a-1 cover sheet & project info layout · pdf fileterry j. martin associates, a.i.a. ... cb...
TRANSCRIPT
A-1
Sheet Title:
COVER SHEET &PROJECT INFO
Drawn by:
Project:
Scale:
Date:
#15057
MARCH 2016
HEL
EN W
AYR
ESID
ENC
ECu
stom
Hom
e0
Hel
en W
ayLo
s Gat
os, C
A 95
033
Project
Lice
nse
# C
2322
1
RESI
DEN
TIA
L &
CO
MM
ERCI
AL
ARC
HIT
ECTU
RE
61 E
ast
Mai
n St
reet
, Sui
te D
Los
Gato
s, C
A 9
5030
Phon
e: 4
08-3
95-8
016
Fax:
408
-395
-573
2te
rry@
tmaa
rchi
tect
s.ne
t
TERR
Y J.
MA
RTIN
ASS
OCI
ATES, A.I.
A.
Date
:Re
vDe
scrip
tion
Print Date: 08/15/2016
08/1
5/20
16Bu
ildin
g &
Site
App
rova
l App
licat
ion
TERRY J. MARTIN ASSOCIATES, A.I.A.TERRY J. MARTIN, AIA
61 E MAIN STREET, SUITE DLOS GATOS, CA 95030
(408) 395-8016
YAJNESH RAI &SHOTA MJAVIA
[email protected]@hotmail.com
MODERN TECHNOLOGY RESOURCES, INCIGOR KLEYNER, PHD, CE, GE
1485 BAYSHORE BLVDSAN FRANCISCO, CA 94124
(415) 859-9532
A-1A-2A-3A-4A-5
COVER SHEET & PROJECT INFOSCHEMATIC SITE PLANFLOOR PLANEXTERIOR ELEVATIONSGARAGE PLAN & ELEVATIONS
HELEN WAY RESIDENCE
ABBREVIATIONSEQUIP EQUIPMENTETC ET CETERA, AND OTHER THINGSEW EACH WAYEXT EXTERIOR(E) EXISTINGEQ EQUALEW EACH WAYEXH EXHAUSTEXP EXPANSION, EXPANDINGEXT EXTERIOR
FAB FABRICATE, FABRICATIONFD FLOOR DRAINFDN FOUNDATIONFE, FEC FIRE EXTINGUISHER, FE CABINETFF FINISH FLOORFG FIBERGLASSFH FIRE HYDRANTFIN FINISHFLR FLOORFOC FACE OF CONCRETEFOS FACE OF STUDFRP FIBERGLASS REINFORCED PANELFS FAR SIDEFT FOOT, FEETFTG FOOTINGFURR FURRINGFUT FUTUREFV FIELD VERIFY
GA GAUGEGAL GALLONGALV GALVANIZEDGB GRAB BARGC GENERAL CONTRACORGD GARBAGE DISPOSALGL GLASSGND GROUNDGSM GALVANIZED SHEET METALGYP GYPSUM
HB HOSEBIBHD HOLDDOWNHDR HEADERHDWD HARDWOODHDWR HARDWAREHGR HANGERHM HOLLOW METALHORIZ HORIZONTALHT HEIGHTHVAC HEATING VENTILATION & AIR CONDITIONING
ID INSIDE DIAMETERIN INCHINCL INCLUDE(S), INCLUDINGINFO INFORMATIONINSUL INSULATIONINV INVERTEDINT INTERIOR
JAN JANITORJBOX JUNCTION BOXJCT JUNCTIONJH JOINT HANGERJT JOINT
KIT KITCHENKW KILOWAT
LAB LABORATORYLAV LAVATORYLAT LATERALLB POUNDLF LINEAL FEET, LINEAR FEETLIN LINEAL, LINEARLT LIGHTLVR LOUVER
M, m METERMATL MATERIALMAX MAXIMUMMB MACHINE BOLTSMAX MAXIMUMMECH MECHANICALMEMB MEMBRANEMFR, MNF MANUFACTURERMIN MINIMUM, MINUTEMIR MIRRORMISC MISCELLANEOUSMTD MOUNTEDMTL METALMUL MULLION
N NORTHNEC NATIONAL ELECTRICAL CODENIC NOT IN CONTRACTNO NUMBERNOM NOMINALNS NEAR SIDENTS NOT TO SCALE(N) NEW
O/ OVER (ORDER OF INSTALLATION)OAI OUTSIDE AIR INTAKEOC ON CENTEROD OUTSIDE DIAMETEROFCI OWNER FURNISHED GC INSTALLEDOFOI OWNER FURNISHED & INSTALLEDOPNG OPENINGOL OCCUPANT LOADOPG OPENINGOPP OPPOSITEORIG ORIGINAL
P, | |, // PARALLELPA PUBLIC ADDRESSPC PIECEPERP, ⊥ PERPENDICULARPH PANIC HARDWAREPL PLATEPLAM PLASTIC LAMINATEPLAS PLASTERPLMBG PLUMBINGPLYWD PLYWOODPNL PANELPOL POLISHEDPR PAIRPREFAB PREFABRICATEDPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POINT, PRESSURE TREATEDPTN PARTITION
R RISERRAD RADIAL, RADIUSRCP REFLECTED CEILING PLANRD ROOF DRAINRECPT RECEPTACLEREF REFERENCEREINF REINFORCE(MENT)REQD REQUIREDREQMTS REQUIREMENTSRESIL RESILIENTREV REVISIONRM ROOMRPM REVOLUTIONS PER MINUTERV ROOF VENTRWL RAIN WATER LEADER
S SOUTHSAD SEE ARCHITECTURAL DRAWINGSSAN SANITARYSASM SELF ADHERED SHEET MEMBRANESC SOLID CORESCD SEAT COVER DISPENSERSCHED SCHEDULESEC, SECT SECTIONSF SQUARE FOOT, FEETSHT SHEETSHWR SHOWERSIM SIMILAR (TO)SJ SEISMIC JOINTSLD SEE LANDSCAPE DRAWINGSSM SHEET METALSMS SHEET METAL SCREWSND SANITARY NAPKIN DISPENSERSNR SANITARY NAPKIN RECEPTACLESPEC(S) SPECIFICATION(S)SPN SOLE PLATE NAILINGSQ SQUARESQ FT SQUARE FOOT, FEETSS, SSTL STAINLESS STEELST STRAP TIE, STREETSTA, STN STATIONSTE SUITESTL STEELSUSP SUSPENDEDSY, SQ YD SQUARE YARD(S)SYM SYMMETRICALSW SHEAR WALL
T, TRD TREADTB TOWEL BART&B TOP AND BOTTOMTBC TO BE CONFIRMEDTBS TO BE SELECTEDTD TIE DOWNTEL TELEPHONETEMP TEMPORARY, TEMPERATURETEMPD TEMPEREDTER TERAZZOTHRESH THRESHOLDT&G TONGUE AND GRROVETHK THICK(NESS)THRU THROUGHTOC TOP OF CONCRETETOS, TS TOP OF SLABTP TOP PLATETRANS TRANSFORMERTSTAT THERMOSTATTV TELEVISIONTYP TYPICAL
UC, U/C UNDER-COUNTERUNF UNFINISHEDUNO UNLESS NOTED OTHERWISEUON UNLESS OTHERWISE NOTEDUR URINAL
V VOLTVB VAPOR BARRIERVCT VINYL COMPOSTION TILEVEN VENEERVERT VERTICALVEST VESTIBULEVIF VERIFY IN FIELDVOL VOLUME
W WESTW/ WITHW/O WITHOUTWC WATER CLOSETWD WOODWDW WINDOWWH WATER HEATERWO WHERE OCCURSWP WATERPROOF(ING)WT WEIGHT
YD YARD
& AND∠ ANGLE@ AT° DEGREE (ANGLE, BEARING, TEMP)Ø DIAMETER∆ DELTA, REVIISION/ DIVIDE, DIVIDED BY, SEQUENCE=, ≠ EQUAL (TO), NOT EQUAL (TO)' FOOT/FEET, MINUTES (BEARING)" INCH(ES), SECONDS (BEARING)>, ≥ GREATER THAN, OR EQUAL TO<, ≤ LESS THAN, OR EQUAL TO- MINUS, SUBTRACT(ED)# NUMBER, POUND(S)% PERCENT+ PLUS, ADD(ED)± PLUS/MINUS (APPROXIMATELY)
AB ANCHOR BOLTABV ABOVEAC ASPHALTIC CONCRETEA/C AIR CONDITIONINGACOUST ACOUSTIC(AL)AD AREA DRAINADDL ADDITIONALADJ ADJUST(ABLE)AEJ ALL EDGE JOINTSAFF ABOVE FINISH FLOORAHJ AUTHORITY HAVING JURISDICTIONAIA AMERICAN INSTITUTE OF ARCHITECTSALT ALTERNATE, ALTERNATIVEALUM ALUMINUMAMP AMPEREARCH ARCHITECT(URAL)ASPH ASPHALTASSOC ASSOCIATIONAWN AWNING
BD BOARDBEL BELOWBLDG BUILDINGBLK, BLKG BLOCK, BLOCKINGBM BEAMBN BOUNDARY NAILBOT BOTTOMBS BOTH SIDESBTU BRITISH THERMAL UNITBTWN BETWEEN
CAB CABINETCB COLUMN BASECBC CALIFORNIA BUILDING CODECEC CALIFORNIA ELECTRICAL CODECEM CEMENT(ITIOUS)CER CERAMICCF CUBIC FEETCFC CALIFORNIA FIRE CODECFM, CFS CUBIC FEET PER MINUTE, SECONDCI CAST IRONCIR CIRCLE, CIRCULARCIRC CIRCULATIONCJ CONTROL JOINTCL CENTER LINECLG CEILINGCLO CLOSETCLR CLEARCMC CALIFORNIA MECHANICAL CODECNTR COUNTERCO CLEAN OUT, COMPANYCOL COLUMNCOMP COMPOSITECONC CONCRETECONN CONNECT(ION)CONST CONSTRUCTIONCONT CONTIN UE/UAL/UOUSCOR CORNERCORR CORRIDORCPC CALIFORNIA PLUMBING CODECPR COPPERCPT CARPETCRC CALIFORNIA RESIDENTIAL CODECSMT CASEMENTCW COLD WATERCU CUBIC
DBL DOUBLEDBL HNG DOUBLE HUNGDEG DEGREEDEPT DEPARTMENTDET DETAILDF DOUGLAS FIR, DRINKING FOUNTAINDIA DIAMETERDIAG DIAGONALDIM DIMENSIONDISP DISPENSER, DISPOSALDIST DISTANCEDIV DIVIDE, DIVISIONDN DOWNDOUG DOUGLAS (FIR)DR DRAIN, DOORDWG DRAWINGDTL DETAILDW DISHWASHERDWR DRAWER
E EASTEA EACHEL ELEVATIONELEC ELECTRICALELEV ELEVATION, ELEVATOREMER EMERGENCYEN EDGE NAILINGENCL ENCLOSUREENGR ENGINEEREP ELECTRICAL PANELEQ EQUAL
PROJECT TEAMOWNER ARCHITECT
AREA CALCULATIONSGENERAL CONTRACTOR IS REQUIRED TO SCHEDULE & COORDINATE THE FOLLOWINGMANDATORY CONSTRUCTION OBSERVATION SITE VISITS WITH ARCHITECT PRESENT.PROVIDE NOTICE TO ARCHITECT AT LEAST 48 HOURS PRIOR TO SUCH VISITS.PRIOR TO BEGINNING WORK, PROVIDE ARCHITECT & OWNER WITH A CRITICAL PATHSCHEDULE SHOWING THE FOLLOWING CONSTRUCTION MILESTONES:
PARCEL MAP VICINITY MAP
PROJECT DATACONSTRUCTION OBSERVATION REQUIRED
ADDITIONALLY, CONTRACTOR SHALL SCHEDULE A MANDATORY WALKTHRU WITHARCHITECT & OWNER PRESENT AT SUBSTANTIAL COMPLETION.
INITIALS REQD SITE VISIT MILESTONE
ROUGH FRAMINGWINDOW SELECTION, PRIOR TO ORDERING WINDOWSROUGH ELECTRICAL, MOUNTED BOXES PRIOR TO PULLING WIRE
SUBSTANTIAL COMPLETION PRIOR TO GRANTING OCCUPANCY
PRE CONSTRUCTION SITE MEETING
FRAMING & INSULATION, PRIOR TO COVERING FRAMING W/ FINISHES
AFTER FINISH REMOVAL, PRIOR TO STRUCTURAL DEMOLITION
ARCHITECT'S INITIALS ARE REQUIRED TO THE LEFT OF EACH SITE VISIT LISTED PRIOR TOPROCEEDING WITH SUBSEQUENT WORK & INDICATE ONLY THAT ARCHITECT WAS PRESENT& PROVIDED WITH THE OPPORTUNITY TO OBSERVE CONSTRUCTION AT THAT PHASE.
Terry J. Martin Associates, A.I.A.A Certified Build It Green Rater
Smart Solutions From The Ground UpBuild It Green
PROJECT ADDRESS: 0 Helen Way Los Gatos CA 95033
OWNER: Yajnesh Rai & Shota Mjavia
APN: 544-39-079
ZONING: HS, Hillside
LOT AREA: 0.30 Acre Net, 0.37 Acre Gross
BUILDING AREA: See Area Calculations on this sheet
STORIES: 2 Story Residence w/ Detached Garage
CONSTRUCTION TYPE: Type VB
FIRE SPRINKLERS: YES (Deferred Submittal)
OCCUPANCY: Group R-3 Single Family Residence, Group U Private Garage
APPLICABLE CODES: Santa Clara County Municipal Code 2013 CA RESIDENTIAL BUILDING CODE 2013 CA Bldg Code, 2013 CA Res Bldg Code, 2013 CA Elec Code
2013 CA Mech Code, 2013 CA Plmbg Code, 2013 CA Energy Code 2013 CA Fire Code, 2013 CalGreen Code, 2013 CA Ref Stds Code All as amended by The State Of California and Local Jurisdiction(s).
ADDITIONAL DOCUMENTS & REQUIREMENTS
SHEET INDEX
PROJECT SCOPE
Custom Home0 Helen Way
Los Gatos, CA 95033
•
BUILDING AREA:
LOWER LEVEL 1,120 Sq FtMAIN LEVEL 997 Sq Ft (Not Including Covered Porches)
TOTAL LIVING AREA: 2,117 Sq Ft
+ COVERED ENTRY 24 Sq Ft+ COVERED PORCH 99 Sq Ft
TOTAL FLOOR AREA: 2,240 Sq Ft
+ DETACHED GARAGE: 441 Sq Ft (Not Counted As Floor Area)
Merge Three Lots into One 0.30 Acre Site. Provide (N) Single Family Residence w/Detached Garage on Vacant Lot. Provide (N) Septic System.One 62"Ø Tree to be Removed.
GEOTECHNICAL ENGINEER
GEOTECHNICAL INVESTIGATION / SOIL REPORT
REPORT ENTITLED GEOTECHNICAL REPORT FOR 0 HELEN WAY, LOS GATOS, DATED12/02/2015, PROJECT #2015-31, PREPARED BY MODERN TECHNOLOGY RESOURCES,INC., PROJECT GEOTECHNICAL ENGINEER, IS PART OF THE CONSTRUCTION DOCUMENTS.ALL WORK MUST COMPLY WITH SOIL REPORT REQUIREMENTS & RECOMMENDATIONS,THE CALIFORNIA BUILDING CODE, AND ALL OTHER APPLICABLE CODES & ORDINANCESAS ADOPTED, AMENDED, & ENFORCED BY LOCAL JURISDICTION (AHJ).
TITLE 24 CALIFORNIA ENERGY CODE COMPLIANCE
"0 HELEN WAY RESIDENCE ENERGY CALCULATIONS", #TBD, DATED TBD, PREPARED BYFRI ENERGY CONSULTANTS, LLC, PROJECT TITLE 24 ENERGY CONSULTANT, IS PART OFTHE CONSTRUCTION DOCUMENTS. ALL WORK MUST COMPLY WITH ENERGY REPORTREQUIREMENTS & RECOMMENDATIONS, CALIFORNIA ENERGY CODE, & ALL OTHERAPPLICABLE CODES & ORDINANCES AS ADOPTED, AMENDED, & ENFORCED BY LOCALJURISDICTION.
ARBORIST
DUE TO THE SCOPE OF WORK FOR THIS PROJECT, NO ARBORIST REPORT HAS BEENPREPARED. IN THE EVENT THAT PROJECT SCOPE CHANGES, CONTACT ARCHITECT &AUTHORITY HAVING JURISDICTION (AHJ) TO DETERMINE IF AN ARBORIST REPORT ISREQUIRED. NO WORK SHALL BE COMMENCED WITHIN THE DRIPLINE OF ANY TREEPROTECTED BY ANY AHJ PRIOR TO RETAINING A LICENSED ARBORIST.
COORDINATION REQUIREMENTS
COORDINATE WITH ARCHITECT
SEE CONSTRUCTION OBSERVATION NOTE ON THIS SHEET. PROVIDE ARCHITECT WITHMINIMUM 48 HOUR NOTICE OF MILESTONE REQUIRING CONSTRUCTION OBSERVATION.COPY ARCHITECT ON ALL CORRESPONDENCE WITH ALL PROJECT CONSULTANTS.
COORDINATE WITH ARCHITECT & INSTALLER
TITLE 24 ENERGY CODE INSTALLATION REQUIREMENTS ARCHITECT, GENERAL CONTRACTOR, & INSTALLERS MUST BE PRESENT FOR SITE
MEETING PRIOR TO COMPLETION & SIGNING OF ENERGY CODE COMPLIANCE FORMS &INSTALLATION CERTIFICATES BY THE INSTALLERS. PROVIDE ARCHITECT WITH MINIMUM48 HOUR PRIOR NOTICE. REQUIRED FORMS ARE LISTED IN THE TITLE 24 ENERGY REPORT.
COORDINATE WITH STRUCTURAL ENGINEER
COORDINATE WITH ARCHITECT & STRUCTURAL ENGINEER TO PROVIDE REQUIREDNOTICE & TO SCHEDULE MANDATORY CONSTRUCTION OBSERVATION. PROVIDEARCHITECT WITH MINIMUM 48 HOURS ADVANCE NOTICE AND THE OPPORTUNITY TO BEPRESENT FOR ANY & ALL SITE VISITS & CONSTRUCTION OBSERVATION ATTENDED BYTHE STRUCTURAL ENGINEER. SUBMIT ALL REQUESTS FOR INFORMATION TO ARCHITECT.COPY ARCHITECT ON ALL CORRESPONDENCE WITH PROJECT STRUCTURAL ENGINEER,ENERGY CONSULTANT, AND ALL OTHER PROFESSIONAL CONSULTANTS.
N/A
Please Note: Orientation of other plans within the set may vary from this Vicinity Map.Please Note: Orientation of other plans within the set may vary from this Parcel Map.
TJ