a new geodetic datum for nepal after the 2015 gorka earthquake · gorka earthquake and may...

20
A new geodetic datum for Nepal after the 2015 Gorka Earthquake Chris Pearson Niraj Manandhar

Upload: others

Post on 23-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

A new geodetic datum for Nepal

after the 2015 Gorka Earthquake

Chris Pearson

Niraj Manandhar

Page 2: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an
Page 3: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Required by GPS

No deformation model

Datums and epoch dates change frequently

Approximate transformationNo NDMITRF

Nepal Everest

Inexact No deformation model

Satellite Laser Ranging

Very Long Baseline Interferometry

DORIS: DopplerGNSS (GPS)

ITRF Measurement Techniques

Nepal Everest datum has no mechanism to correct for crustal deformation

No epoch date

Page 4: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Required by GPS

No deformation model

Datums and epoch dates change frequently

NDMITRF2014

Modernized datum for Nepal

Stable coords deformation model

Satellite Laser Ranging

Very Long Baseline Interferometry

DORIS: DopplerGNSS (GPS)

ITRF Measurement Techniques

Modernized geodetic datum aligned with ITRF2014Coordinates transformed to 1 Jan 2016 using the a

national deformation model

Page 5: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Positio

n

How the NDM works

Time2005

NDM

Patch

2016

Modernized datum coordinate

Page 6: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Secular velocity field

• Velocity from four recent studies were aligned with the ITRF2014

velocities

• The combined velocity field was used to produce a grid file with a

density of 20 points/degree

Page 7: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Residuals from alignment

0

5

10

15

20

25

30

35

-3 -2 -1 0 1 2 3

Freq

uen

cy

North Residuals mm/yr

w-o allignment

0

10

20

30

40

50

60

-3 -2 -1 0 1 2 3

Freq

uen

cy

East Residuals mm/yr

w-o allignment

0

20

40

60

80

-3 -2 -1 0 1 2 3

Freq

uen

cy

East Residuals mm/yr

after allignment

0

10

20

30

40

50

60

-3 -2 -1 0 1 2 3

Freq

uen

cy

North Residuals mm/yr

after allignment

Page 8: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Secular velocity field

• Velocity from four recent studies were aligned with the ITRF2014

velocities

Page 9: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Verification of earthquake models

Page 10: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Two possible models for Gorka Earthquake

Galetzka et al. 2015 (JPL) Wang et al in prep (SOPAC)

RMS Galetzka

E m 0.21

N m 0.11

U m 0.08

RMS Wang

E m 0.07

N m 0.02

U m 0.03

Page 11: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Post seismic relexation

Mencin et al Nature Geosciences 2016

43/1 itt

ikikkk ettHPttHEtvtm

Page 12: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Control

• The stations of the CALTECH network now operated by UNAVCO

can be adopted as a 0 order network of CORS

• Coordinates determined using specialist GNSS software to give

coordinates precisely aligned to the ITRF at epoch 2016.0

Page 13: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Deformation models in survey adjustments Example: Patch for an Earthquake

Measured Vector

Measured Position and Vector

Ground Displacement

Corrected Nepal2016 vector EPOCH 2016.0

National Deformation Model

Patch

Earthquake

Epoch 2016.0

Page 14: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Adjustment of GPS before and after the Gorkha Earthquake

Page 15: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

First Order adjustment Preliminary

results• Data from 2009-2016

• 222 baselines 217 used 5 rejections

Page 16: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Results from adjustmentmax min mean +- 1 sig RMS

m m m m m

Combined pre & post free adjustment seuw= 1.03

E 0.11 -0.12 -0.001 0.002 0.022N 0.15 -0.29 0.000 0.002 0.027U 0.34 -0.39 -0.003 0.005 0.069

Combined pre & post constrained adjustment Seuw=1.2

E 0.09 -0.12 -0.002 0.002 0.023

N 0.15 -0.29 -0.001 0.002 0.027

U 0.32 -0.38 -0.005 0.005 0.074

Combined pre & post constrained wo NDM Seuw=26.7

E 0.30 -0.49 0.000 0.008 0.104

N 0.92 -1.73 -0.022 0.028 0.383

U 1.19 -0.85 0.005 0.022 0.295

Page 17: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Significant baselines without aftershock model

Page 18: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Distortion grid Nepal 2016.0 -Nepal-Everest transformation

Page 19: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Conclusions

• datum aligned to a realization of the ITRF

• common reference epoch after the recent

sequence of earthquakes

• deformation model

• Velocity model

• Earthquake displacements

• Control

• Top level control CORS network

• Establish lower order control relative to the CORS

– New marks surveyed with GPS

– Readjust existing measurements starting with 1st order

• correction grids to transform GIS coordinates

from Nepal Everest into the new system.

DO

NE

to d

o o

r underw

ay

Page 20: A new geodetic datum for Nepal after the 2015 Gorka Earthquake · Gorka earthquake and May aftershock Title Towards a modernized geodetic datum for Nepal: Options for developing an

Combined vertical displacements from Gorka earthquake and May aftershock