a second look at brimstowad
TRANSCRIPT
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 1/27
A SECOND LOOK ATA SECOND LOOK ATBRIMSTOWADBRIMSTOWAD
S. D. CHAWATHES. D. CHAWATHE
Hon. Director (Technical)Hon. Director (Technical)
IWWAIWWA
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 2/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 3/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 4/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 5/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
CHAWATHE ET AL : RAINFALL ANALYSIS FOR THE DESIGN OF STORMCHAWATHE ET AL : RAINFALL ANALYSIS FOR THE DESIGN OF STORM
SEWERS IN BOMBAYSEWERS IN BOMBAY --19771977
ChawatheChawathe has provided the most comprehensive analysis yet for stormhas provided the most comprehensive analysis yet for storm
durations of 5 to 60 minutes, and twice per year to once in tendurations of 5 to 60 minutes, and twice per year to once in ten yearsyears
frequency . He used 1349frequency . He used 1349 ColabaColaba storms between 1944 and 1972 andstorms between 1944 and 1972 and
27082708 santacruzsantacruz storms between 1940 and 1972storms between 1940 and 1972
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 6/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 7/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 8/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 9/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 10/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 11/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 12/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 13/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 14/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 15/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
NEW ANALYSISNEW ANALYSIS
We haveWe have analysedanalysed the hourly data available in digital form ( forthe hourly data available in digital form ( for
the period 1969the period 1969--1979)1979) seperatelyseperately forfor ColabaColaba andand SantacruzSantacruz toto
produce Intensityproduce Intensity-- DurationsDurations-- Frequency (IDF) relationships forFrequency (IDF) relationships fordurations of 1 to 48 hrs and for a range of frequencies betweendurations of 1 to 48 hrs and for a range of frequencies between 11
and 50 years. We have alsoand 50 years. We have also analysedanalysed the daily data for the periodthe daily data for the period
19591959--1989 for durations of 1 to 8 days.1989 for durations of 1 to 8 days.
The analyses have been carried out by determining the extremThe analyses have been carried out by determining the extremee
probability distribution on the annual maxima.probability distribution on the annual maxima.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 16/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
RAINFALL ANALYSISRAINFALL ANALYSIS
•• CHAWATHE ,1977, 5CHAWATHE ,1977, 5--60 min (observed) , 194060 min (observed) , 1940--7272
•• CWPRS PUNE FOR CIDCO, (CWPRS PUNE FOR CIDCO, ( MahimMahim creek), 1954creek), 1954--7676
•• NEDECO (NEDECO (MahimMahim creek), 1 to 12 hrs , 80 yearscreek), 1 to 12 hrs , 80 years
•• WH + AIC, 1 to 48 hrs, 1969WH + AIC, 1 to 48 hrs, 1969--19791979
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 17/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
STORM INTENSITIES FOR USE IN WALRUS MODELSTORM INTENSITIES FOR USE IN WALRUS MODELIntensity in mms/hrIntensity in mms/hr
PERIODPERIOD DURATION(hrsDURATION(hrs))
1 21 2 4 8 124 8 12
1 in 10 yrs 109 89 61.51 in 10 yrs 109 89 61.5 35.5 2835.5 28
1 in 5 yrs 91.4 70.3 511 in 5 yrs 91.4 70.3 51 27.6 2427.6 24
1 in 2 yrs 74 53.3 381 in 2 yrs 74 53.3 38 22.5 19.422.5 19.4
1 in 1 yr 58 40.6 30.41 in 1 yr 58 40.6 30.4 18.1 16.518.1 16.5
2 in 1 yr 25 17 122 in 1 yr 25 17 12 7.6 5.97.6 5.9
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 18/27
BRIMSTOWAD USES EXTREME VALUEBRIMSTOWAD USES EXTREME VALUE
PROBABILITY METHODPROBABILITY METHOD
THIS METHOD IS UNRELIABLE AND DOES NOT REFLECTTHIS METHOD IS UNRELIABLE AND DOES NOT REFLECT
THE ACTUAL FREQUENCIES OF STORMS IN THE PASTTHE ACTUAL FREQUENCIES OF STORMS IN THE PAST
DATA.DATA.
THE METHOD OF RAINFALL ANALYSIS SUGGESTED IN THETHE METHOD OF RAINFALL ANALYSIS SUGGESTED IN THE
CELEBRATED REFERENCE BOOKCELEBRATED REFERENCE BOOK ““WATER SUPPLY ANDWATER SUPPLY AND
WASTE WATER DISPOSALWASTE WATER DISPOSAL” ” BY G. M. FAIR AND J. C. GEYERBY G. M. FAIR AND J. C. GEYER
IS MORE RELIABLE.IS MORE RELIABLE.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 19/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 20/27
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 21/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
To design the drainage system for 1 in 1 year storm aTo design the drainage system for 1 in 1 year storm a
considerable increase in capacity is required and this resultsconsiderable increase in capacity is required and this results
in drains of substantially larger dimensions and a largein drains of substantially larger dimensions and a large
increase in the number of drains to be replaced orincrease in the number of drains to be replaced or
augmentedaugmented…………………………There is 37 % increase in expenditureThere is 37 % increase in expenditureforfor catchmentcatchment 129.129.
This clearly indicates that designing for the increased leveThis clearly indicates that designing for the increased levell
of service is no where justified.of service is no where justified.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 22/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
AS DISCUSSED THE COST OF DESIGNING FOR STORMS OFAS DISCUSSED THE COST OF DESIGNING FOR STORMS OF
GREATER INTENSITY THAN A 2 IN 1 YEAR EVENT IS NOTGREATER INTENSITY THAN A 2 IN 1 YEAR EVENT IS NOT
JUSTIFIED.JUSTIFIED.
IT IS THEREFORE PROPOSED TO CONSTRUCT WORKS TO AIT IS THEREFORE PROPOSED TO CONSTRUCT WORKS TO A
DASIGN CAPACITY TO ONLY COPE UP WITH A 2 IN 1 YEARDASIGN CAPACITY TO ONLY COPE UP WITH A 2 IN 1 YEAR
EVENT.EVENT.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 23/27
BRIMSTOWAD DESIGNS FOR TWICE IN ABRIMSTOWAD DESIGNS FOR TWICE IN A
YEAR STORMYEAR STORM
BRIMSTOWAD JUSTIFIES TWICE IN A YEAR FREQUENCYBRIMSTOWAD JUSTIFIES TWICE IN A YEAR FREQUENCYFOR STORMS IN DESIGN.FOR STORMS IN DESIGN.
26/7 EXPERIENCE HAS TAUGHT US TO REVIEW THIS26/7 EXPERIENCE HAS TAUGHT US TO REVIEW THIS
ASPECT AND ADOPT FREQUENCIES SUCH AS SAY ONCE INASPECT AND ADOPT FREQUENCIES SUCH AS SAY ONCE INTEN YEARS FOR DESIGN.TEN YEARS FOR DESIGN.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 24/27
BRIMSTAWAD SAYSBRIMSTAWAD SAYS
CRITERIA FOR LOCAL AREA DRAINAGE SYSTEMCRITERIA FOR LOCAL AREA DRAINAGE SYSTEM
This Report , providing proposals to Master Plan andThis Report , providing proposals to Master Plan andPreliminary Engineering , does not cover the detailedPreliminary Engineering , does not cover the detailedinvestigation and proposals for local drainage systems.investigation and proposals for local drainage systems.
The proposals contained in subsequent sections are theThe proposals contained in subsequent sections are theresult of analysis of the major network and give in outlineresult of analysis of the major network and give in outlinethe requirements to alleviate the major causes of flooding.the requirements to alleviate the major causes of flooding.
As with any analysis on this scale , not all branches wereAs with any analysis on this scale , not all branches wereconsidered.considered.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 25/27
BRIMSTOWAD SAYSBRIMSTOWAD SAYS
IN MANY CASES IN THE CITY AND SUBURBS,FLOODINGIN MANY CASES IN THE CITY AND SUBURBS,FLOODINGWILL OCCUR DUE TO LOCAL DEFFICIENCIES WITHIN THEWILL OCCUR DUE TO LOCAL DEFFICIENCIES WITHIN THE
SYSTEM WHICH HAVE NOT BECOME EVIDENT DURING THESYSTEM WHICH HAVE NOT BECOME EVIDENT DURING THE
COURSE OF OUR WORK.COURSE OF OUR WORK.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 26/27
BRIMSTOWAD DOES NOT COVER LOCALBRIMSTOWAD DOES NOT COVER LOCAL
STORM DRAINAGE SYSTEMSSTORM DRAINAGE SYSTEMS
THE STORM WATER DRAINAGE SYSTEM CAN BE DIVIDED INTO TWO SUBTHE STORM WATER DRAINAGE SYSTEM CAN BE DIVIDED INTO TWO SUB--
SYSTEMS. LOCAL DRAINAGE SYSTEM COVERING SMALL /MEDIUM/LARGESYSTEMS. LOCAL DRAINAGE SYSTEM COVERING SMALL /MEDIUM/LARGE
ROADS AND SMALL NALLAS FORM THE UPROADS AND SMALL NALLAS FORM THE UP--STREAM SUB SYSTEM ANDSTREAM SUB SYSTEM AND
MEDIUM / LARGE NALLAS/RIVERS FORM THE DOWNSMEDIUM / LARGE NALLAS/RIVERS FORM THE DOWNS--TREAM SUBTREAM SUB--
SYSTEM.SYSTEM.
MOST OF THE AREA OF MUMBAI FORMS THE CATCHMENT AREA FOR THEMOST OF THE AREA OF MUMBAI FORMS THE CATCHMENT AREA FOR THE
LOCAL DRAINAGE SUB SYSTEM. SINCE THE UPLOCAL DRAINAGE SUB SYSTEM. SINCE THE UP--STREAM SUBSTREAM SUB--SYSTEMSYSTEM
INITIALLY COLLECTS STORM WATER RUNINITIALLY COLLECTS STORM WATER RUN--OFF AND SUBSEQUENTLYOFF AND SUBSEQUENTLY
PASSES THE SAME TO THE DOWNPASSES THE SAME TO THE DOWN--STREAM SUBSTREAM SUB--SYSTEM, IT ISSYSTEM, IT IS
NECESSARY TO DESIGN IT PROPERLY AND IDENTIFY CONSTRUCTIONNECESSARY TO DESIGN IT PROPERLY AND IDENTIFY CONSTRUCTION
PROPOSALS FOR THE SAME.PROPOSALS FOR THE SAME.
BRIMSTOWAD DOES NOT COVER THESE PROPOSALS.BRIMSTOWAD DOES NOT COVER THESE PROPOSALS.
8/7/2019 A Second Look at Brimstowad
http://slidepdf.com/reader/full/a-second-look-at-brimstowad 27/27
RECOMMENDATIONSRECOMMENDATIONS
DESIGN / PROPOSALS SHOULD BE PREPARED FOR INTENSITIES OFDESIGN / PROPOSALS SHOULD BE PREPARED FOR INTENSITIES OFSTORMS FOR A FREQUENCY OF OCCURRENCE OF SAY ONCE IN TENSTORMS FOR A FREQUENCY OF OCCURRENCE OF SAY ONCE IN TENYEARS.YEARS.
DESIGN/PROPOSALS SHOULD BE ADDED FOR LOCAL STORM WATERDESIGN/PROPOSALS SHOULD BE ADDED FOR LOCAL STORM WATERDRAINAGE SYSTEMS (SMALL/MEDIUM/LARGE ROADS , SMALL NALLASDRAINAGE SYSTEMS (SMALL/MEDIUM/LARGE ROADS , SMALL NALLASWITH CONCENTRATION TIME 10 MIN. TO 60 MIN.)WITH CONCENTRATION TIME 10 MIN. TO 60 MIN.)
USE RAINFALL INTENSITYUSE RAINFALL INTENSITY-- DURATIONDURATION-- FREQURENCY RELATIONSHIPSFREQURENCY RELATIONSHIPSDEVLOPED BY CHAWATHE ET AL FOR DESIGNING LOCAL STORM WATERDEVLOPED BY CHAWATHE ET AL FOR DESIGNING LOCAL STORM WATER
DRAINAGE SYSTEMDRAINAGE SYSTEM REDEVELOP RAINFALL INTENSITYREDEVELOP RAINFALL INTENSITY--DURATIONDURATION-- FREQUENCY RELATIONFREQUENCY RELATION
SHIPS BASED ON HOURLY RAINFALL DATA FOR DURATION OF STORMSSHIPS BASED ON HOURLY RAINFALL DATA FOR DURATION OF STORMSOF MORE THAN ONE HOUR DURATION BY USING METHODOLOGY USEDOF MORE THAN ONE HOUR DURATION BY USING METHODOLOGY USEDBY CHAWATHE ET AL . EXTREME VALUE PROBABILITY METHOD SHOULDBY CHAWATHE ET AL . EXTREME VALUE PROBABILITY METHOD SHOULDNOT BE USED FOR THIS PURPOSE. DESIGN/ PROPOSALS SHOULD BENOT BE USED FOR THIS PURPOSE. DESIGN/ PROPOSALS SHOULD BE
FRESHLY PREPARED FOR LARGE NALLAS/ RIVERS SUCH AS MITHI USINGFRESHLY PREPARED FOR LARGE NALLAS/ RIVERS SUCH AS MITHI USINGTHESE RELATIONSHIPS.THESE RELATIONSHIPS.
MODIFY BRIMSTOWAD ON ABOVE LINES AND REVISE ALL COSTMODIFY BRIMSTOWAD ON ABOVE LINES AND REVISE ALL COSTESTIMATESESTIMATES