality Assurance volume II.
11 We suggested to contractor to construct the sand mixed gravel shoulders simultaneously with the WBMlayers as per MORD section 405,Para 405.3.5.
12 The shoulder material of sand and gravel is not properly mixed. It shall be scarify, suitably remix, wateredto OMC and compact to achieve the required relative compaction of min.98% of lab MDD as per theagreement clause.
13 Gradation is conducted for OGPC and Seal coat Coarse Aggregate material and results are found to bewithin the specified limits as per agreement specification.
14 During execution, The rate of spraying of prime coat is verified and found to be within the specified limitsas per Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed duringexecution and found varying from 30°C to 37°C, which are within the specified limits as per MORDspecifications.
15 During execution, the rate of spreading of tack coat is verified and found to be within the specified limits asper Clause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during execution
MONTHLY REPORT
64 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
and found varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.16 During execution, Temparature at mixing, laying and at compaction are verified during execution and found
to be within the specified temperature range.17 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km and Km 2/850 is
verified and found to be fairly tallying with the required measurements. The details are given in Annexure-5.18 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from Km 0/0 to Km
and Km 2/850are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. Thedetails are given in Annexure - 4.
19 The Cautionary ,Direction and place of identification of semi - reflective sign boards with all details shall beprovided as per the agreement, for better visibility for vehicular traffic during the night
20 In KM 2 It is observed that rain cuts and gullies formed at some places. The same shall be rectifiedimmediately.
21 The Contractor shall take necessary precautions for safety of the workers and preserving their health whileworking in such jobs, which require special protection and precaution
22 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork: Road from Kakuvaripalem R&B Road to Vellapalem in Chillakur Mandal SPSR Nellore
1. 84 % value of the work is completed.2 Work to be done as per Milestones:
Mile stone 1 to the end of Dt: 22.08.2011- Earthwork, CD Works, ccpavement and GSB.Mile stone 2 to the end of Dt: 22.11.2011- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 22.02.2012- BT and Road furniture.
3 The measurements like width and thickness of the GSB Layer from Km 0/0 to Km 1/380 are is verified andfound to be tallying with the required measurements. The details are given in Annexure - 1. As per MORDspecifications minimum CBR requirement for GSB is 20%. In special cases, the minimum CBR can berestricted to 15%. It is to be specified in the agreement specification to avoid confusion.Materials
4 Cement: The fineness of cement, consostency of cement, initial & final setting of cement tests areconducted randomly and results are within the permissible limits.
5 Coarse Aggregate: Sieve analysis for 20 mm graded metal is conducted and observed values are withinthe specified limits as per table-2 of IS 383
6 Fine aggregate: Sieve analysis test are conducted. Sand is conforming to zone-II and the values are withinthe specified limits as per table-4 of IS 383-1970.Fineness modulus is varying from 2.77 to 2.81 as againstthe allowable limits of 2.0 to 3.50
7 Workability of concrete: The slump cone test was conducted for M30 grade of concrete. The values whichare obtained are satisfactory as per mix design,
8 CC Cubes: M30 grade CC cubes are casted and tested and the test results are satisfactory.9 M30 grade CC Pavement is completed from Km 1.257 to Km 1.380
10 3 No's of cores were taken to verify the thickness and compressive strength. The average thicknessobserved as 201mm to 204mm against 200mm thick. The Equivalent Cube Strength varies from 29.68 to31.11 N/mm2 as against requirement of 25.5 N/mm2.
11 Spacing of Mechanically sawn Construction joint shall be done for at a spacing of 2.5m to 3.75 m12 Minor cracks are observed near ch.1293. This is due to delayed joint cutting. Guidelines given in section
1500 MORD shall be followed.13 Field Dry Density (FDD) tests were conducted for GSB layer from Km 0.000 to Km 1.380. It is fairly tallying
with the specification after recompaction.14 The measurements like width and thickness of the WBM Gr.-II Layer from Km 0.000 to Km 1.257 are
verified The details are given in Annexure-215 Volumetric analysis tests were conducted for WBM Gr-II layer from Km 0.000 to Km 1.257. It is fairly
tallying with the requirement of clause 405.13 of PMGSY Quality Assurance Volume II.16 The measurements like width and thickness of the WBM Gr- III Layer from Km 0.000 to Km 1.257 are
verified and the required measurements. The details are given in Annexure-317 Volumetric analysis tests were conducted for WBM Gr-III layer from Km 0.000 to Km 1.257. It is fairly
tallying with the requirement of clause 405.13 of PMGSY Quality Assurance Volume II.18 The sand mixed gravel shoulders simultaneously with the WBM layers as per MORD section 405, Para
MONTHLY REPORT
65 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
405.3.5.19 The shoulder material of sand and gravel not properly mixed. It should be scarified and remixed, water to
OMC and compacted to achieve the required density of 98%.20 Aggregate for OGPC: The gradation and other physical tests are conducted for Coarse aggregate and the
observed values are satisfying the MORD Para 508.1.2.1.21 Aggregate for Seal Coat: The gradation test for seal coat chips were conducted and the observed values
are fairly satisfying the requirements of MORD Para 510.2.2 as per the instruction of TPQA.22 During execution, The rate of spraying of prime coat is verified and found within the specified limits as per
Clause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during execution andfound varying from 35°C to 45°C, which are within the specified limits as per MORD specifications.
23 During execution, the rate of spread of tack coat is verified and found within the specified limits as perClause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during execution andfound to be varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.
24 During execution, Temparature at mixing, laying and at compaction are verified during execution and foundto be within the specified temperature range. The tempera ions were regularly monitored.
25 The measurements like width and thickness of the OGPC & Seal coat from Km 0/0 to Km 1/257 is verified.The details are given in Annexure-4
26 The obtained values of Bitumen Extraction Test Results for OGPC and Seal Coat in % from Km 0/0 toKm 1/257 are verified and found tallying with the requirement as per IRC:SP:20 and IRC:SP:11. The detailsare given in Annexure - 5
27 Cautionary, direction and place identification sign board shall be Semi reflective, for better visibility forvehicular traffic during the night.
28 Guard stones painted in black and white shall be erected all along the outer edge of curves29 O.K CARDS are issued at every stage of work.30 White washing is to be done to parapet walls for the newly constructed culvert for the clear visibility to the
vehicular traffic.31 The field officers are requested to maintain the site order book and get the instructions from the inspecting
officers from time to time.32 The Project informatory boards were erected with all details at site as per the guide lines given by SPIU,
NCRMP.
Name ofWork: Road from GD road to Vavillapalem in Vakadu Mandal of SPSR Nellore Dt.
1. Two works are there in this package. The individual progress of this work is 84.62%2 Works to be done as per Combined Milestone:
Mile stone 1 to the end of Dt: 09.8.2011- Earthwork, CD Works and CC PavementMile stone 2 to the end of Dt: 09.11.2011- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 09.02.2012- BT and Road furniture.
3 The field officers are requested to maintain site order book and get the instructions from the inspectingofficers from time to time.
4 The formation width is verified between KM 0/230 to KM 0/705 and Km 0/00 to 0/200 (Branch road) and atsome locations the width of formation is less. The field officers are requested to furnish the reasons for thesame. (Existing CC pavement is from Km 0.00 to Km 0.230 )
5 The measurements like width and thickness of the GSB layers from KM 0/230 to KM 0/705 and 0/00 to0/200 (Branch Road) are verified. The details are given in Annexure -1
6 It is observed that the shoulder material of sand and gravel is not properly mixed. It shall be scarified,suitably remixed, watered to OMC and compacted to achieve the required relative compaction of min.98%of lab MDD as per the agreement clause.
7 The measurements like width and thickness of the WBM Grade-II layer from KM 0/230 to KM 0/705 andKm 0/00 to 0/200 (Branch Road) are verified. The details are given in Annexure -2
8 Volumetric analysis test conducted for WBM GR-II layer from KM 0/230 to KM 0/705 and Km 0/00 to0/200 (Branch Road). It is fairly tallying with the specification of Clause 405.13 of PMGSY Qualityassurance Volume =II
9 The measurements like width and thickness of the WBM Grade-III layer from KM 0/230 to KM 0/705 andKm 0/00 to 0/200 (Branch Road) are verified. The details are give in annexure -3
10 Aggregate for OGPC: The gradation and other physical tests are conducted for Coarse aggregate and the
MONTHLY REPORT
66 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
observed values are satisfying the MORD Para 508.1.2.1 after screening and removing the undersizedmaterials as per the guidance of TPQA.
11 Aggregate for Seal Coat: The gradation seal coat chips conducted and the observed values are fairlysatisfying the MORD Para 510.2.2 after screening the chips on 2.36 mm size screen.
12 During execution, The rate of spraying of prime coat is verified and found within the specified limits as perClause 502 and Table 500.1 of MORD. The spraying temperatures are also observed during execution andfound varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.
13 During execution, the rate of spreading of tack coat is verified and found within the specified limits as perClause 503 and Table 500.2 of MORD. The spraying temperatures are also observed during execution andfound varying from 30°C to 37°C, which are within the specified limits as per MORD specifications.
14 During execution, Temparature at mixing, laying and at compaction are verified during execution and foundto be within the specified temperature range.
15 The measurements like width and thickness of the OGPC & Seal coat from Km 0/230 to Km 0/705 and Km0/00 to 0/200 (Branch Road) is verified. The details are given in Annexure-4
16 The Bitumen Extraction Test Results for OGPC and Seal Coat in % from KM 0/230 to KM 0/705 and Km0/00 to 0/200 (Branch Road) are verified as per IRC:SP:20 and IRC:SP:11. The details are given inAnnexure - 5
17 The field officers have not furnished the bills for Bitumen used for the road. The same shall be furnished tothe TPQA staff for verification.
18 The Cautionary, Direction and place of identification sign boards shall be semi - reflective. They shall beprovided as per the agreement.
19 White wash shall be done to body walls of the culverts for the clear visibility of vehicular traffic.20 The Hectometer Stones are fixed, but not as per specification Painting and printing to be done as per IRC-
67-2001.21 Provide the guard stones with painting all along the outer edge of the sharp curves.22 The measurements of R.C.C Slab Length 7.5m, width4.5m and depth 0.3m, are verified and found as per
approved Drawing.23 At the time of inspection in slab, we observed honeycombs in some locations of the return walls, it has to
be rectified and corrected properly as per MORD sub clause 811.24 The Project informatory boards were erected with all details at site as per the guide lines given by SPIU,
NCRMP.25 Para wise compliance report shall be furnished duly attending to the above remarks.
MONTHLY REPORT
67 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
11.0 Statement Showing the Inspections and Site Visits of Districts during the Month of May-2012
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN SRIKAULAM DISTRICT FOR THE MONTH OF MAY 2012
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF VISIT NO. OFVISITS
1 NCRMP/B-W/ AP/Br/R&B/01/ Bendigadda/001 Construction of High level Bridge across Bendigadda at km4/10 of Pundi -Parlakimidi road in Srikakulam District. 10.05.12 1
2 NCRMP/B-W/ AP/Br/R&B/01/ Patnavanipeta/001Construction of HLB At KM 11/6-8 of NH-5 to patnavanipetaRoad Via Tamada connecting Sundarapalem in Srikakulam
District.11.05.12 & 26.05.12 2
3 NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005 Road from Kotcherla road to Kollibhemavaram & Cycloneshelter in Etcherla Mandal.
03.05.12, 04.05.12,05.05.12, 11.05.12 &
26.05.125
4 NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005 Road from Kotcherla road to Pathesundrapalem in EtcherlaMandal.
05.05.12, 06.05.12,07.05.12, 09.05.12,11.05.12 & 26.05.12
6
5 NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005 Road from Mentada to Dovupeta in Etcherla Mandal 31.05.12 1
6 NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005 Road from Koyyam R & b road to Moosavanipeta in EtcherlaMandal 11.05.12 1
7 NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from Borubadra, Malagam road to Kollipadu viaSeepuram, Gantapeta in Santhabommali Mandal 03.05.12 1
8 NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&B Road to Uddandapalem inSanthabommali Mandal.
02.05.12, 03.05.12,04.05.12, 11.05.12 4
MONTHLY REPORT
68 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9 NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelter at Kollipadu inSanthabommali Mandal.
03.05.12, 04.05.12,05.05.12, 19.05.12,
22.05.12, 11.05.12 &26.05.12
7
10 NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelter at Runku in SanthabommaliMandal. 03.05.12, 11.05.12 2
11 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from Deppuru, Bahadapalli road to Onkuluru & cycloneshelter.
11.05.12, 12.05.12,29.05.12, 31.05.12 4
12 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from Pollada to Komaralthada & to cyclonic shelter. 07.05.12,11.05.12&29.05.12 3
13 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from R&B Road to Devunthalada. 07.05.12, 11.05.12&12.05.12 3
14 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from R&B NP road to URK Puram. 07.05.12, 11.05.12 &29.05.12 3
TOTAL 43
MONTHLY REPORT
69 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN VIJAYNAGARAM DISTRICT FOR THE MONTH OF MAY 2012
SNO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OFVISIT
NO. OFVISITS
1 NCRMP/B-W/ AP/ Br/ R&B/ 02/ Puligadda/ 007Construction of Minor Bridge at Km. 7/2 near Puligadda of Konada–Ramatheertham R&B Road to Konathalapalem via Yerukonda,Pasupam, Kollayavalsa (Z.P. Road)
05.05.12 1
2 NCRMP/ B-W/ AP/ Br/ R&B/ 02/ Chakaligadda /008
Construction of Minor Bridge at Km 15/2 near Chakaligadda ofKonada Ramatheertham R&B road to Konathalapalem (via)Yerukonda, Pasupam, Kollayavalsa (ZP Road)
05.05.12 1
3 NCRMP/B-W/ AP/ Br/ R&B/ 02/ Puligadda/ 007Construction of Minor Bridge at Km. 7/2 near Puligadda of Konada–Ramatheertham R&B Road to Konathalapalem via Yerukonda,Pasupam, Kollayavalsa (Z.P. Road)
25.05.12 2
4 NCRMP/ B-W/ AP/ Br/ R&B/ 02/ Chakaligadda /008
Construction of Minor Bridge at Km 15/2 near Chakaligadda ofKonada Ramatheertham R&B road to Konathalapalem (via)Yerukonda, Pasupam, Kollayavalsa (ZP Road)
25.05.12 2
5 NCRMP/B-W/AP/RD/R&B/ 02/ Konada/009
Improvements to Road from Konada Ramatheertham (R&B) Roadto Konathalapalem (Via) Pasupam, Yerukonda, Kollayavalsa fromKm 12/0 to 16/5 (Km 0/0 to 4/0 i.e. up to NH-5 crossing) inVizianagaram District, Andhra Pradesh.
25.05.12 1
TOTAL 5
MONTHLY REPORT
70 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN VISHAKAPATNAM DISTRICT FOR THE MONTH OF MAY 12
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OFVISIT
NO. OFVISITS
1 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Bangarampeta in NakkapalliMandal 02.05.12 1
2 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta inPayakaraopeta Mandal 02.05.12 1
3 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in NakkapalliMandal 04.05.12 1
4 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in NakkapalliMandal 04.05.12 1
5 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in NakkapalliMandal 07.05.12 2
6 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in NakkapalliMandal 07.05.12 2
7 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta inPayakaraopeta Mandal 15.05.12 2
8 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Gajapathinagaram inPayakaraopeta Mandal 15.05.12 1
9 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in NakkapalliMandal 16.05.12 3
MONTHLY REPORT
71 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in NakkapalliMandal 16.05.12 3
11 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta inPayakaraopeta Mandal 17.05.12 3
12 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in NakkapalliMandal 19.05.12 4
13 NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003 Road from R&B B.P Kallalu to Matchvanipalem in AnandapuramMandal 25.05.12 1
14 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta inPayakaraopeta Mandal 25.05.12 4
15 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Gajapathinagaram inPayakaraopeta Mandal 29.05.12 2
16 NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta inPayakaraopeta Mandal 29.05.12 5
17 NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002 Road from R & B road to Kattubolu to Marripalem 29.05.12 1
TOTAL 17
MONTHLY REPORT
72 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN EAST GODAVARI DISTRICT FOR THE MONTH OF MAY 12
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THISMONTH
DATES OF VISIT NO. OFVISITS
1
NCRMP/B-W /AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to P.Chodipallipeta CS
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012 -
7
2 Road from R&B Road to K.Chodipallipeta CS
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012 -
7
3 Road from R&B Road to Hukumpeta CS
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012 -
7
4 Road from R&B Road to Gaddipeta CS
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012 -
7
MONTHLY REPORT
73 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5 Road from R&B Road to Danavaipeta CS
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012 -
7
6
NCRMP/B-W/ AP/MPCS/PRED/04/Thondangi/001
Cyclone Shelter at Avulamanda and of Thondangi Mandal,E.G.Dt.
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012
7
7 Cyclone Shelter at Lakshmanudipeta of Thondangi Mandal,E.G.Dt.
04.05.2012,05.05.2012,06.05.2012,15.05.2012,22.05.2012,
29.05.2012 &30.05.2012
7
8 NCRMP/B-W/ AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Road to Chinaraghavulapeta CycloneShelter
02.05.2012,11.05.2012,
18.05.2012 &21.05.2012
4
9 NCRMP/B-W/ AP/MPCS/PRED/04/Uppalaguptam/002
Cyclone Shelter at Pedaraghavulapeta of UppalaguptamMandal, E.G.Dt.
02.05.2012,11.05.2012,
18.05.2012 &21.05.2012
4
TOTAL 57
MONTHLY REPORT
74 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN WEST GODAVARI DISTRICT FOR THE MONTH OF MAY 12
SNO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THISMONTH
DATES OF VISITS NO. OFVISITS
1
NCRMP/B-W/AP/RHB/PRED/05/Mogalthuru/001
Road from NH 214 A at Ranga Statue center to Harijanawadaof Kalipatnam (E) (Mogalthuru Mandal W.G.Dist.)
16-5-2012, 17-5-2012, 21-5-2012, 24-5-2012 & 25-5-
20125
2 R&B road at Panchayat Office to Pulaparthivarithota viaBadava (Mogalthuru Mandal W.G.Dist.)
01-5-2012, 02-5-2012,08-5-2012, 10-5-2012,15-5-2012, 16-5-2012,17-5-2012, 21-5-2012,24-5-2012 & 25-5-2012
10
3 Mogalthuru Vempa R&B Road at Uchintha Kalava Bridge toGogulamma Harijanapeta (Mogalthuru Mandal W.G.Dist.)
02-5-2012, 03-5-2012,08-5-2012, 10-5-2012,11-5-2012, 16-5-2012,17-5-2012, 21-5-2012,26-5-2012 & 29-5-2012
10
4 From Narsapur Mogalthuru R&B road to Dayadaldaspeta viaVenkateshwara Swamy temple (Mogalthuru Mandal W.G.Dist.) 29-5-2012 & 31-5-2012 2
5 Road from NH 214 A road to Harijanapeta of Kothota(Mogalthuru Mandal W.G.Dist.) 26-5-2012 1
6NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
R&B Road to Indira nagar (via) Pochamma temple (NarsapurMandal W.G.Dist.)
03-5-2012, 04-5-2012 &08-5-2012 3
7 Road from R&B road to Pedalanka (Narsapur MandalW.G.Dist.)
03-5-2012, 04-5-2012 &10-5-2012 3
MONTHLY REPORT
75 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8 Road from LB Cheria CC road to Chillapalem of LB Cheria(Narsapur Mandal W.G.Dist.)
03-5-2012, 04-5-2012 &11-5-2012 3
9
NCRMP/B-W/AP/RHB/ PRED/05/Kalla/003
From A-U R&B Road to Satyanarayanapuram, (Kalla MandalW.G.Dist.) 05-07-2012 1
10 From A-U R&B Road to Mekaladibba (Kalla Mandal W.G.Dist.) 05-07-2012 1
Total 39
MONTHLY REPORT
76 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN KRISHNA DISTRICT FOR THE MONTH OF MAY 12
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THIS MONTH
DATES OF VISITS NO. OF VISITS
1NCRMP/B-
W/AP/RHB/PRED/06/Machilipatnam/002
Road from R&B road to B.V.Thota 31.05.2012 1
2 NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B road throughGantalammapalem
2.05.12,3.5.12,4.5.12,6.5.12,8.5.12,12.5.12,22.5.12,& 31.5.12 8
3 NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu(M)/003
Road from R&B road to Cyclone shelter atChandala 7.5.12 1
4 NCRMP/B-W/AP/RCS/PRED/06/Machipatnam/001
Road from Chinnapuram R&B road toGundupalem
2.5.12,15.5.12,21.5.12,22.5.12,& 25.5.12 5
Road from Potlapalem ZP road to Potepalli 31.5.12 1
Road from Bhogireddipalli R&B road toRamakhandam 15.5.12, 25.5.12 2
Total 18
MONTHLY REPORT
77 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN GUNTUR DISTRICT FOR THE MONTH OF MAY 12
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THISMONTH
DATES OF VISIT NO. OFVISITS
1 NCRMP/B-W/AP/PRED/07/Nagaram/002 R/f R&B road to Mohammad Alipalem
1.05.2012,7.05.2012,11.05.2012,12.05.2012,24.05.2012
5
2 NCRMP/B-W/AP/PRED/07/Nagaram/002 R/f R&B road to Katurivaripalem
1.05.2012, 4.05.2012,7.05.2012,15.05.2012,16.05.2012,17.05.2012,23.05.2012
7
3 NCRMP/B-W/AP/RCS/PRED/07/PV Palem/001 Road from R&B road to Mandevaripalem 1.05.2012, 4.5.2012,7.05.2012. 3
4 NCRMP/B-W/AP/RCS/PRED/07/PV Palem/001 Road from R&B Road Alluru to Yadavapalem 19.05.2012 1
5 NCRMP/B-W/AP/RCS/PRED/07/Karlapalem/002 From R&B road to Yaramvaripalem 7.05.2012,15.05.2012 2
6 NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003 Road from R & B Road to Adavala H/O Bavajipalem 1.05.2012, 7.05.2012 2
7 NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003 Road from R & B Road to Atlavaripalem 31.05.2012 1
MONTHLY REPORT
78 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8 NCRMP/B-W/AP/Br/R&B/07/Bapatla/010 Reconstruction of HLB @ km 5/2 of Bapatla - Suryalankaroad across Perali drain in Guntur District. 4.05.2012 1
9 NCRMP/B-W/AP/RCS/PRED/07/Bapatla/004 Road from R & B Road to Hanumanthanagar 7.05.2012 1
10 NCRMP/B-W/AP/RCS/PRED/07/Bapatla/004 Road from R & B Road to Adarsanagar 7.05.2012 1
TOTAL 24
MONTHLY REPORT
79 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN PRAKASHAM DISTRICT FOR THE MONTH OF MAY 12
SNO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTHDATES OF
VISITNO. OFVISITS
1 NCRMP/B-W/AP/Br/R&B/08/Kanaparthy/012
Construction of High level Bridge at Km 16/10 ofNaguluppalapadu – Kanaparthy road in Prakasam District
21/05/2012,30/05/2012 2
2 NCRMP/B-W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cyclone shelter in Ulavapadu Mandal Prakasamdistrict 05-10-2012 1
3 NCRMP/B-W/APMPCS/PRED/08/NGPadu/003
Kanaparthy cyclone shelter in Naguluppapadu MandalPrakasam district
21/05/2012,30/05/2012 2
4 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001 Road from R&B road to Narravaripalem
05/05/2012,10/05/2012,17/05/2012
3
5 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from NH5 to Mulaguntapadu
05/05/2012,10/05/2012,17/05/2012
3
6 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
Road from R&B road to Binginapalli Harijanawada CycloneShelter 05-05-2012 1
7 NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07 Road from MC Road to Subbarayadu Satram 05-12-2012 1
8 NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 Road from R&B road Pellur to Vasepallipadu 05-05-2012 1
MONTHLY REPORT
80 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9 NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10 Road from R&B road to Kesupalem 05-05-2012 1
10 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001 Road from R&B road to Vijayanagar colony cyclone shelter 05-07-2012 1
11 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001 Road from NH road to Challareddypalem 05-07-2012 1
12 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B road to Jeevaraksh nagar colony cycloneshelter 05-07-2012 1
13 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001 Road from R&B road to Ramnagar colony cyclone shelter 7/5/2012,
30/05/2012 2
14 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001 Road from R&B road to cyclone shelter at Mankenavaripalem 05-07-2012 1
15 NCRMP/B-W/AP/RCS/PRED/08/Chirala/002 Road from R&B Road to Keertivaripalem cyclone shelter 7/5/2012,30/05/2012 2
TOTAL 23
MONTHLY REPORT
81 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING NUMBER & DATES OF TPQA INSPECTIONS IN PRAKASHAM DISTRICT FOR THE MONTH OF MAY 12
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THISMONTH
DATES OF VISITS NO. OFVISITS
1 NCRMP/B-W/AP/RCS/PRED/09/Chillakur/004 Road from Kakuvaripalem R&B road to vellapalm 03.05.2012,16.05.2012 2
2 NCRMP/B-W/AP/RCS/PRED/09/kota/001 road from R&B road to A.S PURAM 03.05.2012 1
3 NCRMP/B-W/AP/RCS/PRED/09/kota/001 Road from GD Road to Vavillapalem 03.05.2012,16.05.2012 2
4 NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/003 Road from R&B Road to Muttembake Via Pittuvanipalli 03.05.2012 1
5 NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/003 Road from R&B Chittamur to Soma Samudram 03.05.2012 1
6 NCRMP/B-W/AP/RCS/PRED/09/D.V.SATRAM/008
Road from R&B road to Sullurpeta Mallam toberjengalapalli cyclone shelter 03.05.2012 1
7 NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007
Road from Kotha Satram R&B to Indrsanagar (via)Thumalapenta palam, Patharavadu palam, Ramudu palam,Karaduvari palam &Sreeramapuram in SPSR NelloreDistrict.
04.05.2012,05.05.2012 2
8 NCRMP/B-W/AP/RCS/PRED/09/KAVALI/004 Road from pedattapupalem R&B road to ChennayapalemH.wada 04.05.2012,05.05.2012 2
9 NCRMP/B-W/AP/RHB/PRED/09/T.P.Gudur/012
Ring Road to T.P.Gudur-Salipeta R&B Road viaC.S.Puram and Mandapam Village
04.05.2012,18.05.2012,23.05.2012 3
10 NCRMP/B-W/AP/RHB/PRED/09/T.P.Gudur/012 Road from R&B Road C.S.Puram to Siva Rama Puram. 04.05.2012,18.05.2012,
23.05.2012 3
MONTHLY REPORT
82 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
11 NCRMP/B-W/AP/RCS/PRED/09/T.P.GUDUR/005 Road from7/2 M.C Road to venkannapalem pattapupalem 04.05.2012,23.05.2012 2
12 NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005 Road from kt R&B ROAD TO ALLAGANIPADU to Vavilla 04.05.2012,09.05.2012 2
13 NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005 Road from R&B road Kancharapalem HW to Alaganipadu. 04.05.2012.09.05.2012 2
14 NCRMP/B-W/AP/RHB/PRED/09/BOGOLO/001 Road from NH5 to Sambasivapuram 04.05.2012,05.05.2012 2
15 NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006 Road Connecting R&B Road through Voturu Village inSPSR Nellore District. 04.05.2012 1
16 NCRMP/B-W/AP/RHB/PRED/09/Allur/009 Road from R&Broad alluru to Galidibbalu (via) Chukavanidibba 09.05.2012 1
TOTAL 28