A-SMGCS EUROCONTROL Project Paul Adamson Project Manager

Upload: trandung

Post on 13-Apr-2018

227 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

A-SMGCS

EUROCONTROL ProjectPaul AdamsonProject Manager

Page 2: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Eurocontrol Airport OperationsProgramme

Consists of four main projects:A-SMGCSAirport CDM ApplicationsAirside Capacity EnhancementRunway Safety

Also involved in Wake VortexTimeframe 2002-2006

Page 3: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

A-SMGCS Project• ECAC-Wide• Identifies & addresses implementation issues• Based upon several agreed & validated Implementation Levels,

enabling: – Evolutionary implementation– Local needs to be met

• Supported by:– ECIP Process– Regulation– Guidance material

• Integral component of APR & EATM

Page 4: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Project Objectives

• To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified and addressed:– Systems– Procedures– Human Factors– Institutional– Training/Licensing

• Coordinate with & expand upon the work of EC & ICAO;• Coordinate with FAA, NAV CANADA etc.

Page 5: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

A-SMGCS Context & Project Scope

A-SMGCS

MOBILES

CollaborativeDecision Making

ArrivalManagement

AirportManagement

DepartureManagement

Planning

/ RoutingGuidance

Surveillance

Control

Times ofarrival

Times ofDeparture

Stand allocation

Runway /Taxiway status,…

Navigation(GNSS,…)

Mobile Position

Voice And Data Linkcommunication

Automatic DependantSurveillance

Other sensors Mobile Parameters

Alerts, guidance,…

Traffic situation

Assigned routes

Alert events Conflictresolutions

ProjectScope

Page 6: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Outline of Project Phases• Requirements Definition

– Operational Requirements– Operational Concept– High Level Functional Specifications

• Evaluation & Validation– Simulation– Live trials at representative airports– Focus on safety, throughput, human factors, procedures and tools

• Update of Requirements– Updated & agreed requirements documentation for Levels 1 & 2

• Support to Implementation– Guidance material– ECIP objectives & regulation (as agreed & required)– Updates for ICAO & other documentation– Licensing, training etc.

Page 7: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Project OrganisationAirport Operations Team

Airport Operations ProgrammeAdvisory Group

A-SMGCSProject

A-SMGCSProject Coordination Group

A-SMGCSProcedures Group

ICAOEUROCAE

EC

Page 8: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

What are ‘A-SMGCS Levels’?• Level 1

– Based upon improved surveillance (cooperative independent, dependent or multilateration) and procedures (identification, issuance of ATCinstructions & clearances)

• Level 2– Safety nets (runway, ‘restricted’ areas) and associated procedures

• Level 3– Detection of all conflicts on movement area, improved guidance &

planning (for controllers)• Level 4

– Resolution of all conflicts, automatic planning & automatic guidance for (pilots & controllers)

Page 9: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

SMGCS Level 1Enhanced

SUR Procedures

Level 2Enhanced

SUR Procedures R/W Safety

Nets

Level 3

+Guidance?

Level 4

+Planning?

A-SMGCS

•Procedures•Performance•Safety•Training•Licensing•HF•Certification•Interfaces

•Procedures•Performance•Safety•Training•HF•Certification

Time

DraftICAO

A-SMGCSManual

BETA Results

EUROCAEMASPS

TBD TBD

ICAOSMGCSManual

EMMA Results

Scope of Project

Harmonised Application of SMGCSA-SMGCS Implementation LevelsShowing evolutionary levels & issues to be addressed

Page 10: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Level 1• A-SMGCS Surveillance• Manoeuvring Area for Vehicles• Movement Area for Aircraft• Cooperative & Non-cooperative

Surveillance• Display

– Traffic ‘Context’– Position– Identity

• Performance based upon ICAO/EUROCAE

Air Traffic Controller

TrafficSituationPicture

Traffic ContextPosition, Identity

of Mobiles

Airport Traffic Context

Airport Traffic

Actions onTraffic

SurveillanceInformation

Page 11: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Level 2• A-SMGCS Surveillance +

(elementary) Control• Conflicts/infringements

between all mobiles on runways

• Incursion into ‘restricted areas’ by aircraft

• Appropriate alert to controllers

• Intended as a commonly agreed ‘minimum’ safety net

Air Traffic Controller

Traffic SituationPicture +Conflicts /

InfringementsDetection

Traffic ContextPosition, Identity,

Speed,… ofMobiles

Airport Traffic Context

Airport Traffic

Actions onTraffic

SurveillanceInformation

Alerts

Page 12: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Level 2 Runway Safety Net• Aimed at detecting potentially dangerous scenarios• Addresses aircraft & vehicles (not persons)• Does not vehicle/vehicle conflicts• ‘Generic’ scenarios identified for:

– Single runway– parallel runways– Intersecting runways

• Multiple conflicts to be considered as multiple pairs• Two warning types

– Prediction– Alert

• Parameters for:– Normal Visibility– Low Visibility

32 1432 1432 1432 14

Page 13: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Need for A-SMGCS Procedures

• No provisions addressing use of A-SMGCS Surveillance• Ambiguities with respect to the use of SMR:

– Interpretations of ‘augment’ & ‘assist’– Diverse uses/procedures

• Need for harmonised use of A-SMGCS surveillance data– Concerns Controllers/Pilots/drivers– Global application, increased traffic in all weather conditions

• Basis for further A-SMGCS developments• Need to deliver benefits of A-SMGCS!

Page 14: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

A-SMGCS Procedures• Transponder Operation• Methods of identification• Issuance of ATC instructions and clearances to aircraft & vehicles on the Manoeuvring

area– Taxi Clearances– Resolution of conflicts

• Issuance of ATC instructions and clearances to aircraft and vehicles on the the runway– Conditional Clearances– Multiple line-up/intersection departures– Crossing

• Phraseology• Contingency & Failure mode• Low Visibility Procedures (transition from Visibility 2 to 3)

Page 15: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Transponder Operating Procedures

• Pilots requested to switch on their transponders from:– From the request for push-back

or taxi (whichever is earlier)

– After landing, until the aircraft is parked on stand

• Use ‘XPNDR’ or equivalent mode

• Not use ‘STBY’ or ‘OFF’

• AIP, AIC & Brochure

Page 16: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Procedure 2 Issuance of Taxi Clearances and Instructions (current SMGCS)

27

RPX 123,stand 1,

request taxi for departure

RPX 123Taxi to holding position

runway 27 via taxiway Alpha

RPX at holding Position Runway 27

RPX 123,Roger

•Applied to aircraft & vehicles•Applied in Visibility conditions (1), 2, 3 & 4

Page 17: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Procedure 2 Issuance of Taxi Clearances and Instructions (A-SMGCS)

27

RPX 123,stand 1,

request taxi for departure

RPX 123Taxi to holding position

runway 27 via taxiway Alpha

•To be applied to identified aircraft & vehicles•Could be applied in Visibility conditions 1,2 & 3

Page 18: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Procedure 3 Resolution of Conflicts on Taxiways (current SMGCS)

DLH 456 report passing Alpha

Taxi to Bravo,RPX 123

•Applied to aircraft & vehicles•Applied in Visibility (1), 2, 3 & 4

Report passing Alpha,

DLH 456

DLH 456 passing Alpha

RPX 123, taxi to Bravo

RPX 123, holding position Bravo

RPX 123, roger

DLH 345,roger

Page 19: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Procedure 3 Resolution of Conflicts on Taxiways

RPX 123give way to DLH 737,

crossing fromthe right

Give way toDLH 737,RPX 123

•To be applied to identified aircraft & vehicles•To be applied in Visibility 1, 2 (& 3 with specific instructions)•Could also be used to monitor ‘procedural’ separations in Visibility 3

Page 20: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Licensing/Training

• Current provisions based upon the use of ‘SMGCS’, where SMR is used to ‘augment’and ‘assist’.

• However, new European ATC License will support A-SMGCS

• Specific training requirements to be developed

Page 21: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Implementation Mechanisms

• Best Practice• Guidance Material• ECIP• Standards

Aim to ensure consistent application of A-SMGCS tools & procedures, which will build confidence amongst users and provide common specifications assist manufacturers.

Page 22: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

ECIP• A common planning and implementation document for

improving European ATM, which specifies:• What has to be achieved by States / ANSPs

– Currently focuses on ACC capacity targets– Next steps aim to include airspace types, additional performance

criteria (Cost effectiveness, Safety, Security and Environment)– inclusion of airports/TMA performance

• A list of solutions to achieve these targets:– ECIP implementation objectives– Working level (specialists teams) develop/review draft

implementation objectives

• Endorsed by Provisional Council

Page 23: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Current Status & Next Steps

• Agreed requirements documentation

• Agreed Procedures ‘concepts’– Mode S transponder Operating procedures

• Agreed Evaluation & Validation Process

• Call-for-Tender for Simulation issued

• Simulation preparation Starts 11/03• Efforts to secures ‘Trial’ Airports

Page 24: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Outline Roadmap2002 2003 2004 2005 2006

Requirements Definition 12/03

Evaluation/Validation 07/05

Update Requirements 12/05

Support to Implementation 12/06

Development of Standards, Recommendations& Procedures

12/06

Page 25: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Summary• Still lot to do to secure actual & harmonised use:

– Tools– Procedures

• Pragmatic approach is required, with full cooperation of ‘stakeholders’

• Harmonised approach to implementation is essential if benefits are to be brought to individual airports & the overall ATM network

• Global cooperation required (ICAO)

Page 26: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Contact

Paul AdamsonA-SMGCS Project Manager

[email protected] 32 2 729 3308

Page 27: A-SMGCS - Eurocontrol - A - SMGCS... · Project Objectives • To fully develop A-SMGCS Levels 1 & 2, ensuring that all issues relevant to operational implementation are identified

Thanks &Any Questions?