October 2016
A Planning Application by
LOVELL PARTNERSHIPS LTD
In respect of
GT19 Green Lane East, Rackheath
Transport Assessment
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 i
DOCUMENT SIGNATURE AND REVIEW SHEET
Project Details
Project Title: GT19 Green Lane East, Rackheath
Project No.: 1411-88 Report No.: 1411-88/TA/01 Rev D
Client: Lovell Partnerships Ltd
Prepared By: Checked By: Approved for issue
Name Jack Williams Ian Bryant Julian Clarke
Signature JW IB JC
Date 07/07/15 07/07/15 07/07/15
Document Review
Revision Date Description Checked By
A
B
C
D
09/07/15
27/11/15
02/03/16
14/10/16
Revisions made following comments
from planning consultant
Revised Site Masterplan
Update to Site Masterplan
Further Site Masterplan revisions
IB
IB
JW
JW
Issued by:
Bristol Transport Planning Associates Cambridge Sheraton House Cardiff Castle Park London Cambridge Oxford CB3 0AX Welwyn Garden City
01223 370135 [email protected]
www.tpa.uk.com
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 ii
CONTENTS PAGE
1 INTRODUCTION 1
Report Structure
2 PLANNING POLICY 2
National Planning Policy Framework (NPPF)
The Broadland District Local Plan
Joint Core Strategy (JCS) for Broadland, Norwich and South Norfolk
Norfolk County Council Local Transport Plan (LTP)
Norwich Area Transport Strategy (NATS)
Northern Distributor Road
3 SITE CONTEXT 6
Site Location
Pedestrian and Cycle Infrastructure
Passenger Transport
Local Facilities and Services
Local Highway Safety
Local Highway Network
Existing Traffic Flows
4 DEVELOPMENT PROPOSAL 12
Proposed Development
Pedestrian and Cycle Infrastructure
Vehicular Access
Car and Cycle Parking
5 TRIP GENERATION 15
6 FORECAST TRAFFIC FLOWS 17
Forecast Base 2021 Traffic Flows
Development Traffic Flows
Total Forecast 2021 Traffic Flows
7 HIGHWAY IMPACT ASSESSMENT 19
Existing Junction Operation
Forecast Junction Operation
Stopping-up of Broad Lane – Sensitivity Test
8 CONCLUSION 23
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 iii
LIST OF TABLES
Table 2.1 Broadland parking standards
Table 3.1 Summary of local bus services Table 3.2 Summary of rail services from Salhouse station Table 3.3 Local facilities and services Table 3.4 Road traffic collisions - summary table Table 4.1 Indicative development schedule
Table 5.1 Multi-modal trip rates Table 5.2 Multi-modal trip generations – 157 dwellings Table 5.3 Wroxham ward Census 2011 travel to work data Table 6.1 TEMPRO traffic growth factors to 2021 Table 7.1 ARCADY – Salhouse Road / Green Lane East / Green Lane West – surveyed
Table 7.2 ARCADY – Salhouse Road / Green Lane East / Green Lane West – calibrated Table 7.3 ARCADY – Salhouse Road / Green Lane East / Green Lane West – 2021
Table 7.4 ARCADY – Stopping-up of Broad Lane – sensitivity test
LIST OF FIGURES
Figure 3.1 Site location
Figure 3.2 Surveyed AM peak traffic flows
Figure 3.3 Surveyed PM peak traffic flows
Figure 6.1 Forecast base (2021) AM peak traffic flows
Figure 6.2 Forecast base (2021) PM peak traffic flows
Figure 6.3 Development AM peak traffic flows
Figure 6.4 Development PM peak traffic flows
Figure 6.5 Total forecast (2021) AM peak traffic flows
Figure 6.6 Total forecast (2021) PM peak traffic flows
Figure 7.1 Re-distributed traffic flow assumptions
LIST OF APPENDICES
A NDR Salhouse Road junction
B Traffic surveys
C Indicative site layout
D General access arrangements
E Access junction visibility splays
F Access junction swept paths
G TRICS report
H Salhouse Road / Green Lane East / Green Lane West modelling output
I Stopping-up modelling output
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 1 of 23
1 INTRODUCTION
1.1 Transport Planning Associates has been commissioned by Lovell Partnerships Ltd to
provide transport planning advice to support a residential development at land off Green
Lane East, Rackheath.
1.2 The site is bounded to the northeast and east by Green Lane East and to the northwest by
Salhouse Road, whilst a continuous hedgerow bounds the western and southern sides of
the site. It is currently situated on agricultural land, whilst further arable lane surrounds its
western and southern perimeters.
1.3 The development proposal is for 157 homes comprised of 105 open market dwellings and
52 affordable dwellings. Vehicular access will be provided off Green Lane East where
pedestrian provision will also be made. A shared use footway / cycleway will also be
provided on Green Lane East, running adjacent to the application site.
Report Structure
1.4 The following structure has been applied to this report:
Chapter 2: Planning Policy;
Chapter 3: Site Context;
Chapter 4: Development Proposal;
Chapter 5: Trip Generation;
Chapter 6: Forecast Traffic Flows;
Chapter 7: Highway Impact Assessment; and
Chapter 8: Conclusion.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 2 of 23
2 PLANNING POLICY
2.1 This section of the Transport Assessment sets out national and local planning policies that
are considered relevant to the development proposal insofar that they concern transport
matters.
National Planning Policy Framework (NPPF)
2.2 The National Planning Policy Framework (NPPF) sets out the Government’s policy which
informs local authorities and developers regarding future development.
2.3 When referring to the need for supporting evidence in relation to transport when planning a
new development, the NPPF states:
“All development that generates significant amounts of movement should be
supported by a Transport Statement or Transport Assessment. Plans and
decisions should take account of whether:
The opportunities for the sustainable transport modes have been taken
up depending on the nature and location of the site, to reduce the need
for major transport infrastructure;
Safe and suitable access to the site can be achieved for all people; and
Improvements can be undertaken within the transport network that cost
effectively limit the significant impacts of the development.
Development should only be prevented or refused on transport grounds
where the residual impacts of the development are severe.”(Paragraph
32)
2.4 The NPPF outlines that local authorities should seek to provide the infrastructure necessary
to support sustainable economic growth, and with respect to planning decisions key
considerations include ensuring that opportunities for travel by sustainable modes are taken
up, safe and suitable access to the site can be achieved and measures to cater for the
residual impacts can be undertaken, in order to limit the significant impacts of development.
The Broadland District Local Plan
2.5 The Broadland District Local Plan was adopted in May 2006. It contains the policies and
proposals for development in the district. The Local Plan provides policy guidance for
developers and the council’s own development management service on where and what
kind of development may be permitted.
2.6 The transport objectives deriving from the Local Plan include:
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 3 of 23
To promote an efficient and safe transport network and to assist in the
implementation of a comprehensive transport strategy for Broadland;
To locate major development where it is highly accessible for pedestrians and
cyclists and has a good level of public transport service provision;
To promote improved provision for non-motorised users; and
To minimise the adverse effects of traffic and the environment.
2.7 Policies from the Broadland Local Plan which concern transport include:
TRA 4: Within new developments suitable provision will be made for pedestrians
and the quality of the existing pedestrian environment should be enhanced where
possible;
TRA 5: Within new developments safe and coherent provision will be made for
cyclists and the quality of the cycling environment should be enhanced where
possible; and
TRA 7: Where clearly justified developers will be expected to enter into an
agreement to contribute to the appropriate public transport provision.
Parking standards
2.8 Car parking standards for residential developments are stipulated in the Broadland District
Local Plan. Table 2.1 below presents maximum car parking standards based on the number
of bedrooms per dwelling.
Table 2.1 Broadland parking standards
Dwelling size Maximum car parking
1 bedroom Average of 1.5 spaces per unit
2 or 3 bedrooms 2 spaces per unit
4 or more bedrooms 3 spaces per unit
2.9 The standards also indicate that average car ownership per dwelling is 1.6 vehicles within
the region.
2.10 The Local Plan has been replaced by the Joint Core Strategy (JCS) for Broadland, Norwich
and South Norfolk.
Joint Core Strategy (JCS) for Broadland, Norwich and South Norfolk
2.11 The Joint Core Strategy (JCS) is one of the key policy documents that make up the Local
Development Framework within Norwich. The document has been prepared by the three
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 4 of 23
councils of Broadland, Norwich and South Norfolk, working together with Norfolk County
Council as the Greater Norwich Development Partnership (GNDP).
2.12 The JCS sets out the long-term vision and objectives for the area, including strategic
policies for steering and shaping development up to 2026.
2.13 Policy 6 within the JCS aims to enhance the role of Norwich as a Regional Transport Node,
particularly through the implementation of the Norwich Area Transportation Strategy (NATS)
and will improve access to rural areas. This will be achieved by:
Implementation of the Norwich Area Transportation Strategy (NATS) including
construction of the Northern Distributor Road (NDR);
Upgrading the bus, cycling and walking network, including Bus Rapid Transit on key
routes in the Norwich area;
Enhancing the Norwich Park & Ride system;
Promoting improvement of rail services, including improved journey time and
reliability to London and Cambridge, and innovative use of the local rail network;
Provision of an A140 Long Stratton Bypass;
Promoting improvements to the A11 and A47;
Focusing development near to essential services to encourage walking and cycling
as the primary means of travel with public transport for wider access; and
Continuing to improve public transport accessibility to and between Main Towns and
Key Service Centres.
North East Growth Triangle
2.14 Changes to the JCS were adopted in January 2014 to include the North East Growth
Triangle (NEGT) in the Broadland Part of the Norwich Policy Area. This area for growth
includes Old Catton, Sprowston, Rackheath and Thorpe St Andrew. The Growth Triangle
AAP was adopted in July 2016.
2.15 This location will deliver an urban extension on both sides of the Northern Distributor Road
(NDR). Complete delivery of the extension is dependent on implementation of the NDR.
However, there is scope for partial delivery, the precise extent of which will be assessed
through the Area Action Plan which is being produced by the Broadland District Council.
2.16 The structure of the local geography suggests that this new community will take the form of
a series of inter-related new villages or quarters and will include:
at least 7,000 dwellings (rising to a total of at least 10,000 dwellings after 2026);
a district centre based around an accessible ‘high street’ and including a new library,
education and health facilities;
new pre-school provision and up to six new primary schools plus a new secondary
school with an initial phase to open as early as possible. To facilitate early provision
the early phases of development will concentrate on family housing;
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 5 of 23
new employment allocations for local needs including expansion of the Rackheath
employment area;
Bus Rapid Transit to the city centre, possibly via Salhouse Road and Gurney Road,
and a choice of safe and direct cycle routes to the centre;
safe and direct cycle and pedestrian routes, and orbital bus services, to Broadland
Business Park, Rackheath employment area, airport employment areas and to the
surrounding countryside; and
new rail halts at Rackheath and Broadland Business Park.
Growth Triangle Area Action Plan (AAP) – Land Allocation
2.17 The Area Action Plan incorporates proposed allocations of land within the Growth Triangle.
Policy Allocation GT19 identifies the proposed development site to the south of Green Lane
East as land allocated for residential development.
2.18 The following conditions are proposed for future development at this location:
The provision of residential development including 33% affordable housing;
Pedestrian and cycle links across the frontage of the site;
Landscape masterplan prior to development should include: recreational areas and
public space and extensive landscaping along the western edge of the site adjacent
to the route of the NDR; and
Appropriate noise assessment to identify any appropriate mitigation necessary to
offset the impact of the operation of the NDR.
Norfolk County Council Local Transport Plan (LTP)
2.19 This Local Transport Plan defines Norfolk County Council's transport strategy for the period
2006 to 2021. The LTP overall vision for the Norfolk area is:
“Norfolk is a well-connected place in which to live and do business and to visit,
and is known as a national leader in making the transport system safer and
reducing the impact transport has on climate change and the wider
environment.”
2.20 The strategic approach within the LTP is to reduce the need to travel and encourage and
support people and businesses to get to destinations in a more sustainable manner while
reducing congestion, protecting the environment and enhancing road safety.
2.21 The main strategies that come through within the LTP are:
Delivering sustainable growth - Integrating spatial, economic and transport planning
by improving accessibility to reduce the remoteness of Norwich. In particular, by
improving road network connections and public transport within sub-regions; and
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 6 of 23
Improving accessibility through enhancing local connections and promoting better
accessibility to jobs and services especially by public transport, walking and cycling.
2.22 The LTP recognises that Norwich is an area where growth will be focused and identifies the
importance of:
Providing essential infrastructure, including a NDR and improvements to the A11
and A47 trunk roads, needed to accommodate growth and support the development
of the Norwich area as a sustainable community; and
Supporting Norwich’s role as a Regional Interchange Centre and the role of
surrounding market towns.
Norwich Area Transport Strategy (NATS)
2.23 The NATS document details a transportation strategy for the Norwich Area until 2021. The
strategy has been prepared by Norfolk County Council, in partnership with Norwich City
Council, Broadland District Council and South Norfolk Council.
2.24 The policies within the strategy relating to transport include:
Improving accessibility in the Norwich area by improving facilities for all modes of
transport, improving access and accommodating growth in the number of trips by
means other than the car (Policy 8);
Improving facilities for pedestrians and cyclists (Policies 9, 10, 11, 12, 13 & 14);
Improving public transport routes, information, frequency and reliability (Policies 15,
16, 17,18, 19, 20 & 21);
Improving traffic movement through policies on combating congestion (Policy 46 -
56); and
Providing access for everyone through appropriately designed infrastructure and
promoting buses with access for people with disabilities (Policies 75 – 80).
Northern Distributor Road
2.25 The NDR is a new 20 kilometre bypass linking the A47 to the south east of Norwich to the
proposed Eco-town and to Norwich International Airport to the north. On the 1st June 2015 it
won development consent after the transport secretary concluded there was a ‘compelling
case in the public interest’ for the scheme. It has been designed to relieve congestion and
spur development to the north of Norwich. The work on the road has now commenced and
the completion date is February 2018.
2.26 The new dual carriageway will run to the west of the proposed development site and a new
4-arm roundabout junction will be developed, linking directly with Salhouse Road. A plan
which illustrated the location of the consented junction in relation to Green Lane East and
the development site is provided at Appendix A.
3 SITE CONTEXT
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 7 of 23
3.1 This section of the report highlights the application site in terms of the local highway network
and describes the existing opportunities for pedestrians, cyclists and passenger transport
users. It also outlines local services and facilities currently provided within the vicinity of the
site.
Site Location
3.2 The application site is located within the village of Rackheath to the northeast of Norwich. It
is bounded to the northeast and east by Green Lane East and to the northwest by Salhouse
Road, whilst a continuous shelter belt of mature trees bounds the western and southern
sides of the site.
3.3 The site is currently situated on agricultural land, whilst further arable lane surrounds its
western and southern perimeters. The location of the development is shown in Figure 3.1.
Pedestrian and Cycle Infrastructure
3.4 The location of the proposed development site, on the periphery of Rackheath, means that
opportunities for pedestrians and cyclists within the immediate vicinity are limited.
3.5 A pedestrian footway is provided on the eastern verge of Broad Lane which runs adjacent to
the site. This footway starts at the eastern most extent of the application site and runs in a
southeast to northwest alignment, separated from the carriageway by a grass verge.
3.6 Approximately 135m from its origin the footway merges onto Vera Road at a simple priority
junction and dropped kerbs are provided on either side of the junction to assist with
pedestrian movements. Vera Road has wider footways along both sides of the carriageway
providing pedestrian access to a large residential area east of the site.
3.7 To the northwest of this junction, Broad Lane becomes Green Lane East and the footway
continues to run adjacent to the carriageway.
3.8 Across the four-arm mini roundabout to the north of the site, the footway continues along
Green Lane West towards Rackheath Industrial Estate. To the east of the junction,
Salhouse Road has footways along both sides of the carriageway which continue through
the centre of Rackheath. No pedestrian infrastructure is provided along Salhouse Road to
the west of the junction and there are no formal pedestrian crossing facilities at the mini
roundabout.
3.9 Owing to the existing nature of the application site, opportunities for cyclists are limited.
Whilst there are no defined cycle routes, the nature of the roads and associated observed
traffic volumes ensure the local highway network is generally conducive to cycling.
Passenger Transport
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 8 of 23
Bus
3.10 The application site is served well by public transport services, with the nearest stop located
directly adjacent to its eastern boundary along Green Lane East. A short section of footway
as well as tactile paving and a raised kerb have been provided on the grass verge to
accommodate pedestrians waiting at the stop. Bus route 53 heading north to Wroxham and
Hoveton can be boarded at this stop.
3.11 A bus stop, from which buses head in a southwest direction towards Norwich, is located
approximately 65m to the northeast of the site along Salhouse Road. A raised kerb with
tactile paving is also present at this stop and a bus shelter which incorporates seating, a bus
timetable and flag are also provided.
3.12 A summary of the local bus service is provided in Table 3.1.
Table 3.1 Summary of local bus services
Service Frequency
Number Route Monday to
Friday Saturday Sunday
53
Hoveton - Thorpe End
– Norwich Railway
Station - Tuckswood
2 services per
hour
First 07:00,
Last 18:28
2 services per
hour
First 07:00,
Last 18:28
1 service per
hour
First 09:38,
Last 17:38
First and Last times are taken from when a bus can be boarded or departed from the nearest stop.
3.13 The local bus service identified in Table 3.1 provides links to several key destinations such
as Norwich and the Wroxham / Hoveton area with a frequency of approximately 2 services
per hour during the week and on Saturdays, with a reduced service on Sundays.
3.14 An additional school bus service operates during the morning with a return service in the
afternoon. This provides a service for children attending Broadland High School in Hoveton.
Rail
3.15 Salhouse, the nearest railway station, is located approximately 2.3 kilometres to the
northeast of the application site. This station is served by trains operated by Greater Anglia.
3.16 Services operate between Norwich and Cromer railway stations at a frequency of
approximately 1 train every hour.
3.17 A summary of the services which halt at Salhouse railway station is provided in Table 3.2.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 9 of 23
Table 3.2 Summary of rail services from Salhouse station
Origin Destination Average journey
duration from Salhouse Main frequency
Norwich Cromer 38 minutes
1 service per hour
First Train Outbound: 05:50,
Last Train Outbound : 23:03
Cromer Norwich 13 minutes
1 service per hour
First Train Outbound: 06:27,
Last Train Outbound: 23:03
First and Last times are taken from when the train can be boarded at Salhouse railway station
3.18 As shown in Table 3.2, Salhouse railway station accommodates services that run to key
destinations such as Norwich and locations en-route to Cromer.
Local Facilities and Services
3.19 Rackheath incorporates a number of facilities and services which residents are likely to use
on a day to day basis. Table 3.3 below summarises the facilities available as well as
approximate walking and cycling distances based on 3mph and 12mph respectively.
Table 3.3 Local facilities and services
Destination
Approximate
distance from site
(kilometres)
Walk time, minutes
(based on 3mph)
Cycle time,
minutes (based on
12mph)
Primary school 0.12 2 1
Pharmacy 0.24 3 1
Fish and chip shop 0.35 4 1.5
Convenience store 0.4 5 2
Post office 0.4 5 2
3.20 Table 3.3 highlights a number of facilities which are available within a 500m radius of the
application site. A maximum walking time of 5 minutes to these amenities means that the
availability of basic services is good.
Local Highway Safety
3.21 Information on the road traffic collisions which have been recorded in the area has been
obtained from the CrashMap website for the most recent five year period.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 10 of 23
3.22 In total there have been five recorded accidents within the immediate vicinity of the site over
this period, with four of these occurring at the mini roundabout linking Salhouse Road with
Green Lane East and West.
3.23 The majority of these accidents resulted in slight injuries. In one accident a serious injury
was sustained by a motorcyclist at the mini roundabout. A summary of all the accidents
which have occurred near to the application site is presented in Table 3.4.
Table 3.4 Road traffic collisions - summary table
Year Location Severity Casualties Vulnerable
User?
2011 On mini roundabout (Green
Lane West – Salhouse Rd) Slight 1 Motorcycle
2012 Broad Lane southbound Slight 1 Cyclist
2013 On mini roundabout (Green
Lane West – Salhouse Rd) Slight 1 No
2013 On mini roundabout (Green
Lane West – Salhouse Rd) Slight 1 Cyclist
2015 On mini roundabout (Green
Lane West – Salhouse Rd) Serious 1 Motorcycle
3.24 The five incidents which have occurred across the five year period do not constitute a
pattern of behaviour that is likely to be exacerbated with the proposed development in place.
Local Highway Network
3.25 A mini roundabout junction at the northern most point of the site connects the two roads
running adjacent to its boundaries with the wider highway network.
3.26 From the south eastern arm of the mini roundabout, Green Lane East runs adjacent to the
eastern boundary of the site. Green Lane East is a single carriageway two-way road with a
footway running along the eastern edge, separated by a grass verge. There is no street
lighting provided along the extent of this road.
3.27 Approximately 95m from the mini roundabout the speed limit along Green Lane East
changes from 30 mph to 40 mph for vehicles heading south and vice versa for vehicles
heading north.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 11 of 23
3.28 Further south of this point, Vera Road joins Green Lane East at a simple priority junction.
Vera Road leads to a large residential area and provides access to a number of residential
streets.
3.29 From this junction Green Lane East becomes Broad Lane which continues in a northwest to
southeast alignment. The footway continues along its eastern verge before dissipating near
the south-eastern extent of the site. Further south Broad Lane crosses a railway track at an
automatic half barrier crossing (AHBC). A demarcated lane for pedestrians is also provided
across the level crossing.
3.30 Southwest of the mini roundabout, Salhouse Road runs adjacent to the northern boundary
of the application site. Approximately 85m from the mini roundabout the speed limit changes
from 30 mph to the national speed limit. Street lighting and pedestrian footway infrastructure
is not provided which is consistent with the rural character of the road. Salhouse Road
continues approximately 4 kilometres west before joining the A1042 Norwich ring road.
3.31 From the eastern arm of the mini roundabout, Salhouse Road continues towards the centre
of Rackheath. Footways are provided along both sides of the carriageway and the road is
subject to a 30 mph speed limit. Street lighting is provided along the stretch of carriageway
nearest to the mini roundabout.
3.32 Green Lane West constitutes the fourth arm of the mini roundabout to the north, providing
access towards Rackheath Industrial Estate and the A1151. A footway is provided on to the
eastern verge of the carriageway. No street lighting is present along the extent of Green
Lane West and the road is subject to a 30 mph speed limit.
Existing Traffic Flows
3.33 In order to provide an understanding of the existing traffic flows in the vicinity of the
application site, a full manual classified junction survey was undertaken on Tuesday 14th
April 2015 between 07:00 and 10:00, and 16:00 and 19:00 at the 4-arm mini-roundabout
junction between Salhouse Road, Green Lane East and Green Lane West.
3.34 The full dataset from this survey is presented in Appendix B.
3.35 Analysis of the traffic data has revealed that the local highway network peaks are between
08:00 and 09:00 for the morning peak and 17:00 and 18:00 for the evening peak.
3.36 The surveyed traffic flows across the mini-roundabout during both the AM and PM peak
periods are presented in Figure 3.2 and Figure 3.3.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 12 of 23
4 DEVELOPMENT PROPOSAL
4.1 This section of the Transport Assessment sets out the key principles of the development
proposal.
Proposed Development
4.2 The development proposal is in outline for up to 157 dwellings and the illustrative
masterplan provides a mix of open market and affordable homes. An indicative schedule of
development is detailed in Table 4.1.
Table 4.1 Indicative development schedule
Bedrooms Open Market Affordable
1 - 18
2 28 20
3 45 12
4 27 2
5 5 -
Total 105 52
4.3 The illustrative masterplan is contained in the ‘Proposed Development Plan’ by Richard Pike
Associates which is provided at Appendix C.
Pedestrian and Cycle Infrastructure
4.4 Improved pedestrian and cycle infrastructure will also be provided across the Green Lane
East and Salhouse Road frontages of the site which will link to proposed internal layout and
the existing footways.
4.5 An uncontrolled pedestrian crossing, characterised by dropped kerbs and tactile paving, will
be provided on Green Lane East, approximately 60m south east of the junction with
Salhouse Road. This will ensure that a link is created between the site and the existing
pedestrian infrastructure on the eastern side of Green Lane East.
4.6 A new 3m wide shared use footway/cycleway will be provided on Green Lane East which
will run adjacent to the carriageway along the length of the development from the southeast,
to Salhouse Road further north. The provision of this footway/cycleway was discussed with
the local highway authority during pre-application consultation and agreed to be appropriate.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 13 of 23
4.7 Site GT18 to the north-west of Salhouse Road is allocated for 300 additional residential
dwellings. Pedestrian links to this site will also need to be developed when it comes
forward. At present, an uncontrolled pedestrian crossing, characterised by dropped kerbs
and tactile paving, will be provided on the southern side of Salhouse Road where the
footway/cycleway is stopped providing part of this pedestrian link. It will however be the
responsibility of the developer of the GT18 site to provide the completed pedestrian link
across the two developments.
4.8 The proposed access improvements, including the shared use footway/cycleway, pedestrian
access points and crossing facilities are shown in TPA drawing PL101 Rev D contained in
Appendix D.
Vehicular Access
4.9 Two vehicular access points to the site will be provided off Green Lane East via priority T-
junctions. These may lead into an internal loop road and other links from which access to
dwellings would be provided. The location of these proposed access junctions is shown on
the drawing at Appendix D.
4.10 Access from Green Lane East is considered appropriate as traffic flows along this road are
likely to decrease following the stopping up of Broad Lane as part of the NDR scheme. The
location of the access junctions will minimise disruption to traffic flows on Salhouse Road,
which are likely to increase following the development of the NDR and prevent any possible
conflict with any new access to the development land to the north-west of the road.
4.11 In addition, a number of dwellings will be provided with access directly onto Green Lane
East. Access to these dwellings will be provided via six dropped kerb crossovers leading to
private driveways. These proposals are synonymous with the access arrangements for
existing dwellings on the eastern side of the road. This is likely to significantly change the
character of Green Lane East so it better represents a residential street.
4.12 The posted speed limit changes from 30mph to 40mph for vehicles heading south adjacent
to the proposed site. To reflect the change in character of Green Lane East following
development, an application may be submitted to relocate the speed limit signage further
south of the site. This would be appropriate given the reduced traffic volumes following the
stopping up of Broad Lane and the lower anticipated vehicle speeds following the change in
character of Green Lane East.
4.13 The local highway authority is ultimately responsible for the setting of speed limits and any
application to change the posted speed limit will be made through a Speed Regulation Order
under Section 84 of the Road Traffic Regulation Act 1984.
4.14 The access junctions have been designed in accordance with the visibility splays and site
stopping distances set out in Manual for Streets for a 30mph road. Visibility splays of 2.4m x
43m are provided at each access junction and these are shown in TPA drawing PL102 Rev
D at Appendix E.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 14 of 23
4.15 Additionally, the access junctions have been designed using swept paths of appropriate
servicing vehicles to ensure that refuse collection and emergency access can be achieved
at all times and TPA drawing SP101 Rev D contained in Appendix F shows these
movements.
Car and Cycle Parking
4.16 Car and cycle parking will be incorporated within the development in accordance with
Broadland District Council’s parking requirements set out in Chapter 2. Applying Broadland’s
standards, the maximum number of car parking spaces the development may provide is 339
spaces. Average car ownership within the district is 1.6 spaces per dwelling which would
demand 251 spaces to be provided for residents. Sufficient on-plot parking will be provided
within these parameters to discourage any on-street parking.
4.17 Broadland’s standards also stipulate that an average of 2 spaces per unit or less will be
provided over the development site for housing areas off good accessibility. This applies to
developments which fall within a 200m walking distance from a bus stop which is served by
buses of a frequency of 15 minutes or less to town, district or a local service centre.
4.18 Applying Broadland’s standards, formal cycle parking areas are not required where houses
are provided with garages or rear gardens for a shed. Sufficient on-plot space will be
provided allowing occupants to store cycles at their own discretion.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 15 of 23
5 TRIP GENERATION
5.1 This section of the Transport Assessment considers the quantum of trips that could be
expected to be generated by the proposed development.
5.2 The proprietary database TRICS 7.2.1 has been interrogated for trip rates using a sample of
sites similar to the proposed development.
5.3 Trip rates using ‘Land Use 03 – Residential, sub class M – Mixed private / affordable
housing’ have been extracted and the following criteria applied:
Multi-modal surveys;
Weekday surveys only;
Surveys dating back to 2010; and
Sites ranging from 80 – 250 dwellings.
5.4 A full copy of the TRICS report is contained in Appendix G and Table 5.1 below provides
the vehicle and people trip rates during the AM and PM peak periods.
Table 5.1 Multi-modal trip rates
Trip rates per
dwelling
AM peak PM peak
Arrivals Departures Arrivals Departures
Vehicles 0.105 0.308 0.273 0.151
People 0.155 0.627 0.473 0.247
5.5 The trip rates detailed in Table 5.1 have been used to calculate the number of trips that may
be generated by the proposed development. These resultant trip numbers are provided in
Table 5.2.
Table 5.2 Multi-modal trip generations – 157 dwellings
Mode AM peak PM peak
Arrivals Departures Total Arrivals Departures Total
Vehicles 16 48 64 43 24 67
People 24 98 122 74 39 113
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 16 of 23
5.6 Based on the TRICS trip rates it is estimated that some 64 two-way vehicular trips may be
generated by the proposed development during the AM peak, with 67 trips during the PM
peak.
5.7 To provide a robust approximation for the modal share of trips for the proposed
development, travel to work data for the Wroxham ward has been interrogated from the
2011 Census.
5.8 Table 5.3 below presents the mode share of methods of travel within the ward. It also
presents a redistribution of people trips generated by the development based on mode
share.
Table 5.3 Wroxham ward Census 2011 travel to work data
Mode Mode
Share
AM peak PM peak
Arrivals Departures Arrivals Departures
Train 1.0% 0 1 1 0
Bus, minibus or coach 5.4% 1 5 4 2
Motorcycle 1.4% 0 1 1 1
Driving a car or van 79.1% 19 78 59 31
Passenger in a car or van 4.7% 1 5 3 2
Bicycle 1.8% 0 2 1 1
On foot 5.1% 1 5 4 2
Other 1.5% 0 1 1 0
5.9 As can be seen from the data present in the table above, drivers of cars and vans account
for the greatest proportion of trips (79.1%) generated by the proposed development. A total
of 97 two-way vehicle trips may be expected during the AM peak with 90 two-way trips
during the PM peak period. Trips associated with all other transport modes are low in
comparison and this is owing to the rural nature of Rackheath.
5.10 The vehicle trips presented in Table 5.3 provide a higher approximation for those generated
by the development than calculated using TRICS trip rates (Table 5.2). This is nonetheless
considered a more robust approximation based on local travel characteristics.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 17 of 23
6 FORECAST TRAFFIC FLOWS
6.1 This chapter of the report presents the calculations associated with the establishment of a
forecast baseline traffic flow scenario which provides a basis for producing and modelling
future year traffic growth scenarios.
Forecast Base 2021 Traffic Flows
6.2 To determine the background growth that is anticipated in the area, TEMPRO has been
utilised to extract local growth factors for the AM and PM peak periods for 2015 to 2021
(future year 5 years post submission of the application).
6.3 Origin – destination growth factors for rural Broadland have been derived for car drivers
which have then been adjusted according to the National Traffic Model (NTM) (AF09
dataset) using rural and principal road parameters with regional effects. Table 6.1 below
details the growth factors derived from TEMPRO.
Table 6.1 TEMPRO traffic growth factors to 2021
Peak Local Growth
NTM Adjusted
Origin Destination
Weekday AM 1.0669 1.0626 1.1126
Weekday PM 1.0684 1.072 1.1183
6.4 The NTM adjusted growth factors presented in Table 6.1 have been applied to the surveyed
AM and PM peak period flows to produce the forecast base 2021 traffic flows. These flows
provide a model onto which the traffic associated with the development site can be added
and these are contained in Figure 6.1 and Figure 6.2 for each respective peak period.
Development Traffic Flows
6.5 The vehicular trips which are likely to be generated by the proposed development have
been distributed in accordance with the existing traffic flows on the local highway network.
6.6 In accordance with the directional flow proportions along Green Lane East, it is expected
that a number of vehicles will enter and leave the development via Green Lane East to the
south. This equates to approximately 20 percent of two-way development trips during each
respective peak period.
6.7 At the mini-roundabout between Salhouse Road, Green Lane East and Green Lane West,
development traffic has been distributed in accordance with existing turning proportions.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 18 of 23
6.8 The distribution of development traffic in both the AM and PM peaks is illustrated in Figure
6.3 and Figure 6.4 respectively.
Total Forecast 2021 Traffic Flows
6.9 The development traffic has been added to the forecast base 2021 traffic flows to produce
the total forecast 2021 traffic flows.
6.10 Total forecast traffic flows for the AM peak are presented in Figure 6.5 and for the PM peak
in Figure 6.6.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 19 of 23
7 HIGHWAY IMPACT ASSESSMENT
7.1 This chapter of the Transport Assessment considers the junction capacity of the 4-arm mini-
roundabout between Salhouse Road, Green Lane East and Green Lane West. The junction
has been modelled under the loading of the existing (2015) traffic flows and then calibrated
using queue length data to ensure its suitability for future year traffic analysis.
Existing Junction Operation
7.2 To provide an assessment of the potential impact of the development on the existing mini-
roundabout junction, it has been modelled in the 2015 AM and PM peak periods using
ARCADY in Junctions 9.
7.3 The results of the modelling are contained in Appendix H together with a geometric
parameter drawing. A summary of the modelling results is contained in Table 7.1 below.
Table 7.1 ARCADY – Salhouse Road / Green Lane East / Green Lane West – surveyed
AM Peak PM Peak
RFC Modelled
Queue
Observed
Queue RFC
Modelled
Queue
Observed
Queue
Salhouse
Road East 0.72 3 4 0.50 1 2
Green Lane
East 0.58 1 1 0.43 1 2
Salhouse
Road West 0.40 1 1 0.63 2 2
Green Lane
West 0.53 1 3 0.99 11 2
7.4 The results of the modelling in Table 7.1 indicate that the junction operates above its
theoretical capacity during the PM peak. The Green Lane West arm is modelled to have an
RFC of 0.99 (99%) with a corresponding queue of 11 vehicles.
7.5 However, the queue lengths recorded at the time of the survey do not suggest there is a
capacity issue at this arm of the junction. The average observed queue during the PM peak
hour was 2 vehicles.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 20 of 23
7.6 A direct intercept adjustment of this arm has therefore been applied to adjust its capacity
and reflect the practical operation of this junction. In addition, the model has been calibrated
during the AM peak to reflect the increased queueing, observed at the Green Lane West
arm. A summary of the adjusted results is detailed in Table 7.2.
Table 7.2 ARCADY – Salhouse Road / Green Lane East / Green Lane West – calibrated
AM Peak PM Peak
RFC Modelled
Queue
Observed
Queue RFC
Modelled
Queue
Observed
Queue
Salhouse
Road East 0.72 3 3 0.51 1 2
Green Lane
East 0.58 1 1 0.43 1 2
Salhouse
Road West 0.40 1 1 0.63 2 2
Green Lane
West 0.71 3 3 0.67 2 2
7.7 The results set out in Table 7.2 suggest that the junction operates within capacity without
any significant queuing and is representative of observed on-street conditions.
Forecast Junction Operation
7.8 Future year capacity analysis for 2021 has been undertaken (5 years post registration of the
application) with the following scenarios included in the modelling:
Forecast Base 2021 traffic flows [surveyed traffic plus TEMPRO background
growth]
Total Forecast 2021 traffic flows [surveyed plus background growth and proposed
development traffic]
7.9 The mini-roundabout has been modelled using ARCADY in Junctions 9 in the context of the
above traffic flows. The results of the modelling are contained in Appendix H and a
summary is presented in Table 7.3.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 21 of 23
Table 7.3 ARCADY – Salhouse Road / Green Lane East / Green Lane West – 2021
2021 Forecast Base 2021 Total Forecast
AM Peak PM Peak AM Peak PM Peak
RFC Queue RFC Queue RFC Queue RFC Queue
Salhouse
Road East 0.83 4 0.62 2 0.84 5 0.68 2
Green Lane
East 0.68 2 0.50 1 0.81 4 0.55 1
Salhouse
Road West 0.45 1 0.73 3 0.47 1 0.75 3
Green Lane
West 0.81 4 0.78 3 0.85 4 0.85 5
7.10 The results presented in Table 7.3 suggest that the mini-roundabout is forecast to operate
within its theoretical capacity during the future year. The Salhouse Road East arm is
forecast to have a RFC of 0.84 during the AM peak, however this represents an RFC
increase of 0.01 from a scenario with no development.
7.11 The RFC at the Green Lane East arm which provides access towards and from the
development is forecast to increase by 0.12 within the AM peak following the introduction of
the development traffic. This increase is not considered significant and the forecast increase
in queue length by approximately 2 vehicles will not generate a traffic problem on this arm.
Stopping-up of Broad Lane – Sensitivity Test
7.12 As the consented NDR is developed, Broad Lane, which joins Green Lane East to the south
of the proposed site will be permanently stopped up at its junction with Norwich Road. The
stopping-up of Broad Lane is illustrated on the NDR general arrangement plan at Appendix
A.
7.13 The observed traffic flows presented in Chapter 3 have therefore been re-distributed to
reflect the road closure. In the absence of observed origin / destination data for local trips, a
number of assumptions have been made as to the re-distribution of these flows across each
arm of the mini-roundabout. Figure 7.1 illustrates these re-distributed traffic flow
assumptions.
7.14 The TEMPRO growth factors presented in Chapter 6 have been applied to the re-distributed
surveyed traffic flows to provide the 2021 forecast base situation following the stopping-up
of the road south of Green Lane East. The development traffic has also been added and
distributed across the mini-roundabout based on the turning proportions of the re-distributed
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 22 of 23
traffic. It has also been assumed that all development traffic will be directed to and from the
development via the northern section of Green Lane East, across the mini-roundabout.
7.15 The re-distributed traffic following the stopping-up of Broad Lane at Norwich Road has been
loaded to the calibrated ARCADY model to assess the impact at the mini-roundabout
junction. The results of the modelling are contained at Appendix I and summarised in Table
7.4.
Table 7.4 ARCADY – Stopping-up of Broad Lane – sensitivity test
2021 Forecast Base 2021 Total Forecast
AM PM AM PM
RFC Queue RFC Queue RFC Queue RFC Queue
Salhouse
Road East 0.86 5 0.57 1 0.87 5 0.62 2
Green Lane
East 0.44 1 0.32 1 0.64 2 0.38 1
Salhouse
Road West 0.59 1 0.74 3 0.62 2 0.78 3
Green Lane
West 0.79 3 0.76 3 0.84 4 0.85 5
7.16 The results presented in Table 7.2 indicate that the mini-roundabout junction will operate
within its theoretical capacity in 2021 following the stopping-up of Broad Lane and with the
development in place.
7.17 The Salhouse Road East arm of the junction will have a maximum RFC of 0.87 during the
AM peak following development, however the development traffic will generate an RFC
increase of just 0.01 at this arm with no additional queuing forecast.
7.18 Modelling the mini-roundabout junction under various future year scenarios has indicated
that the junction will continue to operate within capacity with minimal queuing both with and
without the development in place. The impact of the traffic associated with the development
is likely to be negligible at the junction and is unlikely to cause any issues on the
surrounding highway network.
7.19 The stopping-up at Broad Lane will not significantly impact the capacity at the mini-
roundabout junction. Whilst a number of assumptions have been made regarding the flows
of traffic along the NDR and at the junction, it is anticipated that flows will be re-distributed
across the junction which will not create a capacity issue on any of the four arms.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Page 23 of 23
8 CONCLUSION
8.1 Transport Planning Associates has been instructed to provide transport planning advice in
relation to a proposed residential development at Green Lane East, Rackheath.
8.2 This Transport Assessment has set out the national and regional planning policies that are
relevant to the proposed development and its context. The existing transport context of the
application site has also been set out.
8.3 It has been identified that there is reasonable access to the site by various modes of
transport, as the quiet nature of the village centre means that, in the absence of specific
cycling infrastructure or high quality pedestrian facilities, the site benefits from an
appropriate level of accessibility.
8.4 Details of the proposed development have been provided and the level of car and cycle
parking that may be provided has been set out.
8.5 Details on access into the site for vehicles, cyclists and pedestrians has also been provided
and these have been designed in accordance with the relevant guidance.
8.6 The number of trips that may be generated by all modes of transport by the development
have been calculated using TRICS 7.2.1. These trips have been modified using Census
2011 travel to work data to better reflect existing travel patterns in the village. Given the rural
character of Rackheath and the distance from the nearest business area, the percentage of
those who travel by car is high and this is reflected in the estimated vehicle trips generated
by the development.
8.7 The mini roundabout junction between Green Lane East, Salhouse Road and Green Lane
West has been modelled under various traffic flow scenarios using ARCADY in Junctions 9.
Existing flows observed during turning count surveys, 2021 forecast base flows and 2021
total forecast flows (including development traffic) have been loaded into the model to
assess its current and future capacity. The results indicate that the impact of the
development traffic will be negligible and only moderate levels of queuing will be evident.
8.8 A modelling sensitivity test has also been conducted on the junction to reflect the consented
stopping-up of Broad Lane as part of the NDR scheme. It has been concluded that traffic will
be redistributed across the junction and there will be no material impact on the operational
capacity at any arm.
8.9 It is therefore concluded that there is no reason on highways or transport grounds for these
proposals not to go ahead.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Figures
FIGURES
INDICATIVE
I N F O R M A T I O N
STATUS:
A4ORIGINALPLOT SIZE
WS
E
GT19 Green Lane East, Rackheath
Site location
Lovell Partnerships Ltd
SCALE:
DATE:
PREPARED BY:
NTS
3.1
FIGURE NO:
1411-88
JOB NO:
10/10/16
JW
CHECKED BY: APPROVED BY:
IB JC
Contains Ordnance
Survey data © Crown
copyright and database
right 2016
Site location
RESERVED COPYRIGHT
1 99 191 25
0 2 7 2
75 3
115 4
26 0
2 0
2 1
40 1
331 3
36 3
105 169 29 0
0 4 4 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 3.2 -
Project No: Figure No: Revision:
Surveyed AM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
0 109 241 94
0 1 8 0
50 1
313 0
86 0
1 0
0 0
31 0
160 6
27 3
52 114 67 0
0 0 2 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 3.3 -
Project No: Figure No: Revision:
Surveyed PM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
1 110 213 28
0 2 8 2
83 3
128 4
29 0
2 0
2 1
45 1
368 3
40 3
117 188 32 0
0 4 4 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.1 -
Project No: Figure No: Revision:
Forecast base (2021) AM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
0 122 270 105
0 1 9 0
56 1
350 0
96 0
1 0
0 0
35 0
179 7
30 3
58 127 75 0
0 0 2 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.2 -
Project No: Figure No: Revision:
Forecast base (2021) PM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
0 0 11 0
0 0 0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
2 0
22 34 6 0
0 0 0 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.3 -
Project No: Figure No: Revision:
Developemt AM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
0 0 33 0
0 0 0 0
0 0
0 0
12 0
0 0
0 0
0 0
0 0
4 0
5 11 7 0
0 0 0 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.4 -
Project No: Figure No: Revision:
Developemt PM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
1 110 224 28
0 2 8 2
83 3
128 4
30 0
2 0
2 1
45 1
368 3
42 3
139 222 38 0
0 4 4 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.5 -
Project No: Figure No: Revision:
Total forecast (2021) AM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
0 122 303 105
0 1 9 0
56 1
350 0
108 0
1 0
0 0
35 0
179 7
34 3
63 138 82 0
0 0 2 0
Traffic Flow : Total 000
Traffic Flow : HGV 000
IBJW
Approved By:
NTS
Checked By:Prepared By:
IB
10/10/16 I N F O R M A T I O N
Scale:Status:Date:
1411-88 6.6 -
Project No: Figure No: Revision:
Total forecast (2021) PM peak traffic flows
GT19 Green Lane East, Rackheath
Lovell Partnerships Ltd
A4ORIGINAL
PLOT SIZE INDICATIVE
Salhouse Road
West
Salhouse Road
East
Green Lane West
Green Lane East
RESERVED COPYRIGHT
1/2
A B C
L
K
1/2 J
D
E + F
F - All
I H G
1/2 1/2 1/2
Existing flows #
Decreased flows #
Increased flows #
Revision:
1411-88 7.1 -
GT19 Green Lane East, RackheathPrepared By: Checked By: Approved By:
JW IB IB
Lovell Partnerships LtdProject No: Figure No:
10/10/16 I N F O R M A T I O N NTS
Stopped-up at Broad Lane
A4ORIGINAL
PLOT SIZE INDICATIVE
Northern Distributor Road
(NDR)
+ 1/2 B
Re-distributed traffic flow assumptions
Date: Status:
+ 1/2 H
+ 1/2 G
Scale:
Salhouse
Road West
Salhouse
Road East
Green Lane West
Green Lane East
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix A
APPENDIX A
����� ��� � � ��� ����
�� ��� ��� � � �� � ��� � �� � ��
� � ! " #$ % &' "( &) * + + ) !, * + - ) . %$ / ) * # &$ ( ) ' * ' 0# "1 $ ' % " ) 2 &) 3) ( +$ &$ & " $4 " 2
56 " % & " 2 7 8 . " + # " 2 7 %&) 8$ #$ ) + " % -$ #9$ !: * &;) . %$< * & & +$ 7 ' " #
= > ? 3 ) 8 " 2$ #! " & - : ' " # +$ ! * 0
9$ !: * &;) . %$
� � ! " #$ % &' "( &) * + + ) !, * + - ) . %$ / ) * # &$ ( ) ' * ' 0# "1 $ ' % " ) 2 &) 3) ( +$ &$ & " $4 " 2@$ ( ) ' * ' 0 @ ) ( % ) " + , &) ' * 7$
= > ? 3) 8 " 2$ #! " & - : ' " # +$ ! * 0, " &$ < ) ( ) . 2 # ! " & -8 * & 3 - " 2 7 ( + * 2 &A 8 ' " # 7$* 3 3$ % % * 2 # * 3 3$ % % &)' * " + ! * 0 8 ' " # 7$ 2 ) ' & -* 8 . & $ 2 & ! " & - &$ ( ) ' * ' 0 " & " 7 * & " ) 2 $ * % . ' $ %: ' ) * # B * 2$ &) 8$ , &) ( ( $ # C ( * &D . 2 3 & " ) 2 ! " & - = + . % &$ * # / ) * #< ) 8 " 2$ #@ . ' 2 " 2 7 ;$ * # * 2 #E "$ + # ? 3 3$ % %: ' " # 7$< ) ( ) . 2 #@$ ( ) ' * ' 0@ ) ( % ) " +, &) ' * 7$
@$ ( ) ' * ' 0@ ) ( % ) " +, &) ' * 7$, " &$ < ) ( ) . 2 # ! " & -&$ ( ) ' * ' 0 " & " 7 * & " ) 2 $ * % . ' $ % 9 $ ! E "$ + # ? 3 3$ % %
9 $ !9 $ ! &= ) 2 # %
9 $ !E "$ + #? 3 3$ % %
9 $ !E " $ + #? 3 3$ % %
9$ !E "$ + #? 3 3$ % %F GHI
JKLMNO PQRSTUVW XYZ[
\ ] ^_ `a bcd e fgh
ij k k l mn l k o k p q rs t t u vw u t x w y z {| } ~ �� ~ � ���� � �� � �� ��� �������� ���
�� � � ��� � �
� ¡ ¢ £ ¤ ¥¦ £ § ¨©ª ¦ «¦ ¬ ® ¯ £ ° ±²³ µ² £ µ²³ ¤ £ «²³ ¶
� · µ ¦ ¬ ® ¹ ©ª ¦ µ £ ¬ ° ¡ £º » ¬ ¤ ¼
½ ¾ ¿ ÀÁ ÂÃÄ Å Æ Ç Å È ÉÊËÊË
ÌÌÍÍ
Î Ï Ð;) $E * '
Ñ * Ò$ 8 )E * ' / * 3 Ó -$ * & -;* + +
;$ * & -Ô ) ) # > * ' 3 -< ) 1 $ ' &
< -$ ' ' 0@ ' $ $E * ' ;* + +E * '
\] ^_ `a bcd e fgh� · µ ¦ ¬ ® ¹ ©ª ¦ Õ °³ ¢ ¶ £ µ² £ ¼
Ö × Ø Ù Ø Ú Û Ü Ý Ø Þ ßà Û á â ã ä å æ çãè é ê å å ë ì ãâ ã ä å æ çí â ã í ê å é î ìï ð é å ã çñ ò ó ã ã ô ã çñ ò ó ã ã ô ã çñ õ ã ã ô ã çö÷ ø ù úû ü ö ÷ ø ý üþ ø ÿ � ú� ý ø ú �� ý÷ ø �÷ � �� þ ÿ þ ø � � ø ø � ÿ þ �þ ÿ ý � � � ÿ ü þ þ ý � � ÷ � � � � � � � � � � � � � � � � � � � � � � � � � ! " " # " $% � � � � � � � � � � � & ' ( ) * + , - � . / � " � # " 0 1 2 34 5 6 7 1 2 3 ó 7 8 3 9: 5 ; ó 3 5 <= ó 2 3 â 2 > ?� � @ A ö � B A B C D ð E â F G H G : õ H: â ì I 1 õ Hä J G ä K G : õ H: G ð L ò 1 G : õ Hâ G FM : G ð ä â L N O L ï 1 : ì O Gä J G ä K G : : â ì I L 1 ò 1 2 ML 1 L O L ì P ð : ì O G Q R S T U V T U V W Xð ä ì P G Y L P G 1 2 MN â ï ñ G ä O O L O P GTom McCabe
Interim Director of Environment
Transport and Development
Norfolk County Council
County Hall, Martineau Lane
Norwich NR1 2SG
Z[\ ] _ ab _ c d ef ` _ e gh ` _ i j kl c k em j en b o^ k p j c k m _b j e cl c k em j en b q _ jf f p j c k m _b j e cl c k em j en b rm _h g p j c k m _b j e cst ef e c u o^ k p j c kst ef e c u v c kw p j xb _ _ en b _y _ v f b k r e b z { v h c ky _ v f b k |b { v _ j _ } | vf e pr _ j ub j _b jy _ v f b k |b { v _ j _ } | _ j ~ ~ emd en b _f e c � m { v pb `b eb� e c �y _ v f b k zh pn b _ `fy _ v f b k d _ j e c j ub � j u cfy _ v f b k � j q j c ` _ }st ef e c u �^ ` v j afst ef e c u ib f ` _ em `b k � } � j }f � i � �j c k � _ e k pb � j }f � � i �y _ v f b k z }m pb | _ jm xf � � e a_ e u a ^ ~ � j } c ~^ �y _ v f b k �^ ` � j }f � z }m p b � j }fy _ v f b k � _ e k p b � j }fy _ v f b k y _ en j `b � b j cf ~�m m b f f � y � � �y _ v f b k |h _ c e c u � b j kf �f {b� e a m { g e cb k � eb p k �m m b f f �y _ v f b k r � j p b fy _ v f b k d e m ab fz a j e c j uby p j c `^ gb _b j k e c m c � h cm e c � e a ab db n b p v {b c z cf b c � _ kb _�ib u h p j e c � � � � �^ �� �� � � �� � � � � �� � � � � �� � � ���� � � � � � � � � � � �
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix B
APPENDIX B
Rackheath - Manual Traffic Survey, Tuesday 14th April 2015
Junction: Green Lane West / Salhouse Road / Green Lane East
Approach: Green Lane West
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0700 - 0715 0 0 3 1 0 0 0 4 0 0 17 10 0 0 0 27 0 0 2 2 2 0 0 6 0 0 0 0 0 0 0 0
0715 - 0730 0 0 6 0 1 0 0 7 0 0 21 7 0 0 0 28 0 3 8 1 0 0 0 12 0 0 0 0 0 0 0 0
0730 - 0745 0 0 3 1 0 0 0 4 1 0 32 12 3 0 0 48 1 0 15 0 0 0 0 16 0 0 0 0 0 0 0 0
0745 - 0800 0 0 2 0 2 0 0 4 0 2 34 12 3 0 0 51 1 2 20 1 0 0 0 24 0 0 0 0 0 0 0 0
Hourly Total 0 0 14 2 3 0 0 19 1 2 104 41 6 0 0 154 2 5 45 4 2 0 0 58 0 0 0 0 0 0 0 0
0800 - 0815 0 0 6 3 0 0 0 9 0 0 24 11 2 0 0 37 0 0 25 3 0 0 0 28 0 0 1 0 0 0 0 1
0815 - 0830 0 0 3 0 0 0 0 3 0 0 38 8 1 0 0 47 0 0 16 2 1 0 0 19 0 0 0 0 0 0 0 0
0830 - 0845 0 0 7 2 0 0 0 9 0 0 49 6 1 0 0 56 0 1 23 3 1 0 0 28 0 0 0 0 0 0 0 0
0845 - 0900 0 0 3 2 0 0 0 5 0 1 39 11 2 0 0 53 0 0 15 0 0 0 0 15 0 0 0 1 0 0 0 1
Hourly Total 0 0 19 7 0 0 0 26 0 1 150 36 6 0 0 193 0 1 79 8 2 0 0 90 0 0 1 1 0 0 0 2
0900 - 0915 0 0 10 2 2 0 0 14 0 0 28 13 0 0 0 41 0 0 12 1 1 0 0 14 0 0 0 0 0 0 0 0
0915 - 0930 0 0 2 3 0 0 0 5 0 0 28 4 0 0 0 32 0 0 9 3 0 0 0 12 0 0 0 1 0 0 0 1
0930 - 0945 0 0 2 2 0 0 0 4 0 0 17 8 2 0 0 27 0 0 8 2 0 0 0 10 0 0 0 0 0 0 0 0
0945 - 1000 0 0 4 1 0 0 0 5 0 1 11 4 0 0 0 16 0 0 11 0 0 0 0 11 0 0 0 0 0 0 0 0
Hourly Total 0 0 18 8 2 0 0 28 0 1 84 29 2 0 0 116 0 0 40 6 1 0 0 47 0 0 0 1 0 0 0 1
Session Total 0 0 51 17 5 0 0 73 1 4 338 106 14 0 0 463 2 6 164 18 5 0 0 195 0 0 1 2 0 0 0 3
1600 - 1615 0 0 7 0 0 0 0 7 2 1 30 5 0 0 0 38 1 2 12 3 0 0 0 18 0 0 0 0 0 0 0 0
1615 - 1630 0 0 13 3 0 0 0 16 1 1 33 12 0 0 0 47 0 0 12 4 0 0 0 16 0 0 0 0 0 0 0 0
1630 - 1645 0 1 19 5 0 0 0 25 1 1 45 7 0 0 0 54 1 1 27 3 0 0 0 32 0 0 0 0 0 0 0 0
1645 - 1700 0 1 15 3 0 0 0 19 0 0 33 5 2 0 0 40 0 1 15 2 0 0 0 18 0 0 0 0 0 0 0 0
Hourly Total 0 2 54 11 0 0 0 67 4 3 141 29 2 0 0 179 2 4 66 12 0 0 0 84 0 0 0 0 0 0 0 0
1700 - 1715 0 0 22 2 0 0 0 24 1 2 61 14 0 0 1 79 2 3 28 3 0 0 0 36 0 0 0 0 0 0 0 0
1715 - 1730 0 0 23 2 0 0 0 25 0 3 41 13 0 0 0 57 0 0 20 7 1 0 0 28 0 0 0 0 0 0 0 0
1730 - 1745 1 1 23 1 0 0 0 26 2 2 47 9 3 2 0 65 1 0 25 1 0 0 0 27 0 0 0 0 0 0 0 0
1745 - 1800 0 1 13 1 0 0 0 15 0 0 30 4 0 0 0 34 0 0 12 2 0 0 0 14 0 0 0 0 0 0 0 0
Hourly Total 1 2 81 6 0 0 0 90 3 7 179 40 3 2 1 235 3 3 85 13 1 0 0 105 0 0 0 0 0 0 0 0
1800 - 1815 0 0 12 2 0 0 0 14 0 1 27 11 1 0 0 40 0 1 18 1 0 0 0 20 0 0 0 0 0 0 0 0
1815 - 1830 0 0 9 2 0 0 0 11 0 0 24 4 0 0 0 28 0 1 13 0 0 0 0 14 0 0 0 0 0 0 0 0
1830 - 1845 0 0 10 0 0 0 0 10 0 1 14 2 0 0 0 17 0 0 10 2 0 0 0 12 0 0 0 0 0 0 0 0
1845 - 1900 0 1 7 3 0 0 0 11 0 0 11 0 0 0 0 11 0 0 7 0 0 0 0 7 0 0 0 0 0 0 0 0
Hourly Total 0 1 38 7 0 0 0 46 0 2 76 17 1 0 0 96 0 2 48 3 0 0 0 53 0 0 0 0 0 0 0 0
Session Total 1 5 173 24 0 0 0 203 7 12 396 86 6 2 1 510 5 9 199 28 1 0 0 242 0 0 0 0 0 0 0 0
Left to Salhouse Road (East) Ahead to Green Lane East Right to Salhouse Road (West) U-Turn
Rackheath - Manual Traffic Survey, Tuesday 14th April 2015
Junction: Green Lane West / Salhouse Road / Green Lane East
Approach: Salhouse Road (East)
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0700 - 0715 0 0 4 2 0 0 1 7 0 0 37 4 0 0 0 41 0 0 7 0 1 0 0 8 0 0 0 0 0 0 0 0
0715 - 0730 1 0 5 1 0 0 1 8 0 2 36 8 0 0 0 46 0 1 12 1 0 0 0 14 0 0 0 0 0 0 0 0
0730 - 0745 0 0 4 3 0 0 1 8 2 0 55 7 1 0 0 65 0 0 8 0 0 1 0 9 0 0 0 0 0 0 0 0
0745 - 0800 0 0 9 2 0 0 1 12 2 1 73 9 0 0 0 85 0 0 9 3 0 0 0 12 0 0 0 0 0 0 0 0
Hourly Total 1 0 22 8 0 0 4 35 4 3 201 28 1 0 0 237 0 1 36 4 1 1 0 43 0 0 0 0 0 0 0 0
0800 - 0815 0 0 4 4 0 0 1 9 3 2 86 5 0 0 0 96 0 0 7 1 0 0 0 8 0 0 1 0 0 0 0 1
0815 - 0830 0 0 5 0 0 0 0 5 0 3 66 10 0 0 0 79 0 1 9 0 1 0 0 11 0 0 0 0 0 0 0 0
0830 - 0845 0 0 8 1 0 0 1 10 0 1 63 4 3 0 0 71 0 0 8 1 0 0 0 9 0 0 0 0 1 0 0 1
0845 - 0900 0 0 11 0 0 0 0 11 3 0 46 5 0 0 0 54 0 0 8 0 0 0 0 8 0 0 0 0 0 0 0 0
Hourly Total 0 0 28 5 0 0 2 35 6 6 261 24 3 0 0 300 0 1 32 2 1 0 0 36 0 0 1 0 1 0 0 2
0900 - 0915 0 0 8 0 0 0 1 9 0 2 46 3 1 0 0 52 0 0 10 2 0 0 0 12 0 0 0 0 0 0 0 0
0915 - 0930 0 0 4 1 0 0 1 6 0 0 33 0 0 0 0 33 0 0 8 2 2 0 0 12 0 0 0 0 0 0 0 0
0930 - 0945 0 0 5 1 1 0 1 8 0 0 33 5 0 0 0 38 0 0 3 1 0 0 0 4 0 0 0 0 0 0 0 0
0945 - 1000 0 0 3 4 0 0 0 7 0 0 32 6 1 0 0 39 0 1 7 2 0 0 0 10 0 0 0 0 0 0 0 0
Hourly Total 0 0 20 6 1 0 3 30 0 2 144 14 2 0 0 162 0 1 28 7 2 0 0 38 0 0 0 0 0 0 0 0
Session Total 1 0 70 19 1 0 9 100 10 11 606 66 6 0 0 699 0 3 96 13 4 1 0 117 0 0 1 0 1 0 0 2
1600 - 1615 0 0 5 2 0 0 1 8 0 0 19 9 0 0 0 28 0 0 13 3 0 0 0 16 0 0 0 0 0 0 0 0
1615 - 1630 0 0 5 0 0 0 0 5 0 1 23 7 1 0 1 33 0 0 7 0 0 0 0 7 0 0 1 0 0 0 0 1
1630 - 1645 0 0 5 2 0 0 2 9 0 1 30 6 0 0 0 37 0 0 3 4 1 0 0 8 0 0 0 0 0 0 0 0
1645 - 1700 0 0 5 2 0 0 0 7 0 3 33 8 0 0 0 44 0 0 5 1 0 0 0 6 0 0 0 0 0 0 0 0
Hourly Total 0 0 20 6 0 0 3 29 0 5 105 30 1 0 1 142 0 0 28 8 1 0 0 37 0 0 1 0 0 0 0 1
1700 - 1715 0 0 6 2 0 0 2 10 0 2 38 7 1 0 0 48 0 0 3 2 0 0 0 5 0 0 0 0 0 0 0 0
1715 - 1730 0 0 4 0 0 0 0 4 0 0 17 6 1 0 1 25 0 1 8 1 0 0 0 10 0 0 0 0 0 0 0 0
1730 - 1745 0 0 4 1 0 0 1 6 2 2 30 6 3 0 0 43 0 0 9 1 0 0 0 10 0 0 0 0 0 0 0 0
1745 - 1800 0 0 5 0 0 0 0 5 0 1 34 4 1 0 0 40 0 0 5 0 0 0 0 5 0 0 0 0 0 0 0 0
Hourly Total 0 0 19 3 0 0 3 25 2 5 119 23 6 0 1 156 0 1 25 4 0 0 0 30 0 0 0 0 0 0 0 0
1800 - 1815 0 0 10 0 0 0 0 10 1 0 31 4 0 0 0 36 0 0 9 0 0 0 0 9 0 0 1 0 0 0 0 1
1815 - 1830 0 0 7 1 1 0 1 10 0 0 27 5 1 0 0 33 0 0 2 0 0 0 0 2 0 0 0 0 0 0 0 0
1830 - 1845 0 0 2 0 0 0 1 3 0 0 19 5 0 0 0 24 0 1 5 0 0 0 0 6 0 0 0 0 0 0 0 0
1845 - 1900 1 0 3 0 0 0 0 4 0 0 15 1 0 0 0 16 0 0 6 0 0 0 0 6 0 0 0 0 0 0 0 0
Hourly Total 1 0 22 1 1 0 2 27 1 0 92 15 1 0 0 109 0 1 22 0 0 0 0 23 0 0 1 0 0 0 0 1
Session Total 1 0 61 10 1 0 8 81 3 10 316 68 8 0 2 407 0 2 75 12 1 0 0 90 0 0 2 0 0 0 0 2
Left to Green Lane East Ahead to Salhouse Road (West) Right to Green Lane West U-Turn
Rackheath - Manual Traffic Survey, Tuesday 14th April 2015
Junction: Green Lane West / Salhouse Road / Green Lane East
Approach: Green Lane East
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0700 - 0715 0 0 6 0 0 0 0 6 1 1 12 9 0 0 0 23 0 1 1 1 0 0 0 3 0 0 0 0 0 0 0 0
0715 - 0730 0 0 6 1 0 0 0 7 0 2 27 4 2 0 0 35 0 0 3 2 0 0 1 6 0 0 0 0 0 0 0 0
0730 - 0745 0 0 21 1 1 0 0 23 1 1 22 6 1 0 0 31 0 0 6 1 0 0 0 7 0 0 0 0 0 0 0 0
0745 - 0800 1 0 21 3 0 0 0 25 0 0 36 6 1 0 0 43 0 0 5 1 1 0 1 8 0 0 0 0 0 0 0 0
Hourly Total 1 0 54 5 1 0 0 61 2 4 97 25 4 0 0 132 0 1 15 5 1 0 2 24 0 0 0 0 0 0 0 0
0800 - 0815 0 0 28 0 0 0 0 28 0 0 32 8 0 0 0 40 0 0 5 3 0 0 0 8 0 0 0 0 0 0 0 0
0815 - 0830 0 1 24 3 0 0 0 28 1 1 36 6 1 0 0 45 0 0 4 0 1 0 0 5 0 0 0 0 0 0 0 0
0830 - 0845 1 0 22 1 0 0 0 24 0 1 30 8 2 0 0 41 0 0 7 0 0 0 1 8 0 0 0 0 0 0 0 0
0845 - 0900 0 0 20 0 1 0 0 21 0 0 36 11 1 1 0 49 0 0 5 3 0 0 0 8 0 0 0 0 0 0 0 0
Hourly Total 1 1 94 4 1 0 0 101 1 2 134 33 4 1 0 175 0 0 21 6 1 0 1 29 0 0 0 0 0 0 0 0
0900 - 0915 0 1 12 0 1 0 0 14 0 0 17 7 1 0 0 25 0 0 2 1 0 0 2 5 0 0 0 0 0 0 0 0
0915 - 0930 0 0 10 0 1 0 0 11 0 1 24 9 0 0 0 34 0 0 6 2 0 0 0 8 0 0 0 0 0 0 0 0
0930 - 0945 0 0 12 0 0 0 0 12 0 3 24 5 2 1 0 35 2 0 4 0 0 0 1 7 0 0 0 0 0 0 0 0
0945 - 1000 0 0 6 0 0 0 0 6 0 0 16 2 2 0 0 20 0 0 7 0 0 0 0 7 0 0 0 0 0 0 0 0
Hourly Total 0 1 40 0 2 0 0 43 0 4 81 23 5 1 0 114 2 0 19 3 0 0 3 27 0 0 0 0 0 0 0 0
Session Total 2 2 188 9 4 0 0 205 3 10 312 81 13 2 0 421 2 1 55 14 2 0 6 80 0 0 0 0 0 0 0 0
1600 - 1615 0 0 12 1 0 0 0 13 0 0 10 7 0 0 0 17 0 0 5 0 0 0 1 6 0 0 0 0 0 0 0 0
1615 - 1630 0 0 4 1 0 0 0 5 0 0 23 7 1 0 0 31 1 0 12 2 0 0 0 15 0 0 1 0 0 0 0 1
1630 - 1645 0 0 11 3 0 0 0 14 0 2 15 13 2 0 0 32 1 0 12 1 0 0 2 16 0 0 0 0 0 0 0 0
1645 - 1700 1 1 9 1 0 0 0 12 0 1 19 5 0 0 0 25 0 0 7 7 0 0 0 14 0 0 0 0 0 0 0 0
Hourly Total 1 1 36 6 0 0 0 44 0 3 67 32 3 0 0 105 2 0 36 10 0 0 3 51 0 0 1 0 0 0 0 1
1700 - 1715 0 0 11 1 0 0 0 12 0 2 24 6 0 0 0 32 0 0 20 2 0 0 1 23 0 0 0 0 0 0 0 0
1715 - 1730 0 0 11 1 0 0 0 12 0 1 26 5 0 0 0 32 0 0 12 0 0 0 0 12 0 0 0 0 0 0 0 0
1730 - 1745 0 0 12 4 0 0 0 16 0 3 21 1 0 0 0 25 0 0 13 4 0 0 1 18 0 0 0 0 0 0 0 0
1745 - 1800 0 0 12 0 0 0 0 12 0 1 31 6 0 1 0 39 0 0 10 3 0 0 1 14 0 0 0 0 0 0 0 0
Hourly Total 0 0 46 6 0 0 0 52 0 7 102 18 0 1 0 128 0 0 55 9 0 0 3 67 0 0 0 0 0 0 0 0
1800 - 1815 0 0 4 4 0 0 0 8 0 0 17 8 0 0 0 25 0 0 10 0 0 0 2 12 0 0 0 0 0 0 0 0
1815 - 1830 0 0 6 0 0 0 0 6 0 1 22 4 0 0 0 27 0 1 2 1 0 0 0 4 0 0 0 0 0 0 0 0
1830 - 1845 0 0 13 2 0 0 0 15 1 0 13 4 0 0 0 18 0 0 3 0 0 0 2 5 0 0 0 0 0 0 0 0
1845 - 1900 0 0 11 0 0 0 0 11 0 2 16 3 0 0 0 21 0 0 5 0 0 0 0 5 0 0 0 0 0 0 0 0
Hourly Total 0 0 34 6 0 0 0 40 1 3 68 19 0 0 0 91 0 1 20 1 0 0 4 26 0 0 0 0 0 0 0 0
Session Total 1 1 116 18 0 0 0 136 1 13 237 69 3 1 0 324 2 1 111 20 0 0 10 144 0 0 1 0 0 0 0 1
Left to Salhouse Road (West) Ahead to Green Lane West Right to Salhouse Road (East) U-Turn
Rackheath - Manual Traffic Survey, Tuesday 14th April 2015
Junction: Green Lane West / Salhouse Road / Green Lane East
Approach: Salhouse Road (West)
TIME P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL P/CYCLE M/CYCLE CAR LGV OGV1 OGV2 BUS TOTAL
0700 - 0715 0 0 10 1 0 0 0 11 0 0 9 5 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0715 - 0730 0 0 8 2 1 0 0 11 0 1 19 5 1 0 0 26 0 0 3 0 1 0 0 4 0 0 0 0 0 0 0 0
0730 - 0745 2 0 7 2 0 0 0 11 0 0 17 6 0 0 0 23 0 0 0 2 1 0 0 3 0 0 0 0 0 0 0 0
0745 - 0800 1 1 12 4 0 0 0 18 0 0 19 6 1 0 1 27 0 0 6 0 0 0 0 6 0 0 0 0 0 0 0 0
Hourly Total 3 1 37 9 1 0 0 51 0 1 64 22 2 0 1 90 0 0 9 2 2 0 0 13 0 0 0 0 0 0 0 0
0800 - 0815 1 0 13 1 0 0 0 15 0 2 23 8 0 0 0 33 0 0 2 1 0 0 0 3 0 0 0 0 0 0 0 0
0815 - 0830 0 0 14 0 1 0 0 15 1 0 14 7 1 0 0 23 0 0 5 2 0 0 0 7 0 1 0 0 0 0 0 1
0830 - 0845 0 1 21 3 2 0 0 27 0 1 25 5 1 0 0 32 0 0 8 2 0 0 0 10 0 1 0 0 0 0 0 1
0845 - 0900 0 0 12 1 1 0 0 14 0 0 18 6 1 0 0 25 0 0 7 2 0 0 0 9 0 0 0 0 0 0 0 0
Hourly Total 1 1 60 5 4 0 0 71 1 3 80 26 3 0 0 113 0 0 22 7 0 0 0 29 0 2 0 0 0 0 0 2
0900 - 0915 0 0 6 1 0 0 0 7 0 0 15 8 1 0 0 24 0 0 5 3 2 0 0 10 0 0 0 0 0 0 0 0
0915 - 0930 0 0 6 3 0 0 0 9 0 3 19 5 1 0 0 28 0 0 7 2 0 0 0 9 0 0 0 0 0 0 0 0
0930 - 0945 0 0 9 5 0 0 0 14 1 0 23 6 0 0 0 30 0 1 3 0 0 0 0 4 0 0 1 0 0 0 0 1
0945 - 1000 0 0 7 3 0 0 0 10 0 0 15 3 0 0 0 18 0 0 3 0 0 0 0 3 0 0 0 1 0 0 0 1
Hourly Total 0 0 28 12 0 0 0 40 1 3 72 22 2 0 0 100 0 1 18 5 2 0 0 26 0 0 1 1 0 0 0 2
Session Total 4 2 125 26 5 0 0 162 2 7 216 70 7 0 1 303 0 1 49 14 4 0 0 68 0 2 1 1 0 0 0 4
1600 - 1615 0 0 13 1 0 0 0 14 0 1 29 5 1 0 0 36 1 0 13 0 0 0 0 14 0 0 1 0 0 0 0 1
1615 - 1630 0 0 6 8 1 0 0 15 0 1 52 3 0 0 0 56 0 0 8 1 0 0 0 9 0 0 0 0 0 0 0 0
1630 - 1645 0 0 12 3 1 0 0 16 0 6 47 6 0 0 0 59 0 0 14 0 0 0 0 14 0 0 0 0 0 0 0 0
1645 - 1700 0 0 11 1 1 0 0 13 1 0 69 11 0 0 0 81 0 0 21 3 0 0 0 24 0 0 1 0 0 0 0 1
Hourly Total 0 0 42 13 3 0 0 58 1 8 197 25 1 0 0 232 1 0 56 4 0 0 0 61 0 0 2 0 0 0 0 2
1700 - 1715 0 0 14 0 0 0 0 14 0 1 70 5 0 0 0 76 0 2 15 3 0 0 0 20 0 0 0 0 0 0 0 0
1715 - 1730 0 2 8 2 0 0 0 12 4 3 68 6 0 0 0 81 0 1 19 3 0 0 0 23 0 0 0 0 0 0 0 0
1730 - 1745 1 1 9 0 0 0 0 11 1 4 63 7 0 0 0 75 0 0 15 4 0 0 0 19 0 0 0 0 0 0 0 0
1745 - 1800 1 0 13 2 0 0 0 16 3 0 60 3 0 0 0 66 0 1 15 0 0 0 0 16 0 0 0 0 0 0 0 0
Hourly Total 2 3 44 4 0 0 0 53 8 8 261 21 0 0 0 298 0 4 64 10 0 0 0 78 0 0 0 0 0 0 0 0
1800 - 1815 0 0 13 1 0 0 0 14 3 2 61 2 1 0 0 69 0 0 14 1 0 0 0 15 0 0 0 0 0 0 0 0
1815 - 1830 0 0 17 1 0 0 0 18 2 1 34 2 0 0 0 39 0 0 12 0 0 0 0 12 0 0 0 0 0 0 0 0
1830 - 1845 0 0 9 0 0 0 0 9 2 3 36 2 0 0 0 43 1 1 5 2 0 0 0 9 0 0 0 0 0 0 0 0
1845 - 1900 0 0 7 1 0 0 0 8 1 2 27 1 0 0 0 31 0 0 3 1 0 0 0 4 0 0 0 0 0 0 0 0
Hourly Total 0 0 46 3 0 0 0 49 8 8 158 7 1 0 0 182 1 1 34 4 0 0 0 40 0 0 0 0 0 0 0 0
Session Total 2 3 132 20 3 0 0 160 17 24 616 53 2 0 0 712 2 5 154 18 0 0 0 179 0 0 2 0 0 0 0 2
Left to Green Lane West Ahead to Salhouse Road (East) Right to Green Lane East U-Turn
Rackheath - Maximum Queue Length Survey, Tuesday 14th April 2015
Junction 1
TimeGreen Lane
West
Salhouse
Road (E)
Green Lane
East
Salhouse
Road (W)
07:05 1 2 2 1
07:10 1 2 2 1
07:15 1 3 1 2
07:20 1 3 2 2
07:25 2 6 2 1
07:30 1 5 2 2
07:35 2 7 2 1
07:40 2 5 2 1
07:45 2 7 2 1
07:50 2 8 2 1
07:55 1 7 1 1
08:00 2 6 2 2
08:05 2 7 1 2
08:10 3 5 1 1
08:15 2 6 1 1
08:20 3 5 1 1
08:25 3 4 1 2
08:30 5 5 2 1
08:35 6 3 1 1
08:40 3 4 1 1
08:45 3 2 2 1
08:50 2 2 2 1
08:55 1 2 2 1
09:00 2 3 2 0
09:05 1 1 2 0
09:10 2 2 2 1
09:15 1 1 1 0
09:20 1 1 2 0
09:25 1 1 2 0
09:30 1 2 1 1
09:35 1 2 1 0
09:40 0 1 1 0
09:45 1 1 1 1
09:50 0 1 0 1
09:55 1 1 1 1
10:00 0 1 1 1
TimeGreen Lane
West
Salhouse
Road (E)
Green Lane
East
Salhouse
Road (W)
16:05 1 2 2 3
16:10 1 1 2 1
16:15 2 2 2 2
16:20 2 1 1 1
16:25 3 1 2 2
16:30 2 2 1 2
16:35 4 2 2 3
16:40 3 2 2 2
16:45 3 1 2 3
16:50 2 1 2 3
16:55 2 2 1 2
17:00 3 2 2 2
17:05 3 3 1 2
17:10 2 2 2 2
17:15 2 1 2 1
17:20 3 1 3 3
17:25 4 1 3 2
17:30 4 3 2 3
17:35 6 4 4 2
17:40 4 3 2 3
17:45 5 2 2 3
17:50 2 4 4 2
17:55 2 2 3 2
18:00 3 2 4 2
18:05 2 2 2 1
18:10 2 2 2 1
18:15 2 3 3 1
18:20 1 2 2 1
18:25 1 2 1 1
18:30 1 1 1 2
18:35 2 1 2 1
18:40 1 1 1 2
18:45 1 2 2 2
18:50 2 2 1 1
18:55 1 2 1 3
19:00 1 1 1 1
0
1
2
3
4
5
6
7
8
9
AM Maximum Queues
Green Lane West Salhouse Road (E) Green Lane East Salhouse Road (W)
0
1
2
3
4
5
6
7
PM Maximum Queues
Green Lane West Salhouse Road (E) Green Lane East Salhouse Road (W)
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix C
APPENDIX C
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix D
APPENDIX D
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix E
APPENDIX E
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix F
APPENDIX F
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix G
APPENDIX G
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 1
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
Calculation Reference: AUDIT-219603-150623-0625
TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 03 - RESIDENTIAL
Category : M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL VEHICLES
Selected regions and areas:
02 SOUTH EAST
ES EAST SUSSEX 3 days
SC SURREY 1 days
WS WEST SUSSEX 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set
Filtering Stage 2 selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter range
are included in the trip rate calculation.
Parameter: Number of dwellings
Actual Range: 80 to 199 (units: )
Range Selected by User: 80 to 250 (units: )
Public Transport Provision:
Selection by: Include all surveys
Date Range: 01/01/10 to 01/01/15
This data displays the range of survey dates selected. Only surveys that were conducted within this date range are
included in the trip rate calculation.
Selected survey days:
Monday 1 days
Wednesday 1 days
Thursday 2 days
Friday 1 days
This data displays the number of selected surveys by day of the week.
Selected survey types:
Manual count 5 days
Directional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total adding
up to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveys are
undertaking using machines.
Selected Locations:
Suburban Area (PPS6 Out of Centre) 1
Edge of Town 3
Neighbourhood Centre (PPS6 Local Centre) 1
This data displays the number of surveys per main location category within the selected set. The main location categories
consist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre and
Not Known.
Selected Location Sub Categories:
Residential Zone 4
Village 1
This data displays the number of surveys per location sub-category within the selected set. The location sub-categories
consist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village, Out
of Town, High Street and No Sub Category.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 2
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
Filtering Stage 3 selection:
Use Class:
C 3 5 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order 2005
has been used for this purpose, which can be found within the Library module of TRICS®.
Population within 1 mile:
1,000 or Less 1 days
1,001 to 5,000 2 days
5,001 to 10,000 2 days
This data displays the number of selected surveys within stated 1-mile radii of population.
Population within 5 miles:
25,001 to 50,000 2 days
75,001 to 100,000 1 days
125,001 to 250,000 2 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:
1.1 to 1.5 3 days
1.6 to 2.0 2 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,
within a radius of 5-miles of selected survey sites.
Travel Plan:
Yes 5 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,
and the number of surveys that were undertaken at sites without Travel Plans.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 3
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
LIST OF SITES relevant to selection parameters
1 ES-03-M-04 MIXED HOUSING EAST SUSSEX
SOUTH COAST ROAD
PEACEHAVEN
Edge of Town
Residential Zone
Total Number of dwellings: 1 8 8
Survey date: FRIDAY 25/10/13 Survey Type: MANUAL
2 ES-03-M-05 HOUSES & FLATS EAST SUSSEX
A26 CROWBOROUGH RD
FIVE ASH DOWN VILLAGE
NEAR UCKFIELD
Neighbourhood Centre (PPS6 Local Centre)
Village
Total Number of dwellings: 1 3 8
Survey date: MONDAY 30/06/14 Survey Type: MANUAL
3 ES-03-M-06 MIXED HOUSES EAST SUSSEX
FIELD END
MARESFIELD
Edge of Town
Residential Zone
Total Number of dwellings: 8 0
Survey date: WEDNESDAY 01/10/14 Survey Type: MANUAL
4 SC-03-M-07 HOUSES/FLATS SURREY
EPSOM ROAD
GUILDFORD
Suburban Area (PPS6 Out of Centre)
Residential Zone
Total Number of dwellings: 1 9 9
Survey date: THURSDAY 24/10/13 Survey Type: MANUAL
5 WS-03-M-05 MIXED HOUSING WEST SUSSEX
ELLIS ROAD
S BROADBRIDGE HEATH
WEST HORSHAM
Edge of Town
Residential Zone
Total Number of dwellings: 9 2
Survey date: THURSDAY 23/10/14 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays a
unique site reference code and site address, the selected trip rate calculation parameter and its value, the day of the week
and date of each survey, and whether the survey was a manual classified count or an ATC count.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 4
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL VEHICLES
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.083 5 139 0.225 5 139 0.30807:00 - 08:00
5 139 0.105 5 139 0.308 5 139 0.41308:00 - 09:00
5 139 0.122 5 139 0.192 5 139 0.31409:00 - 10:00
5 139 0.121 5 139 0.154 5 139 0.27510:00 - 11:00
5 139 0.135 5 139 0.119 5 139 0.25411:00 - 12:00
5 139 0.103 5 139 0.135 5 139 0.23812:00 - 13:00
5 139 0.122 5 139 0.129 5 139 0.25113:00 - 14:00
5 139 0.141 5 139 0.165 5 139 0.30614:00 - 15:00
5 139 0.201 5 139 0.139 5 139 0.34015:00 - 16:00
5 139 0.217 5 139 0.143 5 139 0.36016:00 - 17:00
5 139 0.273 5 139 0.151 5 139 0.42417:00 - 18:00
5 139 0.291 5 139 0.131 5 139 0.42218:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 1.914 1.991 3.905
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 8
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL TAXIS
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.006 5 139 0.004 5 139 0.01007:00 - 08:00
5 139 0.004 5 139 0.004 5 139 0.00808:00 - 09:00
5 139 0.010 5 139 0.010 5 139 0.02009:00 - 10:00
5 139 0.001 5 139 0.006 5 139 0.00710:00 - 11:00
5 139 0.007 5 139 0.001 5 139 0.00811:00 - 12:00
5 139 0.007 5 139 0.006 5 139 0.01312:00 - 13:00
5 139 0.001 5 139 0.007 5 139 0.00813:00 - 14:00
5 139 0.006 5 139 0.006 5 139 0.01214:00 - 15:00
5 139 0.009 5 139 0.010 5 139 0.01915:00 - 16:00
5 139 0.003 5 139 0.000 5 139 0.00316:00 - 17:00
5 139 0.006 5 139 0.003 5 139 0.00917:00 - 18:00
5 139 0.001 5 139 0.003 5 139 0.00418:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 0.061 0.060 0.121
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 12
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL CYCLISTS
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.004 5 139 0.006 5 139 0.01007:00 - 08:00
5 139 0.000 5 139 0.014 5 139 0.01408:00 - 09:00
5 139 0.003 5 139 0.006 5 139 0.00909:00 - 10:00
5 139 0.000 5 139 0.000 5 139 0.00010:00 - 11:00
5 139 0.001 5 139 0.001 5 139 0.00211:00 - 12:00
5 139 0.001 5 139 0.003 5 139 0.00412:00 - 13:00
5 139 0.006 5 139 0.000 5 139 0.00613:00 - 14:00
5 139 0.001 5 139 0.003 5 139 0.00414:00 - 15:00
5 139 0.004 5 139 0.000 5 139 0.00415:00 - 16:00
5 139 0.013 5 139 0.016 5 139 0.02916:00 - 17:00
5 139 0.013 5 139 0.007 5 139 0.02017:00 - 18:00
5 139 0.004 5 139 0.006 5 139 0.01018:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 0.050 0.062 0.112
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 16
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL VEHICLE OCCUPANTS
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.085 5 139 0.294 5 139 0.37907:00 - 08:00
5 139 0.133 5 139 0.476 5 139 0.60908:00 - 09:00
5 139 0.142 5 139 0.270 5 139 0.41209:00 - 10:00
5 139 0.143 5 139 0.194 5 139 0.33710:00 - 11:00
5 139 0.164 5 139 0.138 5 139 0.30211:00 - 12:00
5 139 0.132 5 139 0.168 5 139 0.30012:00 - 13:00
5 139 0.148 5 139 0.158 5 139 0.30613:00 - 14:00
5 139 0.188 5 139 0.209 5 139 0.39714:00 - 15:00
5 139 0.333 5 139 0.175 5 139 0.50815:00 - 16:00
5 139 0.306 5 139 0.184 5 139 0.49016:00 - 17:00
5 139 0.370 5 139 0.192 5 139 0.56217:00 - 18:00
5 139 0.367 5 139 0.148 5 139 0.51518:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 2.511 2.606 5.117
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 20
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL PEDESTRIANS
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.023 5 139 0.040 5 139 0.06307:00 - 08:00
5 139 0.022 5 139 0.096 5 139 0.11808:00 - 09:00
5 139 0.039 5 139 0.050 5 139 0.08909:00 - 10:00
5 139 0.042 5 139 0.039 5 139 0.08110:00 - 11:00
5 139 0.033 5 139 0.034 5 139 0.06711:00 - 12:00
5 139 0.029 5 139 0.023 5 139 0.05212:00 - 13:00
5 139 0.027 5 139 0.024 5 139 0.05113:00 - 14:00
5 139 0.032 5 139 0.029 5 139 0.06114:00 - 15:00
5 139 0.063 5 139 0.043 5 139 0.10615:00 - 16:00
5 139 0.067 5 139 0.023 5 139 0.09016:00 - 17:00
5 139 0.056 5 139 0.044 5 139 0.10017:00 - 18:00
5 139 0.027 5 139 0.022 5 139 0.04918:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 0.460 0.467 0.927
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 24
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL PUBLIC TRANSPORT USERS
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.003 5 139 0.033 5 139 0.03607:00 - 08:00
5 139 0.000 5 139 0.040 5 139 0.04008:00 - 09:00
5 139 0.007 5 139 0.013 5 139 0.02009:00 - 10:00
5 139 0.003 5 139 0.004 5 139 0.00710:00 - 11:00
5 139 0.011 5 139 0.010 5 139 0.02111:00 - 12:00
5 139 0.006 5 139 0.004 5 139 0.01012:00 - 13:00
5 139 0.003 5 139 0.007 5 139 0.01013:00 - 14:00
5 139 0.014 5 139 0.001 5 139 0.01514:00 - 15:00
5 139 0.017 5 139 0.004 5 139 0.02115:00 - 16:00
5 139 0.027 5 139 0.000 5 139 0.02716:00 - 17:00
5 139 0.034 5 139 0.003 5 139 0.03717:00 - 18:00
5 139 0.007 5 139 0.001 5 139 0.00818:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 0.132 0.120 0.252
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
TRICS 7.2.1 040615 B17.16 (C) 2015 TRICS Consortium Ltd Tuesday 23/06/15
Residential - Mixed private/affordable Page 28
Transport Planning Associates Ltd Castle Park Cambridge Licence No: 219603
TRIP RATE for Land Use 03 - RESIDENTIAL/M - MIXED PRIVATE/AFFORDABLE HOUSING
MULTI-MODAL TOTAL PEOPLE
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALS
No. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate
00:00 - 01:00
01:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 07:00
5 139 0.115 5 139 0.373 5 139 0.48807:00 - 08:00
5 139 0.155 5 139 0.627 5 139 0.78208:00 - 09:00
5 139 0.191 5 139 0.339 5 139 0.53009:00 - 10:00
5 139 0.188 5 139 0.237 5 139 0.42510:00 - 11:00
5 139 0.209 5 139 0.184 5 139 0.39311:00 - 12:00
5 139 0.168 5 139 0.198 5 139 0.36612:00 - 13:00
5 139 0.184 5 139 0.189 5 139 0.37313:00 - 14:00
5 139 0.235 5 139 0.242 5 139 0.47714:00 - 15:00
5 139 0.418 5 139 0.222 5 139 0.64015:00 - 16:00
5 139 0.413 5 139 0.222 5 139 0.63516:00 - 17:00
5 139 0.473 5 139 0.247 5 139 0.72017:00 - 18:00
5 139 0.406 5 139 0.176 5 139 0.58218:00 - 19:00
19:00 - 20:00
20:00 - 21:00
21:00 - 22:00
22:00 - 23:00
23:00 - 24:00
Total Rates: 3.155 3.256 6.411
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 80 - 199 (units: )
Survey date date range: 01/01/10 - 01/01/15
Number of weekdays (Monday-Friday): 5
Number of Saturdays: 0
Number of Sundays: 0
Surveys manually removed from selection: 1
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix H
APPENDIX H
Filename: Green Lane East - Salhouse Road.j9
Path: P:\14\11\88 - Green Lane East, Rackheath\08 Calculations and Technical Data\Junction analysis\Arcady
Report generation date: 10/10/2016 16:18:56
»Un-calibrated - Surveyed, AM »Un-calibrated - Surveyed, PM »Calibrated AM - Surveyed, AM »Calibrated AM - Forecast Base, AM »Calibrated AM - Total Forecast , AM »Calibrated PM - Surveyed, PM »Calibrated PM - Forecast Base, PM »Calibrated PM - Total Forecast , PM
Junctions 9ARCADY 9 - Roundabout Module
Version: 9.0.0.4211 []
© Copyright TRL Limited, 2016
For sales and distribution information, program advice and maintenance, contact TRL:
Tel: +44 (0)1344 770758 email: [email protected] Web: http://www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the
solution
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
1
Summary of junction performance
AM PM
Queue (Veh) Delay (min) RFC LOS Queue (Veh) Delay (min) RFC LOS
Un-calibrated - Surveyed
1 - Salhouse Road East 2.5 0.34 0.72 C 1.0 0.23 0.50 B
2 - Green Lane East 1.3 0.27 0.58 C 0.7 0.17 0.43 A
3 - Salhouse Road West 0.6 0.14 0.40 A 1.7 0.21 0.63 B
4 - Green Lane West 1.1 0.18 0.53 B 10.6 0.97 0.99 F
AM
Queue (Veh) Delay (min) RFC LOS
Calibrated AM - Surveyed
1 - Salhouse Road East 2.5 0.34 0.72 C
2 - Green Lane East 1.3 0.27 0.58 C
3 - Salhouse Road West 0.6 0.14 0.40 A
4 - Green Lane West 2.3 0.37 0.71 C
Calibrated AM - Forecast Base
1 - Salhouse Road East 4.3 0.54 0.83 D
2 - Green Lane East 2.1 0.38 0.68 C
3 - Salhouse Road West 0.8 0.16 0.45 A
4 - Green Lane West 3.6 0.53 0.81 D
Calibrated AM - Total Forecast
PM
Queue (Veh) Delay (min) RFC LOS
Calibrated PM - Surveyed
1 - Salhouse Road East 1.0 0.25 0.51 B
2 - Green Lane East 0.7 0.17 0.43 B
3 - Salhouse Road West 1.7 0.21 0.63 B
4 - Green Lane West 2.0 0.21 0.67 B
Calibrated PM - Forecast Base
1 - Salhouse Road East 1.5 0.33 0.62 C
2 - Green Lane East 1.0 0.20 0.50 B
3 - Salhouse Road West 2.5 0.28 0.73 C
4 - Green Lane West 3.3 0.31 0.78 C
Calibrated PM - Total Forecast
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
2
File summary
Units
Analysis Options
Demand Set Summary
File Description
Title Green Lane East - Salhouse Road
Location Rackheath
Site number
Date 12/05/2015
Version
Status (new file)
Identifier
Client La Ronde Wright Ltd
Jobnumber 1411-88
Enumerator TPA"jack.williams
Description
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay units
m kph Veh Veh perHour min -Min perMin
Mini-roundabout
model
Vehicle
length (m)
Calculate Queue
Percentiles
Calculate detailed
queueing delay
Calculate residual
capacity
RFC
Threshold
Average Delay
threshold (min)
Queue threshold
(PCU)
JUNCTIONS 9 5.75 0.85 0.60 20.00
Scenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment length
(min)
Run
automatically
Surveyed AM DIRECT 08:00 09:00 60 15 ü
Surveyed PM DIRECT 17:00 18:00 60 15 ü
Forecast
BaseAM DIRECT 08:00 09:00 60 15 ü
Forecast
BasePM DIRECT 17:00 18:00 60 15 ü
Total
Forecast AM DIRECT 08:00 09:00 60 15 ü
Total
Forecast PM DIRECT 17:00 18:00 60 15 ü
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
3
Un-calibrated - Surveyed, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A1Un-
calibratedü ü D1,D2 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.25 B
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
4
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 852.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D1 Surveyed AM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
5
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 36.000 331.000 40.000
2 - Green
Lane
East 29.000 0.000 105.000 169.000
3 - Salhouse
Road
West
115.000 26.000 2.000 75.000
4 - Green
Lane
West 25.000 191.000 99.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.09 0.81 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.53 0.12 0.01 0.34
4 - Green
Lane
West 0.08 0.60 0.31 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 8 1 3
2 - Green
Lane East 14 0 0 2
3 - Salhouse
Road
West
3 0 0 4
4 - Green
Lane
West 8 4 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.083 1.009 1.025
2 - Green
Lane East 1.138 1.000 1.000 1.024
3 - Salhouse
Road
West
1.035 1.000 1.000 1.040
4 - Green
Lane
West 1.080 1.037 1.020 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.72 0.34 2.5 C 409.00 409.00
2 - Green Lane East 0.58 0.27 1.3 C 303.00 303.00
3 - Salhouse Road West 0.40 0.14 0.6 A 218.00 218.00
4 - Green Lane West 0.53 0.18 1.1 B 316.00 316.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
6
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East436.00 109.00 314.20 623.26 0.700 427.28 162.22 0.0 2.2 0.294 C
2 - Green
Lane East304.00 76.00 490.57 535.74 0.567 298.95 250.91 0.0 1.3 0.248 B
3 - Salhouse
Road West204.00 51.00 240.22 700.40 0.291 202.37 549.30 0.0 0.4 0.120 A
4 - Green
Lane West316.00 79.00 163.45 725.64 0.435 312.97 279.14 0.0 0.8 0.144 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East456.00 114.00 302.62 630.18 0.724 454.83 162.64 2.2 2.5 0.339 C
2 - Green
Lane East304.00 76.00 511.65 523.41 0.581 303.67 245.79 1.3 1.3 0.272 C
3 - Salhouse
Road West204.00 51.00 246.09 697.54 0.292 203.98 569.23 0.4 0.4 0.122 A
4 - Green
Lane West300.00 75.00 165.09 724.61 0.414 300.17 284.98 0.8 0.7 0.141 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East380.00 95.00 278.20 644.74 0.589 383.95 150.81 2.5 1.5 0.233 B
2 - Green
Lane East312.00 78.00 439.32 565.78 0.551 312.34 222.84 1.3 1.3 0.237 B
3 - Salhouse
Road West184.00 46.00 244.40 698.38 0.263 184.20 507.25 0.4 0.4 0.117 A
4 - Green
Lane West276.00 69.00 152.60 731.99 0.377 276.41 276.00 0.7 0.6 0.132 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East364.00 91.00 376.53 586.16 0.621 363.59 206.15 1.5 1.6 0.269 C
2 - Green
Lane East292.00 73.00 451.23 558.70 0.523 292.55 288.89 1.3 1.1 0.226 B
3 - Salhouse
Road West280.00 70.00 229.68 705.53 0.397 278.85 514.10 0.4 0.6 0.140 A
4 - Green
Lane West372.00 93.00 212.70 696.80 0.534 369.99 295.84 0.6 1.1 0.182 B
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
7
Un-calibrated - Surveyed, PM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A1Un-
calibratedü ü D1,D2 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.46 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
8
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 852.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D2 Surveyed PM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
9
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 27.000 160.000 31.000
2 - Green
Lane
East 67.000 0.000 52.000 114.000
3 - Salhouse
Road
West
313.000 86.000 1.000 50.000
4 - Green
Lane
West 94.000 241.000 109.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.12 0.73 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.19 0.00 0.11
4 - Green
Lane
West 0.21 0.54 0.25 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 11 4 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 2
4 - Green
Lane
West 0 3 1 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.111 1.038 1.000
2 - Green
Lane East 1.030 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.020
4 - Green
Lane
West 1.000 1.033 1.009 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.50 0.23 1.0 B 218.00 218.00
2 - Green Lane East 0.43 0.17 0.7 A 233.00 233.00
3 - Salhouse Road West 0.63 0.21 1.7 B 450.00 450.00
4 - Green Lane West 0.99 0.97 10.6 F 444.00 444.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
10
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East228.00 57.00 329.79 602.98 0.378 225.61 448.80 0.0 0.6 0.158 A
2 - Green
Lane East204.00 51.00 273.16 673.18 0.303 202.28 282.24 0.0 0.4 0.127 A
3 - Salhouse
Road West476.00 119.00 189.22 749.69 0.635 469.31 286.22 0.0 1.7 0.209 B
4 - Green
Lane West308.00 77.00 475.33 559.06 0.551 303.26 183.20 0.0 1.2 0.231 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East252.00 63.00 493.73 507.38 0.497 250.56 492.74 0.6 1.0 0.232 B
2 - Green
Lane East268.00 67.00 347.75 628.64 0.426 266.80 396.54 0.4 0.7 0.165 A
3 - Salhouse
Road West440.00 110.00 242.89 723.70 0.608 440.34 371.67 1.7 1.6 0.212 B
4 - Green
Lane West556.00 139.00 468.13 562.91 0.988 518.34 215.09 1.2 10.6 0.968 F
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East156.00 39.00 456.46 529.17 0.295 158.14 485.85 1.0 0.4 0.163 A
2 - Green
Lane East224.00 56.00 253.81 685.43 0.327 224.95 360.79 0.7 0.5 0.131 A
3 - Salhouse
Road West464.00 116.00 197.23 745.76 0.622 463.89 281.52 1.6 1.6 0.213 B
4 - Green
Lane West440.00 110.00 477.03 557.96 0.789 465.28 184.09 10.6 4.3 0.745 E
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East236.00 59.00 453.39 530.83 0.445 234.57 460.52 0.4 0.8 0.202 B
2 - Green
Lane East236.00 59.00 322.30 643.92 0.367 235.68 365.66 0.5 0.6 0.147 A
3 - Salhouse
Road West420.00 105.00 216.44 736.51 0.570 421.02 341.55 1.6 1.4 0.191 B
4 - Green
Lane West472.00 118.00 442.02 578.22 0.816 471.90 195.45 4.3 4.3 0.560 D
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
11
Calibrated AM - Surveyed, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.30 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
12
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D1 Surveyed AM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
13
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 36.000 331.000 40.000
2 - Green
Lane
East 29.000 0.000 105.000 169.000
3 - Salhouse
Road
West
115.000 26.000 2.000 75.000
4 - Green
Lane
West 25.000 191.000 99.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.09 0.81 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.53 0.12 0.01 0.34
4 - Green
Lane
West 0.08 0.60 0.31 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 8 1 3
2 - Green
Lane East 14 0 0 2
3 - Salhouse
Road
West
3 0 0 4
4 - Green
Lane
West 8 4 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.083 1.009 1.025
2 - Green
Lane East 1.138 1.000 1.000 1.024
3 - Salhouse
Road
West
1.035 1.000 1.000 1.040
4 - Green
Lane
West 1.080 1.037 1.020 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.72 0.34 2.5 C 409.00 409.00
2 - Green Lane East 0.58 0.27 1.3 C 303.00 303.00
3 - Salhouse Road West 0.40 0.14 0.6 A 218.00 218.00
4 - Green Lane West 0.71 0.37 2.3 C 316.00 316.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
14
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East436.00 109.00 312.24 624.43 0.698 427.33 162.05 0.0 2.2 0.293 C
2 - Green
Lane East304.00 76.00 489.94 536.11 0.567 298.96 249.63 0.0 1.3 0.248 B
3 - Salhouse
Road West204.00 51.00 240.23 700.39 0.291 202.37 548.67 0.0 0.4 0.120 A
4 - Green
Lane West316.00 79.00 163.45 551.68 0.573 310.84 279.14 0.0 1.3 0.244 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East456.00 114.00 302.70 630.13 0.724 454.78 162.65 2.2 2.5 0.339 C
2 - Green
Lane East304.00 76.00 511.64 523.42 0.581 303.66 245.84 1.3 1.3 0.272 C
3 - Salhouse
Road West204.00 51.00 246.08 697.55 0.292 203.98 569.22 0.4 0.4 0.122 A
4 - Green
Lane West300.00 75.00 165.09 550.66 0.545 300.26 284.97 1.3 1.2 0.240 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East380.00 95.00 278.64 644.48 0.590 383.94 150.84 2.5 1.5 0.234 B
2 - Green
Lane East312.00 78.00 439.46 565.70 0.552 312.33 223.12 1.3 1.3 0.237 B
3 - Salhouse
Road West184.00 46.00 244.40 698.38 0.263 184.20 507.39 0.4 0.4 0.117 A
4 - Green
Lane West276.00 69.00 152.60 558.04 0.495 276.89 276.00 1.2 1.0 0.214 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East364.00 91.00 373.70 587.85 0.619 363.64 205.91 1.5 1.6 0.267 C
2 - Green
Lane East292.00 73.00 450.30 559.25 0.522 292.56 287.04 1.3 1.1 0.226 B
3 - Salhouse
Road West280.00 70.00 229.68 705.52 0.397 278.85 513.18 0.4 0.6 0.140 A
4 - Green
Lane West372.00 93.00 212.70 522.85 0.711 366.91 295.84 1.0 2.3 0.373 C
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
15
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
16
Calibrated AM - Forecast Base, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.43 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
17
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D3Forecast
BaseAM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
18
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 40.000 368.000 45.000
2 - Green
Lane
East 32.000 0.000 117.000 188.000
3 - Salhouse
Road
West
128.000 29.000 2.000 83.000
4 - Green
Lane
West 28.000 213.000 110.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.09 0.81 0.10
2 - Green
Lane
East 0.09 0.00 0.35 0.56
3 - Salhouse
Road
West
0.53 0.12 0.01 0.34
4 - Green
Lane
West 0.08 0.61 0.31 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 8 1 2
2 - Green
Lane East 13 0 0 2
3 - Salhouse
Road
West
3 0 0 4
4 - Green
Lane
West 7 4 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.079 1.009 1.024
2 - Green
Lane East 1.129 1.000 1.000 1.022
3 - Salhouse
Road
West
1.033 1.000 1.000 1.038
4 - Green
Lane
West 1.071 1.038 1.019 1.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
19
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.83 0.54 4.3 D 456.00 456.00
2 - Green Lane East 0.68 0.38 2.1 C 338.00 338.00
3 - Salhouse Road West 0.45 0.16 0.8 A 244.00 244.00
4 - Green Lane West 0.81 0.53 3.6 D 350.00 350.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East488.00 122.00 346.48 604.64 0.807 473.55 180.64 0.0 3.6 0.421 D
2 - Green
Lane East340.00 85.00 542.57 506.40 0.671 332.36 277.46 0.0 1.9 0.332 C
3 - Salhouse
Road West228.00 57.00 266.87 688.98 0.331 226.05 608.06 0.0 0.5 0.129 A
4 - Green
Lane West352.00 88.00 182.16 541.01 0.651 344.96 310.76 0.0 1.8 0.296 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East508.00 127.00 335.20 611.40 0.831 505.18 181.10 3.6 4.3 0.542 D
2 - Green
Lane East336.00 84.00 567.48 491.82 0.683 335.42 272.89 1.9 2.1 0.381 C
3 - Salhouse
Road West228.00 57.00 272.10 686.44 0.332 227.98 630.80 0.5 0.5 0.131 A
4 - Green
Lane West332.00 83.00 183.86 539.96 0.615 332.44 316.22 1.8 1.6 0.290 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East424.00 106.00 307.81 627.75 0.675 432.49 169.42 4.3 2.2 0.319 C
2 - Green
Lane East348.00 87.00 492.50 535.77 0.650 348.52 247.79 2.1 1.9 0.322 C
3 - Salhouse
Road West208.00 52.00 273.06 685.99 0.303 208.21 567.96 0.5 0.4 0.126 A
4 - Green
Lane West304.00 76.00 171.80 547.06 0.556 305.43 309.48 1.6 1.3 0.250 B
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
20
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East404.00 101.00 410.52 566.48 0.713 403.33 229.31 2.2 2.4 0.365 C
2 - Green
Lane East328.00 82.00 497.45 532.77 0.616 329.04 316.40 1.9 1.7 0.296 C
3 - Salhouse
Road West312.00 78.00 257.61 693.48 0.450 310.55 568.88 0.4 0.8 0.156 A
4 - Green
Lane West412.00 103.00 237.05 508.87 0.810 402.78 331.10 1.3 3.6 0.525 D
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
21
Calibrated AM - Total Forecast , AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.53 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
22
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D5Total
Forecast AM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
23
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 42.000 368.000 45.000
2 - Green
Lane
East 38.000 0.000 139.000 222.000
3 - Salhouse
Road
West
128.000 30.000 2.000 83.000
4 - Green
Lane
West 28.000 224.000 110.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.09 0.81 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.53 0.12 0.01 0.34
4 - Green
Lane
West 0.08 0.62 0.30 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 7 1 2
2 - Green
Lane East 11 0 0 2
3 - Salhouse
Road
West
3 0 0 4
4 - Green
Lane
West 7 4 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.071 1.009 1.024
2 - Green
Lane East 1.111 1.000 1.000 1.019
3 - Salhouse
Road
West
1.033 1.000 1.000 1.038
4 - Green
Lane
West 1.071 1.036 1.019 1.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
24
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.84 0.59 4.7 E 459.00 459.00
2 - Green Lane East 0.81 0.60 3.8 E 398.00 398.00
3 - Salhouse Road West 0.47 0.17 0.9 A 245.00 245.00
4 - Green Lane West 0.85 0.61 4.4 E 362.00 362.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East492.00 123.00 358.47 597.89 0.823 476.33 185.13 0.0 3.9 0.449 D
2 - Green
Lane East396.00 99.00 543.33 507.71 0.780 383.63 291.47 0.0 3.1 0.448 D
3 - Salhouse
Road West228.00 57.00 299.95 673.67 0.338 225.98 627.01 0.0 0.5 0.133 A
4 - Green
Lane West364.00 91.00 187.42 538.51 0.676 356.19 338.52 0.0 2.0 0.317 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East512.00 128.00 344.38 606.33 0.844 508.90 186.42 3.9 4.7 0.586 E
2 - Green
Lane East400.00 100.00 568.17 493.12 0.811 397.31 285.11 3.1 3.8 0.601 E
3 - Salhouse
Road West228.00 57.00 312.17 667.77 0.341 227.96 653.30 0.5 0.5 0.136 A
4 - Green
Lane West340.00 85.00 190.17 536.80 0.633 340.63 349.97 2.0 1.8 0.307 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East424.00 106.00 320.36 620.66 0.683 433.64 175.40 4.7 2.3 0.335 C
2 - Green
Lane East412.00 103.00 492.56 537.59 0.766 413.01 261.44 3.8 3.5 0.490 D
3 - Salhouse
Road West208.00 52.00 314.60 666.64 0.312 208.22 590.97 0.5 0.5 0.131 A
4 - Green
Lane West316.00 79.00 178.33 543.77 0.581 317.43 344.49 1.8 1.4 0.267 C
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
25
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East408.00 102.00 425.42 558.03 0.731 406.92 236.34 2.3 2.6 0.392 C
2 - Green
Lane East384.00 96.00 499.35 533.50 0.720 387.01 332.99 3.5 2.8 0.419 D
3 - Salhouse
Road West316.00 79.00 295.18 676.01 0.467 314.39 591.18 0.5 0.9 0.165 A
4 - Green
Lane West428.00 107.00 245.65 504.35 0.849 416.12 363.93 1.4 4.4 0.612 E
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
26
Calibrated PM - Surveyed, PM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.21 B
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
27
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D2 Surveyed PM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
28
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 27.000 160.000 31.000
2 - Green
Lane
East 67.000 0.000 52.000 114.000
3 - Salhouse
Road
West
313.000 86.000 1.000 50.000
4 - Green
Lane
West 94.000 241.000 109.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.12 0.73 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.19 0.00 0.11
4 - Green
Lane
West 0.21 0.54 0.25 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 11 4 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 2
4 - Green
Lane
West 0 3 1 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.111 1.038 1.000
2 - Green
Lane East 1.030 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.020
4 - Green
Lane
West 1.000 1.033 1.009 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.51 0.25 1.0 B 218.00 218.00
2 - Green Lane East 0.43 0.17 0.7 B 233.00 233.00
3 - Salhouse Road West 0.63 0.21 1.7 B 450.00 450.00
4 - Green Lane West 0.67 0.21 2.0 B 444.00 444.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
29
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East228.00 57.00 331.66 601.89 0.379 225.60 449.30 0.0 0.6 0.158 A
2 - Green
Lane East204.00 51.00 273.74 672.83 0.303 202.28 283.53 0.0 0.4 0.127 A
3 - Salhouse
Road West476.00 119.00 189.22 749.69 0.635 469.31 286.80 0.0 1.7 0.209 B
4 - Green
Lane West308.00 77.00 475.33 823.69 0.374 305.64 183.20 0.0 0.6 0.115 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East252.00 63.00 519.09 492.61 0.512 250.34 499.54 0.6 1.0 0.246 B
2 - Green
Lane East268.00 67.00 355.46 624.08 0.429 266.76 413.97 0.4 0.7 0.167 B
3 - Salhouse
Road West440.00 110.00 242.83 723.73 0.608 440.34 379.40 1.7 1.6 0.212 B
4 - Green
Lane West556.00 139.00 468.12 827.55 0.672 550.51 215.05 0.6 2.0 0.213 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East156.00 39.00 439.02 539.33 0.289 158.41 481.18 1.0 0.4 0.158 A
2 - Green
Lane East224.00 56.00 248.61 688.51 0.325 225.00 348.81 0.7 0.5 0.130 A
3 - Salhouse
Road West464.00 116.00 197.31 745.72 0.622 463.89 276.30 1.6 1.6 0.213 B
4 - Green
Lane West440.00 110.00 477.04 822.58 0.535 443.15 184.15 2.0 1.2 0.159 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East236.00 59.00 453.23 530.92 0.445 234.53 460.48 0.4 0.8 0.201 B
2 - Green
Lane East236.00 59.00 322.21 643.98 0.366 235.67 365.55 0.5 0.6 0.147 A
3 - Salhouse
Road West420.00 105.00 216.43 736.51 0.570 421.02 341.46 1.6 1.4 0.191 B
4 - Green
Lane West472.00 118.00 442.01 842.85 0.560 471.70 195.44 1.2 1.2 0.161 A
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
30
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
31
Calibrated PM - Forecast Base, PM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.28 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
32
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D4Forecast
BasePM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
33
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 30.000 179.000 35.000
2 - Green
Lane
East 75.000 0.000 58.000 127.000
3 - Salhouse
Road
West
350.000 96.000 1.000 56.000
4 - Green
Lane
West 105.000 270.000 122.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.12 0.73 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.19 0.00 0.11
4 - Green
Lane
West 0.21 0.54 0.25 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 10 4 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 2
4 - Green
Lane
West 0 3 1 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.103 1.035 1.000
2 - Green
Lane East 1.028 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.019
4 - Green
Lane
West 1.000 1.031 1.009 1.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
34
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.62 0.33 1.5 C 244.00 244.00
2 - Green Lane East 0.50 0.20 1.0 B 260.00 260.00
3 - Salhouse Road West 0.73 0.28 2.5 C 504.00 504.00
4 - Green Lane West 0.78 0.31 3.3 C 497.00 497.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East256.00 64.00 370.39 581.19 0.440 252.92 503.28 0.0 0.8 0.181 B
2 - Green
Lane East228.00 57.00 306.57 653.62 0.349 225.89 316.74 0.0 0.5 0.140 A
3 - Salhouse
Road West536.00 134.00 211.78 738.92 0.725 526.11 320.68 0.0 2.5 0.271 C
4 - Green
Lane West344.00 86.00 532.70 791.19 0.435 340.97 205.19 0.0 0.8 0.132 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East284.00 71.00 579.13 459.34 0.618 280.95 558.41 0.8 1.5 0.331 C
2 - Green
Lane East300.00 75.00 398.06 599.05 0.501 298.20 462.01 0.5 1.0 0.198 B
3 - Salhouse
Road West492.00 123.00 271.98 709.78 0.693 492.52 424.28 2.5 2.3 0.277 C
4 - Green
Lane West624.00 156.00 523.71 796.07 0.784 613.83 240.79 0.8 3.3 0.314 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East172.00 43.00 493.35 509.45 0.338 176.06 539.03 1.5 0.5 0.182 B
2 - Green
Lane East248.00 62.00 277.79 671.52 0.369 249.54 391.63 1.0 0.6 0.143 A
3 - Salhouse
Road West520.00 130.00 219.13 735.31 0.707 519.91 308.20 2.3 2.4 0.278 C
4 - Green
Lane West492.00 123.00 534.00 790.32 0.623 498.38 205.02 3.3 1.7 0.210 B
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
35
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East264.00 66.00 506.77 501.49 0.526 261.78 514.42 0.5 1.1 0.248 B
2 - Green
Lane East264.00 66.00 360.04 621.81 0.425 263.48 408.50 0.6 0.7 0.167 B
3 - Salhouse
Road West468.00 117.00 242.25 724.16 0.646 469.88 381.27 2.4 1.9 0.238 B
4 - Green
Lane West528.00 132.00 493.57 813.74 0.649 527.62 218.56 1.7 1.8 0.209 B
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
36
Calibrated PM - Total Forecast , PM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.34 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
37
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D6Total
Forecast PM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
38
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 34.000 179.000 35.000
2 - Green
Lane
East 82.000 0.000 63.000 138.000
3 - Salhouse
Road
West
350.000 108.000 1.000 56.000
4 - Green
Lane
West 105.000 303.000 122.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.14 0.72 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.68 0.21 0.00 0.11
4 - Green
Lane
West 0.20 0.57 0.23 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 9 4 0
2 - Green
Lane East 2 0 0 0
3 - Salhouse
Road
West
0 0 0 2
4 - Green
Lane
West 0 3 1 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.094 1.035 1.000
2 - Green
Lane East 1.025 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.019
4 - Green
Lane
West 1.000 1.028 1.009 1.000
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
39
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.68 0.40 1.9 C 249.00 249.00
2 - Green Lane East 0.55 0.22 1.2 B 284.00 284.00
3 - Salhouse Road West 0.75 0.31 2.8 C 516.00 516.00
4 - Green Lane West 0.85 0.40 4.6 C 529.00 529.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East260.00 65.00 402.79 562.91 0.462 256.65 507.53 0.0 0.8 0.194 B
2 - Green
Lane East248.00 62.00 305.51 654.88 0.379 245.60 353.94 0.0 0.6 0.146 A
3 - Salhouse
Road West548.00 137.00 227.15 731.62 0.749 536.96 323.96 0.0 2.8 0.294 C
4 - Green
Lane West364.00 91.00 549.74 782.25 0.465 360.58 214.37 0.0 0.9 0.141 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East292.00 73.00 627.10 432.18 0.676 287.64 565.70 0.8 1.9 0.403 C
2 - Green
Lane East328.00 82.00 398.56 599.31 0.547 325.71 516.19 0.6 1.2 0.218 B
3 - Salhouse
Road West504.00 126.00 293.80 699.39 0.721 504.35 430.48 2.8 2.7 0.309 C
4 - Green
Lane West664.00 166.00 543.88 785.32 0.846 648.92 254.26 0.9 4.6 0.403 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East176.00 44.00 540.72 482.57 0.365 181.37 547.76 1.9 0.6 0.203 B
2 - Green
Lane East276.00 69.00 280.44 670.56 0.412 277.84 441.65 1.2 0.7 0.153 A
3 - Salhouse
Road West532.00 133.00 241.59 724.59 0.734 531.89 316.69 2.7 2.7 0.311 C
4 - Green
Lane West524.00 131.00 554.56 779.31 0.672 533.92 218.92 4.6 2.1 0.254 C
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
40
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East268.00 67.00 553.95 474.73 0.565 265.37 521.59 0.6 1.2 0.283 C
2 - Green
Lane East284.00 71.00 359.63 622.65 0.456 283.55 459.68 0.7 0.8 0.177 B
3 - Salhouse
Road West480.00 120.00 257.88 716.75 0.670 482.33 385.31 2.7 2.1 0.259 C
4 - Green
Lane West564.00 141.00 512.04 804.01 0.701 563.50 228.17 2.1 2.3 0.248 B
Generated on 10/10/2016 16:20:14 using Junctions 9 (9.0.0.4211)
41
GT19 Green Lane East, Rackheath Lovell Partnerships Ltd Transport Assessment
1411-88/TA/01 Rev D Transport Planning Associates
October 2016 Appendix I
APPENDIX I
Filename: Green Lane East - Salhouse Road - Stopping up.j9
Path: P:\14\11\88 - Green Lane East, Rackheath\08 Calculations and Technical Data\Junction analysis\Arcady
Report generation date: 10/10/2016 16:21:04
»Un-calibrated - Surveyed, AM »Un-calibrated - Surveyed, PM »Calibrated AM - Surveyed, AM »Calibrated AM - Forecast Base, AM »Calibrated AM - Total Forecast, AM »Calibrated PM - Surveyed, PM »Calibrated PM - Forecast Base, PM »Calibrated PM - Total Forecast, PM
Junctions 9ARCADY 9 - Roundabout Module
Version: 9.0.0.4211 []
© Copyright TRL Limited, 2016
For sales and distribution information, program advice and maintenance, contact TRL:
Tel: +44 (0)1344 770758 email: [email protected] Web: http://www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the
solution
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
1
Summary of junction performance
AM
Queue (Veh) Delay (min) RFC LOS
Calibrated AM - Surveyed
1 - Salhouse Road East 2.7 0.36 0.74 C
2 - Green Lane East 0.5 0.22 0.35 B
3 - Salhouse Road West 1.1 0.17 0.53 B
4 - Green Lane West 2.2 0.36 0.70 C
Calibrated AM - Forecast Base
1 - Salhouse Road East 4.9 0.60 0.86 E
2 - Green Lane East 0.8 0.27 0.44 C
3 - Salhouse Road West 1.4 0.20 0.59 B
4 - Green Lane West 3.3 0.49 0.79 D
Calibrated AM - Total Forecast
1 - Salhouse Road East 5.2 0.64 0.87 E
2 - Green Lane East 1.7 0.41 0.64 C
3 - Salhouse Road West 1.6 0.21 0.62 B
4 - Green Lane West 4.3 0.59 0.84 E
PM
Queue (Veh) Delay (min) RFC LOS
Calibrated PM - Surveyed
1 - Salhouse Road East 0.9 0.22 0.47 B
2 - Green Lane East 0.4 0.16 0.26 A
3 - Salhouse Road West 1.9 0.22 0.67 B
4 - Green Lane West 1.9 0.20 0.66 B
Calibrated PM - Forecast Base
1 - Salhouse Road East 1.3 0.28 0.57 C
2 - Green Lane East 0.5 0.18 0.32 B
3 - Salhouse Road West 2.7 0.29 0.74 C
4 - Green Lane West 2.9 0.28 0.76 C
Calibrated PM - Total Forecast
1 - Salhouse Road East 1.5 0.34 0.62 C
2 - Green Lane East 0.6 0.20 0.38 B
3 - Salhouse Road West 3.2 0.33 0.78 C
4 - Green Lane West 4.7 0.40 0.85 C
There are warnings associated with one or more model runs - see the 'Data Errors and Warnings' tables for each Analysis or Demand Set.
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
2
File summary
Units
Analysis Options
Demand Set Summary
File Description
Title Green Lane East - Salhouse Road
Location Rackheath
Site number
Date 12/05/2015
Version
Status (new file)
Identifier
Client La Ronde Wright Ltd
Jobnumber 1411-88
Enumerator TPA"jack.williams
Description
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay units
m kph Veh Veh perHour min -Min perMin
Mini-roundabout
model
Vehicle
length (m)
Calculate Queue
Percentiles
Calculate detailed
queueing delay
Calculate residual
capacity
RFC
Threshold
Average Delay
threshold (min)
Queue threshold
(PCU)
JUNCTIONS 9 5.75 0.85 0.60 20.00
Scenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment length
(min)
Run
automatically
Surveyed AM DIRECT 08:00 09:00 60 15 ü
Surveyed PM DIRECT 17:00 18:00 60 15 ü
Forecast
BaseAM DIRECT 08:00 09:00 60 15 ü
Forecast
BasePM DIRECT 17:00 18:00 60 15 ü
Total
ForecastAM DIRECT 08:00 09:00 60 15 ü
Total
ForecastPM DIRECT 17:00 18:00 60 15 ü
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
3
Un-calibrated - Surveyed, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID Name Use specific Demand Set(s) Specific Demand Set(s) Network flow scaling factor (%) Network capacity scaling factor (%)
A1 Un-calibrated ü D1,D2 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.24 B
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
4
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 852.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D1 Surveyed AM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
5
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 2.000 0.000 367.000 40.000
2 - Green
Lane East 15.000 0.000 53.000 85.000
3 - Salhouse
Road
West
130.000 13.000 2.000 160.000
4 - Green
Lane
West 25.000 96.000 195.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.90 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.43 0.04 0.01 0.52
4 - Green
Lane
West 0.08 0.30 0.62 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 8 2 3
2 - Green
Lane East 13 0 0 2
3 - Salhouse
Road
West
5 0 0 3
4 - Green
Lane
West 8 4 3 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.083 1.016 1.025
2 - Green
Lane East 1.133 1.000 1.000 1.024
3 - Salhouse
Road
West
1.046 1.000 1.000 1.031
4 - Green
Lane
West 1.080 1.037 1.031 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.74 0.37 2.7 C 409.00 409.00
2 - Green Lane East 0.35 0.22 0.5 B 154.00 154.00
3 - Salhouse Road West 0.53 0.17 1.1 B 306.00 306.00
4 - Green Lane West 0.53 0.18 1.1 B 317.00 317.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
6
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East424.00 106.00 295.11 634.22 0.669 416.35 162.89 0.0 1.9 0.267 C
2 - Green
Lane East156.00 39.00 606.89 464.78 0.336 154.02 104.58 0.0 0.5 0.192 B
3 - Salhouse
Road West288.00 72.00 144.38 743.95 0.387 285.51 616.53 0.0 0.6 0.130 A
4 - Green
Lane West308.00 77.00 152.87 730.62 0.422 305.13 277.02 0.0 0.7 0.140 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East460.00 115.00 323.03 617.50 0.745 456.85 164.63 1.9 2.7 0.365 C
2 - Green
Lane East152.00 38.00 666.16 429.75 0.354 151.83 113.72 0.5 0.5 0.216 B
3 - Salhouse
Road West284.00 71.00 147.21 742.57 0.382 284.00 670.79 0.6 0.6 0.131 A
4 - Green
Lane West336.00 84.00 152.14 731.01 0.460 335.52 279.07 0.7 0.8 0.151 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East396.00 99.00 249.33 661.62 0.599 400.62 145.53 2.7 1.5 0.234 B
2 - Green
Lane East160.00 40.00 561.30 491.82 0.325 160.19 88.65 0.5 0.5 0.181 B
3 - Salhouse
Road West252.00 63.00 146.65 742.86 0.339 252.41 574.84 0.6 0.5 0.122 A
4 - Green
Lane West256.00 64.00 137.66 739.65 0.346 257.20 261.40 0.8 0.5 0.125 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East356.00 89.00 356.52 597.54 0.596 356.15 214.58 1.5 1.5 0.249 B
2 - Green
Lane East148.00 37.00 584.94 477.48 0.310 148.13 127.73 0.5 0.5 0.182 B
3 - Salhouse
Road West400.00 100.00 134.55 748.72 0.534 397.60 598.53 0.5 1.1 0.170 B
4 - Green
Lane West368.00 92.00 205.29 699.55 0.526 365.81 326.86 0.5 1.1 0.179 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
7
Un-calibrated - Surveyed, PM
Data Errors and Warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
Severity Area Item Description
Warning Mini-roundabout
Mini-roundabout appears to have unbalanced flows and may behave like a priority junction;
treat results with caution. See User Guide for details.[Arms 3 and 4 have 73% of the total flow
for the roundabout for one or more time segments]
ID Name Use specific Demand Set(s) Specific Demand Set(s) Network flow scaling factor (%) Network capacity scaling factor (%)
A1 Un-calibrated ü D1,D2 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.42 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
8
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 852.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D2 Surveyed PM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
9
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 0.000 187.000 31.000
2 - Green
Lane
East 34.000 0.000 26.000 57.000
3 - Salhouse
Road
West
347.000 43.000 1.000 107.000
4 - Green
Lane
West 94.000 121.000 230.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.86 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.09 0.00 0.21
4 - Green
Lane
West 0.21 0.27 0.52 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 0 5 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 1
4 - Green
Lane
West 0 3 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.000 1.048 1.000
2 - Green
Lane East 1.030 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.009
4 - Green
Lane
West 1.000 1.033 1.022 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.46 0.21 0.8 B 217.00 217.00
2 - Green Lane East 0.26 0.15 0.3 A 118.00 118.00
3 - Salhouse Road West 0.67 0.22 1.9 B 500.00 500.00
4 - Green Lane West 0.96 0.82 8.7 E 446.00 446.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
10
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East228.00 57.00 285.13 628.36 0.363 225.76 453.93 0.0 0.6 0.148 A
2 - Green
Lane East104.00 26.00 383.74 604.71 0.172 103.18 127.15 0.0 0.2 0.119 A
3 - Salhouse
Road West524.00 131.00 112.35 787.12 0.666 516.37 374.56 0.0 1.9 0.216 B
4 - Green
Lane West308.00 77.00 435.41 582.73 0.529 303.65 193.32 0.0 1.1 0.212 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East244.00 61.00 461.55 525.55 0.464 242.86 497.04 0.6 0.8 0.211 B
2 - Green
Lane East136.00 34.00 517.57 524.15 0.259 135.44 186.85 0.2 0.3 0.154 A
3 - Salhouse
Road West496.00 124.00 139.88 773.79 0.641 496.31 513.13 1.9 1.8 0.217 B
4 - Green
Lane West560.00 140.00 429.03 586.27 0.955 529.57 207.15 1.1 8.7 0.817 E
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East156.00 39.00 417.01 551.53 0.283 157.78 488.98 0.8 0.4 0.153 A
2 - Green
Lane East112.00 28.00 402.42 594.27 0.188 112.44 172.37 0.3 0.2 0.125 A
3 - Salhouse
Road West512.00 128.00 109.89 788.26 0.650 511.98 404.97 1.8 1.8 0.217 B
4 - Green
Lane West452.00 113.00 434.65 583.12 0.775 471.34 187.22 8.7 3.9 0.599 E
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East240.00 60.00 408.25 556.57 0.431 238.63 459.97 0.4 0.7 0.188 B
2 - Green
Lane East120.00 30.00 479.93 546.80 0.219 119.83 166.96 0.2 0.3 0.140 A
3 - Salhouse
Road West468.00 117.00 127.13 779.96 0.600 469.17 472.62 1.8 1.5 0.194 B
4 - Green
Lane West464.00 116.00 403.19 601.34 0.772 465.03 193.12 3.9 3.6 0.447 D
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
11
Calibrated AM - Surveyed, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.29 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
12
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D1 Surveyed AM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
13
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 2.000 0.000 367.000 40.000
2 - Green
Lane East 15.000 0.000 53.000 85.000
3 - Salhouse
Road
West
130.000 13.000 2.000 160.000
4 - Green
Lane
West 25.000 96.000 195.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.90 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.43 0.04 0.01 0.52
4 - Green
Lane
West 0.08 0.30 0.62 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 8 2 3
2 - Green
Lane East 13 0 0 2
3 - Salhouse
Road
West
5 0 0 3
4 - Green
Lane
West 8 4 3 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.083 1.016 1.025
2 - Green
Lane East 1.133 1.000 1.000 1.024
3 - Salhouse
Road
West
1.046 1.000 1.000 1.031
4 - Green
Lane
West 1.080 1.037 1.031 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.74 0.36 2.7 C 409.00 409.00
2 - Green Lane East 0.35 0.22 0.5 B 154.00 154.00
3 - Salhouse Road West 0.53 0.17 1.1 B 306.00 306.00
4 - Green Lane West 0.70 0.36 2.2 C 317.00 317.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
14
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East424.00 106.00 293.35 635.28 0.667 416.39 162.74 0.0 1.9 0.266 C
2 - Green
Lane East156.00 39.00 605.74 465.46 0.335 154.02 104.00 0.0 0.5 0.191 B
3 - Salhouse
Road West288.00 72.00 144.38 743.95 0.387 285.51 615.38 0.0 0.6 0.130 A
4 - Green
Lane West308.00 77.00 152.87 556.93 0.553 303.22 277.02 0.0 1.2 0.232 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East460.00 115.00 322.49 617.82 0.745 456.83 164.58 1.9 2.7 0.364 C
2 - Green
Lane East152.00 38.00 665.79 429.98 0.354 151.83 113.54 0.5 0.5 0.216 B
3 - Salhouse
Road West284.00 71.00 147.20 742.58 0.382 284.00 670.42 0.6 0.6 0.131 A
4 - Green
Lane West336.00 84.00 152.14 557.32 0.603 334.93 279.07 1.2 1.5 0.268 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East396.00 99.00 250.50 660.92 0.599 400.58 145.63 2.7 1.5 0.234 B
2 - Green
Lane East160.00 40.00 562.05 491.37 0.326 160.19 89.03 0.5 0.5 0.181 B
3 - Salhouse
Road West252.00 63.00 146.65 742.86 0.339 252.41 575.58 0.6 0.5 0.122 A
4 - Green
Lane West256.00 64.00 137.66 565.96 0.452 258.47 261.40 1.5 0.8 0.197 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East356.00 89.00 353.68 599.24 0.594 356.20 214.34 1.5 1.5 0.247 B
2 - Green
Lane East148.00 37.00 583.08 478.58 0.309 148.14 126.80 0.5 0.5 0.182 B
3 - Salhouse
Road West400.00 100.00 134.55 748.72 0.534 397.60 596.67 0.5 1.1 0.170 B
4 - Green
Lane West368.00 92.00 205.29 525.86 0.700 362.73 326.86 0.8 2.2 0.357 C
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
15
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
16
Calibrated AM - Forecast Base, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.42 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
17
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D3Forecast
BaseAM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
18
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 0.000 408.000 45.000
2 - Green
Lane
East 17.000 0.000 59.000 95.000
3 - Salhouse
Road
West
145.000 14.000 2.000 178.000
4 - Green
Lane
West 28.000 107.000 217.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.90 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.56
3 - Salhouse
Road
West
0.43 0.04 0.01 0.53
4 - Green
Lane
West 0.08 0.30 0.61 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 0 2 2
2 - Green
Lane East 12 0 0 2
3 - Salhouse
Road
West
5 0 0 3
4 - Green
Lane
West 7 4 3 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.000 1.017 1.024
2 - Green
Lane East 1.118 1.000 1.000 1.022
3 - Salhouse
Road
West
1.048 1.000 1.000 1.034
4 - Green
Lane
West 1.071 1.038 1.032 1.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
19
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.86 0.60 4.9 E 455.00 455.00
2 - Green Lane East 0.44 0.27 0.8 C 171.00 171.00
3 - Salhouse Road West 0.59 0.20 1.4 B 340.00 340.00
4 - Green Lane West 0.79 0.49 3.3 D 352.00 352.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East476.00 119.00 325.73 615.38 0.774 463.77 181.23 0.0 3.1 0.371 C
2 - Green
Lane East172.00 43.00 674.09 425.67 0.404 169.36 115.40 0.0 0.7 0.232 B
3 - Salhouse
Road West320.00 80.00 159.79 735.17 0.435 316.97 683.66 0.0 0.8 0.142 A
4 - Green
Lane West344.00 86.00 169.41 546.66 0.629 337.54 307.34 0.0 1.6 0.279 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East512.00 128.00 356.08 597.19 0.857 504.70 185.51 3.1 4.9 0.598 E
2 - Green
Lane East172.00 43.00 735.31 389.38 0.442 171.56 125.48 0.7 0.8 0.275 C
3 - Salhouse
Road West320.00 80.00 165.55 732.39 0.437 319.96 741.32 0.8 0.8 0.145 A
4 - Green
Lane West372.00 93.00 171.23 545.52 0.682 370.36 314.28 1.6 2.0 0.339 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East436.00 109.00 278.22 643.83 0.677 446.68 162.35 4.9 2.2 0.319 C
2 - Green
Lane East176.00 44.00 626.07 454.23 0.387 176.49 98.83 0.8 0.6 0.216 B
3 - Salhouse
Road West280.00 70.00 162.55 733.84 0.382 280.57 640.01 0.8 0.6 0.133 A
4 - Green
Lane West284.00 71.00 152.76 556.57 0.510 287.81 290.37 2.0 1.1 0.226 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
20
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East396.00 99.00 387.91 578.22 0.685 396.04 236.54 2.2 2.2 0.330 C
2 - Green
Lane East164.00 41.00 644.98 442.60 0.371 164.19 138.96 0.6 0.6 0.216 B
3 - Salhouse
Road West440.00 110.00 149.58 740.09 0.595 436.82 659.59 0.6 1.4 0.196 B
4 - Green
Lane West408.00 102.00 225.52 513.34 0.795 398.93 360.87 1.1 3.3 0.490 D
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
21
Calibrated AM - Total Forecast, AM
Data Errors and Warnings No errors or warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A2Calibrated
AMü ü D1,D3,D5 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.48 D
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
22
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct -180.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 672.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D5Total
ForecastAM DIRECT 08:00 09:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
23
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
2.000 0.000 408.000 45.000
2 - Green
Lane
East 25.000 0.000 86.000 138.000
3 - Salhouse
Road
West
145.000 16.000 2.000 178.000
4 - Green
Lane
West 28.000 124.000 217.000 1.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.90 0.10
2 - Green
Lane
East 0.10 0.00 0.35 0.55
3 - Salhouse
Road
West
0.43 0.05 0.01 0.52
4 - Green
Lane
West 0.08 0.34 0.59 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 50 0 2 2
2 - Green
Lane East 8 0 0 1
3 - Salhouse
Road
West
5 0 0 3
4 - Green
Lane
West 7 3 3 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.500 1.000 1.017 1.024
2 - Green
Lane East 1.083 1.000 1.000 1.015
3 - Salhouse
Road
West
1.048 1.000 1.000 1.034
4 - Green
Lane
West 1.071 1.033 1.032 1.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
24
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (08:00-08:15)
Main results: (08:15-08:30)
Main results: (08:30-08:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.87 0.64 5.2 E 455.00 455.00
2 - Green Lane East 0.64 0.41 1.7 C 249.00 249.00
3 - Salhouse Road West 0.62 0.21 1.6 B 342.00 342.00
4 - Green Lane West 0.84 0.59 4.3 E 369.00 369.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East476.00 119.00 342.79 605.51 0.786 463.01 189.47 0.0 3.2 0.392 C
2 - Green
Lane East248.00 62.00 672.60 429.73 0.577 242.80 133.20 0.0 1.3 0.313 C
3 - Salhouse
Road West324.00 81.00 207.72 713.17 0.454 320.73 707.68 0.0 0.8 0.152 A
4 - Green
Lane West360.00 90.00 179.72 541.60 0.665 352.54 348.73 0.0 1.9 0.307 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East512.00 128.00 370.26 589.06 0.869 504.03 192.37 3.2 5.2 0.642 E
2 - Green
Lane East252.00 63.00 731.15 394.78 0.638 250.56 143.14 1.3 1.7 0.411 C
3 - Salhouse
Road West320.00 80.00 217.12 708.68 0.452 319.99 764.60 0.8 0.8 0.154 A
4 - Green
Lane West384.00 96.00 180.33 541.18 0.710 382.31 356.78 1.9 2.3 0.372 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East436.00 109.00 299.59 631.33 0.691 447.49 170.44 5.2 2.4 0.344 C
2 - Green
Lane East256.00 64.00 630.66 454.86 0.563 257.29 116.42 1.7 1.3 0.306 C
3 - Salhouse
Road West280.00 70.00 215.48 709.50 0.395 280.63 672.46 0.8 0.7 0.140 A
4 - Green
Lane West304.00 76.00 161.94 552.19 0.551 308.09 334.17 2.3 1.3 0.250 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
25
Main results: (08:45-09:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East396.00 99.00 407.75 566.74 0.699 396.05 244.63 2.4 2.4 0.352 C
2 - Green
Lane East240.00 60.00 643.72 446.65 0.537 240.56 160.08 1.3 1.2 0.292 C
3 - Salhouse
Road West444.00 111.00 199.51 717.13 0.619 440.37 684.77 0.7 1.6 0.214 B
4 - Green
Lane West428.00 107.00 236.40 507.89 0.843 415.99 403.49 1.3 4.3 0.590 E
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
26
Calibrated PM - Surveyed, PM
Data Errors and Warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
Severity Area Item Description
Warning Mini-roundabout
Mini-roundabout appears to have unbalanced flows and may behave like a priority junction;
treat results with caution. See User Guide for details.[Arms 3 and 4 have 73% of the total flow
for the roundabout for one or more time segments]
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.21 B
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
27
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D2 Surveyed PM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
28
Vehicle Mix
Results
Results Summary for whole modelled period
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 0.000 187.000 31.000
2 - Green
Lane
East 34.000 0.000 26.000 57.000
3 - Salhouse
Road
West
347.000 43.000 1.000 107.000
4 - Green
Lane
West 94.000 121.000 230.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.86 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.09 0.00 0.21
4 - Green
Lane
West 0.21 0.27 0.52 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 0 5 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 1
4 - Green
Lane
West 0 3 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.000 1.048 1.000
2 - Green
Lane East 1.030 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.009
4 - Green
Lane
West 1.000 1.033 1.022 1.000
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.47 0.22 0.9 B 217.00 217.00
2 - Green Lane East 0.26 0.16 0.4 A 118.00 118.00
3 - Salhouse Road West 0.67 0.22 1.9 B 500.00 500.00
4 - Green Lane West 0.66 0.20 1.9 B 446.00 446.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
29
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East228.00 57.00 286.78 627.40 0.363 225.75 454.37 0.0 0.6 0.149 A
2 - Green
Lane East104.00 26.00 384.81 604.06 0.172 103.18 127.72 0.0 0.2 0.120 A
3 - Salhouse
Road West524.00 131.00 112.35 787.12 0.666 516.37 375.64 0.0 1.9 0.216 B
4 - Green
Lane West308.00 77.00 435.41 847.37 0.363 305.74 193.31 0.0 0.6 0.110 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East244.00 61.00 481.49 513.94 0.475 242.73 502.38 0.6 0.9 0.220 B
2 - Green
Lane East136.00 34.00 530.50 516.39 0.263 135.41 193.72 0.2 0.4 0.157 A
3 - Salhouse
Road West496.00 124.00 139.84 773.80 0.641 496.31 526.07 1.9 1.8 0.217 B
4 - Green
Lane West560.00 140.00 429.02 850.91 0.658 554.85 207.12 0.6 1.9 0.199 B
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East156.00 39.00 403.92 559.15 0.279 157.95 485.49 0.9 0.4 0.150 A
2 - Green
Lane East112.00 28.00 394.02 599.31 0.187 112.48 167.86 0.4 0.2 0.123 A
3 - Salhouse
Road West512.00 128.00 109.95 788.23 0.650 511.98 396.55 1.8 1.8 0.217 B
4 - Green
Lane West452.00 113.00 434.66 847.76 0.533 454.75 187.26 1.9 1.2 0.154 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East240.00 60.00 407.45 557.04 0.431 238.60 459.75 0.4 0.7 0.188 B
2 - Green
Lane East120.00 30.00 479.38 547.13 0.219 119.82 166.68 0.2 0.3 0.140 A
3 - Salhouse
Road West468.00 117.00 127.12 779.97 0.600 469.17 472.07 1.8 1.5 0.194 B
4 - Green
Lane West464.00 116.00 403.19 865.98 0.536 464.02 193.11 1.2 1.2 0.149 A
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
30
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
31
Calibrated PM - Forecast Base, PM
Data Errors and Warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
Severity Area Item Description
Warning Mini-roundabout
Mini-roundabout appears to have unbalanced flows and may behave like a priority junction;
treat results with caution. See User Guide for details.[Arms 3 and 4 have 73% of the total flow
for the roundabout for one or more time segments]
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.27 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
32
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D4Forecast
BasePM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
33
Origin-Destination Data
Vehicle Mix
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 0.000 209.000 35.000
2 - Green
Lane
East 38.000 0.000 29.000 64.000
3 - Salhouse
Road
West
388.000 48.000 1.000 120.000
4 - Green
Lane
West 105.000 135.000 257.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.86 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.70 0.09 0.00 0.22
4 - Green
Lane
West 0.21 0.27 0.52 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 0 5 0
2 - Green
Lane East 3 0 0 0
3 - Salhouse
Road
West
0 0 0 1
4 - Green
Lane
West 0 3 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.000 1.048 1.000
2 - Green
Lane East 1.028 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.008
4 - Green
Lane
West 1.000 1.031 1.023 1.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
34
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.57 0.28 1.3 C 244.00 244.00
2 - Green Lane East 0.32 0.18 0.5 B 132.00 132.00
3 - Salhouse Road West 0.74 0.29 2.7 C 556.00 556.00
4 - Green Lane West 0.76 0.28 2.9 C 496.00 496.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East256.00 64.00 316.05 610.54 0.419 253.17 501.13 0.0 0.7 0.167 A
2 - Green
Lane East116.00 29.00 428.56 577.65 0.201 115.01 140.65 0.0 0.2 0.129 A
3 - Salhouse
Road West580.00 145.00 125.86 780.78 0.743 569.24 417.71 0.0 2.7 0.271 C
4 - Green
Lane West340.00 85.00 479.96 821.22 0.414 337.21 215.14 0.0 0.7 0.123 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East276.00 69.00 534.02 483.44 0.571 273.73 561.11 0.7 1.3 0.283 C
2 - Green
Lane East152.00 38.00 592.77 478.64 0.318 151.17 214.98 0.2 0.5 0.183 B
3 - Salhouse
Road West556.00 139.00 156.96 765.72 0.726 556.03 586.97 2.7 2.7 0.286 C
4 - Green
Lane West624.00 156.00 480.08 820.98 0.760 615.04 232.91 0.7 2.9 0.280 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East176.00 44.00 451.55 531.54 0.331 179.09 540.55 1.3 0.5 0.172 B
2 - Green
Lane East128.00 32.00 443.40 569.50 0.225 128.66 187.25 0.5 0.3 0.136 A
3 - Salhouse
Road West568.00 142.00 125.86 780.73 0.728 568.00 446.19 2.7 2.7 0.282 C
4 - Green
Lane West504.00 126.00 482.95 819.42 0.615 509.15 210.91 2.9 1.6 0.196 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
35
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East268.00 67.00 453.01 530.63 0.505 266.05 511.02 0.5 1.0 0.225 B
2 - Green
Lane East132.00 33.00 533.87 514.16 0.257 131.81 185.19 0.3 0.3 0.157 A
3 - Salhouse
Road West520.00 130.00 140.79 773.56 0.672 522.19 524.88 2.7 2.1 0.241 B
4 - Green
Lane West516.00 129.00 447.92 839.72 0.614 516.11 215.06 1.6 1.6 0.186 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
36
Calibrated PM - Total Forecast, PM
Data Errors and Warnings
Analysis Set Details
Junction Network
Junctions
Junction Network Options
Arms
Arms
Capacity Options
Severity Area Item Description
Warning Mini-roundabout
Mini-roundabout appears to have unbalanced flows and may behave like a priority junction;
treat results with caution. See User Guide for details.[Arms 3 and 4 have 72% of the total flow
for the roundabout for one or more time segments]
ID NameInclude in
report
Use specific Demand Set
(s)
Specific Demand Set
(s)
Network flow scaling factor
(%)
Network capacity scaling factor
(%)
A3Calibrated
PMü ü D2,D4,D6 100.000 100.000
Junction Name Junction Type Arm order Junction Delay (min) Junction LOS
1 - Green Lane East - Salhouse Road Green Lane East - Salhouse Road Mini-roundabout 1,2,3,4 0.34 C
Driving side Lighting Road surface In London
Left Normal/unknown Normal/unknown
Arm Name Description
1 Salhouse Road East
2 Green Lane East
3 Salhouse Road West
4 Green Lane West
Arm Minimum capacity (PCU/hr) Maximum capacity (PCU/hr) Assume flat start profile Initial queue (PCU)
1 - Salhouse Road East 0.00 99999.00 0.00
2 - Green Lane East 0.00 99999.00 0.00
3 - Salhouse Road West 0.00 99999.00 0.00
4 - Green Lane West 0.00 99999.00 0.00
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
37
Mini Roundabout Geometry
Slope / Intercept / Capacity
Arm Intercept Adjustments
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Demand overview (Traffic)
ArmApproach road
half-width (m)
Minimum approach
road half-width (m)
Entry
width (m)
Effective flare
length (m)
Distance to
next arm (m)
Entry corner kerb
line distance (m)
Gradient over
50m (%)
Kerbed
central
island
1 - Salhouse
Road East3.00 3.00 3.00 0.0 10.96 9.31 0.0
2 - Green Lane
East3.00 3.00 3.00 0.0 12.08 10.62 0.0
3 - Salhouse
Road West3.00 3.00 3.00 0.0 11.37 9.28 0.0 ü
4 - Green Lane
West3.00 3.00 3.00 0.0 11.35 9.86 0.0
Arm Type Reason Direct intercept adjustment (PCU/hr)
1 - Salhouse Road East None
2 - Green Lane East None
3 - Salhouse Road West None
4 - Green Lane West Direct 270.00
Arm Final slope Final intercept (PCU/hr)
1 - Salhouse Road East 0.591 826.565
2 - Green Lane East 0.593 844.978
3 - Salhouse Road West 0.480 843.099
4 - Green Lane West 0.592 1122.775
IDScenario
name
Time Period
name
Traffic profile
type
Model start time
(HH:mm)
Model finish time
(HH:mm)
Model time period
length (min)
Time segment
length (min)
Run
automatically
D6Total
ForecastPM DIRECT 17:00 18:00 60 15 ü
Vehicle mix varies over turn Vehicle mix varies over entry Vehicle mix source PCU Factor for a HV (PCU)
ü ü HV Percentages 2.00
Arm Linked arm Profile type Use O-D data Scaling Factor (%)
1 - Salhouse Road East DIRECT 100.000
2 - Green Lane East DIRECT 100.000
3 - Salhouse Road West DIRECT 100.000
4 - Green Lane West DIRECT 100.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
38
Origin-Destination Data
Vehicle Mix
Results
Demand (Veh/hr)
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.000 0.000 209.000 35.000
2 - Green
Lane
East 47.000 0.000 36.000 79.000
3 - Salhouse
Road
West
388.000 63.000 1.000 120.000
4 - Green
Lane
West 105.000 179.000 257.000 0.000
Proportions
To
From
1 - Salhouse
Road
East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road
East
0.00 0.00 0.86 0.14
2 - Green
Lane
East 0.29 0.00 0.22 0.49
3 - Salhouse
Road
West
0.68 0.11 0.00 0.21
4 - Green
Lane
West 0.19 0.33 0.48 0.00
Heavy Vehicle proportion
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 0 0 5 0
2 - Green
Lane East 2 0 0 0
3 - Salhouse
Road
West
0 0 0 1
4 - Green
Lane
West 0 2 2 0
Average PCU Per Veh
To
From
1 -
Salhouse
Road East
2 - Green
Lane
East
3 - Salhouse
Road
West
4 - Green
Lane
West
1 - Salhouse
Road East 1.000 1.000 1.048 1.000
2 - Green
Lane East 1.025 1.000 1.000 1.000
3 - Salhouse
Road
West
1.000 1.000 1.000 1.008
4 - Green
Lane
West 1.000 1.023 1.023 1.000
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
39
Results
Results Summary for whole modelled period
Main Results for each time segment
Main results: (17:00-17:15)
Main results: (17:15-17:30)
Main results: (17:30-17:45)
Arm Max RFC Max delay (min) Max Queue (Veh) Max LOS Average Demand (Veh/hr) Total Junction Arrivals (Veh)
1 - Salhouse Road East 0.62 0.34 1.5 C 244.00 244.00
2 - Green Lane East 0.38 0.20 0.6 B 160.00 160.00
3 - Salhouse Road West 0.78 0.33 3.2 C 572.00 572.00
4 - Green Lane West 0.85 0.40 4.7 C 541.00 541.00
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East256.00 64.00 362.81 584.02 0.438 252.94 510.17 0.0 0.8 0.180 B
2 - Green
Lane East140.00 35.00 429.10 577.91 0.242 138.74 186.66 0.0 0.3 0.136 A
3 - Salhouse
Road West600.00 150.00 144.19 772.01 0.777 587.28 423.64 0.0 3.2 0.307 C
4 - Green
Lane West372.00 93.00 504.33 808.65 0.460 368.65 227.15 0.0 0.8 0.135 A
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East276.00 69.00 602.89 444.44 0.621 272.86 570.83 0.8 1.5 0.344 C
2 - Green
Lane East184.00 46.00 591.51 479.88 0.383 182.83 284.24 0.3 0.6 0.201 B
3 - Salhouse
Road West572.00 143.00 181.34 754.04 0.759 572.02 593.00 3.2 3.2 0.330 C
4 - Green
Lane West684.00 171.00 505.06 808.04 0.846 668.67 248.30 0.8 4.7 0.395 C
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East176.00 44.00 511.88 497.37 0.354 179.96 548.09 1.5 0.6 0.191 B
2 - Green
Lane East152.00 38.00 444.19 569.58 0.267 152.96 247.65 0.6 0.4 0.144 A
3 - Salhouse
Road West584.00 146.00 144.78 771.67 0.757 584.05 452.36 3.2 3.2 0.320 C
4 - Green
Lane West544.00 136.00 505.90 807.67 0.674 554.06 222.93 4.7 2.2 0.245 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
40
Main results: (17:45-18:00)
Arm
Total
Demand
(Veh/hr)
Junction
Arrivals
(Veh)
Circulating
flow (Veh/hr)
Capacity
(Veh/hr)RFC
Throughput
(Veh/hr)
Throughput (exit
side) (Veh/hr)
Start
queue
(Veh)
End
queue
(Veh)
Delay
(min)LOS
1 - Salhouse
Road East268.00 67.00 514.40 495.83 0.541 265.69 519.79 0.6 1.1 0.258 C
2 - Green
Lane East164.00 41.00 534.56 514.26 0.319 163.63 245.53 0.4 0.5 0.171 B
3 - Salhouse
Road West532.00 133.00 165.38 761.76 0.698 534.93 532.81 3.2 2.4 0.268 C
4 - Green
Lane West564.00 141.00 470.18 828.38 0.681 564.01 230.13 2.2 2.2 0.227 B
Generated on 10/10/2016 16:22:29 using Junctions 9 (9.0.0.4211)
41