645 5,900 600 600 600 910 2,800 1,175 1,178 1,178 1,178 Shelves on the right hand side 600 600 600 1,000 2,800 4,540 2,070 1,189 45 1,133 45 1,133 45 1,133 45 1,158 23 600 23 5,900 Shelves on the left hand side Project name/ description: Client/ location: Designer/ engineer: Date: Scale: Quote reference: Page No.: Storage Room shelves Pontificio Ateneo S. Anselmo Piazza Cavalieri di Malta 5, 00153 Rome, Italy Andreas Hofer, NZ licensed, Site 1, Carpentry 1:50 cover May 2014 S.A. project 004 List of materials needed (with off- cut allowance): vertical battens 25 x 50 mm: Quantity 16 rm (each 2m in length) horizontal rails (90 x 45 mm): 96 rm (each 6 m in length) plywood sheets 20 x 1200 x 2400: 12 sheets screws 4 x 70 mm: pack of 200 screws 5 x 100 mm: pack of 100 subframe nogs (70 x 45 mm): 53 rm (each 0.6m in length) List of equipment needed: carpenters circular saw electric carpenters planer electric drill and battery drill with screw bits, drill bits and accessories electric jig saw slide compound mitre saw electric overhead router Estimated budget: __________ Estimated budget: _____________

Upload: ewah-construction

Post on 23-Mar-2016

216 views

Category:

Documents


2 download

DESCRIPTION

A storage facility is going to be installed for residential students at Sant Anselmo. These are the plans for some shelving in an available room on the first floor. Students have the option to leave some of their belongings at the college.

TRANSCRIPT

645

5,900

600

600

600

910

2,800

1,1751,178

1,1781,178

Shelves on the right hand side

600

600

600

1,000

2,800

4,540

2,070

1,189451,133

451,133451,133

451,158

23

60023

5,900

Shelves on the left hand side

Project name/ description:

Client/ location:

Designer/ engineer: Date:Scale:

Quote reference: Page No.:

Storage Room shelves

Pontificio Ateneo S. AnselmoPiazza Cavalieri di Malta 5, 00153 Rome, Italy

Andreas Hofer,NZ licensed, Site 1,

Carpentry

1:50

cover

May 2014

S.A. project 004

List of materials needed (with off- cut allowance):

vertical battens 25 x 50 mm: Quantity 16 rm (each 2m in length)

horizontal rails (90 x 45 mm): 96 rm (each 6 m in length)

plywood sheets 20 x 1200 x 2400: 12 sheets

screws 4 x 70 mm: pack of 200

screws 5 x 100 mm: pack of 100

subframe nogs (70 x 45 mm): 53 rm (each 0.6m in length)

List of equipment needed:

carpenters circular saw

electric carpenters planer

electric drill and battery drill with screw bits, drill bits and accessories

electric jig saw

slide compound mitre saw

electric overhead router

Estimated budget: __________

Estimated budget: _____________

915

2,07

0

645 2,626 6453,916

1,16

82,

355

2,37

7

5,90

0

1,521 1,521

S-01

S-01

S-03S-03

1,00

060

060

060

0

2,80

0

1,175 50 1,128 50 1,128 50 1,128 50

5,900

910

9051

090

510

9051

090

1,01

060

060

060

0

645 25

1,090

670 2,576 670

RO

OM

HEI

GH

T 4.

540m

m

45 555 45

7020

600

1,89

0

Floor Plan 1:50

S-01 Room Section 1:50

S-03 Room Section 1:50

Project name/ description:

Client/ location:

Designer/ engineer: Date:Scale:

Quote reference: Page No.:

Floor Plan, room sections

Pontificio Ateneo S. AnselmoPiazza Cavalieri di Malta 5, 00153 Rome, Italy

Andreas Hofer,NZ licensed, Site 1,

Carpentry

1:50

001

May 2014

S.A. project 004

3,240

1,300

Overhead windows as light source limit the height forthe installation of more than four shelves

45 x 90 mm horizontal rails are to be recessed forthe plywood sheets (plywood 20 x 600mm)

Bottom shelf braces are to be screwed the wall bottom plateand the shelf subframe with torx screws 5 x 100 mm.

Vertical battens are to be screwed (4 x 70 mm wood screws)to the front rails of each shelf for vertical support

Wall mounted rails are to be installed with torx head screws 5 x 100 m into wall studsor other existing, solid, structural members of the wall

Plywood sheets are to be recessed into the rails.

Subframe nogs are to be placed at every 600mm centres

Project name/ description:

Client/ location:

Designer/ engineer: Date:Scale:

Quote reference: Page No.:

room sections, specifications

Pontificio Ateneo S. AnselmoPiazza Cavalieri di Malta 5, 00153 Rome, Italy

Andreas Hofer,NZ licensed, Site 1,

Carpentry

1:50

002

May 2014

S.A. project 004

Room- Section views :Cutting planes are positionedas shown on floor plan

Position 01 : plywood inlay

Position 02 : vertical battens

Positin 05 : bottom shelf braces

Position 03 : horizontal rails

Position 04 : subframe nogs

Project name/ description:

Client/ location:

Designer/ engineer: Date:Scale:

Quote reference: Page No.:

Positioning of structural parts for the cutting list

Pontificio Ateneo S. AnselmoPiazza Cavalieri di Malta 5, 00153 Rome, Italy

Andreas Hofer,NZ licensed, Site 1,

Carpentry

1:50

003

May 2014

S.A. project 004

1,146 2,377 2,377

600

20

5,900

2223

20

9045

70 45555

1,890 5025

9045

1,090

137 59

01 08

08

16

88

Plywood sheets, inlay for shelving: 20 x 600 mm

08

Vertical battens: 25 x 50 mm

Horizontal rails: 45 x 90 mm

Subframe nogs: 45 x 70 mm

02

03

04 05

Project name/ description:

Client/ location:

Designer/ engineer: Date:Scale:

Quote reference: Page No.:

cutting list with exact dimensions

Pontificio Ateneo S. AnselmoPiazza Cavalieri di Malta 5, 00153 Rome, Italy

Andreas Hofer,NZ licensed, Site 1,

Carpentry

1:20

004

May 2014

S.A. project 004

Position No. structural parts description, dimensions, SCALE 1: 20 Quantity No.

Position No. Quantity No.parts description, dimensions, SCALE 1: 20 parts description, dimensions, SCALE 1: 20Position No.Quantity No.