9.second prototype

6
Project second prototype By sixforce

Upload: taweechok-satang

Post on 22-Jul-2015

350 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: 9.second prototype

Project second prototype

By sixforce

Page 2: 9.second prototype

Problem and solution

A base that not flat, we use adjuster attach

at bottom of the base to adjust a horizon level

that we want.

A bad welding, we try to fix a bad point

with careful again.

Page 3: 9.second prototype

Improvement

- Quality

We think our product look better and

stronger than last week.

- Weight

Last week our product have only

structure but today it already done, so the total

weight is about 20 kg.

Page 4: 9.second prototype

- Ease of use

With a veneer's flat surface and strong

structure we can use it safety and easily.

- Manufacturing time

As I've said we just finish our product

in this week, so a time that we use in this

week is 11 hour and total time is 19 hour.

- Manufacturing cost

The manufacturing cost is same as last

week.

Page 5: 9.second prototype

We just only one prototype, so the

dimension and functions are the same.

Compare the second prototype with the

CAD model.

Page 6: 9.second prototype

Thank you for your

attention