GIS – a development tool for decision making.
Chhattisgarh GIS Project
A. Anand, Scientist , Regional Remote Sensing Centre, National Remote Sensing Centre ISRO- Dept of Space Nagpur
![Page 2: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/2.jpg)
![Page 3: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/3.jpg)
1. Natural Resources Database on 1:50,000 scale. (IRS-LISS III Multi-temporal data) 2. Road Information System. (IRS PAN+LISS-III & LISS-IV) 3. Georeferencing of 20,379 village (cadastral) maps. (IRS PAN+LISS-III & LISS-IV)
OBJECTIVES
1. Generate various thematic maps of natural resources on 1:50,000 scale using remote sensing &
collateral data.
2. Establishment of district level database in GIS environment.
3. Identify the potentials and limitations of land and water resources and understand the priorities of the
people.
4. Integrate various thematic information and socio-economic for the generation of the action plans.
5. Generate a comprehensive plan for (i) Water resources development and (ii) Land resources
development.
6. Generate Micro-watershed wise site-specific and area-specific action plans for easy implementation by
local bodies.
7. Online information access to gram panchayats anywhere-anytime.
8. Facilitate participation of the local people (farmers, gram sevaks) into the planning process through
periodic interactions.
9. Design a mechanism for periodic monitoring and impact assessment.
CHHATTISGARH GIS PROJECT
Project Started in 2002- 2003
Project Completion 2004-2005
PROJECT FUNDING Each village contributed Rs. 10,000/- in two financial years through (i) Basic Plan (ii) Jawahar Gram Samridhi Yojana (iii) Other Resources of Panchayats. Total : 20379 villages Total cost Rs. 20.38 Crores.
![Page 4: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/4.jpg)
GIS in administration
![Page 5: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/5.jpg)
Basic GIS work starts with digitisation of State, District and Village boundaries
![Page 6: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/6.jpg)
Linking GIS data with Census data
![Page 7: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/7.jpg)
Linking GIS data with Census data
![Page 8: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/8.jpg)
Linking GIS data with Census data
![Page 9: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/9.jpg)
DISTRICT-WISE ANALYSIS OF DEMOGRAPHY AND BASIC AMENITIES To identify local priorities and define appropriate rural development programmes
Durg District
GIS data Query and Analysis
![Page 10: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/10.jpg)
Distance 1.5 km Population 200 - 500
Distance 1.5 – 3.0 km Population 600 - 1500
Distance 3.0 – 5.0 km Population 1500 - 3000
GIS data Query and Analysis
![Page 11: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/11.jpg)
Population 3000 - 15000
Distance 3.0 – 5.0 km Population ~ 1500
GIS data Query and Analysis
![Page 12: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/12.jpg)
SOCIO-ECONOMIC DISTRIBUTION PATTERN
DURG DISTRICT, CHHATTISGARH STATE
GIS data Query and Analysis : output maps
![Page 13: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/13.jpg)
![Page 14: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/14.jpg)
![Page 15: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/15.jpg)
RS &GIS in Natural resources management
![Page 16: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/16.jpg)
Soil
THEMATIC LAYERS of Durg District, CHHATTISGARH
To understand the potentials and limitations of land and water resources development
For Natural resources management basic and derived layers are first created
![Page 17: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/17.jpg)
RS &GIS in Drainage, Waterbodies
and Ground water
![Page 18: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/18.jpg)
DRAINAGE UPDATION : Existing drains Extracted from Image Existing drains
Drainages in plain areas interpreted and updated using remote sensing data. This updation in drainage courses help delineating and planning watershed programmes for optimal utilization of resources; and preparing water and land resources development plans for watersheds at micro and milliwatershed level.
![Page 19: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/19.jpg)
MAHASAMUND : DEM with DRAINAGE
![Page 20: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/20.jpg)
WATER BODY MONITORING USING SPACE TECHNOLOGY
![Page 21: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/21.jpg)
GROUND WATER PROSPECT MAPPING
![Page 22: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/22.jpg)
RS &GIS in Soils and agriculture, Land resource &
Watershed management
![Page 23: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/23.jpg)
Bhoring
Achholi
INTENSIVE AGRICULTURE DOMINATED WITH RICE CULTIVATION
![Page 24: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/24.jpg)
SOILS of CHHATTISGARH
![Page 25: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/25.jpg)
INTEGRATED WATERSHED DEVELOPMENT
![Page 26: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/26.jpg)
![Page 27: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/27.jpg)
![Page 28: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/28.jpg)
![Page 29: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/29.jpg)
![Page 30: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/30.jpg)
RAJNA VILLAGE CLUSTERS AMRAVATI DISTRICT, VIDARBHA
![Page 31: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/31.jpg)
Texture LCC Soil depth Ground water potential Slope
LCC Texture Soil depth Slope LU/LC
WRDP
LRDP
Cadastral-wise information correlation – propagation from 1:50k to 4k
• Incorporation of the field information after field verification.
• Generation of cadastral level theme information and maps.
• Proposition of Alternative Landuse and Drainage line treatment.
![Page 32: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/32.jpg)
Cadastral map overlaid on satellite data
Selection Query of a particular parcel Optimum cropping system suggestion with theme information
Theme selection Query Menus
Ownership (cadastral) detail selection Query Menus
The type of Horticulture crops to be grown. What are the agronomic practices that is to be followed with few graphics illustration. What are the fertilizer to be applied with dosage. What are production economics. What are the market prospects.
Horticulture development DSS
![Page 33: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/33.jpg)
RS &GIS in Road network generation
![Page 34: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/34.jpg)
BODHGHAT
NEW BRIDGE
BODHGHAT
NEW BRIDGE
Updated Roads Existing Roads
ROAD INFORMATION SYSTEM (RIS), CHHATTISGARH
IRS-PAN IMAGE
SURGUJA DISTRICT
NATIONAL & STATE
HIGHWAYS IN CHHATTISGARH
ROAD VALIDATION
![Page 35: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/35.jpg)
BODHGHAT
IMAGERY OF BODHGHAT PROJECT, SOUTH BASTAR
NEW BRIDGE
![Page 36: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/36.jpg)
UPDATED ROADS FROM SATELLITE SCENE
BODHGHAT
NEW BRIDGE
Updated Roads
![Page 37: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/37.jpg)
ROAD INFORMATION SYSTEM (RIS) OF SURGUJA DISTRICT
![Page 38: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/38.jpg)
1
2
Shortest Road Connectivity between Kotarki Village (1) to Bagra Village (2) Total length of the road = 21.6 km
Pack Track / Foot Path
Metalled /Unmetalled
Cart Tracks
LEGEND
Shortest Route
Notified Forest
![Page 39: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/39.jpg)
1
2
Pack Track / Foot Path
Metalled /Unmetalled
Cart Tracks
LEGEND
Shortest Route
Notified Forest
Shortest Road Connectivity between Kotarki Village (1) to Bagra Village (2) Total length of the road = 39.0 KM
![Page 40: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/40.jpg)
1
2
Shortest Road Connectivity between Bakarala Village (1) to Annapurna Village (2) Total length of the road = 11.3 km
Pack Track / Foot Path
Metalled /Unmetalled
Cart Tracks
LEGEND
Shortest Route
Notified Forest
![Page 41: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/41.jpg)
1
2
Pack Track / Foot Path
Metalled /Unmetalled
Cart Tracks
LEGEND
Shortest Route
Notified Forest
Shortest Road Connectivity between Bakarala Village (1) to Annapurna Village (2) Total length of the road = 27.89 km
![Page 42: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/42.jpg)
RS & GIS in Forest management
![Page 43: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/43.jpg)
FOREST INFORMATION SYSTEM OF CHHATTISGARH
![Page 44: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/44.jpg)
FOREST MANAGEMENT INFORMATION SYSTEM
![Page 45: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/45.jpg)
RS &GIS in Land information system
and land managemnt
![Page 46: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/46.jpg)
GEOREFERENCING OF VILLAGE (CADASTRAL) MAPS
Parcel-wise ownership Details integrated with Natural resources information For implementation & Monitoring of developmental Plans in the field.
![Page 47: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/47.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
![Page 48: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/48.jpg)
![Page 49: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/49.jpg)
![Page 50: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/50.jpg)
![Page 51: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/51.jpg)
RRSSC-Nagpur
Indexing, coding & scanning
Digitization
Edge matching at village level
Map cleaning and topology building
Data attachment
Generation of database in GIS environment
Acquisition of G.C.P’s
Geo-referencing
Edge matching with neighbouring villages
Village mosaic at taluk level
Hard copy out put generation -1
Out put evaluation in LRD/ RRSSC
Hard copy out put generation -2
Softcopy OUTPUT
Acquisition of Satellite data PAN/LISS-III
GRIDBASE generation
Rectification of Satellite data
Map grid generation
PROJECT METHODOLOGY Acquisition of village maps from land record department
QA/QC-1
QA/QC-2
QA/QC-3
QA/QC-5
QA/QC-6
QA/QC-4
Merged product generation
![Page 52: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/52.jpg)
GEOREFERENCING OF VILLAGE MAPS USING SATELLITE DATA
TOPOGRAPHICAL MAPS 1:50,000 SCALE
SATELLITE DATA CADASTRAL MAPS AT 1:5,000 SCALE
SATELLITE DATA AT 1:10,000 SCALE BASE VECTORS WITH GCPS
GIS COVERAGE
![Page 53: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/53.jpg)
Merged Product Resourcesat
LISS-IV And
Cartosat –1 data Cadastral Overlay
![Page 54: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/54.jpg)
Merged Product Resourcesat
LISS-IV And
Cartosat –1 data (Natural Colour)
Cadastral Overlay
![Page 55: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/55.jpg)
![Page 56: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/56.jpg)
![Page 57: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/57.jpg)
![Page 58: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/58.jpg)
Umaradah
Belmand
Charota
Padki Bhat
Bhagmara
![Page 59: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/59.jpg)
![Page 60: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/60.jpg)
Umaradah
![Page 61: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/61.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
JAGDALPUR
KONDAGAON
KESHKAL
NARAYANPUR
![Page 62: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/62.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
![Page 63: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/63.jpg)
GEO-REFERENCING OF VILLAGE MAPS
DISTRICT : BASTAR TEHSIL : NARAYANPUR
RI NO : 01 HALKA NO : 002
VILLAGE NO : 417 VILLAGE NAME : ANJREL VILLCODE : 15 02 01 002 417
![Page 64: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/64.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
SOIL EROSION & TANK SILTATION
![Page 65: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/65.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
![Page 66: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/66.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
CATCHMENT TREATMENT
![Page 67: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/67.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
![Page 68: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/68.jpg)
GEO-REFERENCING OF VILLAGE MAPS DISTRICT : BASTAR TEHSIL : NARAYANPUR
![Page 69: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/69.jpg)
Lohari
Marwahi
RECHARGE MECHANISM TO BE RESTORED
PART OF BILASPUR DISTRICT
![Page 70: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/70.jpg)
SINGLE VILLAGE ISOLATED PATCH SONHAT TEHSIL,
KORIYA DISTRICT
![Page 71: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/71.jpg)
• Suitable sites for energy plantations
• Catchment treatment
• Restoration of recharge mechanism
• Restoration of village tanks
• Catchment treatment
• Sustainance of drinking water
• Soil conservation
• Restoration of Farm Ponds
• Suitable sites for horticulture plantations
• Restoration of village tanks
Tank Siltation
USAGE OF GEOREFERENCED VILLAGE MAPS
![Page 72: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/72.jpg)
Specific applications developed for Chhattisgarh State
![Page 73: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/73.jpg)
i. Prioritization of watersheds and water resources development plan for priority watersheds, Department of Panchayat and Rural Development.
ii. Rural Road Connectivity to villages through the forest for 12th Finance Commission, Govt. of Chhattisgarh.
iii. Identification of suitable sites for horticulture, floriculture and vegetable crops in Mahasamund District, for CEO, Zilla Parishad, Mahasamund.
iv. Identification of suitable sites for establishing PURA (Providing Urban amenities in Rural Areas)
v. Forestry Management Information System (FMIS), Forest Department. vi. Hydrology Project of Chhattisgarh State (Funded by World Bank), for Water
Resources Department. vii. Election Commission GIS for delimitation of constituencies, for Chhattisgarh
State Election Commission. viii. Identification of suitable areas for siting industries in the state, for
Chhattisgarh State Industrial Development Corporation (CSIDC) ix. Optimal routing of High Power Transmission Lines, for Chhattisgarh State
Electricity Board. x. Developmental planning of major towns of Chhattisgarh State, for Town and
Country Planning, Raipur. xi. Development Planning of new Raipur City, for Town and Country Planning,
Raipur.
The advantages of the establishment of digital databases on natural resources have
been optimally realized for the priority requirements of various departments of the
state of Chhattisgarh and some of the major applications accomplished are:
![Page 74: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/74.jpg)
Spatial Data Display….
State, District, Tahsil, RI, Halka, Villages
State, District, Tahsil, JPanchayat,Gpanchayat, Villages
Vidhan Sabha Constituencies, Villages
Non-Spatial Data Display….
Infrastructure facilities – Edu, Med, Communication., Industry, Institution
ST Pop.
SC Pop.
OTH Pop.
Pie Display
Statistics Report
• Single Coverage – Multi-layer
• Hierarchical Display
• Multi-level Query
• Multi-level statistics
• Chloropeth map Generation
• Spot & Pie display
CHHATTISGARH CHUNAV R
EG
ION
AL
REM
OTE SENSING SERVIC
E CEN
TRE
NAGPUR
![Page 75: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/75.jpg)
The similar analysis is being carried out for the entire state under Horticulture Mission
![Page 76: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/76.jpg)
PRIORITIZATION OF BLOCKS FOR WATERSHED DEVELOPMENT
Patashree Nala Milliwatershed, Dongargarh, Rajnandgaon, Chhattisgarh
![Page 77: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/77.jpg)
IDENTIFICATION OF SUITABLE SITES FOR INDUSTRIAL IDENTIFICATION OF SUITABLE SITES FOR INDUSTRIAL DEVELOPMENT DEVELOPMENT –– DistrictDistrict--wise for entire State of Chhattisgarhwise for entire State of Chhattisgarh
1.1. Proximity to Rail and Road (NH) Proximity to Rail and Road (NH) –– 15 km on either side15 km on either side2.2. Availability of surface water resourcesAvailability of surface water resources3.3. Availability of nonAvailability of non--culturableculturable wastelandswastelands4.4. Should not be a forest landShould not be a forest land
![Page 78: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/78.jpg)
Criterion for the demarcation of the transmission line in GIS analysis. • Minimum of forest area be disturbed. • Nearer to the road for easy maintenance. • Away from the settlement/Abadi(populated area) • The Transmission line should have minimum bends (Maximum of 60o ) • Cross minimum of Major rivers. • Crossing of the river should be at the minimum span • Line should cross the road, rail and river/stream in more or less perpendicular position. • Should be at-least 5 km away from the Airport • Avoid mining areas (active mining, dumps, etc.) • Should be at-least 5 km away from the Reserve park/National Park boundary.
DEMARCATION OF CORRIDOR FOR CSEB
400 KV TRANSMISSION LINE
OF 1000 km IN DIFFERENT REACHES OF CHHATTISGARH
LAKHELI to
BELAR (285 km)
![Page 79: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/79.jpg)
Handing over of Land Records Maps (19000 villages, 54000 sheets) to Commissioner, Land Records Department, Govt. of Chhattisgarh
Capacity building in the use of Softcopy to LRD Personnel
Handing over to Commissioner, LRD
![Page 80: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/80.jpg)
Handing over of the Thematic Hardcopy Maps and Digital Files to Zilla Parishads
Officials
Officials & Trainees from different district Zilla
Parishads Inauguration : Add. CEO CHiPS, Director SIRD, RRSSC
Scientists
Training on GYAN software to Zilla
Parishads Officials
Chhattisgarh State
Handing over of the Thematic Deliverables to CHiPS and Panchayat & Rural Development Department, Govt. of Chhattisgarh, at Raipur on 28th & 29th August, 2008.
![Page 81: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/81.jpg)
Bhuvan A gate way to Indian Earth Observation
http://bhuvan.nrsc.gov.in/
![Page 82: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/82.jpg)
![Page 83: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/83.jpg)
![Page 84: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/84.jpg)
![Page 85: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/85.jpg)
![Page 86: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/86.jpg)
![Page 87: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/87.jpg)
![Page 88: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/88.jpg)
Space Based Information Support for Decentralised Planning (SIS-DP)
•Objectives •To generate and provide 'Satellite Image Maps' for the entire country as base for decentralized planning. •To prepare thematic & base layers on 1:10000 scale using 'Satellite Image Maps', •To create databank: comprising of 'Satellite Image Maps', thematic and base maps, slope class maps; and organize census data, climate data, cadastral maps, stakeholder's data and available legacy thematic & base data on GIS platform. •To develop comprehensive web portal as per PRIs & stakeholders needs for decentralized planning, governance, outreach to the citizens and data dissemination. •To build Capacity of PRIs & stakeholders for the use of Space Based Information in Decentralized planning and governance.
![Page 89: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/89.jpg)
http://www.india-wris.nrsc.gov.in/
![Page 90: a development tool for decision making. Chhattisgarh GIS Project](https://reader033.vdocument.in/reader033/viewer/2022050915/588dbb501a28ab0d218bde4a/html5/thumbnails/90.jpg)
IRS-P5(Cartosat-1) PAN-2.5M, 30 km, F/A
OCEANSAT-II SCAT, OCM
MEGHA-TROPIQUES SAPHIR, SCARAB &
MADRAS
RISAT C-band SAR; 3-50 m Multi-Pol; Multi mode
CARTOSAT-2 PAN – 1.0 m, 11km
INSAT-3D 19 Ch. Sounder 6 Ch. Imager
INSAT-3A VHRR – 2 Km(vis); 8 Km(IR & WV) CCD – 1 Km
Thank you