Lean Construction Coach
13 years as GC/CM
7 years as subcontractor
1st Lean project 2002
Been a member of, and/or coached, dozens of Lean project teams.
Julie Glassmeyer
![Page 3: A Quick Explanation of Lean Design & Construction](https://reader035.vdocument.in/reader035/viewer/2022070504/62c18f81adf77e5a4e771ac0/html5/thumbnails/3.jpg)
Value Pie: Current State
Value
Non-Value
Added
Waste43%
57%
![Page 4: A Quick Explanation of Lean Design & Construction](https://reader035.vdocument.in/reader035/viewer/2022070504/62c18f81adf77e5a4e771ac0/html5/thumbnails/4.jpg)
History of Lean
Toyota Production System (1948)
![Page 5: A Quick Explanation of Lean Design & Construction](https://reader035.vdocument.in/reader035/viewer/2022070504/62c18f81adf77e5a4e771ac0/html5/thumbnails/5.jpg)
History of Lean Toyota Production System (1948)
Two Non-Negotiables:
CONTINUOUS IMPROVEMENTRESPECT FOR PEOPLE
![Page 6: A Quick Explanation of Lean Design & Construction](https://reader035.vdocument.in/reader035/viewer/2022070504/62c18f81adf77e5a4e771ac0/html5/thumbnails/6.jpg)
1
2
3
4
5
6
Respect for people
Optimize the Whole
Generate Value
Eliminate Waste
Focus on Flow
Continuous Improvement
Six Tenets of Lean Construction