a l io n technical document cover pagea l io n technical document cover pagesc ,rwl ,i u mf~oo, ot...

44
A L IO N TECHNICAL DOCUMENT COVER PAGE SC ,rwL U ,I Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal River 3: Bypass Fiber Quantity Test Plan Project No: 261-8706 Project Name: Crystal River 3 Top Hat Strainer Bypass Testing for ENERCON Client: ENERCON Document Purpose/Summary: This document presents the Alion Test Plan for the Crystal River 3 Top Hat Strainer Bypass Testing measurement. All design inputs are based on the Enercon Design Input Letter [Ref. 10]. This test plan is prepared Safety-related in accordance with the Alion Science and Technology Innovative Technology Solutions Operation Nuclear Quality Assurance Program. Total Page Count: 44 pages Design Verification Method: X Design Review Alternative Calculation ___ Qualification Testing Professional Engineer (if required) Approval:_..... ./.a. Date Matthew G. Jursich 11•/72017. Printed/Typed Name - Sig nature Date David Juryevich - .... I Reviewed By: David Daily Signature_ ate Printed/Typed Name Sigitf•Ure Date ,hr Dig,,Aly by M- A. Approved By: Megan Stachowiak D 0210 1ý3 1 7 2 1 Printed/Typed Name Signature Date

Upload: others

Post on 12-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

A L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL U ,I Mf~oo, Ot

Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20

Document Title: Crystal River 3: Bypass Fiber Quantity Test Plan

Project No: 261-8706

Project Name: Crystal River 3 Top Hat Strainer Bypass Testing for ENERCON

Client: ENERCON

Document Purpose/Summary:

This document presents the Alion Test Plan for the Crystal River 3 Top Hat Strainer Bypass Testing

measurement. All design inputs are based on the Enercon Design Input Letter [Ref. 10].

This test plan is prepared Safety-related in accordance with the Alion Science and Technology Innovative

Technology Solutions Operation Nuclear Quality Assurance Program.

Total Page Count: 44 pages

Design Verification Method:

X Design Review

Alternative Calculation

___ Qualification Testing

Professional Engineer (if required) Approval:_..... ./.a. Date

Matthew G. Jursich 11•/72017.Printed/Typed Name - Sig nature Date

David Juryevich - .... I

Reviewed By: David Daily Signature_ ate

Printed/Typed Name Sigitf•Ure Date

,hr Dig,,Aly by M- A.

Approved By: Megan Stachowiak D 0210 1ý3 1 7 2 1Printed/Typed Name Signature Date

Page 2: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

SCIENCE AND TECHNOLOGY

REVISION HISTORY LOG

Page 2 of 20

Document Number: ALION-PLN-ENER-8706-02 Revision: 0

Document Title: Crystal River 3: Bypass Fiber Quantity Test Plan

Instructions:

Project Manager is to provide a brief description of each document revision including rationale for the change

and, if applicable, identification of source documents used for the change.

REVISION DATE Description

See Cover0 Issued for use.

Page

+ i

Form 6.1.3

Revision I

Effective Date: 2/28/07

Page 3: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

TABLE OF CONTENTS1.0 Background ........................................................................................................................................................... 62.0 Test O bjectives ................................................................................................................................................... 6

2. I Strainer D esign ............................................................................................................................................... 62.2 Fiber Bypass Testing ...................................................................................................................................... 7

3.0 Technical A pproach ........................................................................................................................................... 73. I O verview of Testing Strategy ..................................................................................................................... 73.2 D ebris Load D efinition ................................................................................................................................. 83.3 Scaling of D ebris Q uantities for Testing ........................................................................................... 83.4 Filter Bags ........................................................................................................................................................ 83.5 A ssum ptions .................................................................................................................................................... 9

4.0 Test D escription ................................................................................................................................................. 94. I Scaling and Selection of Prototype ...................................................................................................... 104.2 D ebris and Flow Scaling ............................................................................................................................. 104.3 Fiber D ebris Size D istribution .................................................................................................................. 104.4 D ebris Preparation-Fiber .......................................................................................................................... 104.5 D ebris Introduction .................................................................................................................................... I14.6 H ydraulic Test C onditions ........................................................................................................................ I1

4.6. I Strainer A pproach Velocity .................................................................................................................. I4.6.2 W ater Tem perature and C hem istry .................................................................................................. I14.6.3 W ater Level ............................................................................................................................................. II4.6.4 pH ............................................................................................................................................................... 124.6.5 T urbidity ................................................................................................................................................... 12

4.7 D ebris Type .................................................................................................................................................. 124.8 Test C ontrol ................................................................................................................................................. 124.9 Preparation .................................................................................................................................................... 124.1 0 D ebris A ddition ............................................................................................................................................ 13

5.0 Test M atrix ......................................................................................................................................................... 136.0 Test Procedures ................................................................................................................................................ 137.0 Test Equipm ent and Specifications ........................................................................................................... 14

7. I Equipm ent Specifications ............................................................................................................................ 147.2 Test Equipm ent and A ccuracy .................................................................................................................. 15

8.0 Test A cceptance C riteria ................................................................................................................................ 168.1 Fiber Bypass .................................................................................................................................................. 168.2 H ead Loss ...................................................................................................................................................... 168.3 Testing Stabilization C riteria ..................................................................................................................... 16

8.3.1 Step Stabilization C riteria ..................................................................................................................... 168.3.2 Final Stabilization C riteria ..................................................................................................................... 17

8.4 Test Term ination ......................................................................................................................................... 179.0 Test D ocum entation and Records ........................................................................................................... 1710.0 D ebris H andling Requirem ents ..................................................................................................................... 1811.0 Q uality A ssurance Requirem ents ................................................................................................................. 1812.0 References .......................................................................................................................................................... 20

Page 4: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

LIST OF FIGURES

Figure 2- I: Strainer and T est Tank Layout .................................................................................................................. 7

Figure 4- I: A lion Hydraulic Test Tank D iagram ................................................................................................... 9

LIST OF TABLES

T able 5-I - Bypass T est M atrix .................................................................................................................................... 13

LIST OF APPENDICES

A ppendix I - Calculation of Testing Param eters ........................................................................................ (3 pages)

LIST OF ATTACHMENTS

A ttachm ent A - D esign Input Letter .............................................................................................................. (9 pages)

Attachm ent B - Table 3-2 of N U REG/C R-6808 ............................................................................................ (I page)

A ttachm ent C - Vortex Strength Scale ............................................................................................................ ( I page)

Attachm ent D - Material Safety and Data Sheets ..................................................................................... (10 pages)

Page 5: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

ACRONYMS AND DEFINITIONS

OCOF

AlionCFRCR3

cmD

dpECCSFEGLgpmGSIftHDFGinITSO

kgLDFGlbLOCAMSDSNIPCIPWRQAS or secTBUSNRC/NRC

inches (length)Degrees Celsius

Degrees FahrenheitAlion Science and TechnologyCode of Federal RegulationsCrystal River 3

centimeterDiameterdifferential pressureEmergency Core Cooling SystemFlow ElementGeneric Lettergallons per minute (flow)Generic Safety IssueFeet (of water)High Density FiberglassinchInnovative Technology Solutions OperationKilogramLow Density Fiberglass

PoundLoss of Coolant AccidentMaterial Safety Data SheetNational Instruments

Performance Contracting, Inc.Pressurized Water ReactorQuality AssurancesecondTurbidityUnited States Nuclear Regulatory Commission

Page 6: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

1.0 BACKGROUND

The design of the Emergency Core Cooling System (ECCS) at the Crystal River Nuclear Power Plant

provides a suction source for the ECCS pumps, allowing the ECCS to operate in a containment

recirculation mode. If a Loss-of-Coolant-Accident (LOCA) inside containment were to occur, it could

generate debris that, if transported to and deposited on the containment sump screens, could pass

through the screens and affect downstream components and/or the ability to maintain long term core

cooling.

The United States' Nuclear Regulatory Commission (NRC) Staff has identified Generic Safety Issue (GSI)

- 191, "Assessment of Debris Accumulation on PWR Sump Performance." To this end, on September 13,

2004, the NRC issued Generic Letter (GL) 2004-02 to Pressurized Water Reactor (PWR) Owners for

action to ensure that LOCA-generated debris does not degrade ECCS performance.

2.0 TEST OBJECTIVES

The objective of this test program is to measure the mass of the fibrous debris that passes through the

screen perforated area using:

" Prototype strainer hydraulic tank testing

" 5-micron nominal inline filters to capture bypassed fiber and subsequently take the difference of

pre and post-test weights

" Incremental fiber loading to ensure conservative measurement of fiber bypass

2.1 Strainer Design

A single-ring top hat will be installed in the Alion test tank, see Figure 2- I. The top hat is 38" in length

and has a net surface area of 14.70 ft2 [Ref. 10].

Page 7: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

0• Crystal River 3: Bypass Fiber Quantity Test Plan

AL I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 7 of 20

Side Suction

To Op Manifold

Figure 2- I: Strainer and Test Tank Layout

2.2 Fiber Bypass Testing

Alion will perform a fiber bypass test on a prototypical section of the sump strainer to measure the

maximum fiber bypass quantity through the test strainer that is comprised of one top hat. The testing

will be performed in the Alion Test tank located in Warrenville, Illinois.

3.0 TECHNICAL APPROACH

The discussion of technical approach implemented in this plan includes the following:

* an overview of testing strategy

* debris load definition

* scaling of plant quantities for testing

* filter bags

* assumptions

3.1 Overview of Testing Strategy

The technical approach implemented in this test plan is to measure the bypassed fiber quantity for a

prototypical ECCS strainer using test conditions that conservatively maximize fiber bypass. Alion will

perform bypass testing for Enercon in accordance with the requirements of the project plan [Ref. 14].

A representative approach velocity will be passed through a prototypical strainer. Incremental fiber

additions simulate the worst-case scenario for fiber bypass by minimizing the concentration, which

prevents early bed formation. To account for the installation tolerance of 1/16" for any gaps or

Page 8: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

openings between connecting components of the strainer that provide entry to the strainer internals, a

1/ 16" gap will be included between a portion of the test Top Hat and the plenum. Bypassed fiber will be

captured using downstream 5-micron filter bags via a 100% pass through alignment in the flow stream,

so that bypassed fiber can be captured and measured. See Section 3.4 for filter bag preparation,

processing and measuring. The test report will show the measured bypassed fiber quantities per

addition and the total quantity of bypassed fiber.

3.2 Debris Load Definition

Debris load definition is provided by the Enercon Design Input Letter, which identifies the fibrous debris

source terms for the current plant configuration. The single debris type predicted to be destroy post-

LOCA at Crystal River is NUKON [Ref. 10]. The debris source terms are scaled for the test article in

Appendix I. NUKON will be utilized during testing to represent the plant fibrous debris (see Section

4.7). NUKON fines and smalls will be created according to the current revision of the NEI ZOI Fibrous

Debris Preparation [Ref. 12].

3.3 Scaling of Debris Quantities for Testing

Scaling of debris quantities is detailed in Appendix I.

3.4 Filter Bags

The filter bags used for this test will be 5-micron mesh size, which will capture bypassed NUKON

particles/fibers, which typically have a diameter of 7-micron and are expected to have a much longer

characteristic length, thereby facilitating high capture efficiencies. Before 'use and in accordance with

ALION-SPP-LAB-2352-70 [Ref. 3], the filters will be prewashed to remove any loose material. The

filters will be dried and weighed before and after testing to calculate the amount of NUKON that was

captured in the filter bags during the test. Alion lab procedure ALION-SPP-LAB-2352-70, "Filter Bag

Preparation and Processing Procedure", will be the procedure utilized to measure the collected

NUKON.

At least seven filter bags will be prepared before the test. During testing one filter bag will be set up to

capture NUKON, another used as a control and the remaining filter bags will be switched out one at a

time for each fiber addition. Also, filter bags may be replaced as required to maintain acceptable filter

bag differential pressure. Filter bags will be dried with set drying times until the difference in weight

change between drying sessions is minimal. The test procedures will specify drying time intervals and the

weight change differential. Extreme care shall be taken to preclude any loss of fiber mass throughout the

life of the filter bags. The test procedures also reiterate the significance precluding any loss of fiber of

filter mass.

Page 9: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

* Crystal River 3: Bypass Fiber Quantity Test Plan

A L I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 9 of 20SCIENCE AND TECHNOLOGY Dcmn o LO

Prior to testing, another set of cleaning filter bags shall be used to completely filter out any latent debris

that would affect the post-test mass of the testing filter bags.

3.5 Assumptions

The following assumption is made:

* The effective surface area of the strainer is 1139 ft2 [Ref. 10]. However, testing will be

performed using a scaling ratio based on a 1050 ft 2 strainer. This incorporates margin into the

results for tag/label sacrificial area.

" The fiber from each addition collects on the screen prior to the next addition and does not

remain suspended in the tank volume.

4.0 TEST DESCRIPTION

The test will be performed at the Alion Hydraulics Laboratory located in Warrenville, IL. A diagram of a

typical test tank instrumentation setup is illustrated in Figure 4- I. A pre-test check of SBV-0 I and the

filter housing inlet and outlet valves (e.g. FHI-01 and FHO-01) will be completed to ensure there is no

leakage across the valves. Additionally, the filter housing inlet and outlet valves will be inspected for

leakage at every filter change. A post-test check of SBV-0 I may be completed if SBV-0 I is manipulated

during testing. The test procedures will specify the steps necessary to perform the pre and post-test

checks.

Tank drain

Pump

Figure 4- I: Alion Hydraulic Test Tank Diagram

Page 10: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

4.1 Scaling and Selection of Prototype

A prototype section consisting of one Top Hat will be tested in the tank. This assures a I to I scaling

ratio for dimensions and perforated plate hole size including gaps installed at the base of Top Hats at the

plenum. The height of the gap between the plenum and Top Hat will be 1/16 inch (+1/32", -0"). The

total length of the gap on the interior perimeter of the Top Hat (i.e., adjacent to a plenum cover plate)

will be 11-7/16" (+/- 1/16"), which may be placed on any single interior side of the Top Hat. The

distance between the test Top Hat and the cover plate adjacent to the gap on the interior perimeter of

the Top Hat will be 'A" (+ 1/16", -0"). Also, the total length of gap on the exterior perimeter of the Top

Hat (i.e., at the edge of the plenum) will be 7-9/16" (+/- 1/16"). The effective surface area of the strainer

is 1139 ft2 [Ref. 10]. However, testing will be performed using a scaling ratio based on a 1050 ft2

strainer. This incorporates margin into the results for tag/label sacrificial area. The other test parameters

are scaled and are included in Appendix I.

4.2 Debris and Flow Scaling

All testing parameters will be based on the project inputs outlined in the Design Input Letter [Ref. 10].

These parameters will be scaled based on the ratio of testing strainer area to plant net effective area.

This scaling factor and its use in determining test parameters are shown in Appendix I.

4.3 Fiber Debris Size Distribution

The fiber debris size distribution given in the design input letter [Ref. 10] for NUKON debris classifies

the fibrous debris as "large pieces", "small pieces", and "fines". For the tests outlined in this document,

two fibrous debris classifications will be used, "fines" characterized as Classes 1-3 in NUREG/CR-6224

[Ref. I1] and "smalls" characterized as Classes 4-6 in NUREG/CR-6224. Classes 1-3 "fines" will be used

to represent the latent debris source term for all tests. For the "fines" generated in the design input

letter [Ref. 10], 92% transport to the strainer. For the "small pieces" generated, 20% transport to the

strainer, with 13% remaining as smalls and 7% of the smalls eroding to fines.

4.4 Debris Preparation-Fiber

Debris will be prepared according to the NEI ZOI Fibrous Debris Preparation procedure [Ref. 12]. This

procedure produces the required size distribution of fiber fines and smalls that are easily transportable

and readily disperse in the testing medium. Fines are defined in the NEI procedure document [Ref. 12]

as readily suspendable in water and are Classes I through 3 while smalls are class 4 and 5 of Table 3-2 of

NUREG/CR-6808 [Ref. 13]. Table 3-2 is in Attachment B. All fiber will be Performance Contracting, Inc.

(PCI) NUKON single side baked between 6 and 8 hours. Fibrous fines will be cut, weighed out and

separated using a commercially available pressure washer, and then verified to meet the correct

classification of fiber sizes. Fiber fines are then combined to maintain a fiber mass to volume ratio less

than or equal to 0.21 lbs/gal. Fibrous smalls will be cut for the appropriate mass for each specific

Page 11: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

addition, soaked in water and stirred with a hand paddle until the pieces are fully saturated and

separated from each other. Samples of fiber smalls and fines will be examined and photographed using a

light-board, or equivalent device, to ensure fiber preparation is consistent with the guidance provided in

Reference 12.

4.5 Debris Introduction

Debris will be introduced into the tank in areas of high velocities near the pump return line. This will

allow the flow within the tank to carry the debris to the Top Hats. Adjustable tank internal mixing will

be added to areas of low velocities. Batches of fiber will be added in increments that ensure the

concentration in the test tank is less than or equal to the plant's concentration. Additionally, these

increments will be in the same containers utilized to perform the NEI debris preparation procedure.

This is done to limit the possibility of debris loss through transfer. The plant concentration is calculated

in Appendix I.

Fiber additions are included in the test matrix in Section 5.0.

4.6 Hydraulic Test Conditions

4.6.1 Strainer Approach Velocity

Plant and prototype strainer surface areas for which the approach velocity is used to calculate the

testing flow rate is given in the design input letter [Ref. 10] and specified Appendix I. The approach

velocity to be modeled to during testing is 0.0185 ft/s. The equivalent flow rate for the approach

velocity is 122 gpm.

4.6.2 Water Temperature and Chemistry

The water temperature will be maintained above 60 'F during the course of the test. Temperature shall

not exceed the maximum limit of 110 *F. Deionized/demineralized water will be used and the chemistry

will not be monitored or controlled during this test other than initially verifying the use of

deionized/demineralized water.

4.6.3 Water Level

The pool water level for the bypass test will be initially set at 54 inches. If vortexing occurs, a vortex

suppressor will be installed or the water level will be increased. Any required actions will be recorded in

the test logs. The water level will be recorded during testing and increase with each debris addition.

Test tank water may be removed to mix the next debris addition and re-introduced into the test tank.

Test tank water may be discarded after visually verifying there is no fiber within the water to ensure

there is room for further debris additions.

Page 12: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

4.6.4 pH

pH will not be monitored or controlled during this test.

4.6.5 Turbidity

The tank liquid may be sampled for turbidity when determined by the test engineer. Turbidity

measurements will be recorded for informational purposes only.

4.7 Debris Type

The low density fiberglass insulation quantities that transport to the strainer will be accurately

represented by NUKON. NUKON, provided by PCI, is specified as the plant fibrous insulation. The as-

fabricated density of NUKON is 2.4 lb/ft3 and the fiber diameter is 7 microns [Ref. 8]. Attachment D

contains Material Safety Data Sheet (MSDS) information.

4.8 Test Control

All testing actions and control must be noted in the test log. This includes flow adjustments, debris

addition (beginning and completion), stirring (including the duration of the stir), and all other acts that

affect the testing environment. The test logs shall be able to describe everything about the test without

recourse to the test engineer. Additionally, observations must be in the test logs about the strainer

coverage and any open screen area.

The flow rate of the system should be maintained at - 10 gpm, +20 gpm of the prescribed value.

Stabilization criteria for each subtest are given in Section 8.0.

4.9 Preparation

The test tank must be arranged and equipped as per the following (see Figure 2- I):

* A sparger system will be installed on the return line to aid in the suspension of the debris within

the water. Mechanical mixers may be utilized in low velocity areas to ensure settled debris

becomes re-suspended. Hydraulic shakedown testing can be conducted to ensure that the

return flow will create adequate turbulence to suspend the test debris.

" The differential pressure tubing, both the High and Low lines must be securely fastened inside

the tank to prevent vibrations that cause noisy signals. Furthermore, the Low side must be

securely fastened to the plenum to prevent ambient leakage.

The National Instruments' LabVIEWTM data acquisition program must be programmed to match the test

parameters, such as screen area and correct orifice plate conversion (see Section 7.0). Imperial units

will be displayed and recorded in the test logs and data during testing.

Page 13: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

p Crystal River 3: Bypass Fiber Quantity Test Plan

A I I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 13 of 20

The debris batches of Section 5 must be prepared according to the test matrix and the latest NEI debris

preparation procedure [Ref. 12]. The containers utilized to perform the NEI debris preparation

procedure will be utilized for debris introduction into the test tank (See Section 4.5)

4.10 Debris Addition

All debris will be added in two places directly over the sparger system which will allow the flow within

the tank to carry debris to the Top Hat. This will allow for equal debris bed growth on the top hat.

The debris must be added in a controlled manner as to not disturb the debris bed through unnecessary

turbulence.

Also, visual observations shall be made to ensure that a vortex does not form during the testing. If a

vortex does form, water shall be added to the tank to raise the water level until no vortices are

observed or a vortex suppressor may be installed.

5.0 TEST MATRIX

To maintain the correct debris concentration below that of the plant and to maintain the correct fiber

mass to volume ratio given in the NEI debris preparation procedure [Ref. 12], the volume of water per

addition is specified. The six gallons of water added to the test tank per stage will satisfy both criteria

above while maintaining practical testing actions during testing. It is worth noting that the last addition

for each fiber size will have a different concentration because the addition represents the remaining

amount of scaled test fiber for that size classification.

Table 5-I - Bypass Test Matrix

F. I 122 0.157 0 2175 54.00 0.053 0.00003 0.03 6

F.2 122 0.157 0 2181 54.16 0.107 0.00003 0.03 6

F.3 122 0.157 0 2187 54.32 0.160 0.00003 0.03 6

FA 122 0.030 0 2193 54.48 0.170 0.000006 0.00 6

S.1 122 0 0.036 2199 54.64 0.182 0.00001 0.01 6

6.0 TEST PROCEDURES

The Alion Test Program has developed generic test procedures for debris preparation, fill and start-up

testing, and head loss testing. These generic test procedures are applicable, and the current revisions at

Page 14: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

the time of testing will be used to perform the testing specified in this test plan. Generic test

procedures are listed in References 2 through 7.

The Test Lab Safety Procedure, ALION-SPP-LAB-2352-21 [Ref. 7] shall be followed at all times.

The general sequence of the test is as follows:

I. Prepare test filter bags in accordance with procedure ALION-SPP-LAB-2352-70 [Ref. 3].

2. Verify the tank has been cleaned in accordance with ALION-SPP-LAB-2352-45 [Ref. 4] and filled

according to ALION-SPP-LAB-2352-44 [Ref. 5].

3. Verify the tank is setup correctly and dimensional variations from the general layout included in

Figure 2-I and Figure 4-I are approved by the Project Manager and/or Test Coordinator.

4. Debris shall be prepared in accordance with the latest NEI debris preparation Procedure [Ref.

12].

5. Photographs of typical samples of prepared debris will be taken.

6. For cleaning purposes, filter bags shall be used to filter water in the tank for at least 5 turnovers

prior to adding any debris at a cleaning flow rate greater than the test flow rate to ensure that

no residual debris interferes with the measured bypass quantities.

7. Strainer bypass testing will be performed in accordance with test specific procedures and the

Test Matrix described in Section 5 of this Test Plan.

8. Photographs of the debris bed, open screen area and any non-attached settled debris must be

taken when visibility permits.

9. At the conclusion of testing, process test filter bags in accordance with ALION-SPP-LAB-2352-

70 [Ref. 3].

10. Drain and clean the Test Tank in accordance with Test Tank Draining and Cleaning Procedure,

ALION-SPP-LAB-2352-45 [Ref. 4].

7.0 TEST EQUIPMENT AND SPECIFICATIONS

This section details the test specification requirements in which the test instrumentation must conform.

In addition, the test equipment used and the accuracy of each instrument are discussed.

7.1 Equipment Specifications

The equipment employed during testing and their associated accuracies are given in Section 7.2. The

data acquisition system is used to collect flow rate, differential pressure, and temperature data

throughout the performance of the test. This system also allows for the creation of graphs of the data

as well as tables of the raw data.

Due to instrument noise and combined instrument uncertainties, the data that is displayed via

LabVIEWTM (version controlled by [Ref. I] and verification controlled by [Ref. 2]) is a floating-average,

averaged over the previous 10 data points, with each data point recorded every 2 seconds. This

Page 15: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

QCrystal River 3: Bypass Fiber Quantity Test Plan

I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 15 of 20

averaging may lead to small discrepancies in instrument readouts. In such a case, the most conservative

measurement for any given instrument will be recorded in the test logs. For instance, the lowest flow

rate, highest differential pressure, and highest temperature shall be recorded in the test logs.

7.2 Test Equipment and Accuracy

The details of the equipment used and the calibration of the following instruments in this testing are

identified and controlled in the Test Program Description, ALION-PLN-LAB-2352-003, "Hydraulic

Testing of Debris Program Description: Test Tank" [Ref. I] and Alion "Test Equipment Verification

Procedure" [Ref. 2]. The following is a summary of the equipment used in this testing:

" Scales and Balances, as needed (balances verified prior to use)

o 0 to 150 lbs range, +/- (I % of reading + 0. I Ibs)

o 0 to 610 grams range, +/- 0.02 grams

o 0 to 6 kilograms range, +/- 0.002 kilograms

o 0 to 10 kilograms range, +/- 0.006 kilograms

" Pressure transmitters, as needed

o 0 to 100 inches of water range, +/- 0. 17% accuracy of upper range

o 0 to 250 inches of water range, +/- 0. 17% accuracy of upper range

o 0 to 300 inches of water range, +/- 0.25% accuracy of upper range

o 0 to 25 psi range, +/- 0.25% accuracy of upper range

o 0 to 50 psi range, +/- 0.25% accuracy of upper range

* Flow orifice

o 70 gpm to 900 gpm, +/- 0.25 % of measured velocity

" Thermocouples

o 32 *F to 1652 *F range, +1- 3 'F, LabVIEWTM verified to ±5%" Temperature probe

o -40 CF to 1999 *F range, +/- (0.1% reading + 2 'F)

o -50 to 300 °C range, +/- I °C

" NI LabVIEWTM data acquisition system, (version controlled by [Ref. I])

o Real-time analog data acquisition system, allowing continuous display of test parameter

values and trends. Data is sampled every two seconds, and averaged over the previous

10 data points. Test data is recorded for each instrument in a simple spreadsheet for

later analysis.

* 5-micron nominal filter bags

* Digital Caliper

o 0 to 6 inches, +/- 0.001 inches

Page 16: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Commercially Available Tape Measure

o 0-25', 1/16t inch divisions

o 0- 12', 1/32th inch division up to one foot, I/I 6th inch division after one foot

8.0 TEST ACCEPTANCE CRITERIA

In accordance with the test objective, the acceptance criterion for this testing is to conduct the fiber

bypass test in accordance with applicable test procedures outlined in this document and to successfully

collect and record data. The duration of the test shall be no shorter than 13 hours.

8.1 Fiber Bypass

Fiber that bypasses the test strainer will be collected continuously throughout the test, examined and

quantified at the conclusion of testing.

8.2 Head Loss

Head loss measurements will be recorded continuously throughout the test and are used to determine

the stability of the debris bed before ending the test.

To prevent structural failure to the prototype or tank system, a head loss limit of 6 ft-water will be

imposed during testing. Above this head loss, the Test Module, tank pump, and other components may

become susceptible to fatigue or failure; therefore, the head loss across the debris bed should not

exceed this value. If the head loss approaches this value, the flow rate of the system may be reduced to

maintain a value slightly less than the limit.

8.3 Testing Stabilization Criteria

The head loss measurements for this test will be continuously recorded by the data acquisition system.

The test will be monitored by lab personnel and measurements will additionally be recorded manually

throughout the test. There are multiple stabilization points throughout the test, each with a particular

level of required stability. The criteria are listed in the following sections. Note that pool turnover

times are based on water level and flow rate, and must be calculated separately for each addition.

8.3.1 Step Stabilization Criteria

At least 5 pool turnovers must occur after the end of the debris addition and before the beginning of

the next debris addition.

At the completion of each fiber addition step in the test matrix, settled debris shall be agitated manually

with the intent to ensure that debris reaches the strainer module and that no significant quantities of

debris are allowed to settle elsewhere in the tank environs. However, manual agitation shall continue

only until further manual stirring has no noticeable effect on the system head loss or the amount of

settled debris. Agitation may be provided through use of a wooden oar or through temporary

Page 17: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Q) Crystal River 3: Bypass Fiber Quantity Test Plan

SL I 0 iN Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 17 of 20SCIENE A• . rCHNO OGY

adjustment of the mechanical mixers. Supplemental agitation shall be conducted carefully to avoid

disturbing the debris bed on the strainer module.

8.3.2 Final Stabilization Criteria

Manual agitation of settled debris will be done to ensure all debris reaches the strainer. Additionally,

head loss stabilization may be required by the test coordinator. The test can be considered complete

after the following criteria are satisfied:

* The bypass test has to have run for at least 13 hours.

* A minimum of 6 hours have elapsed since the last debris batch was added to the tank.

" During the first 2 hours of the 6-hour hold, the filter bags must be switched out every 30

minutes (this results in at least 4 filter bags being used for this step) and once every hour after

the 2-hour hold.

* Two consecutive filter bags appear to be clean during or after the 6-hour hold (e.g. No visible

fiber, etc.). These filter bags cannot be the filter bags changed out during the first 4 hours of the

6-hour hold.

8.4 Test Termination

The following cases require that the test be immediately terminated and the pump secured OFF to avoid

equipment damage or personal injury:

a) The head loss across the debris bed should not exceed 6 ft-water. If reached, the flow rate will

be reduced as specified in the test procedure. If reducing the flow rate as specified fails to

maintain the head loss below 6 ft-water, the test must be terminated and the pump must be

secured OFF.

b) Any catastrophic system failure, such as loss of power or equipment malfunction (for which no

spare is available), will require test termination if deemed necessary by the Project Manager or

Test Coordinator.

9.0 TEST DOCUMENTATION AND RECORDS

The test specific procedure and Test Matrix provide the instructions for performing the required test

steps and the associated signatures provide documentation for the performance and witnessing of

critical steps. The test specific procedure also provides a test log, which is used to document significant

points during the performance of the test.

The Test Equipment Verification Procedure [Ref. 2] provides the means to verify the calibration and

setup of each instrument before testing to ensure error-free data acquisition. Furthermore, the

Page 18: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

0) Crystal River 3: Bypass Fiber Quantity Test Plan

LA, L N,!'o 0 -N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 18 of 20

procedure is run again near the end of testing to check for instrument failure or inaccuracies produced

during testing.

Other test laboratory procedures are provided in Section 6.0.

The test logs are used to track the overall progression of testing and not used as safety-related

measurements. The data file recorded by the data acquisition system is used for all stabilization

calculations, post-test analysis, trending, and application. The Fiber Bypass Report will further clarify

how the test data can be utilized.

10.0 DEBRIS HANDLING REQUIREMENTS

This test plan identifies a test matrix using fiberglass. All appropriate MSDS shall be followed and the

following will be used when handling (preparing, mixing, and adding into the test tank) the materials:

* Safety glasses with side shields or goggles,

" Cloth or Tyvek® laboratory coat,

" Dust mask with a N95 rating similar to 3M Model 8210,

* Latex, nitrile or neoprene gloves (leak check gloves before use),

* Long-sleeved shirt and long pants (recommended),

* Fire extinguisher with water, foam, carbon dioxide or dry powder, and

" Filled eye wash station in proximity to debris.

None of the testing debris is directly harmful under normal testing use (submerged in the test tank

water); therefore, the above personnel safety equipment is unnecessary between debris additions or

preparation.

11.0 QUALITY ASSURANCE REQUIREMENTS

The test program is developed, implemented, and maintained in accordance with the Alion Science and

Technology Innovative Technology Solutions Operation (ITSO) Quality Assurance (QA) Program for

nuclear safety-related services. Those processes that affect the quality of the output are identified and

controlled by project specific procedures.

The goal of the testing program is to develop bypass data that may be used to support safety related

analyses; therefore, the data shall be obtained and developed in accordance with the Alion ITSO

IOCFRSO Appendix B QA Program. Although this test is designed to measure the quantity of fiber that

bypasses the strainer, head loss data will be monitored to ensure strainer integrity is maintained and

therefore the Alion QA program will be followed. Materials, parts, and components used by the testingprogram do not perform safety related functions and are not designated for installation and use in

nuclear facilities. The data developed from the testing program, however, will be used to validate the

Page 19: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

performance and/or form the basis for design of components installed in a nuclear facility. Measuring

and test equipment is calibrated in accordance with the ITSO QA Program.

It should be noted that the performance or critical characteristics of the test apparatus and equipment

are not the same as that required for a nuclear safety-related system (i.e. not withstand a design basis

accident); however, to ensure a quality output, the input and process will be controlled in a quality

manner. Those processes that affect quality will be identified and controlled by project-specific

procedures. Those processes that affect quality are preparation of test specimens, measurement and

test equipment (procurement, calibration, and data collection), and test operation.

The fit, form, and function of materials, parts, and components used for testing and analysis by Alion are

controlled by specification to ensure the required design characteristics are established to duplicate

and/or model safety-related nuclear components. Certificates of conformance and compliance may be

used to document specification or design compliance for materials, parts, or components. Debris

materials tested are supplied commercially from original equipment manufacturers.

Page 20: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

aCrystal River 3: Bypass Fiber Quantity Test Plan

L I 0 hN Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: 20 of 20

SCEtNCE AND TECHNO OGY D c m n o LO

12.0 REFERENCES

Current revisions of all Alion procedures shall be used.

I. ALION-PLN-LAB-2352-003 - Hydraulic Testing of Debris Program Description: Test Tank,

Revision 6, 1/9/09

2. ALION-SPP-LAB-2352-13 - Test Equipment Verification Procedure

3. ALION-SPP-LAB-2352-70 - Filter Bag Preparation and Processing Procedure

4. ALION-SPP-LAB-2352-45 - Test Tank Draining and Cleaning Procedure

5. ALION-SPP-LAB-2352-44 - Test Tank Fill Procedure

6. ALION-SPP-LAB-2352-46 - Test Tank Debris Head Loss Procedure

7. ALION-SPP-LAB-2352-21 - Test Lab Safety Procedure

8. NEI 04-07, Volume I, "Pressurized Water Reactor Sump Performance Evaluation Methodology,"

Rev. 0, December 2004

9. NEI 04-07, Volume 2, "Safety Evaluation by the Office of Nuclear Reactor Regulation Related to

NRC Generic Letter 2004-02," Rev. 0, December 6, 2004

10. Enercon Design Input Letter, FPC-121-LTR-001 Revision 3, October 22, 2012 (Included as

Attachment A)

II. NUREG/CR-6224 "Parametric Study of the Potential for BWR ECCS Strainer Blockage Due to

LOCA Generated Debris.", October 1995

12. Nuclear Energy Institute, ZOI Fibrous Debris Preparation: Processing, Storage and Handling

Revision 1, January 2012

13. NUREG/CR-6808 "Knowledge Base for the Effect of Debris on Pressurized Water Reactor

Core Cooling Sump Performance," February 2003

14. ALION-PLN-ENER-8706-01, Revision 0, "Crystal River 3 Top Hat Strainer Bypass Testing for

ENERCON"

Page 21: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Appendix I - Calculation of Testing Parameters

Inputs:Net surface area of 38 in. test top hat = 14.70 ft2 [Ref. 10]

CR3 total plant strainer screen area I 139 ft2 net [Ref. 10]

Maximum Sump Flow Rate during Recirculation = 8696 gpm [Ref. 10]

NUKON Insulation =10 ft3 [Ref. 10]

Latent Fiber = 30.0 Ibm [Ref. 10]

Maximum Containment Water Volume = 71936 ft3 [Ref. 10]

Strainer Area Obstructed by Miscellaneous Debris = 89 ft2 [Ref. 10]

Tank volume = 37.5 gallons/inch (approximately) + 150 gallons (piping volume)

Determination of Test Tank Flow Rates

The total strainer area obstructed by miscellaneous debris identified in the Design Input Letter is 89ft2. Therefore, the total surface area follows:

Crystal River 3 Plant strainer net effective screen area = I 139 ft2 -89 ft 2 = 1050 ft2

Scaling factor (Test Surface Area / Plant Strainer Screen Area) = 14.70 ft2 / 1050 ft2 = 0.014

The testing flow rate and approach velocity are determined by the following formulas:

The Approach Velocity is determined by the following formula:

App. Velocity = Plant Flow (gpm) / (Plant Strainer Area (ft2) * 7.48 gallon/ft3 * 60 sec/min)

App. Velocity = 8696 gpm / (1050 ft2 * 7.48 gal/min * 60 sec/min)

App. Velocity = 0.0185 ft/s

The Scaled Test Tank Flow is determined as follows:

Scaled Test Tank Flow = Plant Flow x Scaling Factor

Scaled Test Tank Flow = 8696 gpm * 0.014

Scaled Test Tank Flow Rate = 121.7 gpm

The flow is rounded up to the nearest gpm for practicality in testing therefore, 122 gpm will be used.

Page 22: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

S 0.0140 j 1050 1 0.0185 1 22 1

Determination of Plant Concentration and Batch Size

The plant concentration is determined by taking the total debris transported to the sump divided by

the maximum containment water volume. This concentration is maintained throughout testing with

the exception of the last debris batches for each debris size. The initial batch (F. I) is calculated below.

The water level changes with each addition and therefore the amount of NUKON required to

maintain the plant concentration also changes. See the following calculations:

Plant Concentration = Total Transported Debris (ft3) / Maximum Containment Water Volume (gal)

Plant Concentration = 15.9 ft3 / (71936 ft3 * 7.48 gal/ft3)

Plant Concentration = 0.00003 ft3 / gallon

Initial Batch Size = Initial Tank Volume * Plant Concentration * NUKON Density

Initial Batch Size = [(54 inches * 37.5 gallons/inch) + 150 gallons] * 0.00003 ft3/gallon * 2.4 lb/ft 3

Initial Batch Size = 0. 16 lb

This batch size will model the fiber suspended in the sump pool.

Determination of Scaled Mass Values for Test Debris Loads

To determine the mass of NUKON for testing, NUKON plant quantities are scaled by volume then

multiplied by the density of NUKON (2.4 lb/ft3). The debris transport fractions are taken from the

Enercon Design Input Letter [Ref. 10]. The bed thickness is determined by dividing the scaled volume

by the strainer surface area ( 14.70 ft2).

For the "fines" generated in the design input letter [Ref. 10], 92% transport to the strainer. For the"small pieces" generated, 20% transport to the strainer, with 13% remaining as smalls and 7% of the

smalls eroding to fines. The latent debris source term is documented in the Enercon Design Input

Letter is treated at LDFG and will be scaled in the same manner as NUKON above.

Page 23: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Table A 1-2: Scaling Fiber for Test Quantities

*Latent fiber is treated as LDFG and scaled directly from the mass given as an input in the Enercon Design Input Letter [Ref. 10]. The volume is

calculated using the density of NUKON.

Table A 1-3: Test Matrix

F. I 122 0.157 0 2175 54.00 0.053 0.00003 0.03 6

F.2 122 0.157 0 2181 54.16 0.107 0.00003 0.03 6

F.3 122 0.157 0 2187 54.32 0.160 0.00003 0.03 6

FA 122 0.030 0 2193 54.48 0.170 0.000006 0.00 6

S.1 122 0 0.036 2199 54.64 0.182 0.00001 0.01 6

Page 24: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Attachment A

Design Input Letter

Page 25: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

E ,ENERCONEnercon Services, Inc.500 TownPark Lane, &dk 275Kennesaw, GA 30144-5509enercon.com770.919.1930

-770.919.1932fat

October 22, 2012FPC-121-LTR-001Revision 3

Ms. Megan StachowiakAlion Science and Technology15505 Howe St.Overland Park, KS 66224

Subject: Design Inputs for Crystal River Strainer Fiber Bypass Testing

Dear Ms. Stachowiak,

ENERCON is providing the following design inputs for Alion's use in the Crystal River StrainerFiber Bypass Prototype Test Plait

1. Conventional Debris Amounts for the Test Case:

The conventional (non-chemical) debris types, densities, and volumes generated for thetest case are documented M' M04-0004, " CR3 Reactor Building GSI 191 DebrisGeneration Calculation", Rev. 4. Inputs collected from calculation M04-0004 can beseen in Attachment A, Tables I and 2.

2. Debris Transport Fractions:

The debris transport fractions are documented in M04-0005, "CR3 ContainmentBuilding GSI-191 Debris Transport Calculation", Rev. 2. Table 3 of Attachment Adisplays the debris transport fractions from calculation M04-0005.

3. Hydraulic and Dimensional Parameters

The hydraulic and dimensional parameters that will be used for testing can be seen inthe table below.

Hydraulic and Dimensional Parameters

Input Value ReferenceTotal Net Strainer Surface Area (ft') 1,139 M04-0007. Rev. 5Strainer Area Obstructed by Miscellaneous Debris (ft2) 89 M04-0007, Rev. 5

Net Surface Area of 38 in Test Top Hat (ft2) 14.70* A4ION-REP-ENER-4724-07, Rev. 0

Maximum Sump Flow Rate Duinng Recirculation 8,696 M04-0007, Rev. 5Mode (gpm) 8,696 M04_07,_e._Maximum Containment Water Volume (ft3) 71,936 M90-0023, Rev. 13Minimum Test Submergence (fit) 0.6 ALION-REP-ENER-

4724-07, Rev. 0Test Strainer Head Loss Limit (psid) 3 S04-0006, Rev. 0

* ALION-REP-ENER-4724-07, Rev. 0 provides a net surface area of a nine (9) Test Top Hatarray. The value provided is the test array surface area, 132.33 f11, divided by nine (9).

Page 26: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

0 Crystal River 3: Bypass Fiber Quantity Test Plan

SC I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: A-3 of A-9

FPC-121-LTR-001, Rev. 3Page 2 of 2

4. Testing Termination Criteria

Testing termination criteria shall be in accordance with Section 6.5 of the revised draftof the Generic Guideline for Strainer Fiber Bypass Test Protocol (I 2f7/201 1) aspublished on the NEI Sump Performance Task Force website.

5. Gap Lengths

The test Top Hat shall be installed onto the test plenum such that there is a gapavailable for flow between the baseplate and the plenum (bypassing the perforatedplate). The height of the gap between the test plenum and Top Hat shall be 1/16"(+1/32", -0"). The total length of the gap on the interior perimeter of the Top Hat (i.e.,adjacent to a plenum cover plate) shall be 11-7/16" (±1/16"), which may be placed onany single interior side of the Top Hat. The distance between the test Top Hat and thecover plate adjacent to the gap on the interior perimeter of the Top Hat shall be 1/4" (+1/16", -0"). Also, the total length of gap on the exterior perimeter of the Top Hat (i.e..at the edge of the plenum) shall be 7-9/16" (±1/16"). See Attachment B for thedetailed calculation of these values.

Regards,

Kip WalkerMechanical Engineering Lead

Waqas AbbasiMechanical Engineer

Mechanical Engineering Manager

Poet Manager

Cc:Craig MillerWes McGoun

Enclosure: Attachment A - 2 pagesAttachment B - 4 pages

Page 27: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

0Crystal River 3: Bypass Fiber Quantity Test Plan

SI. I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: A-4 of A-9SCIENCE AND TECHNO OGDo cuetNo LO

FPC-121-LTR-001, Rev. 3Attachment A

Page 1 of 2

Attachment A: Tables of Calculation Results

Page 28: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

FPC-121-LTR-001, Rev. 3Attachment A

Page 2 of 2

Table 1: Fibrous Insulation Debris Source Term -LBLOCA (M04-0004, Rev. 4)Fines

Total Amn. (individual Small Pieces Large ExposedInsulation Type Destroyed fibers) (<6" on a side) (Uncovered) Pieces

Nukon 10 f? 2 f 8 e 0

Table 2: Latent Debris Source Term (M04-0004, Rev. 4)Latent Debris Type Mass (Ibm Density Size

Latent Fiber 30 94 lbm/t1 2.3 E-05 ft

Table 3: Overall Fraction of Debris Transported to Sup (M04-0005, Rev. 2)Debris Type Size Transport Fraction

Individual Fibers 92%20% (7% as individual fibers, 13% as

Nukon Small Pieces (<6 inches) small pieces)Pieces (>6 inches) 12% (9/o as individual fibers, 3% as

Large Pis(large pieces)

Latent Fiber Individual Fibers 100%

Page 29: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

F3 ENERCONFPC-121-LTR-001, Rev. 3

Attachment BPage I of 4

Attachment B: Crystal River Nuclear Plant Bypass Testing Total Test Gap

Oripinator: A I4/ t. Date: /0/2//Kip Walker

Reviewer: 2 Datei•: In/2/AI2.Priya Chhiba

Page 30: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

FPC-121-LTR-001, Rev. 3

FrtIF~flMAttachmnent B• NE O •Page 2 of 4

Objective

This attachment provides a calculation of the total gap length that may be used in the strainer bypasstesting for Crystal River Nuclear Plant (CR3).

Design Inputs

1. The following dimensions were used to calculate the total amount of gaps that could potentiallybe present in the installed configuration at CR3:

a. Any gaps or opernigs between connecting parts of the srainer that provide entry to thestrainer internals shall not exceed 1/16' (Ref. 1).

b. The baseplate of all Top Hats is square with a side length of '-2 1/2" (Ref. 3).

c. The total number of Top Hats is 32 (Ref. 2).

d. The total number of interior Top Hat sides is 112 (see Assumption 5), and the totalnumber of exterior Top Hat sides is 16 (Ref. 2).

e. Thewidthofthe sumpis4'-l1 3W while the lengthofthe sumpis 10' (Ref 6)

2. The net strainer surface area is 1,139 ft2 (Ref. 4) with 89 ft2 of area obstructed by miscellaneousdebris (Ref. 5) which results in a total net strainer surface area of 1,050 ft2 .

3. The net surface area of a single 38 inch test Top Hat strainer module is 14.70 ft2 per Item 3 of thisletter.

Assumptions

I. It is conservatively assumed that all of the gaps between the sealing plates and the plenums aswell as the clearance between the Top Hats and the plenums are equal to the 1/16 in. clearance asspecified on Drawing PGENCRO04-C-00I (Ref. 1). The clearance specified on this drawing isthe maximum allowable clearance. Most of these connected components are expected to havelittle or no clearance between the connected components.

2. Progress Energy directed ENERCON to use 50% of the total gap length in the testing based onthe following rational. When mating the Top Hat to the plenum or the plenum members to thesunp wall, the areas around the bolts are assumed to be in direct contact. The maximum gapdimension of 1/16 inch would be present at the rmidpoint between bolts, forming an isoscelestriangle with a height of 1/16 inch. This is mathematically equal to 50% of a rectangular 1/16inch gap area For practical purposes, a rectangular gap will be used in testing with 50% of thecalculated total gap length.

Page 31: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Crystal River 3: Bypass Fiber Quantity Test Plan

A L I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: A-8 of A-9SCIIENCE AND TECHNOLOGY D c m n o LO

rj ENERCONFPC-121-LTR-001, Rev. 3

Attachment BPage 3 of 4

3. It is assumed that the bypass amount could be different for a Top Hat gap that is adjacent toanother Top Hat (interior) versus a Top Hat gap that faces a relatively open volume (exterior).Therefore, these gap lengths will be totaled separately, and the ratio of the two values will beused to scale the interior and exterior gap lengths for testing.

4. It is assumed that a gap between the plenum members and the suinp wall would have very similarbypass amounts as an exterior Top Hat gap. Therefore. the sump wall gaps can be represented inthe test by an exterior Top Hat gap.

5. The Top Hats on the South Side of the sump pit are close enough to the sump pit wall that theyare assumed to have a bypass that is similar to interior Top Hats and will be included in the countfor this category.

References

1. Drawing PGENCRO04-C-001, Reactor Building Sump Strainer Notes, Rev. 1

2. Drawing PGENCRO04-C-002, Reactor Building Suwp Strainer Plan & Sections, Rev. 1

3. Drawing PGENCRO04-C-006, Reactor Building Sump Strainer Top Hat Assembly, Rev. 1

4. Calculation M04-0019, RB Sump Screen - Clean Sump Screen Head Loss, Surface Area,Interstitial Volume, Rev. 1

5. Calculation M04-0007, CR3 RB Sump-Head Loss Calculation for Debris Laden Screen, Rev. 5

6. Drawing SC-521-038, Reactor Building Sump Liner, Screen & Coves Plan, Section & Details,Rev. 11

Calculation and Results

The gap lengths are calculated by multiplying the total number of Top Hat sides for each category by thelength of the Top Hat side. The interior gap length is calculated as follows:

I

112 * (1f t + L-f) = 135.33f t

The exterior gap length is calculated as follows:

16 - (1ft +•-ft) = 19.33ft

Equation 1

Equation 2

The gap lengths between two adjacent pieces of the plenum or between the plenum and the sump wall iscalculated based on 4 gaps along the width of the plenum and 5 gaps along the length of the plenum asshown in Reference 2:

Page 32: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

kAENERCONFPC-121-LTR-001, Rev. 3

Attachment BPage 4 of 4

4(4ft +-- f t) + 5coft) = 69.92

Table 1. Installed Plant Strainer Gap Lengths

Gap Length(ft)

Interior Top Hat Gap 135.33Exterior Top Hat Gap 19.33

Sump Wall Gap 69.92Total Gap 224.58

Equation 3

The linear gap lengths to be used for testing are calculated by scaling the gap lengths in Table 1 using theratio of the total test strainer surface area (14.70 ft2) to the total net strainer surface area installed in CR3(1050 ft2). Equation 4 shows the methodology for calculating the total test gap length.

Test Gap Length = Plant Gap Length × Test Strainer Area 14.70 ft2

Plant Net Strainer Area = Plant Gap Length x 1,0 Equation4

Table 2 presents the total gap length to be used for testing. The table presents 100% of the scaled test gaplength and the value for 50% of the scaled value for test gap lengths. Note that there is some discrepancyin the presented values due to rounding errors.

Table 2. Scaled Test Gap Lengths

100%Plant Gap Scaled Test Scaled Test

(0t) Gap Gap (ft)

Interior Top Hat Gap 135.33 1.90 0.95Exterior Top Hat Gap 19.33 0.27 0.14Sump Wall Gap 69.92 0.98 0.49*Total Gap 224.58 3.14 1.57

*Note that this value will be combined with the exterior Top Hat gaps

in the testing (see Assumption 4)

Page 33: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Attachment B

Table 3-2 of NUREG/CR-6808

Table 3-2 Size Classification Scheme for Fibrous Debris'No. Description

I Very small pieces of fibergfass matmial; "micrusopidc fines that appearto be cyinders of varying ID.

2 Singbe, flexible strands of fiberglass; essentlally acts as a suspendingstrand-

3 Mutlple attached or intenwoven strands that exhibit considerableflexibility and that because of random orentations induced by turbulentdrag, can exhibit low settling velocities.

4 Fiber dusters that have more rigidity than Class 3 debris and that reactto drag forces as a semi-igbd body-

5 Clumps of fibrous debns that have been noted to sink when saturatedwith waler. Generated by diferent methods by various researchers buteasily created by manual shredding of fiber malting-

• larger dumps of fibers lying between Classes 5 and 7.

7 E - Fragments of iber that retaain some aspects ofihe original reudangularcansoucti"on of the fiber matting, Typically precut pieces of a largeblanket to simulate moderate-size segments of original blanket

Page 34: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

WCrystal River 3: Bypass Fiber Quantity Test Plan

CIE 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: C-I of C- I

Attachment C

Vortex Strength Scale

~ci

I -~

9

'/I..

r0 4

C. '-7

SU"'C D'.. L

1.J. 'Z7 A.Tt'.

-0 T= FJLI. r

FIG.URE 0 VOp'rEX FTMAIGTH SCALE-RJR mNrKF, ;rLjjy

Page 35: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

Crystal River 3: Bypass Fiber Quantity Test Plan

SCIEC LAI0•D oEoNOO N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-I of D-I0

Attachment D

Material Safety and Data Sheets

Page 36: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

0Crystal River 3: Bypass Fiber Quantity Test Plan

A L I O N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-2 of D-10

SCIENCE ANDO TECHNOLOGN

NUKON

Page 37: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

I I0 Crystal River 3s: bypass rider Quantity I est Plan

SCIENCEA 0ECH N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-3 of D- 10

Material Safety Data SheetMaterial Name: 700 forsi Board MSM Nol: S-MD- 1702"1-1

SSction 1 - Chemical Product and Company Identification *

Product Namejs); 700 Seres Board AF 220 AF 500 Seties, AT-400 Sweri Equiprent & Appliance FbricatpDro Board

F~berglass Basic for Modwng. Fle~t'Map, InutQi-Ou jet-Cel Acoustical Muffier Paclkng Nt#~on',' insAaton Uar*sPipe & Tank Inpugn, Railroad SCR Board. Select Sound Saned Acous.ical Board SR & HT Rwc. TIW Ther m-allnskilatinon al Trwlsportatkori Type. 1000

CMen-s CormnOne Owens Coring Pw•oa, WaN lw ieaoquwfsAtt Prodtuct Sterardsh pToledo, OH 43659 USA

Emergency Contacts:Erergenoes ONLY (after 5pm ET and weekerds; 1 419-248-5330CH1iEMTREC (24 hours everyday 1-800-424.930O

CANUJTEC (Canwa - 24 ho everday: A13 ý96 666

Health and Technical Contacts:Healri lssLms Infowmation (Sam-r5n ETp 9800-GET-PlNKTechnical Product Ilnfrmation iSarr5pm ET) ' 80-GE3T-PINK

J ........ ** *Section 2 - Coqmpoition I Informnaio on Ingredients* "

.AS .Component P.rcen ..t bywt-

65997-17-3 FDer Glass ~AbU- 898bos -a251 0-55-6 UeaY'TImer With formaldehyde and penol 4-15

Component Related Regulatory InformatlonThu prxliuct mnay b~e re.9ulated 1O haeeXPOSLIlIre i's or other intcirnlat an iderilified as it- P otloung F iber Glasswoo. Fdxous gtass Nuisance ýpartculates

Component Infortaftn/Vnformatwon on Non-Hazardous ComponentsNo a&.ttoral inofomaticn avxljatýe

I * Section 3 - Hazards Identification

Appearance and Odor. Pinlr yellow or tan fibrous materia wmt, fait resin odor Some prooucts nave a i brownpaper foifl or polypropylene fatý'nq

Emerglency Overview

Potential Health Effects

tntalathon:Dusts a-nd fibe-s fromrT this product may caust, mrecnarncalIcritation, of the nose, throat ai eprtr rc

P• 1 " of g Issue. 1)xi? No®rt America English

Page 38: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

* Crystal River 3: Bypass Fiber Quantity Test Plan

L I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-4 of D-10

Material Safety Data SheetMaterial Name: 700 Series Board MSDS No.: 15-MSO1 1700I01.IM

Skin Contact:Dusts and hbers from rtis prfo. cause temporary mecanical ritation to the skin

Eye Contact:Dusts and ftiers from this product may cause temporary mecanircal irritacton to the eyes

ingsto of this rodut• is unitikely Howtever. inge-tion of prodc may proou~e gatroSritest!!linal imato and

Medical Conditions Aggravated by Exposure:Chronic res~fatoiy or Oin conditions may tempoirarly wioren frm exposure to "neX prdut

Section 4 - Firt Aid Measures •

Inhalation:If italed remove t affeteo person to fresh air it imtaon grs et medical aenon

Skin Contact:For skin co.tact wash wvir mild soap and ruining waler Use a washcloth to he'p remove fiters To avoid furtherirritaton, do no lt ib or soratch' affeclad areas Ri*nbr~ig or scatc hingý mawy forCe fber-s ito" the skin It irntatlonpersists get mnedica altention

Never use compressed air to remove fliers from the skin, 1f fters are seen penetrating ftrom the skin, the fibercan be removed by arply•ng and rmoving adhesive tiO so that the fibers achere to the tape and are pulled otof the ski,

Eye Contact:I-mmeiately flush e wit plenty of running water for at least 15 minutes If irritation persis get medicalattention

Ingestion:ingestion of thii materal is uritily1 IV it des occur watch the person for seveal days to make sie that partialo- complete •ntestinal obstT,ýlion does not occur Donot irnuce vomit;io unl•ss do•eircd Ioc ds o by medcalpersoninel

• * Section 5 - Fire FIgthting Measurs*

Flash Point None Flash Point Method- Notappi"abeUpper Flammabtity Limit Not applcwdle Lower Flammability Limft: Not appicabe

Flammability Classificatio: Nonitanimtle

Extinguishing Media:Dry chemcal floam carb ioxide, water fog

Unusal Fire & Explosion Hazards:Thtse products avy ereas acriid smoke in a susta fire

FlereFl•bt •png Instructions:Use self-conitained breaithing apparatus (SCE5A anrd 'S.I bunker turniout gear inl a sustafned fire

pa 2 Of 9 ssje Uate 12)121'ý3 Page~) f 9isse Dta 212)03North America -rngfsh

Page 39: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

I I 1%. - n~ rL~ ~ r~ nI~

9 Lrystai Risver I: Bypass rider Quantity Iest rlan

K L N0I ., 0 O N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-5 of D- 10

Material Safety Data SheetMaterlal Name: 700 Series Board MSDS No: 1ISO- 1T020-01-M

Hazrdous Combustio Products:Pnrmary combustion produict afr cart" ryiw oxiode carborn dioxide ammrnia, ard wawr Other ,udetermineoWopounds coulO be reased In smai uant•iues

Section 6 - Accidental Release Measures

Contalameot Procedures:This mate••l settle oii of the afr If concentrated on land it can Then ,e swo,)Pe u for disposal as a non-hazardous waste This mallnwWt s Sink and disperse along te io•tlto • wao e ways and ponds It can-no easilybe removed anfer it is walibome owvver tie material is r on-hazadus t water

Clean-Up Procedures:Scoo up material WC pull ito a sjuieoe container for disposal as a non-rarardous waste

lResponse Procedures:Isolate area Keep unnec y wersonncl awvy

Special Procodures:None

" Sectlon 7 - Handling and Storsla •

Handling Procedures:Keep proxluct in its pacnaging as long as practicable to mrirumze elntiar dust generaton Keep work areasclean Avoid unnecessary of scrap materials

Storap Procedures:Material should be kept 7y and uncercover

S* ction 8 - Exposur Controls I Personal Protection

Exposure Guidellins:A: General Product Information

Folow at applicabie exposure Imrts

B: Componeln Exposure LmntsACGIH and OSHA exposure fimit lists have been crecked for those componerts with CAS regstry -umbersFiber Glass Wool (Fibrous Glass) (G5 7-17-3)

ACGIM I f{cc TVVA for respirfae fioe Ionger than 5 uri %ilh a diraeer less than 3 Lir,(Listed unde, Syntthetc vitre•• us fiters") (related to Glass wool fibers)10 mg/hn3 TWA tinhvatee particulate). 3 ngIr-n3 TWVA esvrable particulate) (Thlese,values are fr Particuiae mraitter cDta ing no asestos and I", aystalline silicai(rel~atedl to P~afticulates rfbi otherwise dýassirfied iPNOC))

OSH-A I fitierccesirale TWA iat (See Note Belcwir ~rvilaed t- (3a,,w, l ib

Notes: ýa) Voluntary PEL was estab)stite b- the Nortt American ManufaCtures Association (NAIMA) and OSHAper tf al and SCfety Pan ersp Progcry iSPPi aeeme for SyI VltreuJs Fibes iSVF.

Page 3 of 9 Issue Datr Page3 ol9 I~ue ate 2~%23 Nrth A -nerica - Eng islh

Page 40: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

I I - -- - - E ~ ~ ~ ~ flL...9 lrlStLI I•iver I: Bypass rioer Iuantity i est riP"

VWSCIEC 0N TCNOLG Document No: ALION-PLN-ENER-8706-02 Revision: 0 1Page: D-6 of D-I10

Material Safety Data SheetMaternal Name: 700 Series Board MSDS No,: 1s-MSo- 1702001-M

Ventilation:General ddiluon ventilatici aý ior cal exhauist vertilation should e providd as necessary to maintainexposures belov regulatory limts Dust collertion Vsyterns should be used in opatlns involving cutting ormachining aid may be recured in operations using pner foqls

PERSONAL PROTECTIVE EOUIPMENTRespiratory Protection:

F|beGIassQ j if thermal decomposition proauts are not antcipaled, a praterl fi ed NIOSHI or MSHAapproved N series e dust reptr suh as the 3M modei 8210 7 mo 8271 vi U h dityenvirornrents) or equivalent shouxt be used when high -rUSt i• s a rOr-t , the level of glass ftbrms inthe air exceejs the occLrpatinal exposure Imits, ritilio ocr) s o. insalklng or emivinq any of these prxodcsin ,ony ventilated spaces As an extra precaoion y iu may t-ro but are not -euired to whar a dispfsabledust respirator at alt tfimes

Hot Use Applications: ,en the lemperature of Ite suýrce berig isulated exceeds 25'rF 12 M0C) lncu•ginitial system sartup te bi nder fn thee prDucts may un dergo var;iJs degrees of decompositiuon epending onthe temperure of the application The need for respe'atory protection will vary accoreing to the airborneconcentration of the decomposition products reea• d a accumated in the area

If the- insulation s installed or h ot sur faces aibove 2O57 T2 1-,~ bit below 69.0,r i343"C, a futll-ace, respiraitowIih cartridges approved for protection against organic vapors (or formaldehyde I availaUbe) should be s I-areas with good general andior local eoxtast ventilatron where exposwes are ýcntrotleo below the formadehydecarbon mornoxie and arvnmoia PEL or STEL and additive e ae been factored in then respiratoryprotecti, n is rmally not needed

form1jajtoe e In some nriig temperature aplicaticns these p7oducts may iniially elease corn•c tio" Offormaldehlye equat to or greater than 0 1 ppm but es tan 0 5 ppm Airborne concentratcins should beassessed to deltmine the appropriate type of respiratory protectio 1 to be used vit-en doubt, use sucpliea arrespiratory pfotec-tion

Ammonia Significant a f amm nia y be raSed initialy in high tlemerature app~lcatlons. Ammoniahas goaxd wmng prope-ties and any resp,rator weefef experier.cn irtaiori while w-aring ra al purigingresp rator sh-uld leave .area

Simultaneous respiratory proteaion against forma&ldeyde and ammronia requires use of a supped air system Acareful assessent of the w place enonme sul be made to deltfrmn tie appropriate respiratoryprotection required If air -pj ifytng respirator is uset for Iammona protectiont should be I face w!thctgeacppoved for ammornia

Carbon Mooxide Reiratory otection enerally requres a supe air s Caronmonoxdeas poor

Use respiratory protefton i-n accordalnce wim respirtor manufac••urers ins•r•Ctions and in .ccordnrce with yourcompany's respiratory proteto program lcal eqratinari OShA regulatidri unde 29) CFR i9i0 134

Skin Protection:Normal wor cothin on sleeved stirt IOro pa-tss amd gqovesý is recormmended %kn mtatiori is krowri tooccur c-iefy at the pressurP s such as arou r -e cec-, 4rsts wa&st a-d between the f ngers

Eyes/Face ProtcIve Equipment:Wea safety glasses g l or face shield

Page 4 of 9 I t j Dnli,:1 222t03 Page4 01Y lsue Dte 12203Nort AmetIca - gtislh

Page 41: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

* Crystal River 3: Bypass Fiber Quantity Test Plan

C L NI 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-7 of D-10SCiIE E AND TCNNOLDGY

Material Safety Data Shoot

Matera "na : 700 Series Board MSDS No.: 115-.IlS 17020-01-M

Section 9 - Physical & Cheml"l P es •

Appearance: Fibrlous Odor: OrganicPhysical State: Soed pH: Not applicable

Vapor Pressure mrin Hg a Vapor Density EAirI): Not appicable20 C): Not applicable

Boling Point: Not applicable Solubility (H20): InsolubleSpecific Gravity Freezing Point Not apclicable

(Waterml): Not apphlic*eEvaporation Rate (n-euqy Viscosity: Not applicable

Acetateal): Noit applicate

Physical Propeies: Additional informationNo addiltioal informAion avaitanle

Section 10 - Chemical Stably & Reacttvty Information

Stability:This is a stabl materit

Conditions to Avoid:None expected

lIcompatible Materials:None exlpeded

Hazardous Decomposition Products:Prirmay combustion Producs rPe ca(rbon monoidcwap rbon dotOe de amnonra and water Other unreterminedcompounds could be release in small quantities

Hazardous Polymtrizabon:Mrl occur

Acute and Chronic Toxicity:A: General Product Information

Du•sts may cause mezhanical irriacon to eyes a!n siri Ingestinn may cause transient rritation of tir•o•t, stomachand gastrointestial tra<ct Irnalation may case coughing nýose aod Vroat irtaton arid sneezing Higherexposures may cause idifficujlty breathingconetl and chsttihtl s

If tIS product is subjec to high temperature processing ow ir ouctI is appliM to n surtaces, tormaicehyde gasmay be released Ammonia gas and carbon rornode may atso be rfeeased Formaloehyde may irtate V ¢ý;-nthe skin and eyes Fomildehyoe is a lung sensitzer causing an astrma-like allergy ftre exposures mayca.se alleirgy attack~s w*th shortness of breath, wheezing. coi.ghing and ciest gtitnes5 Repeated exposujre moycause tronchi.s Fomialdehy may cause allergic skin sen"uzwjao. reactons Ammonia gas carn cauterespiratory tract anrd eye rntation Breathing carbon rican cause headaches na us•seea dizziness and canbe faat at high conrce-,ntons

pap 5 of i igejo E)ntr- 12Z'03 Na thAnmrica Fng sh

Page 42: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

I - -. - - -- .- ~.---~ ~ Ii..=

All Crystal Klver 3: Bypass rider Quantity I est ria"

/i L I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-8 of D- 10SCIE CI AND TECHNOLOGY

Material Safety Data SheetMaterial Name: 700 Series Board MSDS No.. 165-SD- 17020-O1-M

B: Component Analys - LDSOILCSOUrea. polymer with for-aldehyde and phenol (261046554)Oral LD50 Rat 7 gmlkgOral LDS0 Muse 7 gmftvg

C: Component Analysis - LD 0LC For ChemIcals Which May Be Released During UseAmmonta (766441-7)hhla!laon LCS0 R•at 2000 pJpm4H

Inhalat•on LCS0 Mos 4230 ppm/riH

Carbon monoxide (130-N-01Inhatin LC50 Rat 1 B07 n41Inhti•n LCSO Mouse 2444 ppmi/4H

Fonaldelty (660.)

Flow-thwougtiLC50 Fathea Minnow 24 1 maL 9 PhrFlow-through LC50 BtImgill 0 10 intLq (96 hr

Fib•l glassf Wo In Octote 2001 the Intern•aWioral Aygecy f-r Research on Cancer (IARC) dass)fedý fiberglass woo0 as Group 3 no: classirfiale a8 to rts carcinogenhietyto hmarns' The 2101 decision was batsed onhuman studies and anima! research that have not shown an association between inhalat•on expostue to dust fromfiber glass wooi a the devemvent of respiratory disease T-is cication repla--es the IARQC finding i 1987of a Group B designation 'possilY C n e humans'

In May 1997 t1e American Conterence of Govemmelnw IqCustrial Hygr),nits (ACGIH) adopted an A3 carcinogenciasfication for gass wc4 fibers The ACGIH A3c- assiftation onsrwders g!ass wool to te cwciogemc. kiexpenmental anerras at reatively high doses by routeS of adrimnstrion., at sries or by rmeCriSns that it doesnot cont rerl'elvant to Wioft(8r exiposure It also feveviewed the availatle &pKlemiolog~rA4 stutties and ocuethat they co not confirm an inmased risk of cainer In exposed hMans Overall tte ACGIH fcund that theavailable rnsdiciasciermfic evidence suggests !a glass wool %s not I*eioyto cause cancer in hvmans excertunder un;ommn or unlukely -outes or l-vels If exLpsjue

tIi 1994 the Nationa! Toxicoioy ProgramW NP c •asstied 9gass wool (respiabei sin as aeaso ntabyl ciptedto be a human carc'iogen- Ti cla was primrily based upon the 1987 iARC classification NTP iscurery onsiderng reclassify;ng this material

Carcinogenic"t:A: General Product Information

No infoirmaion ava-latite for the product

13- Comfponent CarelnoegwlicityACGIIH IARC OSHA and NTP carcinogen hsts have been checked for those components with CAS reg itr'ynumbetXrs

Fiber Glass Wool (Fibrous Glass) (6997-17-3)IARC Group 3 Iasslfible as t is car,,rogenicty to hm s irelated to Classwool

October 20101 MeetingACGIH A3 - animal carr -ogen (relateu to Gass wool f be-s)

NTP Reasoably ant cpated to ie a humra carcnogen tri, to qlasSwoo I pcssibksaedec car, lgeli),

Pap ý) o 9 Isq l;ouPe' ', Y217 3 Page6 0 ~lIss* Dae I2~2J 3North America Fngili-0

Page 43: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

*D Crystal River 3: Bypass Fiber Quantity Test Plan

AL I O N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D-9 of D- 10

Material Safety Data Sheet

Makterfl Name: 700 Series Board MSDS No.: 15-MSD- 17020-01-M

Section 12 - Ecolo al Information

No data avaiabIe for this product This materal is ri•ot exc to cause •arm to animals pl3~s or fish

* Section 13 - Disposal Considerations N,.

US EPA Waste Nume & Descriptions:A: General Product Infomiation

This rrodtt if liscarded, is not expected to be a chactenristic hazardous waste ý-Ler RCRA

: Component Waste NumbersNo EPA Waste NOmesP ar p a :p-ptle for tS p-ouct 5 crmlponerts

Disposal Instructions:

Dispose of waste matenad accordg to Local State F edea.. and Prov;inca Evl ti Regulations

S* ** Section 14 - Trans tin Informaion

US DOT InformationShipping Name: Nor regulat-C for transWrrHazard Class: NoneUWINA I: NonPacking Group: NoneRequired Label(s): None

TOG InfomationShipping Name, NA regt jf tranpoHazard Class: NorneUNINA #: NonePacking Group: NornRqired Label(s): NoneAdditional Info.: None

Additional Transportation Regulations:No addiuonal irrnimatlorm ayai;abie

Section 15- Re torynformaon

US Federal Regulations:A: General Product Information

No addional frmaton aorm~ab4e

B: Component AnalysisThis rmateral c.ortatns one or more ofthe f olonh required Co be iKjeýed u"lder SARA Section 302(40 CFR 355 Aperdix A) SARA Section 313 140 CFR 372 65) aridor CERCLA t40 CFR 302 4).None

Page 7 of Issue DaW 12ý22)03 Page7 of9 Isue Lste~12/2-034;4 America ý ngt91sh

Page 44: A L IO N TECHNICAL DOCUMENT COVER PAGEA L IO N TECHNICAL DOCUMENT COVER PAGESC ,rwL ,I U Mf~oo, Ot Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page Il of 20 Document Title: Crystal

9 C.lrystal River 3: bypass riler QuanILILy i L ridn

SCL I 0 N Document No: ALION-PLN-ENER-8706-02 Revision: 0 Page: D- 10 of D- 10

Material Safety Data SheetMaterial Name: 7M0 Series Board MSDS No,: 154M - 17020-01-M

The foltowi.n is Provided o axie in the pirepa!aton if SARA section 3t I anri 312 repors

SARA 311V312Acute Health Hazrd Yes

Chronic Helth Hazard: YesFire Hazd No

Sudden Release of Pressure Hazard: NoReactive Hazar: No

C: Clean Air ActThe fcolwing co ionents appear on the Clear Af Acl-1990 Hazardous Air Pollut.nts ListNone

State Regulations:A: General Product Information

No adimtonal informatrn availabie

B: Component Analysis - StateThe following cont&5,e appear on one o, or.e of the orf sat z ss s list1

____t CAS • CA FL MA W NJ PAFiber Glass Wool (Fibroas Glassi F65997-11-3 Yes' No Yes' Yes' No ~Yes'irelated to Minerof wool fite__________

The fo0llwing statementls) are 0rcided unoer tRe CaI31forn Safe DnnkliN Water and Toxic Enfotcemint Act of 1986(Proposlion 65)WARNING! Tis Prfouic! eýturir a chernical kno,. to the state of Califorun to cat!secancr

Other Regulations:A: General Product Information

No; additional informationi areiatie

8: Component Ana~is - Inventory _____--__-___1..__ -Component CAS It TSCA $L .E.NECS .

riber Gass Wool F,•rous Glass) .. 65997•7 Yes Yes YesUfeapolymer Avlth formnaldehyd~e and phenol 25i10 5~6 6, Yes Yes No___

C: Component Analysis WHiWS IDLThe lollowng components are ide-tified under the Canadian HazardousPr Aroducts A- Dre iclosure List

Co mponent CAS #Fiber Glass Wool FibFaiS Gas5) 659l717-3 1% item 7!5b8 (4) (related to

IFitxrus ass)

WHS Status: ControlledWHS Classificatioi: D2A CarcwargenrcityD2B- Imiation

Page a of 9 Iss• D•e' • 2•2;03 Page$ o ~ lsC~ [1te I?12A33Niorth Arenica - Fnglish