Agenda
Scope
ASCP v/s MRP
ASCP Data Flow Setups
Item Attributes
Plan Options Execute Plan
Q&A
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
3/21
3
Advanced Supply Chain Planning
Oracle Advanced Supply Chain Planning (ASCP) is a comprehensiveplanning solution that decides when and where supplies should bedeployed within an extended supply chain.
Key Capabilities Plan all supply chain facilities simultaneously
Short-term detailed scheduling and long-term aggregateplanning are supported within a single plan
Plans that consider both resource and material constraints
Configure Oracle ASCP to optimize specific business criteria Allows many types of changes to supply, demand and resources
to simulate changing business conditions
Integrated solution
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
4/21
4
ASCP v/s MRP
Oracles focus product Productivity enhancing UI
QOH shown in supply/demand screen Multi-level pegging Ability to define queries and publish to planners Vertical Plan / Gnatt Chart
Plan alt. sources and alt. resources Plan with optimization rules (inv turns / ontime delivery) and
penalty factors
Constrained plan (ECC / EDD / lead time constraints) VMI Support New reports Powerful simulations Different calendars for shipping / manufacturing / receiving Multiple instance planning
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
5/21
5
ASCP Data Flow
Application Data Store
(ADS)
Items, BOM, Routing,
Sales Orders,MDS,
Forecast, Inventory
Planning DataPull Staging tablesPlanning ODS
Load
Operation Data
Store
(ODS)
Custom programs
Cleaned up
Operation Data
Store
(ODS)
Plan Run
Planning Data
Store
(PDS)
Rele
aseR
ecom
mend
ation
s
WIP Mass Load /
Requisition Import /
Reschedule PO /
Reschedule
Requisitions
CreateRequisitions/DiscreteJobs
ReschedulePO/Reqs/Jobs
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
6/21
6
Initial Setups
Decideconfiguration
Centralized v/s Distributed
Apply latest RollupPatches
(Note 223026.1)
Collections RUP #25 (patch#6751704)
Planning Engine RUP #30(patch # 7286961)
Getresponsibilities
Advanced Supply ChainPlanner
Advanced Planning
Administrator
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
7/21
7
Initial SetupsContd.
Define Instance
Define Orgs
Assign CollectionGroups
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
8/21
8
Initial Setupscontd.
Run full data collection
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
9/21
9
Initial Setupscontd.
Gather schema stats on MSC
Grant Org access
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
10/21
10
Key Item Attributes
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
11/21
11
Key Item AttributesContd.
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
12/21
12
Collecting Sales Orders
Define Demand class
Define Master Demand Schedule (MDS)
RefreshMDS
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
13/21
13
Define Plan
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
14/21
14
Plan OptionsMain Tab
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
15/21
15
Plan OptionsOrg tab
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
16/21
16
Plan OptionsConstraints Tab
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
17/21
17
Execute Plan
Refresh MDS
Run Data Collection
Run Custom Data Cleanup Programs
Run plan
Consider creating request setAccess Planners workbench
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
18/21
18
Planners Workbench
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
19/21
19
Release
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
20/21
20
Gotchyas Sales order demand duplicated Inactive items coming over to plan Can not release configured items Planning Data Pull very slow
Run Refresh Collection Snapshots often Run Net change collection
ODS Load takes a long time Set MSC:Purge Stg Tbl Cntrl to Yes
Plan takes a long time to run Set MSC: Share Plan Partitions to No
File space issues Set MSC:Write MBP Flat Files to Yes
Schema stats
-
8/13/2019 A Beginners Guide to Implementating Ascp2111
21/21
21
Q&A
Sandeep Gandhi
513-325-9026
mailto:[email protected]:[email protected]